Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
RS-03-240, Units 1 & 2, Clarification of Compensatory Actions Associated with a License Amendment Request for a One-Time Extension of the Essential Service Water Train Completion Time | 30 December 2003 | Units 1 & 2, Clarification of Compensatory Actions Associated with a License Amendment Request for a One-Time Extension of the Essential Service Water Train Completion Time | High winds |
IR 05000454/2003010 | 29 December 2003 | IR 05000454-03-010(DRS); 05000455-03-010(DRS); 12/01/03 - 12/05/03; Byron Station; Units 1 and 2; Emergency Preparedness Specialist Report | |
ML080280606 | 23 December 2003 | CR 19852 - AMAG-Westinghouse Letter CAE-03-107 Not Accurate | |
ML033520560 | 18 December 2003 | Re Information Request for an NRC Biennial Permanent Modifications and 10 CFR 50.59 Baseline Inspection | Commercial Grade Dedication |
ML040090133 | 17 December 2003 | GFE Registration Letter 12/17/04 Re March 2004 Examination (Multiple Addressees) | Generic Fundamentals Examination |
BYRON 2003-0116, November 2003 Monthly Operating Report for Byron Station Units 1 and 2 | 15 December 2003 | November 2003 Monthly Operating Report for Byron Station Units 1 and 2 | Offsite Dose Calculation Manual |
BYRON 2003-0114, Sixty-Day Response to NRC Bulleting 2003-02, Leakage from Reactor Pressure Vessel Lower Head Penetrations and Reactor Coolant Pressure Boundary Integrity. | 12 December 2003 | Sixty-Day Response to NRC Bulleting 2003-02, Leakage from Reactor Pressure Vessel Lower Head Penetrations and Reactor Coolant Pressure Boundary Integrity. | Boric Acid VT-2 Through-Wall Leak |
ML033420151 | 12 December 2003 | Bryon, Unit 1, Evaluation of Steam Generator Inservice Inspection Summary Report, TAC No. MC0962 | |
TAC:MC0962 | 12 December 2003 | ||
BYRON 2003-0115, Sixty-Day Response to NRC Order EA-03-009, Issuance of Order Establishing Interim Inspection Requirements for Reactor Pressure Vessel Heads at Pressurized Water Reactors. | 12 December 2003 | Sixty-Day Response to NRC Order EA-03-009, Issuance of Order Establishing Interim Inspection Requirements for Reactor Pressure Vessel Heads at Pressurized Water Reactors. | Boric Acid VT-2 |
ML080280603 | 12 December 2003 | NRC Question, Regarding Amag Common Header Installation | |
ML040130816 | 10 December 2003 | Initial SRO Examination 12/2003 | Safe Shutdown Shutdown Margin Loop seal Power change |
ML040130815 | 10 December 2003 | Initial RO Examination 12/2003 | Safe Shutdown Loop seal Power change |
ML033440348 | 9 December 2003 | Meeting Handout to Discuss Licensing Issues and Upcoming Licensing Activities with the Exelon Fleet of Nuclear Plants | Surveillance Frequency Control Program |
ML033560302 | 9 December 2003 | Exelon/Amergen 180-Day Response to NRC Generic Letter 2003-01, Control Room Habitability. | Safe Shutdown Reactor Vessel Water Level Fire Barrier Safe Shutdown Earthquake Probabilistic Risk Assessment Design basis earthquake Fire Protection Program Power Uprate |
ML082470253 | 8 December 2003 | Ltr from Hauser to Printz, Exelon Nuclear Byron and Braidwood Nuclear Stations Exelon Frequency Spectrum Analysis Records | Power change |
ML033421289 | 5 December 2003 | Westinghouse - NSAL 03-12 - 12/05/03 Crossflow Ultrasonic Measurement System | |
RS-03-228, Request for Additional Information Regarding License Amendment for One-Time Extension of Essential Service Water Train Completion Time | 5 December 2003 | Request for Additional Information Regarding License Amendment for One-Time Extension of Essential Service Water Train Completion Time | High winds Probabilistic Risk Assessment Job Performance Measure Large early release frequency |
RS-03-190, Request for License Amendment to Revise Lead Test Assembly Burnup Limits for Byron Station, Unit 1 Cycle 13 | 5 December 2003 | Request for License Amendment to Revise Lead Test Assembly Burnup Limits for Byron Station, Unit 1 Cycle 13 | Exemption Request Fuel cladding Coast down |
ML033350269 | 3 December 2003 | G20030688, G20030689, G20030691 - 12/18/03, Visit by Mr. John Skolds, Chief Nuclear Officer for Exelon Nuclear and Mr. Jeffrey A. Benjamin, Vice President, Licensing and Regulatory Affairs; Nrc'S Oversight & Assess Chart | |
ML033360688 | 2 December 2003 | Response to Order for Compensatory Measures Related to Access Authorization | |
ML040280018 | 1 December 2003 | Miscellaneous Correspondence for Byron Initial Examination - December 2003 | Job Performance Measure Generic Fundamentals Examination |
