Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML24037A020 | 2 February 2024 | LTR-NRC-2024-01 Mackson-Duke 10CFR Part 21 Final Notification and Closure 2.2.2024 | |
RA-24-0015, Submittal of 2023 Sea Turtle Annual Report | 10 January 2024 | Submittal of 2023 Sea Turtle Annual Report | |
IR 05000324/2023011 | 26 December 2023 | NRC Fire Protection Team Inspection - FPTI Report 05000324/2023011 and 05000325/2023011 | Safe Shutdown Probabilistic Risk Assessment Temporary Modification Aging Management License Renewal Fire Protection Program |
IR 05000324/2023402 | 14 December 2023 | Security Baseline Inspection Report 05000324-2023402 and 05000325-2023402 | |
ML24004A209 | 12 December 2023 | Flowline, Inc. - Interim Part 21 Report Notification Regarding Supply of 1 Sch. 80 (0.179 Wall) SB466 Uns C71500 Buttweld Long Radius 90 Degree Elbow; Manufacturer: Flowline; Heat No: 27668; 27 Pieces - Heat Code | |
RA-23-0306, Procedures CSD-EP-BNP-0101-01, EAL Technical Basis Document, Revision 006 and CSD-EP-CNS-0101-01, EAL Technical Basis Document, Revision 005, Summary Of. | 12 December 2023 | Procedures CSD-EP-BNP-0101-01, EAL Technical Basis Document, Revision 006 and CSD-EP-CNS-0101-01, EAL Technical Basis Document, Revision 005, Summary Of. | Exemption Request Pressure Boundary Leakage Grace period Unidentified leakage Operational leakage |
ML23352A238 | 8 December 2023 | 56882-EN 56882 - Tioga Pipe, Inc Interim Part 21 Report Re Supply of 1 Inch Sch. 80 SB466 Uns C71500 Buttweld Long Radius 90 Degree Elbow | |
RA-23-0318, Supplement to Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation | 4 December 2023 | Supplement to Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation | Exemption Request |
ML23297A026 | 27 November 2023 | Proposed Alternatives to ASME Code Section XI Subsection IWE Requirements for Torus Metallic Liner Inspections | Coatings Incorporated by reference |
ML23356A139 | 16 November 2023 | Marsh USA, Inc - Certificate of Liability Insurance | |
RA-23-0284, RA-23-0284 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation | 16 November 2023 | RA-23-0284 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation | Time of Discovery Fitness for Duty Contraband Condition Adverse to Quality Safeguards Contingency Plan Preemption Authority Exemption Request |
ML23317A346 | 14 November 2023 | Duke Fleet - Correction Letter to License Amendment Nos. 312 & 340 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 | Fire Protection Program |
RA-23-0281, Procedure EP-ALL-EPLAN, Duke Energy Common Emergency Plan, Revision 5, Summary of Changes | 1 November 2023 | Procedure EP-ALL-EPLAN, Duke Energy Common Emergency Plan, Revision 5, Summary of Changes | Exemption Request Siren |
IR 05000324/2023003 | 1 November 2023 | Integrated Inspection Report 05000324/2023003 and 05000325/2023003 | Commercial Grade Dedication Temporary Modification Functionality Assessment Operability Determination Fire Protection Program |
IR 05000324/2023010 | 17 October 2023 | Biennial Problem Identification and Resolution Inspection Report 05000324/2023010 and 05000325/2023010 | |
IR 05000325/2023401 | 16 October 2023 | Security Baseline Inspection Report 05000324 and 05000325 2023401 | |
ML23346A132 | 6 October 2023 | Communication from C-10 Research & Education Foundation Regarding NextEra Common Emergency Fleet Plan License Amendment Request and Related Documents Subsequently Published | Pandemic COVID-19 Siren |
ML23256A088 | 25 September 2023 | Issuance of Alternative to Steam Generator Welds | Hydrostatic Probabilistic Risk Assessment Incorporated by reference Finite Element Analysis |
RA-23-0225, Procedure AD-EP-ALL-0109, Offsite Protective Action Recommendations, Revision 9, and the Joint Information Center (JIC) Relocation, Summary of Changes | 20 September 2023 | Procedure AD-EP-ALL-0109, Offsite Protective Action Recommendations, Revision 9, and the Joint Information Center (JIC) Relocation, Summary of Changes | Met Tower Exemption Request |
ML23248A261 | 5 September 2023 | NRR E-mail Capture - Brunswick Steam Electric Plant, Units 1 and 2 - Acceptance of License Amendment Request to Revise the 10 CFR 50.69 Categorization Process | |
ML23195A078 | 29 August 2023 | Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 | Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report Surveillance Frequency Control Program Stress corrosion cracking Pressure Boundary Leakage Fire Protection Program Unidentified leakage Operational leakage |
IR 05000324/2023005 | 23 August 2023 | Updated Inspection Plan for Brunswick Steam Electric Plant, Units 1 and 2 (Report 05000324/2023005 and 05000325/2023005) | Commercial Grade Dedication Cyber Security License Renewal |
RA-23-0199, Response to Request for Additional Information (RAI) Regarding Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1) for Inservice Inspection of the Torus Metallic Liner | 18 August 2023 | Response to Request for Additional Information (RAI) Regarding Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1) for Inservice Inspection of the Torus Metallic Liner | Coatings Through-Wall Leak Through Wall Leak |
