Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML11153A138 | 31 December 2010 | Annual Radiological Environmental Operating Report | Grab sample Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report Annual Radiological Effluent Release Report Chernobyl |
ML103630612 | 29 December 2010 | (Redacted) Safety Evaluation Regarding Transition to a Risk-Informed, Performance-Based Fire Protection Program in Accordance with 10 CFR 50.48(c) | Hot Short Safe Shutdown Unanalyzed Condition Boric Acid High winds Mission time Fire Barrier Time to boil Internal Flooding Probabilistic Risk Assessment Coatings Operator Manual Action Multiple Spurious Operation Emergency Lighting Incorporated by reference B.5.b Significance Determination Process Thermoset Large early release frequency Safeguards Contingency Plan Earthquake Fire Protection Program Fire Watch Very Early Warning Fire Detection |
ML103630210 | 28 December 2010 | Ltr to T. Ray Re Participation in Commission Meeting on Digital Instrumentation and Control (I&C) on 2/1/11 | |
ML13066A754 | 23 December 2010 | Email from J. Mitman, NRR to M. Khanna, NRR on OUO - Jocassee Dam PRA | |
ML110040409 | 23 December 2010 | Draft, Regarding Review of Root Cause Analysis and Actions Addressing the Underground Pipe Damage to the Condensate Storage Tank Return Line | Coatings Operability Determination |
ML14058A069 | 22 December 2010 | Meeting Request on Oconee External Flooding Issue | |
ML14058A070 | 22 December 2010 | Email from M. Khanna, NRR to J. Mitman, NRR OUO - Oconee Flooding Issue Presentation | Internal Flooding B.5.b |
ML13066A753 | 21 December 2010 | Email from V. Rodriguez, NRR to J. Mitman, NRR Oconee Inundation Study Response and Nrc'S Draft Jco | |
ML13066A751 | 20 December 2010 | Email from J. Mitman, NRR to F. Ferrante, NRR FW: Spillway Curve | |
ML13066A752 | 20 December 2010 | Email from F. Ferrante, NRR to J. Mitman, NRR Topo Map of Yard Area and Surroundings | |
ML13066A750 | 19 December 2010 | Email from M. Khanna, NRR to J. Stang, NRR Request - Ouo/Sri Oconee Ext Flooding | |
ML103510379 | 17 December 2010 | NFPA 805 Transition Pilot Plant FAQ 08-0054, Revision 1 | Hot Short Safe Shutdown Shutdown Margin Fire Barrier Operator Manual Action Multiple Spurious Operation Thermoset Large early release frequency Fire Protection Program |
ML13066A748 | 17 December 2010 | Email from J. Mitman, NRR to F. Ferrante, NRR FW: Oconee Adequate Protection Backfit Documented Evaluation | Backfit |
ML13066A749 | 17 December 2010 | Canceled Meeting Notice on Oconee External Flooding Issue | |
ML14058A068 | 17 December 2010 | Email from M. Khanna, NRR to J. Mitman, NRR on Ouo/Sri Oconee Adequate Protection Backfit Documented Evaluation April 12, 2010 | Safe Shutdown Internal Flooding B.5.b Significance Determination Process Earthquake Backfit |
ML13066A747 | 16 December 2010 | Email from M. Khanna, NRR to J. Mitman, NRR Ofi Concerns - OUO - Sensitive Information - Do Not Disclose | Internal Flooding B.5.b Mitigating Strategies |
ML11143A069 | 15 December 2010 | NRR E-mail Capture - Request for Alternative No. RR 10-ON-001 - Oconee Nuclear Station, Units 1, 2, and 3 | |
ML103480707 | 14 December 2010 | Public Meeting Summary - Duke Quality Assurance Program Discussion Meeting | |
ML103470618 | 13 December 2010 | Notice of Public Meeting with Duke Energy Carolinas, LLC, to Discuss Progress of Major Projects on Oconee | |
ML13066A745 | 10 December 2010 | Email from J. Mitman, NRR to J. England, Usbr Can Hydro Turbine Generators Pass Water If the Grid Is Unavailable | |
ML13066A746 | 10 December 2010 | Email from F. Ferrante, NRR to J. Mitman, NRR FW: | |
ML13066A629 | 24 November 2010 | Email from F. Ferrante, NRR to J. Mitman, NRR on Equation for L = 38 Ft | |
ML13066A628 | 22 November 2010 | Email from V. Rodriguez, NRR to J. Mitman, NRR Draft Letter to FERC | Safe Shutdown |
ML103350168 | 22 November 2010 | CFR 21 Notifications - Identification of Defect, Mackson Inc. - Defective Tube Steel | Commercial Grade |
ML103300216 | 21 November 2010 | Weld Overlay UT Results Per Relief Request 09-ON-003 | Weld Overlay DM weld |
