ML022940543
From kanterella
Jump to navigation
Jump to search
ML022940543 | |
Person / Time | |
---|---|
Site: | LaSalle ![]() |
Issue date: | 10/15/2002 |
From: | Barnes G Exelon Nuclear |
To: | Document Control Desk, Office of Nuclear Reactor Regulation |
References | |
Download: ML022940543 (134) | |
Similar Documents at LaSalle | |
---|---|
Category:Fuel Cycle Reload Report
MONTHYEARRA23-019, Cycle 20 Core Operating Limits Reports2023-03-21021 March 2023
[Table view]Cycle 20 Core Operating Limits Reports RA22-041, Unit 2 Cycle 19 Core Operating Limits Report Revision2022-10-0505 October 2022 Unit 2 Cycle 19 Core Operating Limits Report Revision RA22-010, Cycle 20 Core Operating Limits Reports2022-03-21021 March 2022 Cycle 20 Core Operating Limits Reports RA21-043, Cycle 19 Startup Test Report Summary2021-07-15015 July 2021 Cycle 19 Startup Test Report Summary RA21-019, Unit 2 Cycle 19 Core Operating Limits Reports2021-04-0707 April 2021 Unit 2 Cycle 19 Core Operating Limits Reports RA20-044, Unit 2 - Unit 1 Cycle 19 Core Operating Limits Report2020-09-10010 September 2020 Unit 2 - Unit 1 Cycle 19 Core Operating Limits Report RA20-014, Cycle 19 and Cycle 18 Core Operating Limits Reports2020-03-12012 March 2020 Cycle 19 and Cycle 18 Core Operating Limits Reports ML20072K1502020-03-12012 March 2020 Unit 2 - Unit 1 Cycle 19 and Unit 2 Cycle 18 Core Operating Limits Reports RA19-021, Cycle 18 Core Operating Limits Report (COLR)2019-03-21021 March 2019 Cycle 18 Core Operating Limits Report (COLR) RA18-016, Cycle 18 Core Operating Limits Report (COLR)2018-03-22022 March 2018 Cycle 18 Core Operating Limits Report (COLR) RA-17-029, Cycle 17 Core Operating Limits Report (COLR)2017-03-17017 March 2017 Cycle 17 Core Operating Limits Report (COLR) ML16193A5952016-07-0808 July 2016 Cycle 16, Revision 4 Core Operating Limits Report RA16-011, Cycle 17 Core Operating Limits Report (COLR)2016-03-10010 March 2016 Cycle 17 Core Operating Limits Report (COLR) RA15-079, Cycle 16 Core Operating Limits Report (COLR)2015-11-19019 November 2015 Cycle 16 Core Operating Limits Report (COLR) RA15-047, Cycle Core Operating Limits Report (COLR)2015-08-12012 August 2015 Cycle Core Operating Limits Report (COLR) RA15-020, Cycle 16 Core Operating Limits Report (COLR)2015-04-10010 April 2015 Cycle 16 Core Operating Limits Report (COLR) RA15-016, Cycle 16 Core Operating Limits Report (COLR)2015-04-10010 April 2015 Cycle 16 Core Operating Limits Report (COLR) RA14-025, Cycle 16 Startup Test Report Summary2014-04-25025 April 2014 Cycle 16 Startup Test Report Summary RA13-053, Core Operating Limits Report, Cycle 15, Revision 12013-08-28028 August 2013 Core Operating Limits Report, Cycle 15, Revision 1 RA13-010, Core Operating Limits Report, Cycle 15, Revision 02013-03-0606 March 2013 Core Operating Limits Report, Cycle 15, Revision 0 RA13-012, Unit 1 Cycle 15 Core Operating Limits Report (COLR)2013-02-13013 February 2013 Unit 1 Cycle 15 Core Operating Limits Report (COLR) RA12-012, Core Operating Limits Report, Cycle 15, Revision 1. (Non-Proprietary)2012-03-0808 March 2012 Core Operating Limits Report, Cycle 15, Revision 1. (Non-Proprietary) RA12-010, Core Operating Limits Report for LaSalle Unit 1 Cycle 15, Revision 0 (Non-proprietary)2012-03-0606 March 2012 Core Operating Limits Report for LaSalle Unit 1 Cycle 15, Revision 0 (Non-proprietary) RA11-016, Cycle 14 Core Operating Limits Report (COLR)2011-02-25025 February 2011 Cycle 14 Core Operating Limits Report (COLR) RA10-061, Unit 1 Cycle 14, Revision 1 Core Operating Limits Report (COLR)2010-09-23023 