Issue date | Title | Topic | |
---|---|---|---|
ML21181A416 | 30 June 2021 | PNO-lll-21-001 Donald C. Cook Nuclear Plant, Unit 2: Unplanned Shutdown Greater than 7 Days Due to Main Steam Leakage | |
AEP-NRC-2021-28, 10 CFR 50.90 License Amendment Request Regarding a Change to the Reactor Coolant System Pressure and Temperature Limits and Low Temperature Overpressure Protection (LTOP) System | 15 June 2021 | 10 CFR 50.90 License Amendment Request Regarding a Change to the Reactor Coolant System Pressure and Temperature Limits and Low Temperature Overpressure Protection (LTOP) System | Unanalyzed Condition Shutdown Margin Stroke time Anticipated operational occurrence Hydrostatic Surveillance Frequency Control Program Coast down |
ML21158A173 | 9 June 2021 | Review of the Fall 2017 Steam Generator Tube Inspections Report | |
IR 05000315/2021402 | 9 June 2021 | Donald D. C. Cook Nuclear Plant - Security Baseline Inspection Report 05000315/2021402 and 05000316/2021402 | |
ML21147A468 | 3 June 2021 | Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection | |
ML21141A261 | 2 June 2021 | Alternative Request REL-PP2 Related to Fifth 10-Year Inservice Testing Program Interval | Incorporated by reference |
ML21154A112 | 2 June 2021 | Notice of Significant Public Meeting to Discuss NRC End-of-Cycle Performance Assessment of Donald C. Cook Nuclear Plant, Units 1 and 2 for Performance for 2020 Calendar Year | |
ML21154A155 | 2 June 2021 | Information Meeting with a Question and Answer Session to Discuss NRC 2020 End-Of-Cycle Plant Performance Assessment of Donald C. Cook Nuclear Plant, Units 1 and 2 | |
ML21146A286 | 26 May 2021 | Information Request to Support Upcoming Problem Identification and Resolution Inspection at Donald C. Cook Nuclear Plant | Temporary Modification Maintenance Rule Program |
ML21140A305 | 20 May 2021 | NRR E-mail Capture - Final RAI - D.C. Cook 1 & 2 - Relief Request ISIR-4-11, Impractical Examinations for the Fourth 10-Year ISI Interval | |
ML21133A328 | 13 May 2021 | DC Cook - Control Point Hazard | |
ML21130A008 | 12 May 2021 | Relief Request ISIR-5-05 Related to ASME Code Case N 729-6 Supplemental Examination Requirements of Reactor Vessel Closure Head Penetration Nozzles (EPID L-2021-LLR-0033 (COVID-19)) | Pandemic Coronavirus COVID-19 |
AEP-NRC-2021-32, Annual Radiological Environmental Operating Report | 12 May 2021 | Annual Radiological Environmental Operating Report | Annual Radiological Environmental Operating Report Pandemic Chernobyl COVID-19 |
AEP-NRC-2021-35, Request for Relief Related to American Society of Mechanical Engineers (ASME) Code Case N-729-6 Supplemental Examination Requirements, ISIR-5-05 | 4 May 2021 | Request for Relief Related to American Society of Mechanical Engineers (ASME) Code Case N-729-6 Supplemental Examination Requirements, ISIR-5-05 | Boric Acid COVID-19 Pressure Boundary Leakage Through Wall Leak |
IR 05000315/2021001 | 28 April 2021 | Integrated Inspection Report 05000315/2021001 and 05000316/2021001 | Stroke time Enforcement Discretion Functionality Assessment Significance Determination Process Process Control Program Operability Determination Coronavirus COVID-19 Fire Protection Program Power change |
AEP-NRC-2021-27, Annual Radioactive Effluent Release Report | 28 April 2021 | Annual Radioactive Effluent Release Report | Grab sample Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report Process Control Program Annual Radiological Effluent Release Report Pandemic COVID-19 Power change Downpower |