ML103300227 | 19 November 2010 | Request for Additional Information Regarding License Amendment Request for Adopt NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants (2001 Edition), License Amendment Request 2008-01 | Hot Short Safe Shutdown Mission time Fire Barrier Post Accident Monitoring Probabilistic Risk Assessment Fire impairment Operator Manual Action Multiple Spurious Operation Design basis earthquake Foreign Material Exclusion Large early release frequency Earthquake Fire Protection Program |
ML13066A627 | 19 November 2010 | Email from S. Wong, NRR to S. Rosenberg, NRR on New Information Notice on Applicability of Historical Dam Failure Frequency Estimates in Probabilistic Risk Assessments | Probabilistic Risk Assessment |
ML13066A626 | 18 November 2010 | Email from S. Wong, NRR to F. Ferrante, NRR in on NSAC/60 | |
ML103080357 | 17 November 2010 | NFPA 805 Pilot License Amendment Request Review Schedule Update, November 2010 | |
ML13066A625 | 17 November 2010 | Email from S. Wong, NRR to J. Mitman, NRR Draft Letter to FERC | Safe Shutdown |
ML103210284 | 16 November 2010 | Initial Exam 2010-302 Final SRO Written Exam | Safe Shutdown Unanalyzed Condition Time of Discovery High winds Packing leak High Radiation Area Ultimate heat sink Fire Barrier Past operability Missed surveillance Stress corrosion cracking Operability Determination Earthquake Fuel cladding Pressure Boundary Leakage Fire Protection Program Power change Fatality Unidentified leakage Siren Operational leakage |
ML13066A623 | 16 November 2010 | Email from S. Wong, NRR to F. Ferrante, NRR Draft Presentation (with Backup Slides) for Tomorrow'S Meeting | |
ML13066A624 | 16 November 2010 | Email from J. Philip, RES to F. Ferrante, NRR Draft in on Dam Failure Rates | Probabilistic Risk Assessment |
ML103210226 | 15 November 2010 | Supplement for Proposed License Amendment Request to Revise the Technical Specifications Pursuant to the Use of Gadolinia Integral Burnable Absorber Number 2009-12 | Shutdown Margin Fuel cladding |
ML103220101 | 15 November 2010 | License Amendment Request for Approval to Operate a Reverse Osmosis System to Remove Silica from the Borated Water Storage Tanks and Spent Fuel Pools During Unit Operation | Safe Shutdown Boric Acid Shutdown Margin Tornado Missile Manual Operator Action |
ML103210273 | 15 November 2010 | Initial Exam 2010-302 Final RO Written Exam | Unanalyzed Condition |
ML103140545 | 10 November 2010 | Units 1 and 2 - RAI Regarding Response to Generic Letter 2008-01 | |
ML13066A622 | 10 November 2010 | Email from J. Mitman, NRR to J. Mitman, NRR Et Al., Untitled | |
ML103160424 | 10 November 2010 | Independent Spent Fuel Storage Installation and William States Lee, III, Notification of Service/Distribution Listing Update | |
ML14058A067 | 10 November 2010 | Email from J. Mitman, NRR to M. Khanna, NRR Oconee Intake Dike Letter | |
ML103210289 | 9 November 2010 | Initial Exam 2010-302 Post Exam Comments | |
ML13066A587 | 9 November 2010 | Email from J. Mitman, NRR to F. Ferrante, NRR on Jocassee Inflow Calc | |
ML103210227 | 9 November 2010 | Notification of Distribution List Changes Update | |
ML13066A585 | 8 November 2010 | Email from F. Ferrante, NRR to J. Mitman, NRR on in Nsac 60 Meeting | |
ML103140599 | 8 November 2010 | Site, Units 1, 2 & 3, Proposed License Amendment Request for the Reactor Vessel Internals Inspection Plan Number 2010-06 | Unanalyzed Condition Non-Destructive Examination Nondestructive Examination Functionality Assessment Condition Adverse to Quality Aging Management Stress corrosion cracking License Renewal Earthquake Liquid penetrant |
ML103090704 | 3 November 2010 | Technical Specification Bases (Tsb) Change | Safe Shutdown Battery sizing Power Operated Valves |
ML103420586 | 3 November 2010 | FEMA Oconee After Action Report/Improvement Plan, Drill Date - August 3, 2010, Radiological Emergency Preparedness (REP) Program | Design basis earthquake Siren |
ML101800241 | 2 November 2010 | Request for Withholding Information from Public Disclosure, Regarding Oconee Nuclear Design Methodology Using CASMO-4/SIMULATE-3 MOX, TAC Nos. ME4646, ME4647, and ME4648 | Affidavit |
TAC:ME4646 | 2 November 2010 | ||
ML101800233 | 2 November 2010 | Request for Withholding Information from Public Disclosure Regarding Oconee Nuclear Design Methodology Using CASMO-4/SIMULATE-3 MOX, TAC Nos. ME4646, ME4647, and ME4648 | Affidavit |