Semantic search
Jump to navigation
Jump to search
Issue date | From | Title | Project stage | |
---|---|---|---|---|
ML20083M935 | 12 April 1984 | Xcel Energy Warembourg D | Discusses Problems W/Pcrv Prestressing Sys & Resultant Insp Test Results.Liftoff Tests Show Tendon Sys Operable.Nrc Permission to Return to Power Operation from Present Refueling Outage Requested by 840418 | Other |
ML20084C589 | 16 April 1984 | Xcel Energy Warembourg D | Provides Advance Notification of Intent to Propose Tech Spec Changes to Circulation speed-high Trip Setting Listed in Table 4.4-3 & Surveillance Requirement SR 5.3.7 for Secondary Coolant Monitoring | Other |
ML20084H457 | 25 April 1984 | Xcel Energy Warembourg D | Forwards Relaxation Curves for Prestressed Concrete Reactor Vessel Tendon Sys,In Response to 840419 Request.No Immediate Mechanism for Controlling Sleeve Atmosphere Provided.Areas W/Indicated Corrosion Regreased | Other |
ML20084P594 | 7 May 1984 | Xcel Energy Warembourg D | Forwards Pcrv Tendon Sys Relaxation Curves Containing Min Design Lines,Per H Polk 840503 Telcon Request | Other |
ML20084Q444 | 10 May 1984 | Xcel Energy | Proposed Tech Spec Table 4.4-3, Instrument Operating Requirements for Plant Protective Sys,Circulator Trip. Significant Hazards Considerations Encl | Other |
ML20084Q436 | 10 May 1984 | Xcel Energy Lee O | Application to Amend License DPR-34,revising Tech Specs to Change Circulator speed-high Steam Trip Setting.Change Would Increase Circulator Availability While Providing for Initiation of Protective Actions | Request |
ML20084Q422 | 10 May 1984 | Xcel Energy Lee O | Forwards Application to Amend License DPR-34,revising Tech Specs to Change Circulator speed-high Steam Trip Setting (Table 4.4-3).Change Would Increase Circulator Availability While Providing for Initiation of Protective Actions | Request |
ML20092D927 | 15 June 1984 | Xcel Energy Warembourg D | Responds to Requesting Details of Proposed Tendon Surveillance Program.Program Consists of Load Cell Data & Visual Insps.Surveillance Started on 840601.Program Developed Using Reg Guide 1.35 as Ref | Other |
ML20092P626 | 26 June 1984 | Xcel Energy Lee O | Confirms Util Commitment to Fully Investigate 840623 Event in Which Six Control Rod Pairs Failed to Insert Into Core Under Automatic Velocity Limited free-fall Sys.Nrc Approval of Resolutions Will Be Obtained Prior to Reactor Startup | Other |
ML20090C526 | 6 July 1984 | Xcel Energy Lee O | Responds to NRC Concerns Re Fire Protection Review,Bldg 10 Licensing Requirements,Control Rod Failure to Scram, Documentation of Disciplinary Actions,Clearance Tags & Radiological Emergency Exercise Scenario,Per 840625 Meeting | Meeting |
ML20094D774 | 18 July 1984 | Xcel Energy Lee O | Informs of Control Rod & CRD Insp & Testing in Response to NRC 840709 Insp.Major Power Consumption & Scram Verification of All 37 CRD & Orifice Assemblies Completed & Insp Underway.Plan for Further Action Described | Other |
ML20093J117 | 20 July 1984 | Xcel Energy Lee O | Forwards Rev 2 to Updated FSAR for Fort St Vrain.Rev Includes Safety Evaluations Either in Support of License Amends or in Support of Conclusions That Changes Did Not Involve Unreviewed Safety Question | Request |
ML20094R400 | 9 August 1984 | Xcel Energy Warembourg D | Confirms 840806 Telcon on Tech Spec Change Request Re Tendon Corrosion & Anchor Assembly Surveillance.Tech Spec Change Request Will Be Submitted by 840930 | Other |
ML20096C908 | 20 August 1984 | Xcel Energy Warembourg D | Responds to Re Possible Design Mods to Pcrv Tendons & Details of Evaluations & Schedule of Completion of Repts Detailing Results of Metallurgical Exams.Actions Necessary to Evaluate Design Mods for Pcrv Listed | Other |
ML20096C032 | 21 August 1984 | Xcel Energy Lee O | Provides Findings & Positions Re Investigation of 840623 Failure of Six Control Rods to Automatically Insert Upon Scram.Summary of Work on Four CRDs & Description of Tests Encl.Corrective Actions Listed | Other |
ML20098B305 | 7 September 1984 | Xcel Energy Gahm J | Ro:On 840904,while Removing CRD & Orifice Assembly,Motor Overcurrent Condition on Auxiliary Transfer Cask Shutters Occurred,Preventing Full Closure.Caused by One Control Rod String Not Fully Retracted.Work Temporarily Discontinued | Other |
