Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
RA-18-0144, Response to March 12, 2012, Request for Information Enclosure 2, Recommendation 2.1, Flooding, Required Response 3, Flooding Focused Evaluation Summary Report27 September 2018Response to March 12, 2012, Request for Information Enclosure 2, Recommendation 2.1, Flooding, Required Response 3, Flooding Focused Evaluation Summary ReportFukushima Dai-Ichi
Flooding Focused Evaluation
RA-18-0163, Response to Request for Additional Information - Request for License Amendment to Revise the Technical Specifications to Relocate the Pressure-Temperature Limit Curves to a Pressure and Temperature Limits Report27 September 2018Response to Request for Additional Information - Request for License Amendment to Revise the Technical Specifications to Relocate the Pressure-Temperature Limit Curves to a Pressure and Temperature Limits ReportShutdown Margin
Hydrostatic
Finite Element Analysis
Pressure and Temperature Limits Report
License Renewal
Power Uprate
Affidavit
ML18243A29827 September 2018Issuance of Amendment to Modify DC Sources Technical Specification Surveillance Requirement 3.8.4.5Safe Shutdown
Emergency Lighting
Surveillance Frequency Control Program
Fire Protection Program
ML18249A40726 September 2018Closeout of Generic Letter 2016-01, Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools (CAC MF9920, MF9452, MF9451, MF9425, MF9406-MF9408; EPID L-2016-LRC-0001)Aging Management
ML18275A29626 September 2018NRR E-mail Capture - (External_Sender) Brunswick Flooding MSA ReviewFLEX
Earthquake
ML18239A30921 September 2018Request for One-Time Exception to Nuclear Reactor Regulation Office Instructions LIC-109, LIC-101, and LIC-500 Acceptance Review Criteria
ML18263A30820 September 2018(5) 9-20-18 FEMA Letter (Mcasey): Final Disaster Initiated Review Findings for Brunswick Site (Post-Hurricane Florence)Siren
ML18263A30420 September 2018NRR E-mail Capture - Brunswick Draft RAIs - LAR to Allow Implementation of the Provisions 10 CFR 50.69High winds
Fire Barrier
Internal Flooding
Probabilistic Risk Assessment
FLEX
Tornado Generated Missile
Risk-Informed Steering Committee
GOTHIC
ML18172A25818 September 2018Non-Proprietary, Issuance of Amendment Regarding Core Flow Operating Range Expansion (Mellla+)Safe Shutdown
Unanalyzed Condition
Shutdown Margin
Safety Limit Minimum Critical Power Ratio
Non-Destructive Examination
Anticipated operational occurrence
Post Accident Monitoring
Probabilistic Risk Assessment
Finite Element Analysis
Condition Adverse to Quality
FLEX
Abnormal operational transient
Surveillance Frequency Control Program
Design basis earthquake
Flow Accelerated Corrosion
Feedwater Controller Failure
Large early release frequency
MELLLA
Stress corrosion cracking
Time Critical Operator Action
Fuel cladding
Biofouling
Continuous fire watch
Fire Protection Program
Fire Watch
Power change
Flow Induced Vibration
Power Uprate
Stretch Power Uprate
Failure to Scram
Manual Operator Action
Water rod
ML18263A16717 September 2018NRR E-mail Capture - Brunswick Steam Electric Plant, Unit Nos. 1 and 2 - Acceptance of Requested Licensing Action Amendment Request to Adopt TSTF-439
ML18255A01012 September 2018NRC Slides for Target Rock Public MeetingEnforcement Discretion
Coatings
Functionality Assessment
Corrosion bonding
ML18255A01412 September 2018BWROG Presentation Slides for Public Meeting Sept 12 2018Corrosion bonding
ML18250A30831 August 2018NRR E-mail Capture - Brunswick RAIs - LAR to Revise TS to Relocate the Pressure-Temperature Limits to the Pressure and Temperature Limits ReportPressure and Temperature Limits Report
