ML18249A151
| ML18249A151 | |
| Person / Time | |
|---|---|
| Site: | Brunswick |
| Issue date: | 08/13/2018 |
| From: | Duke Energy Progress |
| To: | Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML18249A165 | List:
|
| References | |
| RA-18-0131 | |
| Download: ML18249A151 (4) | |
Text
UPDATED FSAR INITIAL TEST PROGRAM CHAPTER 14 FIGURES Revision:
26 Chapter:
14 Page:
1 of 1 LIST OF FIGURES FIGURE NUMBER TITLE FIGURE 14-1 POWER - FLOW MAP AND START UP TEST CONDITIONS FIGURE 14-2 BRUNSWICK STARTUP AND OPERATIONS ORGANIZATION - PHASE I FIGURE 14-3 BRUNSWICK STARTUP AND OPERATIONS ORGANIZATION - PHASE II
( ~ DUKE ENERGY
UPDATED FSAR INITIAL TEST PROGRAM CHAPTER 14 FIGURES Revision:
24 Figure:
14-1 Page:
1 of 1 POWER - FLOW MAP AND START-UP TEST CONDITIONS
(., DUKE ENERGY 80 N
~
0 f
60 Cl:
l&I
~
IL
.j C I 40
- z:
I-0...
~
';I.
20 40 60 80 E
% RATED CORE FLOW { % OF 7 7. 0
- 10 lbs./hr)
NOTES
- 1. See Table 14.2.1 - 2 for definition of test conditions
- 2. Constant Pump Speed Lines
- a.
Natural circulation
- b.
20'%, Pump speed
- c.
Analytical lower limit of master flow control
- d. Contractual lower limit of flow control
- e.
Rated pump speed (results in rated flow at rated power) 100
UPDATED FSAR INITIAL TEST PROGRAM CHAPTER 14 FIGURES Revision:
24 Figure:
14-2 Page:
1 of 1 BRUNSWICK STARTUP AND OPERATIONS ORGANIZATION - PHASE I
(., DUKE ENERGY ADMINISTRAT1\\IE SUPERVISOR SRO*
AOMI.. ISTRATIVE GROUP TRAINING COORDINATOR SRO* ~
OPERATING SUPER\\IISOR SRO SHIFT (Al SUPERVISOR SRO SHIFT FOREMAN SRO CONTROL OPERATORS AO AUXILIARY OPERATIONS MAINTENANCE SUPERVISOR SRO*
INSTRUMENTATION
- CONTROL FOREMAN I* C TECHNICIANS ELECT A IC IANS -
~
MECHANIC FOREMAN MECHANICS ENGINEERI.. C ENIIIRONMENTAL SUPERVISOR
- RADIATION SRO*
CONTROL SUPERVISOR SRO*
!ENGINEERS SRO*
RADIATION CONTROL*
TEST FOREMAN RC* T TECHNICIA.. S SRO DESIRED, (Al REQUIRED ON SHIFT WHEN SIGNIFICANT TESTING IS IN PROGRESS DURING STARTUI' PROGRAM rLANT MANAGE~~
SRO PLANT QA SUPERINTENOE.. T SUPERVISOR SAO*
SRO*
K.NGINl!:IERS SRO*
GENSSS OPERATIO.. S MANAGER STARTUP
- TEST SUPftRVISOR
~
GE OPERATIONS SUPERINTENDENT STARTUP
- TEST ENGINEERS GE SHIFT SUPERINTENDENTS H
GE I
SITE MANAGER GE LEAD ENGINEER GE 5HIFT TEST ENGINEERS
UPDATED FSAR INITIAL TEST PROGRAM CHAPTER 14 FIGURES Revision:
24 Figure:
14-3 Page:
1 of 1 BRUNSWICK STARTUP AND OPERATIONS ORGANIZATION - PHASE II
( ~ DUKE
-c ENERGY QA SUl'll:RVISOR SRO*
QA ENGINU;RS SRO*
GENSSS OPERATIONS MANAGl:R GIE OPERATIONS SUPl:RINTENCIENT GE SHIFT SUPl!.R,NTl!:NDl!'.NTS GE SITE MANAGKR QI;: LIEAD ENGINEER Q~SHlf"T Tl!ST l:NGINll!:ERS r------------------------------+ ADMINISTRATIVE SUP-ERVISOR SRO*
STARTUP* TEST SUPERVISOR STARTUP
- TEST ENGINEERS r
I I
I I
I L
ENGINEERING SUPERVISOR SRO*
7 PLANT MANAGER SRO*
PLANT SUPERINTENDENT
.J ENVIRONMENTAL
& RADIATION CONTROL SUPERVISOR SRO*
RACIIATION CONTROL
- TEST ISOREMAN ENGINEERS SR0 111 ENGINEERS SRO*
(11)
OPERAl"tON SUPERVISOR SRO 7
SHIPT (A)
SUPERVISOR SRO SAO DESIRED RC* T TECHNICIANS RC* T TECHNICIANS L--------
TO THE LEFT DIS DA5HED LINE SHOWS PERSONNEL ASSIG Nl!D TO UNIT NO.)
STARTUP
_J SHIFT FOREMAN SAO CONTROL OPERATORS RO AUXILIARY OPERATORS (A) REQUIRED ON SHIFT WHIEN SIGNIFICANT TESTING IS IN PROGRESS DURING INITIAL STARTUP PROGRAM. WHEN SIC:NIFICANT TESTING IS NOT IN PROGRESS. SHIFT CREW WILL AEV~RT TO NORMAL 2 UNIT OPERATING CREW.
(Bl MATTERS CONCERNING UNIT 1 WILL BE COORCIINATll!:D THROUGH STARTUP SUPERVISOR.
L SHll'T PORl!:MAN SAO CDNTADL OPERATORS Ro AUXILIARY OPERATORS MAINTENANCE SUPEAVlliOA SRO r - - - - -7 ADMINISTRATIVE GROUP TRAINING COORDINATOR SRO*
I INSTRUMIErtTATION I
INSTRUMENTATtON I
- CONTROi,.
._ _ __,.1-----1
- CONTROL FOR£MAN FOREMAN
__J i*c T£CHNICIANS ELECTRICIANS MECHANIC FOREMAN MECHANICS I
I J
1
- C T!E:CHNICIANS 11!:LECTIUC IANS MECHANIC FOAl:MAN MECHANICS