September 2010 Unit 1 Cycle 14, Revision 1 Core Operating Limits Report (COLR) RA10-022, Cycle 14 Startup Test Report Summary2010-04-23023 April 2010 Cycle 14 Startup Test Report Summary L-88-016, Submittal of Unit 1 Cycle 14 Core Operating Limits Report (COLR)2010-02-25025 February 2010 Submittal of Unit 1 Cycle 14 Core Operating Limits Report (COLR) RA09-002, Cycle 3 Core Operating Limits Report2009-02-0606 February 2009 Cycle 3 Core Operating Limits Report RA08-059, Cycle 12, Revision 3 Core Operating Limits Report (COLR)2008-09-0303 September 2008 Cycle 12, Revision 3 Core Operating Limits Report (COLR) RA08-008, Cycle 13 Core Operating Limits Report (COLR)2008-03-17017 March 2008 Cycle 13 Core Operating Limits Report (COLR) RA07-081, Cycle 12, Revision 4 Core Operating Limits Report (COLR)2007-09-12012 September 2007 Cycle 12, Revision 4 Core Operating Limits Report (COLR) RA07-071, Cycle 12, Revision 3 and Unit 2 Cycle 12, Revision 1, Core Operating Limits Report (COLR)2007-08-0707 August 2007 Cycle 12, Revision 3 and Unit 2 Cycle 12, Revision 1, Core Operating Limits Report (COLR) ML0710902502007-04-13013 April 2007 Cycle 12 Core Operating Limits Report (COLR) ML0509604612005-03-30030 March 2005 Nonproprietary Version of LaSalle Unit 2, Cycle 11 Core Operating Limits Report, Revision 0 ML0407700792004-01-20020 January 2004 to Section 1 of Core Operating Limits Report for LaSalle, Unit 1, Cycle 11. ML0402600112004-01-16016 January 2004 Revised LaSalle County Station, Unit 2 Cycle 10 Core Operating Limits Report (COLR) ML0334304982003-11-26026 November 2003 Cycle 10 Core Operating Limits Report ML0319500772003-07-0303 July 2003 Cycle 10A Core Operating Limits Report (COLR) ML0229405432002-10-15015 October 2002 Cycle 9 Core Operating Limits Report, Amendment 49, Section 4.0, Attachments 4-8, Figure 12 ML0229405322002-10-15015 October 2002 Cycle 9 Core Operating Limits Report, Amendment 49, Sections 1 and 2 ML0219203842002-07-0303 July 2002 Unit 1 Cycle 10 Core Operating Limits Report (Colr), Section 1, Table of Contents - List of Tables ML0219204022002-07-0303 July 2002 Unit 1 Cycle 10 Core Operating Limits Report (Colr), LaSalle Unit 1 Cycle 10, Plant Transient Analysis, Figures - References ML0206004562002-02-0606 February 2002 LaSalle County, Unit 1 - Cycle 10 Reload and Core Operating Limits Report 2023-03-21 Category:Report MONTHYEARML23181A1522023-06-30030 June 2023
[Table view]Attachment 2 - LaSalle County Station Units 1 and 2, Pressure and Temperature Limits Report (PTLR) Up to 54 Effective Full-Power Years (Efpy), Revision 3 RS-23-066, Containment Post-Tensioning System Inservice Inspection Basis for Proposed Extension of Examination Interval Technical Report2023-05-0303 May 2023 Containment Post-Tensioning System Inservice Inspection Basis for Proposed Extension of Examination Interval Technical Report RA22-060, Regulatory Commitment Change Summary Report2022-11-30030 November 2022 Regulatory Commitment Change Summary Report ML22332A4552022-11-10010 November 2022 Attachment 7 - BWRVIP-135, Revision 4: BWR Vessel Internals Project Integrated Surveillance Program (ISP) Data Source Book and Plant Evaluations (Non-Proprietary Version) ML22332A4542022-11-10010 November 2022 Attachment 6 - LaSalle County Generating Station Units 1 and 2 Pressure and Temperature Limits Report (PTLR) for 54 Effective Full-Power Years (EFPY) (Non-Proprietary) NMP1L3469, Constellation Energy Company, LLC, Request for Use of Honeywell Mururoa V4F1 R Supplied Air Suits2022-06-30030 June 2022 Constellation Energy