License Renewal
RA-18-0135, Request for License Amendment - Technical Specification 3.7.4, Control Room Air Conditioning (AC) System30 August 2018Request for License Amendment - Technical Specification 3.7.4, Control Room Air Conditioning (AC) SystemWater Inventory Control
Surveillance Frequency Control Program
ML18239A44627 August 2018302 Examination Draft Items (ADAMS-2A)- Delay Release 2 YrsOvertravel
ML18239A45327 August 2018302 Exam Administrative Items (ADAMS-2D)- Delay Release 2 YrsProbabilistic Risk Assessment
Job Performance Measure
ML18239A45227 August 2018302 Exam Administrative Items (ADAMS-2C)- Delay Release 2 Yrs
ML18239A44827 August 2018302 Exam Final Items (ADAMS-2B)- Delay Release 2 YrsOvertravel
IR 05000324/201800523 August 2018Updated Inspection Plan for Brunswick Steam Electric Plant, Units 1 and 2, NRC Report 05000325/2018005 and 05000324/2018005Fitness for Duty
ML18213A32614 August 2018LTR-18-0298-1 - Ltr to Dr. Michael Corradini Brunswick Steam Electric Plant, Units 1 and 2 - Maximum Extended Load Line Limit Plus (Mella+) License Amendment Request
RA-18-0079, Application to Revise Technical Specifications to Adopt TSTF-439, Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCO14 August 2018Application to Revise Technical Specifications to Adopt TSTF-439, Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCOSurveillance Frequency Control Program
Offsite Circuit
ML18249A13413 August 2018Revision 26 to Updated Final Safety Analysis Report, Chapter 2, Representative Excavation and Stockpiling Summary Sheets, Appendix 2E
ML18249A15013 August 2018Revision 26 to Updated Final Safety Analysis Report, Chapter 13, Conduct of Operations, Figures
ML18249A14913 August 2018Revision 26 to Updated Final Safety Analysis Report, Chapter 12, Radiation Protection, Figures (Redacted)
ML18249A14813 August 2018Revision 26 to Updated Final Safety Analysis Report, Chapter 11, Radioactive Waste Management, Figures
ML18249A14713 August 2018Revision 26 to Updated Final Safety Analysis Report, Chapter 9, Auxiliary Systems, Figures
ML18249A14613 August 2018Revision 26 to Updated Final Safety Analysis Report, Chapter 8, Electric Power, Figures
ML18249A14513 August 2018Revision 26 to Updated Final Safety Analysis Report, Chapter 7, Instrumentation and Controls, Figures
ML18249A14313 August 2018Revision 26 to Updated Final Safety Analysis Report, Chapter 6, Engineered Safety Features, Figures
ML18249A14213 August 2018Revision 26 to Updated Final Safety Analysis Report, Chapter 5, Reactor Coolant System and Connected Systems, Figures. (Redacted)
ML18249A14013 August 2018Revision 26 to Updated Final Safety Analysis Report, Chapter 4, Reactor, Figures
ML18249A13513 August 2018Revision 26 to Updated Final Safety Analysis Report, Chapter 3, Design of Structures, Components, Equipment, and Systems, Figures. (Redacted)
ML18249A15413 August 2018Revision 26 to Updated Final Safety Analysis Report, Chapter 15A, Operational Safety Analysis, FiguresReactor Vessel Water Level
Feedwater Controller Failure
ML18249A13313 August 2018Revision 26 to Updated Final Safety Analysis Report, Chapter 2, Representative Examples of Backfill Progress Sketches and Field and Laboratory Test Data Summary Sheet, Appendix 2D
ML18249A13113 August 2018Revision 26 to Updated Final Safety Analysis Report, Chapter 2, Pertinent Portions of BSEP Structural Fill Quality Assurance Specifications, Appendix 2C