ML21113A281 | 23 April 2021 | NRR E-mail Capture - D.C. Cook Nuclear Plant Unit Nos. 1 and 2 - Acceptance of License Amendment Request Regarding Containment Water Level Instrumentation | Post Accident Monitoring |
AEP-NRC-2021-30, Response to NRC Regulatory Issue Summary 2021-01 Preparation and Scheduling of Operator Licensing Examinations | 22 April 2021 | Response to NRC Regulatory Issue Summary 2021-01 Preparation and Scheduling of Operator Licensing Examinations | |
ML21125A583 | 19 April 2021 | 0 to Updated Final Safety Analysis Report, Chapter 14.3, Figures 14.3.4-76 to 14.3.9-25 (Unit 1) | |
ML21125A580 | 19 April 2021 | 0 to Updated Final Safety Analysis Report, Chapter 3, Reactor (Unit 1) | Boric Acid Shutdown Margin Safe Shutdown Earthquake Earthquake Fuel cladding Flow Induced Vibration |
ML21125A582 | 19 April 2021 | 0 to Updated Final Safety Analysis Report, Chapter 14, Table 14.4.2-1A, Equipment Required to Shutdown Reactor (Unit 1) | |
ML21125A581 | 19 April 2021 | 0 to Updated Final Safety Analysis Report, Chapter 14.2, Standby Safeguards Analysis (Unit 2) | Boric Acid Shutdown Margin Earthquake |
ML21125A589 | 19 April 2021 | 0 to Updated Final Safety Analysis Report, Chapter 14, Safety Analysis, (Unit 2) | Fuel cladding |
ML21125A584 | 19 April 2021 | 0 to Updated Final Safety Analysis Report, Chapter 9, Auxiliary and Emergency Systems | Safe Shutdown Boric Acid Shutdown Margin Loop seal Time to boil Hydrostatic Probabilistic Risk Assessment Operating Basis Earthquake Design basis earthquake Earthquake Control of Heavy Loads Fire Protection Program Tritium Power change |
ML21125A585 | 19 April 2021 | 0 to Updated Final Safety Analysis Report, Chapter 14.3, Tables 14.3.1-1 to 14.3.2-8 (Unit 2) | Loop seal |
ML21125A586 | 19 April 2021 | 0 to Updated Final Safety Analysis Report, Chapter 15, Supplement for Renewed Operating Licenses | Boric Acid Non-Destructive Examination Fire Barrier Coatings Nondestructive Examination Aging Management License Renewal Exemption Request Earthquake Control of Heavy Loads Biofouling Fire Protection Program |
ML21125A587 | 19 April 2021 | 0 to Updated Final Safety Analysis Report, Chapter 14.1, Core and Coolant Boundary Protection Analysis (Unit 2) | Boric Acid Shutdown Margin Fuel cladding Power change |
ML21125A599 | 19 April 2021 | 0 to Updated Final Safety Analysis Report, Chapter 2.0, Site and Environment | Safe Shutdown Boric Acid High winds Fire Barrier Tornado Missile Operating Basis Earthquake Zebra Mussel Design basis earthquake Annual Radiological Environmental Operating Report Veliger Earthquake Turbine Missile Biofouling |
ML21125A579 | 19 April 2021 | 0 to Updated Final Safety Analysis Report, Chapter 3, Figures (Unit 2) | |
ML21125A576 | 19 April 2021 | 9 Technical Specification Bases, List of Effective Pages (Unit 2) | Safe Shutdown Unanalyzed Condition Boric Acid Shutdown Margin Reactor Vessel Water Level High Radiation Area Ultimate heat sink Non-Destructive Examination Grab sample Fire Barrier Stroke time Anticipated operational occurrence Tornado Missile Post Accident Monitoring Internal Flooding Hydrostatic Qualified Offsite Circuit Incorporated by reference Condition Adverse to Quality Missed surveillance Surveillance Frequency Control Program Battery sizing Earthquake Power Operated Valves Turbine Missile Fuel cladding Pressure Boundary Leakage Offsite Circuit Power change Unidentified leakage |
