ML21181A41630 June 2021PNO-lll-21-001 Donald C. Cook Nuclear Plant, Unit 2: Unplanned Shutdown Greater than 7 Days Due to Main Steam Leakage
AEP-NRC-2021-28, 10 CFR 50.90 License Amendment Request Regarding a Change to the Reactor Coolant System Pressure and Temperature Limits and Low Temperature Overpressure Protection (LTOP) System15 June 202110 CFR 50.90 License Amendment Request Regarding a Change to the Reactor Coolant System Pressure and Temperature Limits and Low Temperature Overpressure Protection (LTOP) SystemUnanalyzed Condition
Shutdown Margin
Stroke time
Anticipated operational occurrence
Hydrostatic
Surveillance Frequency Control Program
Coast down
ML21158A1739 June 2021Review of the Fall 2017 Steam Generator Tube Inspections Report
IR 05000315/20214029 June 2021Donald D. C. Cook Nuclear Plant - Security Baseline Inspection Report 05000315/2021402 and 05000316/2021402
ML21147A4683 June 2021Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection
ML21141A2612 June 2021Alternative Request REL-PP2 Related to Fifth 10-Year Inservice Testing Program IntervalIncorporated by reference
ML21154A1122 June 2021Notice of Significant Public Meeting to Discuss NRC End-of-Cycle Performance Assessment of Donald C. Cook Nuclear Plant, Units 1 and 2 for Performance for 2020 Calendar Year
ML21154A1552 June 2021Information Meeting with a Question and Answer Session to Discuss NRC 2020 End-Of-Cycle Plant Performance Assessment of Donald C. Cook Nuclear Plant, Units 1 and 2
ML21146A28626 May 2021Information Request to Support Upcoming Problem Identification and Resolution Inspection at Donald C. Cook Nuclear PlantTemporary Modification
Maintenance Rule Program
ML21140A30520 May 2021NRR E-mail Capture - Final RAI - D.C. Cook 1 & 2 - Relief Request ISIR-4-11, Impractical Examinations for the Fourth 10-Year ISI Interval
ML21133A32813 May 2021DC Cook - Control Point Hazard
ML21130A00812 May 2021Relief Request ISIR-5-05 Related to ASME Code Case N 729-6 Supplemental Examination Requirements of Reactor Vessel Closure Head Penetration Nozzles (EPID L-2021-LLR-0033 (COVID-19))Pandemic
Coronavirus
COVID-19
AEP-NRC-2021-32, Annual Radiological Environmental Operating Report12 May 2021Annual Radiological Environmental Operating ReportAnnual Radiological Environmental Operating Report
Pandemic
Chernobyl
COVID-19
AEP-NRC-2021-35, Request for Relief Related to American Society of Mechanical Engineers (ASME) Code Case N-729-6 Supplemental Examination Requirements, ISIR-5-054 May 2021Request for Relief Related to American Society of Mechanical Engineers (ASME) Code Case N-729-6 Supplemental Examination Requirements, ISIR-5-05Boric Acid
COVID-19
Pressure Boundary Leakage
Through Wall Leak
IR 05000315/202100128 April 2021Integrated Inspection Report 05000315/2021001 and 05000316/2021001Stroke time
Enforcement Discretion
Functionality Assessment
Significance Determination Process
Process Control Program
Operability Determination
Coronavirus
COVID-19
Fire Protection Program
Power change
AEP-NRC-2021-27, Annual Radioactive Effluent Release Report28 April 2021Annual Radioactive Effluent Release ReportGrab sample
Offsite Dose Calculation Manual
Annual Radioactive Effluent Release Report
Annual Radiological Environmental Operating Report
Process Control Program