ML040280021 | 1 December 2003 | Documents Related to Initial Exam Submittal and NRC Comments on Operating Test and ES-401-9 for NRC Comments on Written Exam for Byron Initial Examination - December 2003 | Power change |
ML040140723 | 1 December 2003 | Initial Submittal of Walkthrough Jpms for Byron Initial Examination - Dec 2003 | Job Performance Measure |
ML040280020 | 1 December 2003 | Examination Outline Submittal for Byron Initial Examination - December 2003 | Shutdown Margin Job Performance Measure |
ML040280015 | 1 December 2003 | Various Checklist for Byron Initial Examination - December 2003 | |
ML040140787 | 1 December 2003 | Final as Administered Scenarios for Byron Initial Examination - Dec 2003 | Boric Acid Post Accident Monitoring Power change |
ML040140786 | 1 December 2003 | Final As-Administered Walkthrough Jpms for Byron Initial Examination - Dec 2003 | Job Performance Measure |
ML040140778 | 1 December 2003 | Final As-Administered Administrative Jpms for Byron Initial Examination - Dec 2003 | Shutdown Margin Nuclear Accident Reporting System Job Performance Measure |
ML040140752 | 1 December 2003 | Initial Submittal of Written Exam for Byron Initial Examination - Dec 2003 | Safe Shutdown Shutdown Margin Loop seal Deep Dose Equivalent Power change |
ML040140551 | 1 December 2003 | Initial Submittal of Administrative Jpms for Byron Initial Examination - Dec 2003 | Shutdown Margin Nuclear Accident Reporting System Job Performance Measure |
ML040140746 | 1 December 2003 | Initial Submittal of the Scenarios for Byron Initial Examination - Dec 2003 | Boric Acid Post Accident Monitoring Power change |
ML033160520 | 21 November 2003 | Notice of Meeting with Exelon Generation Company, LLC Re Licensing Activities | |
ML033300211 | 20 November 2003 | FOIA/PA-2003-0444 - Resp 1 - Final | |
TAC:MB6569 | 19 November 2003 | ||
ML032830455 | 19 November 2003 | Units 1 and 2, Package, Re Completion Time from 24 Hours to 7 Days for One Inoperable Instrument Bus Inverter | Safe Shutdown High winds Probabilistic Risk Assessment Large early release frequency Earthquake |
ML082380968 | 19 November 2003 | Briefing, Subject: Byron and Braidwood Recent Potential Over Power Issues | |
ML032970102 | 19 November 2003 | Orders Modifying Licenses for Revised Design Basis Threat and for Training and Physical Fitness Enhancements Applicable to Security Force Personnel | |
ML072680183 | 19 November 2003 | Recent Potential Over Power Issues | |
ML033250556 | 19 November 2003 | Units 1 and 2, Technical Specifications, Re Completion Time from 24 Hours to 7 Days for One Inoperable Instrument Bus Inverter | |
ML033230280 | 18 November 2003 | Notice of Licensee Meeting with Exelon Generation Co., LLC Re Licensee Decision-Making Process | |
ML080280594 | 18 November 2003 | Public Meeting Notice | |
ML033230277 | 18 November 2003 | Letter to Licensees Confirming Public Meeting on Byron Station Dtd 12/02/03 | |
ML033240164 | 18 November 2003 | Response to Request for Additional Information - WCAP-15872-NP, Rev. 0 Use of Alternate Decay Heat Removal in Mode 6 Refueling. | Ultimate heat sink |
RS-03-220, Confirmation of Completion of Actions Implementing the Compensatory Measures Related to Security Force Fitness-for-Duty | 14 November 2003 | Confirmation of Completion of Actions Implementing the Compensatory Measures Related to Security Force Fitness-for-Duty | |
BYRON 2003-0110, October 2003 Monthly Operating Report for Byron Station, Units 1 and 2 | 14 November 2003 | October 2003 Monthly Operating Report for Byron Station, Units 1 and 2 | Offsite Dose Calculation Manual |
ML033230225 | 12 November 2003 | Submittal of WCAP-16084-NP, Development of Risk-Informed Safety Analysis Approach and Pilot Application. | Anticipated operational occurrence Probabilistic Risk Assessment Fuel cladding Coast down |
ML033180436 | 9 November 2003 | G20030685/LTR-03-0729 - Bob Meyer Ltr. Fatigue Rule - 16 Hour Wording | Fatigue Rule |
RS-03-215, Units 1 and 2, Revision to Technical Specification Change Request - Extension of Completion of Time for Instrument Bus Inverters | 7 November 2003 | Units 1 and 2, Revision to Technical Specification Change Request - Extension of Completion of Time for Instrument Bus Inverters | |
RS-03-213, Thirty-Day Report of the Emergency Core Cooling System Evaluation Model Changes and Errors Required by 10 CFR 50.46, Acceptance Criteria for Emergency Core Cooling Systems for light-water Nuclear Power Reactors. | 7 November 2003 | Thirty-Day Report of the Emergency Core Cooling System Evaluation Model Changes and Errors Required by 10 CFR 50.46, Acceptance Criteria for Emergency Core Cooling Systems for light-water Nuclear Power Reactors. |