ML20093K194 | 24 September 1984 | Xcel Energy Gahm J | Submits Info Re Status of Damaged Control Rod Removal on Fuel Deck.Related Info Encl.Possibly Caused by Absorber Strings Not Fully Retracted,Despite Full Retract Limit Switch Indication | Other |
ML20107K230 | 18 October 1984 | Xcel Energy Warembourg D | Updates Tendon Investigations & Corrosion Prevention Programs.Efforts Concentrated on Corrosion Prevention Methods Rather than Detailed Moisture Measurements | Other |
ML20099K727 | 8 November 1984 | Xcel Energy Gahm J | Provides Status of Control Rod Drive & Orificing Assembly (Crdoa) Refurbishing Efforts.Further Investigation of Crdoa Determined That Cause of Inability of Absorber String to Fully Retract Was Cable Failure | Other |
ML20112D736 | 14 December 1984 | Xcel Energy Warembourg D | Forwards Tendon Accessibility Info,Rationale for Tendon Surveillance & Info Re Corrosion Mechanism in Response to 840720 & 1029 Requests for Addl Info.Tendons Considered Acceptable If No Major Mods Necessary | Other |
ML20112C049 | 27 December 1984 | Xcel Energy Lee O | Responds to NRC 841025 Request for Addl Info Re 840510 Application for Amend to License DPR-34,revising Tech Spec Re Helium Circulators Overspeed Trip Setpoint.Analysis Value Encl | Request |
ML20112G506 | 4 January 1985 | Xcel Energy Lee O | Forwards Status of Planned Audit Response to NRC July 1984 Audit of Plant Operations,Per Denton .Repts Covering Technical Details of Listed Subjs Will Be Provided by 850131,per 841128 & 29 Meetings | Meeting |
ML20106B531 | 25 January 1985 | Xcel Energy Brey H | Advises That Util Will Perform Turbine Load Rejection from Full Load Test at End of Cycle 4.Tech Spec Amend Will Be Submitted | Other |
05000267/LER-1984-008, Forwards Addl Info Re Three CRDs & Orifice Assemblies That Failed to Scram During in-core back-EMF Testing,Per 850122 Telcon.Suppl to LER 84-008 Will Be Provided | 28 January 1985 | Xcel Energy Brey H | Forwards Addl Info Re Three CRDs & Orifice Assemblies That Failed to Scram During in-core back-EMF Testing,Per 850122 Telcon.Suppl to LER 84-008 Will Be Provided | Other |
ML20106B613 | 31 January 1985 | Xcel Energy Warembourg D | Discusses Visual Insp of Top Longitudinal Tendons,Per 850115 Meeting Request.Visual Insp of 30% of Longitudinal Tendons for Buttonheads Noted.Inconsistency Exists Between Last Mapping of Raised Buttonheads & Current Insp Results | Meeting |
ML20106B579 | 31 January 1985 | Xcel Energy Gahm J | Submits Plans for Implementing Interim Tendon Surveillance Program,In Response to Concerns.Surveillance Program Will Be Based on Proposed Tech Spec SR 5.2.2,submitted in DW Warembourg | Other |
ML20106B533 | 31 January 1985 | Xcel Energy Warembourg D | Forwards Investigation Into Sources of Chloride in Fort St Vrain Primary Circuit. Rept Re Investigations of Effects of Chlorides on Major Components in Primary Circuit Will Be Sent by 850228 | Other |
ML20132G502 | 12 March 1985 | Bennett D LOS ALAMOS NATIONAL LABORATORY Fly G Fugelso L | Evaluation of CRD Mechanism & Reserve Shutdown Sys Failures & Pcrv Tendon Degradation Issues Prior to Fort St Vrain Restart | Other |
ML20112G463 | 18 March 1985 | Xcel Energy Warembourg D | Forwards Ga Technologies,Inc Rept 907838, Investigation Into Sources of Chloride in Fort St Vrain Primary Circuit, Re Effects of Chloride on Major Components in Primary Circuit.Final Review & Clearance to Be Forwarded by 850326 | Other |
ML20100H112 | 26 March 1985 | Xcel Energy Warembourg D | Forwards Evaluation of Fort St Vrain Metallic Components Exposed to Primary Coolant Chloride Contamination, Per 850318 Commitment | Other |
ML20117M121 | 22 April 1985 | Xcel Energy Warembourg D | Amends 1,080 Amp/H Ref in to 1,058 Amp/H of Required Battery Capacity to Satisfy Load Profile | Other |
ML20117M059 | 26 April 1985 | Xcel Energy Singleton L | Expresses Appreciation for Opportunity to Discuss Quality Aspects of CRD & Orifice Assembly (Crdoa) Refurbishment Program on 850424 in Arlington,Tx.Discusses 850418 Audit to Confirm 18 Crdoas Completed W/High Quality | Other |
ML20132C978 | 17 May 1985 | Office of Nuclear Reactor Regulation | Safety Evaluation Re CRD Instrumentation | Approval |
ML20128N286 | 20 May 1985 | Xcel Energy Warembourg D | Informs of Intent to Conduct Addl Insps of Random Sample of Pcrv Bottom Head Longitudinal Tendon Anchor Assemblies. Thirty-four Longitudinal Bottom End Caps Accessible.Ten End Caps Will Be Removed & Inspected | Other |
