ML18249A126

From kanterella
Jump to navigation Jump to search
6 to Updated Final Safety Analysis Report, Chapter 1, Introduction and Summary, Figures
ML18249A126
Person / Time
Site: Brunswick  Duke Energy icon.png
Issue date: 08/13/2018
From:
Duke Energy Progress
To:
Office of Nuclear Reactor Regulation
Shared Package
ML18249A165 List:
References
RA-18-0131
Download: ML18249A126 (11)


Text

UPDATED FSAR INTRODUCTION AND

SUMMARY

CHAPTER 1 FIGURES Revision:

26 Chapter:

1 Page:

1 of 1 LIST OF FIGURES FIGURE NUMBER TITLE FIGURE 1-1 DELETED BY REVISION 21 FIGURE 1-2 GENERAL ARRANGEMENT PLAN - ELEVATION (-) 17-0 FIGURE 1-3 GENERAL ARRANGEMENT PLAN - ELEVATION 20-0 FIGURE 1-4 GENERAL ARRANGEMENT PLAN - ELEVATION 50-0 FIGURE 1-5 GENERAL ARRANGEMENT PLAN - ELEVATION 80-0 FIGURE 1-6 GENERAL ARRANGEMENT PLAN - ELEVATION 117-4 FIGURE 1-7 GENERAL ARRANGEMENT - SECTIONS A-A AND B-B FIGURE 1-8 GENERAL ARRANGEMENT - SECTION C-C FIGURE 1-9 DELETED FIGURE 1-10 GENERAL ARRANGEMENT - SHOP WAREHOUSE AND STOCKROOM BUILDINGS FIGURE 1-11 NITROGEN & AUGMENTED OFF-GAS BUILDING FIGURE 1-12 DELETED FIGURE 1-13 DELETED FIGURE 1-14 GE REACTOR SYSTEM HEAT BALANCE I

( ~ ~~~~GY. I

UPDATED FSAR DESIGN OF STRUCTURES, COMPONENTS, EQUIPMENT, AND SYSTEMS CHAPTER 1 FIGURES Revision:

24 Figure:

1-2 Page:

1 of 1 GENERAL ARRANGEMENT PLAN - ELEVATION 0 SECURITY-RELATED INFORMATION WITHHOLD UNDER 10 CFR 2.390 fa DUKE

~ ENERGY

UPDATED FSAR DESIGN OF STRUCTURES, COMPONENTS, EQUIPMENT, AND SYSTEMS CHAPTER 1 FIGURES Revision:

24 Figure:

1-3 Page:

1 of 1 GENERAL ARRANGEMENT PLAN - ELEVATION 20-0 SECURITY-RELATED INFORMATION WITHHOLD UNDER 10 CFR 2.390 fa DUKE

~ ENERGY

UPDATED FSAR DESIGN OF STRUCTURES, COMPONENTS, EQUIPMENT, AND SYSTEMS CHAPTER 1 FIGURES Revision:

24 Figure:

1-4 Page:

1 of 1 GENERAL ARRANGEMENT PLAN - ELEVATION 50-0 SECURITY-RELATED INFORMATION WITHHOLD UNDER 10 CFR 2.390 fa DUKE

~ ENERGY

UPDATED FSAR DESIGN OF STRUCTURES, COMPONENTS, EQUIPMENT, AND SYSTEMS CHAPTER 1 FIGURES Revision:

24 Figure:

1-5 Page:

1 of 1 GENERAL ARRANGEMENT PLAN - ELEVATION 80-0 SECURITY-RELATED INFORMATION WITHHOLD UNDER 10 CFR 2.390 fa DUKE

~ ENERGY

UPDATED FSAR DESIGN OF STRUCTURES, COMPONENTS, EQUIPMENT, AND SYSTEMS CHAPTER 1 FIGURES Revision:

24 Figure:

1-6 Page:

1 of 1 GENERAL ARRANGEMENT PLAN - ELEVATION 117-4 SECURITY-RELATED INFORMATION WITHHOLD UNDER 10 CFR 2.390 fa DUKE

~ ENERGY

UPDATED FSAR DESIGN OF STRUCTURES, COMPONENTS, EQUIPMENT, AND SYSTEMS CHAPTER 1 FIGURES Revision:

24 Figure:

1-7 Page:

1 of 1 GENERAL ARRANGEMENT PLAN - ELEVATION 117-4 SECURITY-RELATED INFORMATION WITHHOLD UNDER 10 CFR 2.390 fa DUKE

~ ENERGY

UPDATED FSAR DESIGN OF STRUCTURES, COMPONENTS, EQUIPMENT, AND SYSTEMS CHAPTER 1 FIGURES Revision:

24 Figure:

1-8 Page:

1 of 1 GENERAL ARRANGEMENT - SECTION C-C SECURITY-RELATED INFORMATION WITHHOLD UNDER 10 CFR 2.390 fa DUKE

~ ENERGY

UPDATED FSAR DESIGN OF STRUCTURES, COMPONENTS, EQUIPMENT, AND SYSTEMS CHAPTER 1 FIGURES Revision:

24 Figure:

1-10 Page:

1 of 1 GENERAL ARRANGEMENT - SHOP WAREHOUSE AND STOCKROOM BUILDINGS SECURITY-RELATED INFORMATION WITHHOLD UNDER 10 CFR 2.390 fa DUKE

~ ENERGY

UPDATED FSAR DESIGN OF STRUCTURES, COMPONENTS, EQUIPMENT, AND SYSTEMS CHAPTER 1 FIGURES Revision:

24 Figure:

1-11 Page:

1 of 1 GENERAL ARRANGEMENT - SHOP WAREHOUSE AND STOCKROOM BUILDINGS SECURITY-RELATED INFORMATION WITHHOLD UNDER 10 CFR 2.390 I_,~ DUKE I

~ ENERGY.

UPDATED FSAR INTRODUCTION AND

SUMMARY

CHAPTER 1 FIGURES Revision:

24 Figure:

1-14 Page:

1 of 1 REACTOR HEAT BALANCE FOR 120 PERCENT OF ORIGINAL POWER 1045 P

12.781E+06 #

  • 1190.6 H
  • 0.51 M
  • Carryunder =

0.35%

973 P

  • 2923 MWt 100.0 %

12.862E+06 #

12.755E+06 #

528.9 H 410.1 H 410.1 H 533.9 F 431.4 F 431.4 F 77.0E+06 0.8 1.074E+05 #

415.9 H 528.2 436.7 F H

2.600E+04 #

1.074E+05 #

75.8 H 528.1 H 105.0 F 533.3 F Conditions at upstream side of TSV Core Thermal Power 2923.0 Pump Heating 7.8 Cleanup Losses

-3.5 Other System Losses

-1.1 Turbine Cycle Use 2926.2 MWt h=

Cleanup Demineralizer System Main Steam Flow Main Feed Flow Control Rod Drive Feed Flow Total Core Flow

  1. = Flow, lbm/hr H = Enthalpy, Btu/lbm F = Temperature, F M = Moisture, %

P = Pressure, psia Legend H

Wd=

( ~ DUKE I

ENERGY.