Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML083500039 | 29 December 2008 | Safety Evaluation of Relief Requests for Fourth and Third 10-Year Pump and Valve IST Program | Stroke time Incorporated by reference Scram Discharge Volume Power-Operated Valves Power Operated Valves |
ML083650058 | 29 December 2008 | Senior Reactor and Reactor Operator Retake Examination - Nine Mile Point, Unit 1 | |
ML083380620 | 22 December 2008 | License Amendment No. 199 & 129, Issuance of Amendment No. 199 and 129, Revisions to the TSs Administrative Controls Section for the Inservice Testing Program | Safe Shutdown Incorporated by reference Missed surveillance |
ML083640304 | 17 December 2008 | Independent Spent Fuel Storage Installation and Nine Mile Point, Units 1 & 2 and R. E. Ginna, Withdrawal of the Application for Approval of 10 CFR 50.80 and 10 CFR 72.50 Indirect Transfers of Control of Licenses | |
ML110110031 | 16 December 2008 | Quality Assurance Topical Report, Revision 2 | Fitness for Duty Shutdown Margin Offsite Dose Calculation Manual Coatings Nondestructive Examination Temporary Modification Condition Adverse to Quality Process Control Program Fire Protection Program Grace period |
IR 05000220/2008008 | 15 December 2008 | IR 05000220-08-008, 05000410-08-008, on 10/06/2008 - 10/31/2008, Nine Mile Point, Units 1 and 2, Component Design Bases Inspection | Safe Shutdown Ultimate heat sink Stroke time Probabilistic Risk Assessment Reserve Station Service Transformer Significance Determination Process Reasonable doubt of operability Battery sizing |
Press Release-08-224, NRC Accepts Application for New Reactor at Nine Mile Point | 15 December 2008 | Press Release-08-224: NRC Accepts Application for New Reactor at Nine Mile Point | |
ML083230440 | 12 December 2008 | Final - RO & SRO Written Examination with Answer Key (401-5 Format) (Folder 3) | High winds Shutdown Margin Half scram Stroke time Slow transfer Time to boil Squib Locked High Radiation Area Unidentified leak |
ML083470307 | 9 December 2008 | E-mail from A. Peterson to R. Guzman NRC Request for State Consultation for License Amendment Request | Grace period |
ML083650102 | 5 December 2008 | Rev 55 to Site Emergency Plan | Safe Shutdown Health Physics Network Grab sample Offsite Dose Calculation Manual Emergency Lighting Fuel cladding Fire Protection Program Scaffolding |
ML083440059 | 4 December 2008 | License Amendment Request Pursuant to 10 CFR 50.90: One-Time Extension of the Primary Containment Integrated Leakage Rate Test Interval - Response to NRC Request for Additional Information | Packing leak Probabilistic Risk Assessment Coatings Large early release frequency |
ML083190248 | 4 December 2008 | Request for Withholding Information from Public Disclosure for Calvert Cliffs Nuclear Power Plant Units 1 and 2, Nine Mile Point Nuclear Station Units 1 and 2, and R. E. Ginna Nuclear Power Plant | |
ML083190494 | 1 December 2008 | Relief Request 2ISI-007 and 2ISI-009 for Third 10-Year ISI Interval | Probabilistic Risk Assessment Incorporated by reference Exemption Request |
IR 05000220/2008302 | 26 November 2008 | Er 05000220-08-302, on October 6-23, 2008, Nine Mile Point Nuclear Station, Unit 1; Initial Operator Licensing Examination Report | |
ML12220A101 | 24 November 2008 | Constellation Energy Group, Inc. Definitive Proxy Statement Schedule 14A | Incorporated by reference Grace period Stolen |
ML083080063 | 24 November 2008 | License Amendment, Issuance of Amendment No 128 Action Statement for Two Inoperable Control Room Air Conditioning Subsystems Consistent with TSTF-477 | Safe Shutdown Recently irradiated fuel |
ML083370164 | 20 November 2008 | Special Report: Inoperable Drywell Pressure Monitors | |
ML083040609 | 19 November 2008 | Notice of Consideration of Approval of 10 CFR 50.80 Indirect Transfers of Control of Licenses and Opportunity for a Hear-Nine Mile Point Nuclear Station, Units 1 and 2 | |
ML083230571 | 19 November 2008 | Notice of Consideration of Approval of 10 CFR 50.80 Indirect Transfers of Control of Licenses and Opportunity for a Hearing | |
ML083450681 | 17 November 2008 | GL Report from Nine Mile Point Nuclear Station Units 1 & 2 Report of Damaged Tritium Exit Sign | |
ML083220034 | 14 November 2008 | NRC Operator Licensing Initial Exam Results, Nine Mile Point Nuclear Station, Unit 1 (Cover Letter Publically Available, Enclosures Withheld from Public) (Folder 1).NRC Operator Licensing Initial Exam Results, Nine Mile Point Nuclear Statio | |
ML083230512 | 13 November 2008 | Transmittal of Inservice Testing (IST) Program Update and Associated 10 CFR 50.55a Requests - Response to NRC Request for Additional Information | Stroke time Scram Discharge Volume Grace period |