Company, LLC, Request for Use of Honeywell Mururoa V4F1 R Supplied Air Suits RS-22-018, Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors for LaSalle County Station2022-02-22022 February 2022 Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors for LaSalle County Station RS-21-115, Supplemental Information for License Amendment Request Regarding New Fuel Storage Vault and Spent Fuel Storage Pool Criticality Methodologies, with Proposed Changes to Technical Specifications 4.3.1 and 5.6.52021-11-0404 November 2021 Supplemental Information for License Amendment Request Regarding New Fuel Storage Vault and Spent Fuel Storage Pool Criticality Methodologies, with Proposed Changes to Technical Specifications 4.3.1 and 5.6.5 ML21265A5582021-06-30030 June 2021 Attachment 5: Appendix C, NEI 12-16 Criticality Analysis Checklist RA21-016, Netco Rack Insert 10-year Surveillance Report2021-04-15015 April 2021 Netco Rack Insert 10-year Surveillance Report RS-21-001, Revised Proposed Alternative to Utilize Code Cases N-878 and N-880 for Carbon Steel Piping2021-01-0404 January 2021 Revised Proposed Alternative to Utilize Code Cases N-878 and N-880 for Carbon Steel Piping ML20303A1752020-10-23023 October 2020 Proposed Relief Request from Section XI Repair/Replacement Documentation for Bolting Replacement of Pressure Retaining Bolting RS-20-133, Response to Request for Additional Information Re License Amendment Request to Renewed Facility Operating Licenses to Adopt 10 CFR 50.692020-10-16016 October 2020 Response to Request for Additional Information Re License Amendment Request to Renewed Facility Operating Licenses to Adopt 10 CFR 50.69 ML20085F8612020-03-24024 March 2020 Corrected Drawing for One-Line Electric Power Supply for Lasalle Hardened Containment Vent System (HCVS) Final Integrated Plan (FIP) RA20-015, Triennial Chlorine Survey Report2020-03-20020 March 2020 Triennial Chlorine Survey Report RS-20-024, Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors2020-03-0909 March 2020 Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors ML19228A0232019-08-15015 August 2019 Proposed Alternative to Utilize Code Case N-879 RA19-005, Regulatory Commitment Change Summary Report2019-01-14014 January 2019 Regulatory Commitment Change Summary Report RA18-110, Submittal of 2017 Regulatory Commitment Change Summary Report2018-12-27027 December 2018 Submittal of 2017 Regulatory Commitment Change Summary Report RS-18-131, Report of Full Compliance with Phase 1 and Phase 2 of June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions2018-12-14014 December 2018 Report of Full Compliance with Phase 1 and Phase 2 of June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions ML18024A2772018-08-16016 August 2018 Lessons Learned from Us NRC Response to the February 2017 LaSalle County Station Unit 2 High Pressure Core Spray Injection Valve Failure RA17-072, Post Accident Monitoring Report2017-08-0202 August 2017 Post Accident Monitoring Report RA17-069, Post Accident Monitoring Report2017-07-21021 July 2017 Post Accident Monitoring Report RS-17-025, Response to March 12, 2012, Request for Information Enclosure 2, Recommendation 2.1, Flooding, Required Response 3, Flooding Focused Evaluation Summary Submittal2017-03-0808 March 2017 Response to March 12, 2012, Request for Information Enclosure 2, Recommendation 2.1, Flooding, Required Response 3, Flooding Focused Evaluation Summary Submittal ML16355A4182017-01-11011 January 2017 Flood Hazard Mitigation Strategies Assessment RA16-092, Regulatory Commitment Change Summary Report2016-12-27027 December 2016 Regulatory Commitment Change Summary Report RS-16-182, Mitigating Strategies Flood Hazard Assessment (Msfha) Submittal2016-10-28028 October 2016 Mitigating Strategies Flood Hazard Assessment (Msfha) Submittal ML16305A2962016-10-27027 October 2016 0000-0163-8881-R0-NP, Revision 0, Exelon Nuclear LaSalle County Generating Station Units 1 & 2 Pool Swell Response. ML16167A5022016-09-0606 September 2016 UFSAR, Rev 22, Chap 09 Figures Part 12 of 14 - Redacted ML16167A4462016-09-0606 September 2016 MF7633 and MF7634, UFSAR, Las Fpr Rev._Redacted RS-16-125, Spent Fuel Pool Evaluation Supplemental Report, Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident2016-08-31031 August 2016 Spent Fuel Pool Evaluation Supplemental Report, Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident ML16224A7862016-08-26026 August 2016 Notice of Availability of the Final Plant-Specific Supplement 57 to the Generic Environmental Impact Statement for License Renewal of Nuclear Plants Regarding LaSalle County Station, Units 1 and 2 (TAC Nos. MF5567 and MF5568) ML16200A1562016-07-18018 July 2016 Report on the Safety Aspects of the License Renewal Application of the LaSalle County Station, Units 1 and 2 RS-15-300, Phase 1 (Updated) and Phase 2 Overall Integrated Plan in Response to June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident..2015-12-16016 December 2015 Phase 1 (Updated) and Phase 2 Overall Integrated Plan in Response to June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident.. RA15-075, Transmittal of the 2014 Regulatory Commitment Change Summary Report2015-11-20020 November 2015 Transmittal of the 2014 Regulatory Commitment Change Summary Report ML15107A1542015-04-21021 April 2015 Final Accident Sequence Precursor Analysis for the April 17, 2013, Dual Unit Loss of Offsite Power RS-15-004, County Station Introduction of Lead Use Assemblies2015-01-20020 January 2015 County Station Introduction of Lead Use Assemblies ML14352A1902014-12-18018 December 2014 7491-318563-HAO-1, Rev. 2, LaSalle Requested Documents RS-14-277, Proposed Alternative to Utilize Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping Section XI, Division 12014-09-24024 September 2014 Proposed Alternative to Utilize Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping Section XI, Division 1 ML14177A8592014-06-30030 June 2014 Staff Assessment of the Flooding Walkdown Report Supporting Implementation of Near-Term Task Force Recommendation 2.3 Related to the Fukushima DAI-ICHI Nuclear Power Plant Accident ML14176A9612014-06-24024 June 2014 Submittal of Non-Proprietary BWROG Technical Product, BWROGTP-11-006 - ECCS Containment Walkdown Procedure, Rev 1 (January 2011), as Formally Requested During the Public Meeting Held on April 30, 2014 ML14057A5492014-02-26026 February 2014 Supplemental Information Supporting License Amendment Request to Revise Reactor Coolant System (RCS) Pressure and Temperature (Pit) Curves RS-14-054, LaSalle, Unit 1, Supplemental Information Supporting License Amendment Request to Revise Reactor Coolant System (RCS) Pressure and Temperature (Pit) Curves2014-02-26026 February 2014 LaSalle, Unit 1, Supplemental Information Supporting License Amendment Request to Revise Reactor Coolant System (RCS) Pressure and Temperature (Pit) Curves ML14030A2232014-02-21021 February 2014 Interim Staff Evaluation Relating to Overall Integrated Plan in Response to Order EA-12-049 (Mitigation Strategies) ML14042A3252014-02-19019 February 2014 Mega-Tech Services, LLC Technical Evaluation Report Regarding the Overall