ML20083M93512 April 1984Xcel Energy
Warembourg D
Discusses Problems W/Pcrv Prestressing Sys & Resultant Insp Test Results.Liftoff Tests Show Tendon Sys Operable.Nrc Permission to Return to Power Operation from Present Refueling Outage Requested by 840418Other
ML20084C58916 April 1984Xcel Energy
Warembourg D
Provides Advance Notification of Intent to Propose Tech Spec Changes to Circulation speed-high Trip Setting Listed in Table 4.4-3 & Surveillance Requirement SR 5.3.7 for Secondary Coolant MonitoringOther
ML20084H45725 April 1984Xcel Energy
Warembourg D
Forwards Relaxation Curves for Prestressed Concrete Reactor Vessel Tendon Sys,In Response to 840419 Request.No Immediate Mechanism for Controlling Sleeve Atmosphere Provided.Areas W/Indicated Corrosion RegreasedOther
ML20084P5947 May 1984Xcel Energy
Warembourg D
Forwards Pcrv Tendon Sys Relaxation Curves Containing Min Design Lines,Per H Polk 840503 Telcon RequestOther
ML20084Q44410 May 1984Xcel EnergyProposed Tech Spec Table 4.4-3, Instrument Operating Requirements for Plant Protective Sys,Circulator Trip. Significant Hazards Considerations EnclOther
ML20084Q43610 May 1984Xcel Energy
Lee O
Application to Amend License DPR-34,revising Tech Specs to Change Circulator speed-high Steam Trip Setting.Change Would Increase Circulator Availability While Providing for Initiation of Protective ActionsRequest
ML20084Q42210 May 1984Xcel Energy
Lee O
Forwards Application to Amend License DPR-34,revising Tech Specs to Change Circulator speed-high Steam Trip Setting (Table 4.4-3).Change Would Increase Circulator Availability While Providing for Initiation of Protective ActionsRequest
ML20092D92715 June 1984Xcel Energy
Warembourg D
Responds to Requesting Details of Proposed Tendon Surveillance Program.Program Consists of Load Cell Data & Visual Insps.Surveillance Started on 840601.Program Developed Using Reg Guide 1.35 as RefOther
ML20092P62626 June 1984Xcel Energy
Lee O
Confirms Util Commitment to Fully Investigate 840623 Event in Which Six Control Rod Pairs Failed to Insert Into Core Under Automatic Velocity Limited free-fall Sys.Nrc Approval of Resolutions Will Be Obtained Prior to Reactor StartupOther
ML20090C5266 July 1984Xcel Energy
Lee O
Responds to NRC Concerns Re Fire Protection Review,Bldg 10 Licensing Requirements,Control Rod Failure to Scram, Documentation of Disciplinary Actions,Clearance Tags & Radiological Emergency Exercise Scenario,Per 840625 MeetingMeeting
ML20094D77418 July 1984Xcel Energy
Lee O
Informs of Control Rod & CRD Insp & Testing in Response to NRC 840709 Insp.Major Power Consumption & Scram Verification of All 37 CRD & Orifice Assemblies Completed & Insp Underway.Plan for Further Action DescribedOther
ML20093J11720 July 1984Xcel Energy
Lee O
Forwards Rev 2 to Updated FSAR for Fort St Vrain.Rev Includes Safety Evaluations Either in Support of License Amends or in Support of Conclusions That Changes Did Not Involve Unreviewed Safety QuestionRequest
ML20094R4009 August 1984Xcel Energy
Warembourg D
Confirms 840806 Telcon on Tech Spec Change Request Re Tendon Corrosion & Anchor Assembly Surveillance.Tech Spec Change Request Will Be Submitted by 840930Other
ML20096C90820 August 1984Xcel Energy
Warembourg D
Responds to Re Possible Design Mods to Pcrv Tendons & Details of Evaluations & Schedule of Completion of Repts Detailing Results of Metallurgical Exams.Actions Necessary to Evaluate Design Mods for Pcrv ListedOther
ML20096C03221 August 1984Xcel Energy
Lee O
Provides Findings & Positions Re Investigation of 840623 Failure of Six Control Rods to Automatically Insert Upon Scram.Summary of Work on Four CRDs & Description of Tests Encl.Corrective Actions ListedOther
ML20098B3057 September 1984Xcel Energy
Gahm J
Ro:On 840904,while Removing CRD & Orifice Assembly,Motor Overcurrent Condition on Auxiliary Transfer Cask Shutters Occurred,Preventing Full Closure.Caused by One Control Rod String Not Fully Retracted.Work Temporarily DiscontinuedOther
ML20093K19424 September 1984Xcel Energy
Gahm J