ML083190017 | 12 November 2008 | Notification of Potential Part 21 on All Dimensionally Verified Commercial Grade Items Processed Per Fisher Manufacture Procedure Fmp 2K28 | |
IR 05000410/2008303 | 10 November 2008 | Er 05000410-08-303; on October 6-10, 2008; Nine Mile Point Nuclear Generating Station Unit 2, Operator Licensing Retake Examination Report | Job Performance Measure |
ML083170323 | 6 November 2008 | Response to Request for Additional Information Increased Ownership of Constellation Energy Group, Inc | |
ML083040278 | 6 November 2008 | Request for Additional Information One-Time Extension of Integrated Leak Rate Test Interval (MD9453) | Probabilistic Risk Assessment Large early release frequency |
IR 05000220/2008004 | 5 November 2008 | IR 05000220-08-004 and 05000410-08-004; on 07/01/08 - 09/30/08; Nine Mile Point Nuclear Station, Units 1 and 2; Maintenance Risk Assessment and Event Followup (NRC Integrated Inspection Report) | Unanalyzed Condition High Radiation Area Half scram Fire Barrier Internal Flooding Enforcement Discretion Temporary Modification Functionality Assessment B.5.b Significance Determination Process Operability Determination Incremental Core Damage Probability Deficit Power change Unidentified leakage Siren |
IR 05000220/2008402 | 31 October 2008 | IR 05000220-08-402, 05000410-08-402; on 10/20/2008 - 10/24/2008; Nine Mile Point Nuclear Station, Units 1 and 2; Physical Protection | Affidavit |
ML083230120 | 31 October 2008 | Draft - Section B Operating Exam (Folder 2) | Job Performance Measure |
ML082971036 | 28 October 2008 | Acceptance Review Application for Approval of 10 CFR 50.80 and 10 CFR 72.50 Indirect Transfers of Control of Licenses-Calvert Cliffs Nuclear Power Plant, Units 1 and 2, Nine Mile Point Nuclear Station, Units 1 and 2, and R.E. Ginna | |
ML082970163 | 28 October 2008 | Extension Request for Response to Generic Letter 2008-01 | |
TAC:MD9789 | 28 October 2008 | ||
ML082950442 | 27 October 2008 | Request for Additional Information Increased Ownership of Constellation Energy Group, Inc. by Electricite DE France-Calvert Cliffs Nuclear Power Plant, Unit Nos. 1 and 2, R.E. Ginna Nuclear Power Plant, Nine Mile Point (TAC Nos. MD9634-MD96 | |
ML082830341 | 27 October 2008 | Meeting Summary, Nine Mile Point, No. 2, Category 1 Meeting to Discuss Proposed Extended Power Uprate Application | |
ML091190570 | 27 October 2008 | NRC License Renewal Entrance Meeting, Entrance Exit Form | |
TAC:MD9634 | 27 October 2008 | ||
ML082770565 | 27 October 2008 | Extended Power Uprate Pre-Application Meeting Slides | MELLLA |
ML082910233 | 23 October 2008 | Closeout of Generic Letter 2007-01 Inaccessible or Underground Power Cable Failures That Disable Accident Mitigation Systems or Cause Plant Transients. | |
ML083090387 | 22 October 2008 | 2008 Summary of Regulatory Commitment Changes for the Period of October 1, 2007 to October 1, 2008 | |
ML090330469 | 21 October 2008 | Final Qa/Related Forms (Folder 1) | |
ML082960011 | 17 October 2008 | Operator Licensing Retake Exam Results | |
ML082770229 | 14 October 2008 | Request for Additional Information, Pump and Valve Inservice Testing Program for Next 10-Year IST Interval | Stroke time Scram Discharge Volume Grace period |
ML082900036 | 14 October 2008 | Nine-Month Response to NRC Generic Letter 2008-01, Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems | Reactor Vessel Water Level Packing leak Stroke time |
ML082910068 | 14 October 2008 | Supplemental Information NMP2 Relief Request 2 151-009 | |
ML082900567 | 14 October 2008 | E-mail from D.Vandeputte to R.Guzman Third ISI Interval Relief Request 2ISI-009 | |
ML082890299 | 6 October 2008 | Revised Three Month Response to NRC Generic Letter 2008-01, Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems. | Scaffolding |
ML082810188 | 3 October 2008 | Independent Spent Fuel Storage Installation, Nine Mile Point, R. E. Ginna - Application for Approval of 10 CFR 50.80 and 10 CFR 72.50 Indirect Transfers of Control of Licenses Pursuant to Section 184 of the Atomic Energy | |
TAC:MD9629 | 3 October 2008 | ||
ML082610249 | 3 October 2008 | G20080614/EDATS: OEDO-2008-0656 - Michael Wallace Ltr. Electricite De France'S Increased Percentage Ownership of Constellation Energy Group, Inc | |
ML082900287 | 2 October 2008 | September 10, 2008 NRC Generic Fundamentals Examination (GFE) Results for Nine Mile Point Station, Units 1 & 2 (Cover Letter Publically Available, Enclosures Withheld from Public) | Generic Fundamentals Examination |