Integrated Plan for LaSalle County Station, Units 1 and 2, TAC Nos.: MF1121 and MF1122 ML13358A3652013-12-20020 December 2013 Attachment 5: LaSalle County Station, Unit 1, Pressure/Temperature Limits Report ML13344A9822013-12-0909 December 2013 2012 Regulatory Commitment Change Summary Report ML13282A3502013-10-0404 October 2013 Final Report, Assessment of Wind Speeds Over the LaSalle County Station Ultimate Heat Sink. ML13192A4462013-05-21021 May 2013 Enclosure 1, Updated Transmittal # 1 (Annex a) Seismic Walkdown Report in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic for the LaSalle County Station, Unit 2, Report No. R ML13008A2192013-01-31031 January 2013 U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee 2023-06-30 Category:Technical MONTHYEARML23181A1522023-06-30030 June 2023
[Table view]Attachment 2 - LaSalle County Station Units 1 and 2, Pressure and Temperature Limits Report (PTLR) Up to 54 Effective Full-Power Years (Efpy), Revision 3 RS-23-066, Containment Post-Tensioning System Inservice Inspection Basis for Proposed Extension of Examination Interval Technical Report2023-05-0303 May 2023 Containment Post-Tensioning System Inservice Inspection Basis for Proposed Extension of Examination Interval Technical Report ML22332A4552022-11-10010 November 2022 Attachment 7 - BWRVIP-135, Revision 4: BWR Vessel Internals Project Integrated Surveillance Program (ISP) Data Source Book and Plant Evaluations (Non-Proprietary Version) ML22332A4542022-11-10010 November 2022 Attachment 6 - LaSalle County Generating Station Units 1 and 2 Pressure and Temperature Limits Report (PTLR) for 54 Effective Full-Power Years (EFPY) (Non-Proprietary) NMP1L3469, Constellation Energy Company, LLC, Request for Use of Honeywell Mururoa V4F1 R Supplied Air Suits2022-06-30030 June 2022 Constellation Energy Company, LLC, Request for Use of Honeywell Mururoa V4F1 R Supplied Air Suits RS-22-018, Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors for LaSalle County Station2022-02-22022 February 2022 Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors for LaSalle County Station RS-21-115, Supplemental Information for License Amendment Request Regarding New Fuel Storage Vault and Spent Fuel Storage Pool Criticality Methodologies, with Proposed Changes to Technical Specifications 4.3.1 and 5.6.52021-11-0404 November 2021 Supplemental Information for License Amendment Request Regarding New Fuel Storage Vault and Spent Fuel Storage Pool Criticality Methodologies, with Proposed Changes to Technical Specifications 4.3.1 and 5.6.5 RS-21-001, Revised Proposed Alternative to Utilize Code Cases N-878 and N-880 for Carbon Steel Piping2021-01-0404 January 2021 Revised Proposed Alternative to Utilize Code Cases N-878 and N-880 for Carbon Steel Piping RS-20-133, Response to Request for Additional Information Re License Amendment Request to Renewed Facility Operating Licenses to Adopt 10 CFR 50.692020-10-16016 October 2020 Response to Request for Additional Information Re License Amendment Request to Renewed Facility Operating Licenses to Adopt 10 CFR 50.69 ML20085F8612020-03-24024 March 2020 Corrected Drawing for One-Line Electric Power Supply for Lasalle Hardened Containment Vent System (HCVS) Final Integrated Plan (FIP) ML19228A0232019-08-15015 August 2019 Proposed Alternative to Utilize Code Case N-879 RS-18-131, Report of Full Compliance with Phase 1 and Phase 2 of June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions2018-12-14014 December 2018 Report of Full Compliance with Phase 1 and Phase 2 of