RA-23-0122, License Amendment Request to Revise the 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors, Categorization Process to . | 17 August 2023 | License Amendment Request to Revise the 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors, Categorization Process to . | Safe Shutdown High winds Safe Shutdown Earthquake Internal Flooding Probabilistic Risk Assessment Incorporated by reference Fukushima Dai-Ichi Earthquake Seismic Walkdown Report |
IR 05000324/2023002 | 4 August 2023 | Integrated Inspection Report 05000324/2023002 and 05000325/2023002 | Internal Flooding Enforcement Discretion Temporary Modification Functionality Assessment Local Leak Rate Testing Operability Determination Fire Protection Program Loss of condenser vacuum |
ML23201A204 | 28 July 2023 | Summary of Regulatory Audit in Support of Alternative Request RA-22-0308 for Inservice Inspection of the Torus Metallic Liner | |
IR 05000324/2024301 | 25 July 2023 | Notification of Licensed Operator Initial Examination 05000325/2024301 and 05000324/2024301 | |
ML23212B268 | 25 July 2023 | Notification of Licensed Operator Initial Examination 05000325/2024301 and 05000324/2024301 | |
ML23202A065 | 19 July 2023 | NRR E-mail Capture - Request for Additional Information - Brunswick Steam Electric Plant, Units 1 and 2, Torus Liner Inspection Alternative Request (L-2022-LLR-0089) | Coatings Incorporated by reference Through Wall Leak |
RA-23-0045, Inservice Inspection Program Owner'S Activity Report for Unit 2 Refueling Outage 26 | 28 June 2023 | Inservice Inspection Program Owner'S Activity Report for Unit 2 Refueling Outage 26 | |
RA-23-0145, Independent Spent Fuel Storage Installation (Isfsi), Registration for Use of General License Spent Fuel Casks | 15 June 2023 | Independent Spent Fuel Storage Installation (Isfsi), Registration for Use of General License Spent Fuel Casks | |
RA-23-0135, Submittal of 30 Day Report Per 10 CFR 26.719(c), Unsatisfactory Performance of Health and Human Services Certified Laboratory | 7 June 2023 | Submittal of 30 Day Report Per 10 CFR 26.719(c), Unsatisfactory Performance of Health and Human Services Certified Laboratory | |
RA-23-0139, Registration for Use of General License Spent Fuel Casks | 6 June 2023 | Registration for Use of General License Spent Fuel Casks | |
ML23151A253 | 31 May 2023 | Meeting Summary of 2022 Annual Assessment Regarding Brunswick Steam Electric Plant, Docket Nos. 50-325 and 50-324, Meeting Number 20230392 | |
RA-23-0041, Response to NRC Regulatory Issue Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations | 30 May 2023 | Response to NRC Regulatory Issue Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations | |
ML23146A001 | 24 May 2023 | EN 56538 - Engine Systems Inc and Brunswick | |
ML23212A950 | 24 May 2023 | Engine Systems, Inc., Part 21 Report Re Woodward EGB-35P Governor/Actuator with Foreign Material | |
ML23142A273 | 22 May 2023 | Duke Fleet - Request for Additional Information Proposed Alternative for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1) | Incorporated by reference |
ML23130A390 | 12 May 2023 | Regulatory Audit Plan in Support of Alternative Request RA 22-0308 for Inservice Inspection of the Torus Metallic Liner | Coatings Through Wall Leak |
IR 05000324/2023001 | 10 May 2023 | Integrated Inspection Report 05000324 2023001 and 05000325 2023001 | High Radiation Area Nondestructive Examination Temporary Modification Functionality Assessment Operability Determination Pressure Boundary Leakage Fire Protection Program Power change Unidentified leakage |
ML23118A076 | 1 May 2023 | Approval for Use of Specific Provision of a Later Edition of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI | Incorporated by reference |
RA-23-0047, Duke Energy Annual Radiological Environmental Operating Report - 2022 | 26 April 2023 | Duke Energy Annual Radiological Environmental Operating Report - 2022 | Time of Discovery Grab sample Offsite Dose Calculation Manual Fukushima Dai-Ichi Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report Earthquake Chernobyl |
RA-23-0044, Aduke Energy Annual Report of Changes Pursuant to 10 CFR 50.46 | 26 April 2023 | Aduke Energy Annual Report of Changes Pursuant to 10 CFR 50.46 | |
RA-23-0046, Annual Radioactive Effluent Release Report - 2022 | 24 April 2023 | Annual Radioactive Effluent Release Report - 2022 | Annual Radioactive Effluent Release Report |
RA-23-0096, Post Accident Monitoring (PAM) Instrumentation Report | 12 April 2023 | Post Accident Monitoring (PAM) Instrumentation Report | Post Accident Monitoring Fuel cladding |
RA-23-0063, Notification of Deviation from BWRVIP Guidelines | 11 April 2023 | Notification of Deviation from BWRVIP Guidelines | |
PMNS20230392, Annual Assessment Meeting | 7 April 2023 | Annual Assessment Meeting | |
IR 05000324/2022004 | 4 April 2023 | Reissue - Brunswick Steam Electric Plant - Integrated Inspection Report 05000324/2022004 and 05000325/022004 | Enforcement Discretion Temporary Modification Functionality Assessment Significance Determination Process Operability Determination Severe Accident Management Guideline |
RA-23-0036, Biennial Decommissioning Financial Assurance Reports | 30 March 2023 | Biennial Decommissioning Financial Assurance Reports | |
RA-23-0039, 10 CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums | 30 March 2023 | 10 CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums |