Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
IR 05000331/201700830 June 2017NRC Design Bases Assurance Inspection (Team): Inspection Report 05000331/2017008 (Jen)High Radiation Area
Stroke time
Probabilistic Risk Assessment
Locked High Radiation Area
Significance Determination Process
Large early release frequency
Battery sizing
Weak link
Power Uprate
NG-17-0121, Six-Month Status Report in Response to June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions (Order EA-13-109)29 June 2017Six-Month Status Report in Response to June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions (Order EA-13-109)Tornado Missile
FLEX
NG-17-0124, Submittal of 10 CFR 72.48 Report of Changes, Tests, and Experiments28 June 2017Submittal of 10 CFR 72.48 Report of Changes, Tests, and Experiments
L-2017-118, Submittal of 10 CFR 50.46 30-Day Special Report of Changes in Peak Cladding Temperature28 June 2017Submittal of 10 CFR 50.46 30-Day Special Report of Changes in Peak Cladding Temperature
L-2017-122, NextEra Energy Quality Assurance Topical Report (FPL-1) Revision 21 Annual Submittal28 June 2017NextEra Energy Quality Assurance Topical Report (FPL-1) Revision 21 Annual SubmittalFitness for Duty
Shutdown Margin
Offsite Dose Calculation Manual
Commercial Grade Dedication
Post Accident Monitoring
Probabilistic Risk Assessment
Coatings
Nondestructive Examination
Temporary Modification
Cyber Security
Condition Adverse to Quality
Aging Management
Process Control Program
Safeguards Contingency Plan
License Renewal
Maintenance Rule Program
Fire Protection Program
Grace period
Power Uprate
L-2017-095, Official Service List Changes26 June 2017Official Service List Changes
ML17172A38720 June 2017Information Request to Support Upcoming Temporary Instruction 191 Inspection at Duane Arnold Energy CenterFLEX
Spent Fuel Pool Instrumentation
NG-17-0117, Revision to Request for Additional Information Relating to Revision to Staff Augmentation Times in the Duane Arnold Energy Center Emergency Plan19 June 2017Revision to Request for Additional Information Relating to Revision to Staff Augmentation Times in the Duane Arnold Energy Center Emergency PlanOperating Basis Earthquake
Design basis earthquake
Deep Dose Equivalent
Minimum staff
L-2017-104, Submittal of Report Pursuant to 10 CFR 71.95(a)(3) and (B) - Failure to Follow Conditions of TN-RAM Packaging Certificate of Compliance No. 923315 June 2017Submittal of Report Pursuant to 10 CFR 71.95(a)(3) and (B) - Failure to Follow Conditions of TN-RAM Packaging Certificate of Compliance No. 9233Weak link
ML17214A41114 June 2017Dua 2017 Ile Administrative Files ES-401-9 FinalFuel cladding
ML17214A40114 June 2017Dua 2017 Ile Administrative Files ES-401-4
ML17214A35014 June 2017Dua 2017 Ile - Administered Exam Written Examination HandoutsSlow transfer
Surveillance Frequency Control Program
Overtravel
Offsite Circuit
ML17214A30714 June 2017Dua 2017 Ile - Administered Exam SRO Written ExaminationUnanalyzed Condition
Fire Barrier
Time Critical Operator Action
Fuel cladding
Fire Protection Program
ML17214A29514 June 2017Dua 2017 Ile - Administered Exam RO Written ExaminationShutdown Margin
Half scram
FLEX
Coast down
ML17214A25914 June 2017Dua 2017 Ile - Administered Exam RO-SRO Admin JPMsStroke time
Job Performance Measure
Large early release frequency
Fuel cladding
Offsite Circuit
ML17214A23214 June 2017Dua 2017 Ile - Administered Exam Operating Sim and IP JPMsHalf scram
Job Performance Measure
Offsite Circuit
ML17214A21414 June 2017Dua 2017 Ile - Administered Exam ScenariosMELLLA
Offsite Circuit
Power change
ML17214A05014 June 2017Dua 2017 Ile - Proposed Exam SRO Written ExaminationUnanalyzed Condition
Fire Barrier
Time Critical Operator Action
Fire Protection Program
ML17214A03814 June 2017Dua 2017 Ile - Proposed Exam RO Written ExaminationShutdown Margin
Half scram
FLEX
ML17214A03614 June 2017Dua 2017 Ile - Proposed Exam Scenarios 1-2-3-AltHalf scram
Operating Basis Earthquake
Design basis earthquake
MELLLA
Earthquake
Fuel cladding
Offsite Circuit
Power change
ML17214A03414 June 2017Dua 2017 Ile - Proposed Exam Operating JPMsHalf scram
Slow transfer
Job Performance Measure
Offsite Circuit
ML17214A02814 June 2017Dua 2017 Ile - Proposed Exam Admin RO-SRO JPMs
ML17214A02714 June 2017Dua 2017 Ile - Proposed Exam ES-401-6
NG-17-0093, License Amendment Request (TSCR-168), Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control9 June 2017License Amendment Request (TSCR-168), Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory ControlShutdown Margin
Reactor Vessel Water Level
High Radiation Area
Ultimate heat sink
Stroke time
Water Inventory Control
Hydrostatic
Operating Basis Earthquake
Qualified Offsite Circuit
Surveillance Frequency Control Program
Power Operated Valves
Fuel cladding
Offsite Circuit
Scaffolding
CAC:MF98299 June 2017
ML17159A7967 June 201717 Duane Arnold Energy Center - Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection (Mxg)
ML17152A3891 June 2017DAEC Operator Licensing Examination Approval
ML17151B07031 May 2017Public Meeting Summary of May 23, 2017, Teleconference with Nextera Energy Duane Arnold, LLCProbabilistic Risk Assessment
ML17129A03726 May 2017Safety Evaluation Regarding Implementation of Mitigation Strategies and Reliable Spent Fuel Pool Instrument Related to Orders EA-12-049 and EA-12-051Safe Shutdown
High winds
Shutdown Margin
High Radiation Area
Ultimate heat sink
Mission time
Tornado Missile
Time to boil
Safe Shutdown Earthquake
Locked High Radiation Area
FLEX
Fukushima Dai-Ichi
Design basis earthquake
Spent Fuel Pool Instrumentation
Battery sizing
Earthquake
Fuel cladding
Fire Protection Program
GOTHIC
ML17135A04124 May 2017Flood Hazard Mitigation Strategies AssessmentTornado Missile
Hydrostatic
FLEX
Fukushima Dai-Ichi
Flood Hazard Mitigation Strategies Assessment
CAC:MF792324 May 2017
ML17157B67422 May 2017Duane Arnold Energy Center, Revision 24 to Updated Final Safety Analysis Report, Table of ContentsSafe Shutdown
Incorporated by reference
Aging Management
Fire Protection Program
ML17157B68522 May 2017Duane Arnold Energy Center, Revision 24 to Updated Final Safety Analysis Report, Chapter 11, Radioactive Waste ManagementLoop seal
Grab sample
Hydrostatic
Fuel cladding
ML17157B68922 May 2017Duane Arnold Energy Center, Revision 24 to Updated Final Safety Analysis Report, Chapter 15, Accident Analyses
ML17157B67822 May 2017Duane Arnold Energy Center, Revision 24 to Updated Final Safety Analysis Report, Chapter 4, Reactor
ML17157B67722 May 2017Duane Arnold Energy Center, Revision 24 to Updated Final Safety Analysis Report, Chapter 3, Design of Structures, Components, Equipment, and Systems
ML17157B69122 May 2017Duane Arnold Energy Center, Revision 24 to Updated Final Safety Analysis Report, Chapter 17, Quality AssuranceWeld Overlay
Hydrostatic
Nondestructive Examination
Aging Management
License Renewal
Dissimilar Metal Weld
ML17157B68822 May 2017Duane Arnold Energy Center, Revision 24 to Updated Final Safety Analysis Report, Chapter 14, Initial Test ProgramSafe Shutdown
Shutdown Margin
Hydrostatic
Earthquake
Power change
Coast down
ML17157B69222 May 2017Duane Arnold Energy Center, Revision 24 to Updated Final Safety Analysis Report, Chapter 18, License RenewalBoric Acid
Fire Barrier
Weld Overlay
Hydrostatic
Coatings
VT-2
Aging Management
Flow Accelerated Corrosion
Stress corrosion cracking
License Renewal
Maintenance Rule Program
EVT-1
Fire Protection Program
Power Uprate
Thermography
Thermal fatigue
ML17157B67522 May 2017Duane Arnold Energy Center, Revision 24 to Updated Final Safety Analysis Report, Chapter 1, Introduction and General Description of PlantSafe Shutdown
High winds
Shutdown Margin
Ultimate heat sink
Anticipated operational occurrence
Coatings
Operating Basis Earthquake
Nondestructive Examination
Emergency Lighting
Incorporated by reference
Abnormal operational transient
Design basis earthquake
Scram Discharge Volume
Earthquake
Power-Operated Valves
Fuel cladding
Liquid penetrant
ML17157B68722 May 2017Duane Arnold Energy Center, Revision 24 to Updated Final Safety Analysis Report, Chapter 13, Conduct of OperationsFitness for Duty
Shutdown Margin
Fire Protection Program
ML17157B68422 May 2017Duane Arnold Energy Center, Revision 24 to Updated Final Safety Analysis Report, Chapter 10, Steam and Power ConversionHydrostatic
Nondestructive Examination
Earthquake
Turbine Missile
Liquid penetrant
ML17157B69022 May 2017Duane Arnold Energy Center, Revision 24 to Updated Final Safety Analysis Report, Chapter 16, Technical Specifications
ML17157B68022 May 2017Duane Arnold Energy Center, Revision 24 to Updated Final Safety Analysis Report, Chapter 6, Engineered Safety FeaturesReactor Vessel Water Level
Non-Destructive Examination
Safe Shutdown Earthquake
Coatings
Seismically rugged
Design basis earthquake
Earthquake
Fuel cladding
Liquid penetrant
ML17157B68122 May 2017Duane Arnold Energy Center, Revision 24 to Updated Final Safety Analysis Report, Chapter 7, Instrumentation and Controls
ML17157B68322 May 2017Duane Arnold Energy Center, Revision 24 to Updated Final Safety Analysis Report, Chapter 9, Auxiliary SystemsShutdown Margin
Grab sample
Hydrostatic
Earthquake
ML17157B68222 May 2017Duane Arnold Energy Center, Revision 24 to Updated Final Safety Analysis Report, Chapter 8, Electric Power
ML17157B64922 May 2017Duane Arnold Energy Center, Revision 24 to Updated Final Safety Analysis Report
ML17157B68622 May 2017Duane Arnold Energy Center, Revision 24 to Updated Final Safety Analysis Report, Chapter 12, Radiation ProtectionHigh Radiation Area
Grab sample
Hydrostatic
Locked High Radiation Area
Scram Discharge Volume
ML17157B67922 May 2017Duane Arnold Energy Center, Revision 24 to Updated Final Safety Analysis Report, Chapter 5, Reactor Coolant System and Connected SystemsWeld Overlay
Hydrostatic
Nondestructive Examination
Stress corrosion cracking
Earthquake
Fuel cladding
Liquid penetrant
Dissimilar Metal Weld
Unidentified leakage
Unidentified leak
Power Uprate