ML21125A575 | 19 April 2021 | 0 to Updated Final Safety Analysis Report, Chapter 7, Instrumentation and Control | Safe Shutdown Boric Acid Shutdown Margin Fire Barrier Post Accident Monitoring Emergency Lighting Earthquake Fuel cladding |
ML21125A574 | 19 April 2021 | 0 to Updated Final Safety Analysis Report, Chapter 14.2, Tables 14.2.1-2 to 14.2.7-1 (Unit 1) | |
ML21125A573 | 19 April 2021 | 0 to Updated Final Safety Analysis Report, Chapter 7, Tables | Boric Acid Ultimate heat sink Fuel cladding |
ML21125A570 | 19 April 2021 | 0 to Updated Final Safety Analysis Report, Chapter 14.3, Figures 14.3.1-1A to 14.3.4-75 (Unit 1) | |
ML21125A569 | 19 April 2021 | 0 to Updated Final Safety Analysis Report, Chapter 14.3, Figures 14.3.4-1 to 14.3.4-158 (Unit 2) | |
ML21125A568 | 19 April 2021 | 0 to Updated Final Safety Analysis Report, Chapter 10, Tables | |
ML21125A567 | 19 April 2021 | 0 to Updated Final Safety Analysis Report, Chapter 9, Figures | Boric Acid |
ML21110A527 | 19 April 2021 | GFE Results, March 2021 | Generic Fundamentals Examination |
ML21125A456 | 19 April 2021 | 0 to Updated Final Safety Analysis Report, Chapter 3, Figures (Unit 1) | |
ML21125A562 | 19 April 2021 | 0 to Updated Final Safety Analysis Report, Chapter 5, Containment System | Hydrostatic Coatings Operating Basis Earthquake Nondestructive Examination Finite Element Analysis Design basis earthquake Earthquake |
ML21125A564 | 19 April 2021 | 0 to Updated Final Safety Analysis Report, Chapter 4, Figures | |
AEP-NRC-2021-19, 0 to Updated Final Safety Analysis Report, Chapter 1, Introduction and Summary | 19 April 2021 | 0 to Updated Final Safety Analysis Report, Chapter 1, Introduction and Summary | Safe Shutdown Boric Acid Shutdown Margin Grab sample Offsite Dose Calculation Manual Tornado Missile Probabilistic Risk Assessment Operating Basis Earthquake Incorporated by reference Tornado Generated Missile Tornado Missile Protection Design basis earthquake TORMIS Earthquake Turbine Missile Fuel cladding Pressure Boundary Leakage Fire Protection Program Power change |
ML21125A605 | 19 April 2021 | 0 to Updated Final Safety Analysis Report, Chapter 14.3, Reactor Coolant System Pipe Rupture (Loss of Coolant Accident)(Unit 1) | Boric Acid Shutdown Margin Loop seal Mission time Fire Barrier Hydrostatic Coatings Earthquake Fuel cladding |
ML21125A604 | 19 April 2021 | 0 to Updated Final Safety Analysis Report, Chapter 13, (Historical) Initial Tests and Operations | Boric Acid Hydrostatic |
ML21125A603 | 19 April 2021 | 0 to Updated Final Safety Analysis Report, Chapter 14.3.5 to 14.5.9, Environmental Consequences of a Loss-of-Coolant Accident (Unit 2) | Safe Shutdown |
ML21125A601 | 19 April 2021 | 0 to Updated Final Safety Analysis Report, Chapter 13, Tables | Boric Acid Hydrostatic |
ML21125A600 | 19 April 2021 | 0 to Updated Final Safety Analysis Report, Chapter 3, Tables (Unit 1) | Shutdown Margin Safe Shutdown Earthquake Design basis earthquake |
ML21125A590 | 19 April 2021 | 0 to Updated Final Safety Analysis Report, Chapter 3, Tables (Unit 2) | Shutdown Margin Operating Basis Earthquake Design basis earthquake |
ML21125A598 | 19 April 2021 | 0 to Updated Final Safety Analysis Report, Chapter 10, Steam and Power Conversion System | Loop seal Zebra Mussel Earthquake Turbine Missile |
ML21125A597 | 19 April 2021 | 0 to Updated Final Safety Analysis Report, Chapter 14.2 Standby Safeguards Analysis (Unit 1) | Boric Acid Shutdown Margin Earthquake Fuel cladding |