 Issue dateTitleTopic
LR-N18-0099, 2018 Annual 10 CFR 50.46 Report27 September 20182018 Annual 10 CFR 50.46 ReportCoast down
LR-N18-0086, Supplemental Information to License Amendment Request (LAR) to Amend the Hope Creek Technical Specifications (TS) to Revise Action for Inoperable Emergency Diesel Generator (EDG) a or 826 September 2018Supplemental Information to License Amendment Request (LAR) to Amend the Hope Creek Technical Specifications (TS) to Revise Action for Inoperable Emergency Diesel Generator (EDG) a or 8FLEX
LR-N18-0087, Submittal of Relief Request Associated with the Third Inservice Inspection (ISI) Interval24 September 2018Submittal of Relief Request Associated with the Third Inservice Inspection (ISI) IntervalNon-Destructive Examination
VT-2
EVT-1
Liquid penetrant
Pressure Boundary Leakage
Dissimilar Metal Weld
Scaffolding
ML18271A03413 September 2018Receipt of Stephen Comley, We the People, September 6, 11 and 12 2018 Voicemail and EmailChernobyl
ML18263A14412 September 2018NRR E-mail Capture - Final RAI from Apla: Revise Technical Specifications to Increase Inverter AOT Extension (L-2018-LLA-0101)Internal Flooding
Probabilistic Risk Assessment
ML18255A01412 September 2018BWROG Presentation Slides for Public Meeting Sept 12 2018Corrosion bonding
ML18250A3146 September 2018NRR E-mail Capture - Final RAI: Revise Technical Specifications to Increase Inverter AOT Extension (L-2018-LLA-0101)Anticipated operational occurrence
IR 05000354/201800528 August 2018Updated Inspection Plan (Inspection Report 05000354/2018005)Cyber Security
LR-N18-0083, Measurement Uncertainty Recapture (Mur) Uprate Startup Report24 August 2018Measurement Uncertainty Recapture (Mur) Uprate Startup Report
IR 05000354/201830222 August 2018Retake Operator Licensing Examination Report 05000354/2018302
ML18233A24416 August 2018Requalification Program Inspection - 2018
LR-N18-0079, In-Service Inspection Activities - 90 Day Report Twenty First Refueling Outage8 August 2018In-Service Inspection Activities - 90 Day Report Twenty First Refueling Outage
ML18222A1966 August 2018FEMA - Transmittal of Final After Action Report/Improvement Plan for Salem/Hope Creek Radiological Emergency Preparedness Plume Exercise Held on May 22, 2018
IR 05000354/201801030 July 2018Design Bases Assurance Inspection (Teams) Report 05000354/2018010Large early release frequency
ML18206A73527 July 2018(50-272, 50-311, 50-354), Annual Report Form for Drug Tests for 2017
ML18206A73027 July 2018(50-272, 50-311, 50-354), Transmittal Email 26.717 UpdatesFitness for Duty
ML18206A73127 July 2018(50-272, 50-311, 50-354), Single Positive Test Form Collected on 09/28/2016
ML18206A73227 July 2018(50-272, 50-311, 50-354), Single Positive Test Form Collected on 01/09/2017
ML18206A73327 July 2018(50-272, 50-311, 50-354), Single Positive Test Form Collected on 10/11/2017
ML18206A73427 July 2018(50-272, 50-311, 50-354), Single Positive Test Form Collected on 10/07/2016
LR-N18-0056, Report of Full Compliance with Phase 1 and Phase 2 of June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions25 July 2018Report of Full Compliance with Phase 1 and Phase 2 of June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident ConditionsHigh winds
High Radiation Area
Stroke time
FLEX
Tornado Missile Protection
Design basis earthquake
Foreign Material Exclusion
Severe Accident Management Guideline
Containment Hardened Vent
Battery sizing
Hardened vent
ML18222A19724 July 2018FEMA - Salem and Hope Creek Nuclear Generating Stations After Action Report, Exercise Date - May 22, 2018, Radiological Emergency Preparedness ProgramEarthquake
ML18311A15724 July 2018Operating Test Retake - Examination Approval Letter (Folder 1)
HCH-2018-036, Discharge Monitoring Report for June 201823 July 2018Discharge Monitoring Report for June 2018NJPDES
ML18201A11120 July 2018NRR E-mail Capture - Acceptance Review Results: Hope Creek, Salem 1 & 2 Revise TS to Adopt TSTF-529 (L-2018-LLA-0185)
LR-N18-0073, Supplement to License Amendment Request for Additional Information, Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control.19 July 2018Supplement to License Amendment Request for Additional Information, Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control.Reactor Vessel Water Level
Water Inventory Control
LR-N18-0074, Enclosure 2 to LR-N18-0074, Emergency Plan Document Revisions Implemented June 25, 201818 July 2018Enclosure 2 to LR-N18-0074, Emergency Plan Document Revisions Implemented June 25, 2018Met Tower
FLEX
Severe Accident Management Guideline
B.5.b Mitigating Strategies
Earthquake
Fuel cladding
IR 05000354/201800218 July 2018Integrated Inspection Report 05000354/2018002High Radiation Area
Non-Destructive Examination
Safe Shutdown Earthquake
Enforcement Discretion
Functionality Assessment
Locked High Radiation Area
FLEX
B.5.b
Significance Determination Process
Scram Discharge Volume
Operability Determination
Earthquake
Fire Protection Program
Power change
Downpower
Measurement Uncertainty Recapture
LR-N18-0066, Transmittal of Cyber Security Plan Revision 116 July 2018Transmittal of Cyber Security Plan Revision 1Cyber Security
ML18311A15614 July 2018NRC Corporate Notification Letter (Folder 1)