Text
UPDATED FSAR INTRODUCTION AND
SUMMARY
CHAPTER 1 FIGURES Revision:
26 Chapter:
1 Page:
1 of 1 LIST OF FIGURES FIGURE NUMBER TITLE FIGURE 1-1 DELETED BY REVISION 21 FIGURE 1-2 GENERAL ARRANGEMENT PLAN - ELEVATION (-) 17-0 FIGURE 1-3 GENERAL ARRANGEMENT PLAN - ELEVATION 20-0 FIGURE 1-4 GENERAL ARRANGEMENT PLAN - ELEVATION 50-0 FIGURE 1-5 GENERAL ARRANGEMENT PLAN - ELEVATION 80-0 FIGURE 1-6 GENERAL ARRANGEMENT PLAN - ELEVATION 117-4 FIGURE 1-7 GENERAL ARRANGEMENT - SECTIONS A-A AND B-B FIGURE 1-8 GENERAL ARRANGEMENT - SECTION C-C FIGURE 1-9 DELETED FIGURE 1-10 GENERAL ARRANGEMENT - SHOP WAREHOUSE AND STOCKROOM BUILDINGS FIGURE 1-11 NITROGEN & AUGMENTED OFF-GAS BUILDING FIGURE 1-12 DELETED FIGURE 1-13 DELETED FIGURE 1-14 GE REACTOR SYSTEM HEAT BALANCE I
( ~ ~~~~GY. I
UPDATED FSAR DESIGN OF STRUCTURES, COMPONENTS, EQUIPMENT, AND SYSTEMS CHAPTER 1 FIGURES Revision:
24 Figure:
1-2 Page:
1 of 1 GENERAL ARRANGEMENT PLAN - ELEVATION 0 SECURITY-RELATED INFORMATION WITHHOLD UNDER 10 CFR 2.390 fa DUKE
~ ENERGY
UPDATED FSAR DESIGN OF STRUCTURES, COMPONENTS, EQUIPMENT, AND SYSTEMS CHAPTER 1 FIGURES Revision:
24 Figure:
1-3 Page:
1 of 1 GENERAL ARRANGEMENT PLAN - ELEVATION 20-0 SECURITY-RELATED INFORMATION WITHHOLD UNDER 10 CFR 2.390 fa DUKE
~ ENERGY
UPDATED FSAR DESIGN OF STRUCTURES, COMPONENTS, EQUIPMENT, AND SYSTEMS CHAPTER 1 FIGURES Revision:
24 Figure:
1-4 Page:
1 of 1 GENERAL ARRANGEMENT PLAN - ELEVATION 50-0 SECURITY-RELATED INFORMATION WITHHOLD UNDER 10 CFR 2.390 fa DUKE
~ ENERGY
UPDATED FSAR DESIGN OF STRUCTURES, COMPONENTS, EQUIPMENT, AND SYSTEMS CHAPTER 1 FIGURES Revision:
24 Figure:
1-5 Page:
1 of 1 GENERAL ARRANGEMENT PLAN - ELEVATION 80-0 SECURITY-RELATED INFORMATION WITHHOLD UNDER 10 CFR 2.390 fa DUKE
~ ENERGY
UPDATED FSAR DESIGN OF STRUCTURES, COMPONENTS, EQUIPMENT, AND SYSTEMS CHAPTER 1 FIGURES Revision:
24 Figure:
1-6 Page:
1 of 1 GENERAL ARRANGEMENT PLAN - ELEVATION 117-4 SECURITY-RELATED INFORMATION WITHHOLD UNDER 10 CFR 2.390 fa DUKE
~ ENERGY
UPDATED FSAR DESIGN OF STRUCTURES, COMPONENTS, EQUIPMENT, AND SYSTEMS CHAPTER 1 FIGURES Revision:
24 Figure:
1-7 Page:
1 of 1 GENERAL ARRANGEMENT PLAN - ELEVATION 117-4 SECURITY-RELATED INFORMATION WITHHOLD UNDER 10 CFR 2.390 fa DUKE
~ ENERGY
UPDATED FSAR DESIGN OF STRUCTURES, COMPONENTS, EQUIPMENT, AND SYSTEMS CHAPTER 1 FIGURES Revision:
24 Figure:
1-8 Page:
1 of 1 GENERAL ARRANGEMENT - SECTION C-C SECURITY-RELATED INFORMATION WITHHOLD UNDER 10 CFR 2.390 fa DUKE
~ ENERGY
UPDATED FSAR DESIGN OF STRUCTURES, COMPONENTS, EQUIPMENT, AND SYSTEMS CHAPTER 1 FIGURES Revision:
24 Figure:
1-10 Page:
1 of 1 GENERAL ARRANGEMENT - SHOP WAREHOUSE AND STOCKROOM BUILDINGS SECURITY-RELATED INFORMATION WITHHOLD UNDER 10 CFR 2.390 fa DUKE
~ ENERGY
UPDATED FSAR DESIGN OF STRUCTURES, COMPONENTS, EQUIPMENT, AND SYSTEMS CHAPTER 1 FIGURES Revision:
24 Figure:
1-11 Page:
1 of 1 GENERAL ARRANGEMENT - SHOP WAREHOUSE AND STOCKROOM BUILDINGS SECURITY-RELATED INFORMATION WITHHOLD UNDER 10 CFR 2.390 I_,~ DUKE I
~ ENERGY.
UPDATED FSAR INTRODUCTION AND
SUMMARY
CHAPTER 1 FIGURES Revision:
24 Figure:
1-14 Page:
1 of 1 REACTOR HEAT BALANCE FOR 120 PERCENT OF ORIGINAL POWER 1045 P
12.781E+06 #
- 1190.6 H
- 0.51 M
- Carryunder =
0.35%
973 P
- 2923 MWt 100.0 %
12.862E+06 #
12.755E+06 #
528.9 H 410.1 H 410.1 H 533.9 F 431.4 F 431.4 F 77.0E+06 0.8 1.074E+05 #
415.9 H 528.2 436.7 F H
2.600E+04 #
1.074E+05 #
75.8 H 528.1 H 105.0 F 533.3 F Conditions at upstream side of TSV Core Thermal Power 2923.0 Pump Heating 7.8 Cleanup Losses
-3.5 Other System Losses
-1.1 Turbine Cycle Use 2926.2 MWt h=
Cleanup Demineralizer System Main Steam Flow Main Feed Flow Control Rod Drive Feed Flow Total Core Flow
- = Flow, lbm/hr H = Enthalpy, Btu/lbm F = Temperature, F M = Moisture, %
P = Pressure, psia Legend H
Wd=
( ~ DUKE I
ENERGY.