Submits Info Re Status of Damaged Control Rod Removal on Fuel Deck.Related Info Encl.Possibly Caused by Absorber Strings Not Fully Retracted,Despite Full Retract Limit Switch IndicationOther
ML20107K23018 October 1984Xcel Energy
Warembourg D
Updates Tendon Investigations & Corrosion Prevention Programs.Efforts Concentrated on Corrosion Prevention Methods Rather than Detailed Moisture MeasurementsOther
ML20099K7278 November 1984Xcel Energy
Gahm J
Provides Status of Control Rod Drive & Orificing Assembly (Crdoa) Refurbishing Efforts.Further Investigation of Crdoa Determined That Cause of Inability of Absorber String to Fully Retract Was Cable FailureOther
ML20112D73614 December 1984Xcel Energy
Warembourg D
Forwards Tendon Accessibility Info,Rationale for Tendon Surveillance & Info Re Corrosion Mechanism in Response to 840720 & 1029 Requests for Addl Info.Tendons Considered Acceptable If No Major Mods NecessaryOther
ML20112C04927 December 1984Xcel Energy
Lee O
Responds to NRC 841025 Request for Addl Info Re 840510 Application for Amend to License DPR-34,revising Tech Spec Re Helium Circulators Overspeed Trip Setpoint.Analysis Value EnclRequest
ML20112G5064 January 1985Xcel Energy
Lee O
Forwards Status of Planned Audit Response to NRC July 1984 Audit of Plant Operations,Per Denton .Repts Covering Technical Details of Listed Subjs Will Be Provided by 850131,per 841128 & 29 MeetingsMeeting
ML20106B53125 January 1985Xcel Energy
Brey H
Advises That Util Will Perform Turbine Load Rejection from Full Load Test at End of Cycle 4.Tech Spec Amend Will Be SubmittedOther
05000267/LER-1984-008, Forwards Addl Info Re Three CRDs & Orifice Assemblies That Failed to Scram During in-core back-EMF Testing,Per 850122 Telcon.Suppl to LER 84-008 Will Be Provided28 January 1985Xcel Energy
Brey H
Forwards Addl Info Re Three CRDs & Orifice Assemblies That Failed to Scram During in-core back-EMF Testing,Per 850122 Telcon.Suppl to LER 84-008 Will Be ProvidedOther
ML20106B61331 January 1985Xcel Energy
Warembourg D
Discusses Visual Insp of Top Longitudinal Tendons,Per 850115 Meeting Request.Visual Insp of 30% of Longitudinal Tendons for Buttonheads Noted.Inconsistency Exists Between Last Mapping of Raised Buttonheads & Current Insp ResultsMeeting
ML20106B57931 January 1985Xcel Energy
Gahm J
Submits Plans for Implementing Interim Tendon Surveillance Program,In Response to Concerns.Surveillance Program Will Be Based on Proposed Tech Spec SR 5.2.2,submitted in DW WarembourgOther
ML20106B53331 January 1985Xcel Energy
Warembourg D
Forwards Investigation Into Sources of Chloride in Fort St Vrain Primary Circuit. Rept Re Investigations of Effects of Chlorides on Major Components in Primary Circuit Will Be Sent by 850228Other
ML20132G50212 March 1985Bennett D
LOS ALAMOS NATIONAL LABORATORY
Fly G
Fugelso L
Evaluation of CRD Mechanism & Reserve Shutdown Sys Failures & Pcrv Tendon Degradation Issues Prior to Fort St Vrain RestartOther
ML20112G46318 March 1985Xcel Energy
Warembourg D
Forwards Ga Technologies,Inc Rept 907838, Investigation Into Sources of Chloride in Fort St Vrain Primary Circuit, Re Effects of Chloride on Major Components in Primary Circuit.Final Review & Clearance to Be Forwarded by 850326Other
ML20100H11226 March 1985Xcel Energy
Warembourg D
Forwards Evaluation of Fort St Vrain Metallic Components Exposed to Primary Coolant Chloride Contamination, Per 850318 CommitmentOther
ML20117M12122 April 1985Xcel Energy
Warembourg D
Amends 1,080 Amp/H Ref in to 1,058 Amp/H of Required Battery Capacity to Satisfy Load ProfileOther
ML20117M05926 April 1985Xcel Energy
Singleton L
Expresses Appreciation for Opportunity to Discuss Quality Aspects of CRD & Orifice Assembly (Crdoa) Refurbishment Program on 850424 in Arlington,Tx.Discusses 850418 Audit to Confirm 18 Crdoas Completed W/High QualityOther
ML20132C97817 May 1985Office of Nuclear Reactor RegulationSafety Evaluation Re CRD InstrumentationApproval
ML20128N28620 May 1985Xcel Energy
Warembourg D
Informs of Intent to Conduct Addl Insps of Random Sample of Pcrv Bottom Head Longitudinal Tendon Anchor Assemblies. Thirty-four Longitudinal Bottom End Caps Accessible.Ten End Caps Will Be Removed & InspectedOther