Annual Radiological Effluent Release Report
Pandemic
COVID-19
Power change
Downpower
ML21113A28123 April 2021NRR E-mail Capture - D.C. Cook Nuclear Plant Unit Nos. 1 and 2 - Acceptance of License Amendment Request Regarding Containment Water Level InstrumentationPost Accident Monitoring
AEP-NRC-2021-30, Response to NRC Regulatory Issue Summary 2021-01 Preparation and Scheduling of Operator Licensing Examinations22 April 2021Response to NRC Regulatory Issue Summary 2021-01 Preparation and Scheduling of Operator Licensing Examinations
ML21125A58319 April 20210 to Updated Final Safety Analysis Report, Chapter 14.3, Figures 14.3.4-76 to 14.3.9-25 (Unit 1)
ML21125A58019 April 20210 to Updated Final Safety Analysis Report, Chapter 3, Reactor (Unit 1)Boric Acid
Shutdown Margin
Safe Shutdown Earthquake
Earthquake
Fuel cladding
Flow Induced Vibration
ML21125A58219 April 20210 to Updated Final Safety Analysis Report, Chapter 14, Table 14.4.2-1A, Equipment Required to Shutdown Reactor (Unit 1)
ML21125A58119 April 20210 to Updated Final Safety Analysis Report, Chapter 14.2, Standby Safeguards Analysis (Unit 2)Boric Acid
Shutdown Margin
Earthquake
ML21125A58919 April 20210 to Updated Final Safety Analysis Report, Chapter 14, Safety Analysis, (Unit 2)Fuel cladding
ML21125A58419 April 20210 to Updated Final Safety Analysis Report, Chapter 9, Auxiliary and Emergency SystemsSafe Shutdown
Boric Acid
Shutdown Margin
Loop seal
Time to boil
Hydrostatic
Probabilistic Risk Assessment
Operating Basis Earthquake
Design basis earthquake
Earthquake
Control of Heavy Loads
Fire Protection Program
Tritium
Power change
ML21125A58519 April 20210 to Updated Final Safety Analysis Report, Chapter 14.3, Tables 14.3.1-1 to 14.3.2-8 (Unit 2)Loop seal
ML21125A58619 April 20210 to Updated Final Safety Analysis Report, Chapter 15, Supplement for Renewed Operating LicensesBoric Acid
Non-Destructive Examination
Fire Barrier
Coatings
Nondestructive Examination
Aging Management
License Renewal
Exemption Request
Earthquake
Control of Heavy Loads
Biofouling
Fire Protection Program
ML21125A58719 April 20210 to Updated Final Safety Analysis Report, Chapter 14.1, Core and Coolant Boundary Protection Analysis (Unit 2)Boric Acid
Shutdown Margin
Fuel cladding
Power change
ML21125A59919 April 20210 to Updated Final Safety Analysis Report, Chapter 2.0, Site and EnvironmentSafe Shutdown
Boric Acid
High winds
Fire Barrier
Tornado Missile
Operating Basis Earthquake
Zebra Mussel
Design basis earthquake
Annual Radiological Environmental Operating Report
Veliger
Earthquake
Turbine Missile
Biofouling
ML21125A57919 April 20210 to Updated Final Safety Analysis Report, Chapter 3, Figures (Unit 2)
ML21125A57619 April 20219 Technical Specification Bases, List of Effective Pages (Unit 2)Safe Shutdown
Unanalyzed Condition
Boric Acid
Shutdown Margin
Reactor Vessel Water Level
High Radiation Area
Ultimate heat sink
Non-Destructive Examination
Grab sample
Fire Barrier
Stroke time
Anticipated operational occurrence
Tornado Missile
Post Accident Monitoring
Internal Flooding
Hydrostatic
Qualified Offsite Circuit
Incorporated by reference
Condition Adverse to Quality
Missed surveillance
Surveillance Frequency Control Program
Battery sizing
Earthquake
Power Operated Valves
Turbine Missile
Fuel cladding
Pressure Boundary Leakage
Offsite Circuit
