Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML03017010226 December 2002Y020020302 - E-mail Dated 12/26/02 from Mike Mulligan Issues About LaSalle and Braidwood Plant'S in Their UFSAR
RS-02-214, Response to Request for Additional Information Addressing Request for Amendment to Technical Specification 5.6.5, Core Operating Limits Report (Colr), for Addition of New Analytical Methodology26 December 2002Response to Request for Additional Information Addressing Request for Amendment to Technical Specification 5.6.5, Core Operating Limits Report (Colr), for Addition of New Analytical Methodology
ML02344030024 December 2002Approval of Proposed Revision 70 of Quality Assurance Topical Report EGC-1A, REV.70 in Accordance with 10 CFR 50.54(a) Requirements for Exelon/Amergen Plants
ML03008005320 December 2002Request for License Amendment Regarding Reactor Vessel Specimen Removal ScheduleAnticipated operational occurrence
Hydrostatic
Nondestructive Examination
ML03008004320 December 2002Request for License Amendment Regarding Reactor Vessel Specimen Removal Schedule
ML03016063819 December 2002Y020020292/Y020020293 - Incoming E-mail Dated 12/19/02 from Mike Mulligan Response to Previous Concern About SRV Leakage, Excessive Safety Equipment Operation at LaSalle
ML03016064413 December 2002Y020020292/Y020020293 - Incoming E-mail Dated 12/13/02 from Mike Mulligan Response to Previous Concern About SRV Leakage, Excessive Safety Equipment Operation at LaSalle
ML02354035013 December 2002November 2002 Monthly Operating Report for LaSalle County Station, Units 1 & 2
ML02340030312 December 2002Withdrawal of an Amendment Request
TAC:MB524312 December 2002
ML0225201163 December 2002Issuance of Amendments 146 & 142 to Licenses NPF-11 & NPF-18, Respectively, Extending the Use of Pressure & Temperature Limit Curves in Technical Specification 3.4.11
ML0234305132 December 2002Part 2 of 2, LaSalle, Cycle 9A Core Operating Limits Report (COLR)Shutdown Margin
Anticipated operational occurrence
Minimum Critical Power Ratio
Feedwater Controller Failure
ML0234304242 December 2002Cycle 9A Core Operating Limits Report (COLR)
ML02343048130 November 2002Part 1 of 2 LaSalle, Cycle 9A Core Operating Limits Report (COLR)Shutdown Margin
Safety Limit Minimum Critical Power Ratio
Anticipated operational occurrence
Feedwater Controller Failure
MELLLA
Fuel cladding
ML02345057027 November 2002Request for Technical Specifications Change to Eliminate Requirements for Post Accident Sampling System Using the Consolidated Line Item Improvement ProcessOffsite Dose Calculation Manual
Incorporated by reference
Annual Radioactive Effluent Release Report
ML02338074626 November 2002Part 2 of 2, LaSalle, Unit 1 Cycle 10A Core Operating Limits Report (COLR)Anticipated operational occurrence
Feedwater Controller Failure
MELLLA
ML02338068926 November 2002Part 1 of 2, LaSalle, Unit 1 Cycle 10A Core Operating Limits Report (COLR)Shutdown Margin
Safety Limit Minimum Critical Power Ratio
Anticipated operational occurrence
Feedwater Controller Failure
MELLLA
Fuel cladding
ML02338063126 November 2002Cycle 10A Core Operating Limits Report (COLR)
ML02338059925 November 2002Exemption Request from the Requirements of 10 CFR 50.36(c)(1)Safety Limit Minimum Critical Power Ratio
Abnormal operational transient
Exemption Request
Fuel cladding
ML02337036925 November 2002GFE Registration Letter - February 2003 ExaminationGeneric Fundamentals Examination
ML02333044225 November 2002Spectrum Technologies, Part 21 Initial Notification - Cutler-Hammer A200 NEMA Size 1 StartersMELLLA
ML02331056922 November 2002Part 21 Report Re General Electric Identified the Stability Option III Period Based Detection Algorithm T-Min Specification Has a Defect
ML02336006922 November 2002Reportable Condition Stability Option III: Period Based Algorithm T Specification
ML02329016218 November 2002Final Report, Stability Option III: Possible Successive Confirmation Count Resets - Not ReportableMELLLA
ML02325041315 November 2002October 2002 Monthly Operating Report for LaSalle Units 1 and 2Coast down
TAC:MB555612 November 2002
ML02317029012 November 2002Technical Specifications for License Amendments 155 & 141, Adding Two Footnotes to TSs Table 3.3.8.1-1, Functions 1.e & 2.e, & Makes Editorial Change to Heading of TS Table 3.3.8.1-1
ML02295006512 November 2002License Amendment, Adding Two Footnotes to TSs Table 3.3.8.1-1, Functions 1.e & 2.e, & Makes Editorial Change to Heading of TS Table 3.3.8.1-1Reactor Vessel Water Level
ML02295008812 November 2002Biweekly Notice Memo, Notice of Issuance, Add Two Footnotes to TS Table 3.3.8.1-1, Functions 1.e & 2.e, & Make Editorial Change to Heading of TS Table 3.3.8.1-1