ML18249A13013 August 2018Revision 26 to Updated Final Safety Analysis Report, Chapter 2, Additional Geophysical Information, Appendix 2B
ML18249A12913 August 2018Revision 26 to Updated Final Safety Analysis Report, Chapter 2, Site Characteristics, Appendix 2A Figures
ML18249A12813 August 2018Revision 26 to Updated Final Safety Analysis Report, Chapter 2, Site Characteristics, FiguresEarthquake
ML18249A12613 August 2018Revision 26 to Updated Final Safety Analysis Report, Chapter 1, Introduction and Summary, Figures
ML18249A15313 August 2018Revision 26 to Updated Final Safety Analysis Report, Chapter 15, Accident Analyses, Figures
ML18249A15113 August 2018Revision 26 to Updated Final Safety Analysis Report, Chapter 14, Initial Test Program, Figures
ML18249A15513 August 2018Revision 26 to Updated Final Safety Analysis Report, Chapter 17A, Quality Assurance, Figures
RA-18-0004, Duke Energy Transmittal of Topical Report DUKE-QAPD-001-A, Amendment 4313 August 2018Duke Energy Transmittal of Topical Report DUKE-QAPD-001-A, Amendment 43Safe Shutdown
Fitness for Duty
Offsite Dose Calculation Manual
Commercial Grade Dedication
Coatings
Nondestructive Examination
Emergency Lighting
Condition Adverse to Quality
Aging Management
Process Control Program
Stress corrosion cracking
License Renewal
Commercial Grade
Maintenance Rule Program
Fatigue Rule
Fire Protection Program
ML18249A15913 August 2018Technical Requirements Manual, Revision 73Time of Discovery
Reactor Vessel Water Level
Ultimate heat sink
Offsite Dose Calculation Manual
Safe Shutdown Earthquake
Post Accident Monitoring
Hydrostatic
Operating Basis Earthquake
Functionality Assessment
Scram Discharge Volume
Process Control Program
Stress corrosion cracking
Excess Flow Check Valve
Operability Determination
Earthquake
Pressure Boundary Leakage
Offsite Circuit
Operational leakage
RA-18-0131, Technical Requirements Manual, Revision 6613 August 2018Technical Requirements Manual, Revision 66Time of Discovery
Reactor Vessel Water Level
Ultimate heat sink
Non-Destructive Examination
Offsite Dose Calculation Manual
Safe Shutdown Earthquake
Post Accident Monitoring
Hydrostatic
Operating Basis Earthquake
Functionality Assessment
Scram Discharge Volume
Process Control Program
Stress corrosion cracking
Excess Flow Check Valve
Operability Determination
Earthquake
Pressure Boundary Leakage
Offsite Circuit
Operational leakage
RA-18-0132, Report of 10 CFR 50.59 Evaluations, 10 CFR 72.48 Evaluations, and Commitment Changes13 August 2018Report of 10 CFR 50.59 Evaluations, 10 CFR 72.48 Evaluations, and Commitment ChangesReactor Vessel Water Level
Overspeed trip
ML18225A01210 August 2018NRR E-mail Capture - Draft Brunswick RAIs - LAR to Revise TS to Relocate the Pressure-Temperature Limits to the Pressure and Temperature Limits ReportPressure and Temperature Limits Report
License Renewal
ML18197A4309 August 2018Relief Request ISI-10 to Regarding Alternate Repair of Feedwater Nozzle Dissimilar Metal WeldsWeld Overlay
Nondestructive Examination
Incorporated by reference
Liquid penetrant
Dissimilar Metal Weld
DM weld
ML18220A7907 August 2018NRR E-mail Capture - Brunswick - Adoption of 10 CFR 50.69 - Supplement to the Hwpra and Xfpra Audit Plan for BSEP Onsite AuditHigh winds
Probabilistic Risk Assessment
RA-18-0110, Request for One-Time Allowance to Submit License Amendment Request Referencing Topical Report Draft Safety Evaluation6 August 2018Request for One-Time Allowance to Submit License Amendment Request Referencing Topical Report Draft Safety Evaluation