Power change
Unidentified leakage
ML21125A57519 April 20210 to Updated Final Safety Analysis Report, Chapter 7, Instrumentation and ControlSafe Shutdown
Boric Acid
Shutdown Margin
Fire Barrier
Post Accident Monitoring
Emergency Lighting
Earthquake
Fuel cladding
ML21125A57419 April 20210 to Updated Final Safety Analysis Report, Chapter 14.2, Tables 14.2.1-2 to 14.2.7-1 (Unit 1)
ML21125A57319 April 20210 to Updated Final Safety Analysis Report, Chapter 7, TablesBoric Acid
Ultimate heat sink
Fuel cladding
ML21125A57019 April 20210 to Updated Final Safety Analysis Report, Chapter 14.3, Figures 14.3.1-1A to 14.3.4-75 (Unit 1)
ML21125A56919 April 20210 to Updated Final Safety Analysis Report, Chapter 14.3, Figures 14.3.4-1 to 14.3.4-158 (Unit 2)
ML21125A56819 April 20210 to Updated Final Safety Analysis Report, Chapter 10, Tables
ML21125A56719 April 20210 to Updated Final Safety Analysis Report, Chapter 9, FiguresBoric Acid
ML21110A52719 April 2021GFE Results, March 2021Generic Fundamentals Examination
ML21125A45619 April 20210 to Updated Final Safety Analysis Report, Chapter 3, Figures (Unit 1)
ML21125A56219 April 20210 to Updated Final Safety Analysis Report, Chapter 5, Containment SystemHydrostatic
Coatings
Operating Basis Earthquake
Nondestructive Examination
Finite Element Analysis
Design basis earthquake
Earthquake
ML21125A56419 April 20210 to Updated Final Safety Analysis Report, Chapter 4, Figures
AEP-NRC-2021-19, 0 to Updated Final Safety Analysis Report, Chapter 1, Introduction and Summary19 April 20210 to Updated Final Safety Analysis Report, Chapter 1, Introduction and SummarySafe Shutdown
Boric Acid
Shutdown Margin
Grab sample
Offsite Dose Calculation Manual
Tornado Missile
Probabilistic Risk Assessment
Operating Basis Earthquake
Incorporated by reference
Tornado Generated Missile
Tornado Missile Protection
Design basis earthquake
TORMIS
Earthquake
Turbine Missile
Fuel cladding
Pressure Boundary Leakage
Fire Protection Program
Power change
ML21125A60519 April 20210 to Updated Final Safety Analysis Report, Chapter 14.3, Reactor Coolant System Pipe Rupture (Loss of Coolant Accident)(Unit 1)Boric Acid
Shutdown Margin
Loop seal
Mission time
Fire Barrier
Hydrostatic
Coatings
Earthquake
Fuel cladding
ML21125A60419 April 20210 to Updated Final Safety Analysis Report, Chapter 13, (Historical) Initial Tests and OperationsBoric Acid
Hydrostatic
ML21125A60319 April 20210 to Updated Final Safety Analysis Report, Chapter 14.3.5 to 14.5.9, Environmental Consequences of a Loss-of-Coolant Accident (Unit 2)Safe Shutdown
ML21125A60119 April 20210 to Updated Final Safety Analysis Report, Chapter 13, TablesBoric Acid
Hydrostatic
ML21125A60019 April 20210 to Updated Final Safety Analysis Report, Chapter 3, Tables (Unit 1)Shutdown Margin
Safe Shutdown Earthquake
Design basis earthquake
ML21125A59019 April 20210 to Updated Final Safety Analysis Report, Chapter 3, Tables (Unit 2)Shutdown Margin
Operating Basis Earthquake
Design basis earthquake
ML21125A59819 April 20210 to Updated Final Safety Analysis Report, Chapter 10, Steam and Power Conversion SystemLoop seal
Zebra Mussel
Earthquake
Turbine Missile
ML21125A59719 April 20210 to Updated Final Safety Analysis Report, Chapter 14.2 Standby Safeguards Analysis (Unit 1)Boric Acid
Shutdown Margin
Earthquake
Fuel cladding