RS-02-196, Revised Request for Amendment to Technical Specifications Justification for the Continued Use of Technical Specifications, Section 3.4.11, RCS Pressure and Temperature (P/T) Limits.8 November 2002Revised Request for Amendment to Technical Specifications Justification for the Continued Use of Technical Specifications, Section 3.4.11, RCS Pressure and Temperature (P/T) Limits.Hydrostatic
ML0231904066 November 2002Facility Operating License No. NPF-18, Cycle 9 Core Operating Limits ReportAnticipated operational occurrence
Feedwater Controller Failure
MELLLA
IR 05000373/20020113 November 2002IR 05000373-02-011(DRS) & IR 05000374-02-011(DRS), on 09/09-27/2002, LaSalle County Station; Units 1 & 2. Safety System Design and Performance Capability Inspection. Non-Cited Violations NotedSafe Shutdown
Loop seal
Ultimate heat sink
Hydrostatic
Probabilistic Risk Assessment
Anchor Darling
Temporary Modification
Zebra Mussel
Significance Determination Process
ML0230905581 November 2002Generic Fundamentals Examination (GFE) Section of the Written Operator Licensing Examination Administered on 10/09/2002Generic Fundamentals Examination
RS-02-189, Withdrawal of Requested Amendment to Technical Specifications Excess Flow Check Valve Testing Surveillance and Relief Request RV-1230 October 2002Withdrawal of Requested Amendment to Technical Specifications Excess Flow Check Valve Testing Surveillance and Relief Request RV-12
IR 05000373/200200525 October 2002IR 05000373-02-005, 05000374-02-005, on 07/01 - 09/30/202, LaSalle County Station; Units 1 & 2, Fire Protection, Identification and Resolution of Problems. Non-Cited Violations NotedSafe Shutdown
High Radiation Area
Offsite Dose Calculation Manual
Fire Barrier
Probabilistic Risk Assessment
Coatings
Temporary Modification
VT-2
Zebra Mussel
Emergency Lighting
Locked High Radiation Area
Significance Determination Process
Operability Determination
Maintenance Rule Program
Fire Protection Program
Downpower
Failure to Scram
TAC:MB565724 October 2002
ML02295038624 October 2002Federal Register Notice, Notice of Issuance of Amendments to Facility Operating License and Opportunity for a Hearing Re Extending the Use of Current Pressure and Temperature Limit Curves in Technical Specification 3.4.11
RS-02-164, Request for Amendment to Technical Specification 5.5.13, Primary Containment Leakage Rate Testing Program.24 October 2002Request for Amendment to Technical Specification 5.5.13, Primary Containment Leakage Rate Testing Program.Safe Shutdown
High winds
Fire Barrier
Tornado Missile
Internal Flooding
Probabilistic Risk Assessment
Coatings
Tornado Generated Missile
Large early release frequency
Earthquake
Maintenance Rule Program
Turbine Missile
ML02291022822 October 2002Summary of October 15, 2002, Meeting with Exelon Generation Company, LLC Re Operating Reactor Licensing Issues
RS-02-167, Request for Amendment to Technical Specifications Justification for the Continued Use of Technical Specifications, Section 3.4.11, RCS Pressure and Temperature (P/T) Limits.21 October 2002Request for Amendment to Technical Specifications Justification for the Continued Use of Technical Specifications, Section 3.4.11, RCS Pressure and Temperature (P/T) Limits.
ML02296039215 October 2002September 2002 Monthly Operating Report for LaSalle Units 1 & 2
ML02296022815 October 2002Meeting Handout for Exelon/Amergen Licensing Meeting with NRC
ML02294054315 October 2002Cycle 9 Core Operating Limits Report, Amendment 49, Section 4.0, Attachments 4-8, Figure 12
ML02294050715 October 2002Letter Regards LaSalle Unit 2 Cycle 9 Core Operating Limits Report, Amendment 49
ML02294053215 October 2002Cycle 9 Core Operating Limits Report, Amendment 49, Sections 1 and 2Shutdown Margin
Anticipated operational occurrence
Minimum Critical Power Ratio
Feedwater Controller Failure
MELLLA
Fuel cladding
ML02294049311 October 2002Notification of Pending Changes to the Emergency Response Data System
ML02273051611 October 2002Y020020211 - Reply to M. Mulligan Dated 10/11/02 (3) e-mails to V Dricks-Safety Concern & Corruption: Cooper & Missouri River, NRC and Cooper Ethical & Safety Concern, and Cooper Nuclear StationUltimate heat sink
RS-02-165, Response to Request for Additional Information Re Excess Flow Check Valve Testing Surveillance and Relief Request RV-124 October 2002Response to Request for Additional Information Re Excess Flow Check Valve Testing Surveillance and Relief Request RV-12
ML0227003142 October 2002Meeting with Exelon Generation Company Licensing Activities
ML0228302781 October 2002Part 21.21 Report Involving Stability Option III: Possible Successive Confirmation Count Resets