ML20126B629 | 20 May 1985 | Xcel Energy Brey H | Responds to Commitment Log Item CL-1055 Re Verification of Operability of Surge Diodes on CRD Brake & Limit Switch Relays.Diodes & Functions Listed.Action Request DCAR-704 Initiated to Provide Relocation of Diodes | Other |
ML20128P627 | 23 May 1985 | Office of Nuclear Reactor Regulation Heitner K | Summary of 850516 Meeting W/Util Re Emergency Electrical Power Sys Concerns Resulting from Staff Evaluation of Problems from Testing Emergency Diesel Generators on 841218. Justification for Continued Operation Requested | Meeting |
ML20126C521 | 23 May 1985 | Xcel Energy Warembourg D | Discusses Investigation of Methods to Control Tendon Corrosion Involving Establishment of Nitrogen Blanket on Pcrv Tendon Sys.Establishing & Maintaining Overall Nitrogen Blanket Sys for Tendons Highly Questionable | Other |
ML20133E749 | 28 May 1985 | Office of Nuclear Reactor Regulation Lainas G | Requests Interim Evaluation Re Acceptability of Automatic & Manual Control of Emergency Electrical Power Sys by 850607, Per 850516 Meeting W/Util.Summary of Meeting Encl.W/O Encl | Meeting |
ML20127K137 | 7 June 1985 | Xcel Energy Warembourg D | Discusses Insp of 10 Bottom Longitudinal Tendon End Caps. Tendons Visually & Magnetic Particle Inspected for Evidence of Corrosion,Concavity,Water,Apparent Failures & Cracking.No Raised Buttonheads Found.All Tests Negative | Other |
ML20127K637 | 7 June 1985 | Xcel Energy Lee O | Forwards Interim Tech Specs for Control Rods for Use During Plant Startup.Specs Describe Program to Assure Control Rod & Reserve Shutdown Sys Reliability.Operating Limit of 250 F Max on Control Rod Motor Temp Anticipated | Other |
ML20127J822 | 7 June 1985 | Xcel Energy Warembourg D | Informs of Acceptability of Devcon 5-minute Epoxy for Use in Cementing Resistance Temp Detector Temp Sensors to CRD Cavity & Motor,Based on Test & Inservice Exposure of Epoxy to High Temps | Other |
ML20127L885 | 13 June 1985 | Xcel Energy Warembourg D | Forwards Results of Engineering Evaluation of Design Changes Introduced in CRD & Orifice Assembly Bearings.Physical Comparison Testing of Original & Replacement Shim Motor Bearings Underway to Establish Operating/Design Margins | Other |
ML20127N655 | 14 June 1985 | Xcel Energy Warembourg D | Responds to Concerns Raised During 850516 Meeting in Bethesda,Md Re Review of Emergency Electric Power Sys. Response Addresses Independence of Redundant Emergency Power Trains,Rapid Transfer Sys Testing & Switchgear Control Sys | Meeting |
ML20127N695 | 14 June 1985 | Xcel Energy Brey H | Elaborates on Util Commitments to Listed Plant Activities, Including CRD Mechanism Temp Recording,Requalification, Surveillance & Preventative Maint,Backup Reactor Shutdown Procedure,Tendons & Pcrv Integrity & Electrical Sys | Other |
ML20209E899 | 25 June 1985 | Xcel Energy Lee O | Discusses Status of CRD & Orificing Assembly (Crdoa) Refurbishment Efforts.First 37 Crdoas Refurbished & Installed.Summary of Design Changes & Test Results Encl | Other |
ML20132C948 | 1 July 1985 | INC. EG&G IDAHO Barnes B | Evaluation of CRD Orifice Assembly Bearing Rept from Public Svc Co of Co | Other |
ML20138A807 | 2 July 1985 | Thompson H Office of Nuclear Reactor Regulation | Forwards Updated Safety Evaluation Accepting Util Commitments Re Tendon Surveillance as Basis for Restart. Util Will Incorporate Modified Tendon Surveillance Program Into Tech Specs & Provide Results 6 Months After Restart | Approval |
ML20138A855 | 2 July 1985 | Office of Nuclear Reactor Regulation | Safety Evaluation Accepting Util Tendon Surveillance Proposal.Proposal Will Lead to Maintaining Structural Integrity of Reactor Vessel.Plant Structurally Ready for Restart | Approval |
ML20132E623 | 3 July 1985 | Xcel Energy Lee O | Forwards Interim Tech Specs for Reactivity Control Sys.Tech Specs Will Provide Basis for Program to Assure CRD & Reserve Shutdown Sys Reliability.Specs Include Change to Criteria for Insertion of Reserve Shutdown Matl | Other |
ML20133D024 | 5 July 1985 | Office of Nuclear Reactor Regulation | Safety Evaluation Supporting Emergency Electrical Sys,Per Problems Encountered During 841218 Testing of Emergency Diesel Generator Sets | Approval |