ML20126B62920 May 1985Xcel Energy
Brey H
Responds to Commitment Log Item CL-1055 Re Verification of Operability of Surge Diodes on CRD Brake & Limit Switch Relays.Diodes & Functions Listed.Action Request DCAR-704 Initiated to Provide Relocation of DiodesOther
ML20128P62723 May 1985Office of Nuclear Reactor Regulation
Heitner K
Summary of 850516 Meeting W/Util Re Emergency Electrical Power Sys Concerns Resulting from Staff Evaluation of Problems from Testing Emergency Diesel Generators on 841218. Justification for Continued Operation RequestedMeeting
ML20126C52123 May 1985Xcel Energy
Warembourg D
Discusses Investigation of Methods to Control Tendon Corrosion Involving Establishment of Nitrogen Blanket on Pcrv Tendon Sys.Establishing & Maintaining Overall Nitrogen Blanket Sys for Tendons Highly QuestionableOther
ML20133E74928 May 1985Office of Nuclear Reactor Regulation
Lainas G
Requests Interim Evaluation Re Acceptability of Automatic & Manual Control of Emergency Electrical Power Sys by 850607, Per 850516 Meeting W/Util.Summary of Meeting Encl.W/O EnclMeeting
ML20127K1377 June 1985Xcel Energy
Warembourg D
Discusses Insp of 10 Bottom Longitudinal Tendon End Caps. Tendons Visually & Magnetic Particle Inspected for Evidence of Corrosion,Concavity,Water,Apparent Failures & Cracking.No Raised Buttonheads Found.All Tests NegativeOther
ML20127K6377 June 1985Xcel Energy
Lee O
Forwards Interim Tech Specs for Control Rods for Use During Plant Startup.Specs Describe Program to Assure Control Rod & Reserve Shutdown Sys Reliability.Operating Limit of 250 F Max on Control Rod Motor Temp AnticipatedOther
ML20127J8227 June 1985Xcel Energy
Warembourg D
Informs of Acceptability of Devcon 5-minute Epoxy for Use in Cementing Resistance Temp Detector Temp Sensors to CRD Cavity & Motor,Based on Test & Inservice Exposure of Epoxy to High TempsOther
ML20127L88513 June 1985Xcel Energy
Warembourg D
Forwards Results of Engineering Evaluation of Design Changes Introduced in CRD & Orifice Assembly Bearings.Physical Comparison Testing of Original & Replacement Shim Motor Bearings Underway to Establish Operating/Design MarginsOther
ML20127N65514 June 1985Xcel Energy
Warembourg D
Responds to Concerns Raised During 850516 Meeting in Bethesda,Md Re Review of Emergency Electric Power Sys. Response Addresses Independence of Redundant Emergency Power Trains,Rapid Transfer Sys Testing & Switchgear Control SysMeeting
ML20127N69514 June 1985Xcel Energy
Brey H
Elaborates on Util Commitments to Listed Plant Activities, Including CRD Mechanism Temp Recording,Requalification, Surveillance & Preventative Maint,Backup Reactor Shutdown Procedure,Tendons & Pcrv Integrity & Electrical SysOther
ML20209E89925 June 1985Xcel Energy
Lee O
Discusses Status of CRD & Orificing Assembly (Crdoa) Refurbishment Efforts.First 37 Crdoas Refurbished & Installed.Summary of Design Changes & Test Results EnclOther
ML20132C9481 July 1985INC.
EG&G IDAHO
Barnes B
Evaluation of CRD Orifice Assembly Bearing Rept from Public Svc Co of CoOther
ML20138A8072 July 1985Thompson H
Office of Nuclear Reactor Regulation
Forwards Updated Safety Evaluation Accepting Util Commitments Re Tendon Surveillance as Basis for Restart. Util Will Incorporate Modified Tendon Surveillance Program Into Tech Specs & Provide Results 6 Months After RestartApproval
ML20138A8552 July 1985Office of Nuclear Reactor RegulationSafety Evaluation Accepting Util Tendon Surveillance Proposal.Proposal Will Lead to Maintaining Structural Integrity of Reactor Vessel.Plant Structurally Ready for RestartApproval
ML20132E6233 July 1985Xcel Energy
Lee O
Forwards Interim Tech Specs for Reactivity Control Sys.Tech Specs Will Provide Basis for Program to Assure CRD & Reserve Shutdown Sys Reliability.Specs Include Change to Criteria for Insertion of Reserve Shutdown MatlOther
ML20133D0245 July 1985Office of Nuclear Reactor RegulationSafety Evaluation Supporting Emergency Electrical Sys,Per Problems Encountered During 841218 Testing of Emergency Diesel Generator SetsApproval