June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions ML16167A4462016-09-0606 September 2016 MF7633 and MF7634, UFSAR, Las Fpr Rev._Redacted ML16167A5022016-09-0606 September 2016 UFSAR, Rev 22, Chap 09 Figures Part 12 of 14 - Redacted ML15107A1542015-04-21021 April 2015 Final Accident Sequence Precursor Analysis for the April 17, 2013, Dual Unit Loss of Offsite Power RS-15-004, County Station Introduction of Lead Use Assemblies2015-01-20020 January 2015 County Station Introduction of Lead Use Assemblies RS-14-277, Proposed Alternative to Utilize Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping Section XI, Division 12014-09-24024 September 2014 Proposed Alternative to Utilize Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping Section XI, Division 1 ML14176A9612014-06-24024 June 2014 Submittal of Non-Proprietary BWROG Technical Product, BWROGTP-11-006 - ECCS Containment Walkdown Procedure, Rev 1 (January 2011), as Formally Requested During the Public Meeting Held on April 30, 2014 ML14057A5492014-02-26026 February 2014 Supplemental Information Supporting License Amendment Request to Revise Reactor Coolant System (RCS) Pressure and Temperature (Pit) Curves RS-14-054, LaSalle, Unit 1, Supplemental Information Supporting License Amendment Request to Revise Reactor Coolant System (RCS) Pressure and Temperature (Pit) Curves2014-02-26026 February 2014 LaSalle, Unit 1, Supplemental Information Supporting License Amendment Request to Revise Reactor Coolant System (RCS) Pressure and Temperature (Pit) Curves ML14030A2232014-02-21021 February 2014 Interim Staff Evaluation Relating to Overall Integrated Plan in Response to Order EA-12-049 (Mitigation Strategies) ML14042A3252014-02-19019 February 2014 Mega-Tech Services, LLC Technical Evaluation Report Regarding the Overall Integrated Plan for LaSalle County Station, Units 1 and 2, TAC Nos.: MF1121 and MF1122 ML13358A3652013-12-20020 December 2013 Attachment 5: LaSalle County Station, Unit 1, Pressure/Temperature Limits Report ML13282A3502013-10-0404 October 2013 Final Report, Assessment of Wind Speeds Over the LaSalle County Station Ultimate Heat Sink. ML13192A4462013-05-21021 May 2013 Enclosure 1, Updated Transmittal # 1 (Annex a) Seismic Walkdown Report in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic for the LaSalle County Station, Unit 2, Report No. R ML13199A0412013-01-17017 January 2013 Attachment 11 - Netco Report NET-300054-01, Revision 0, Inspection and Testing of Fast Start Surveillance Coupons F22-F1 1 from the LaSalle County Unit 2 Station RS-11-067, Response to Request for Additional Information Regarding Unit 2 Spent Fuel Pool Storage Racks2011-04-18018 April 2011 Response to Request for Additional Information Regarding Unit 2 Spent Fuel Pool Storage Racks RS-10-007, 375636, Revision 0, Dewatered Resin Flammable Gas Generation Assessment, Appendix B2009-09-28028 September 2009 375636, Revision 0, Dewatered Resin Flammable Gas Generation Assessment, Appendix B RS-10-007, LaSalle Station, Units 1 and 2 - Irsf LAR Support Technical Report Supporting Engineering Change (EC) No. 375636 Type: Document Change Request (DCR) Subtype: Dsgn2009-09-28028 September 2009 LaSalle Station, Units 1 and 2 - Irsf LAR Support Technical Report Supporting Engineering Change (EC) No. 375636 Type: Document Change Request (DCR) Subtype: Dsgn ML1000703012009-09-28028 September 2009 Irsf LAR Support Technical Report Supporting Engineering Change (EC) No. 375636 Type: Document Change Request (DCR) Subtype: Dsgn ML13199A0402009-09-10010 September 2009 Attachment 10 - Netco Report NET-332-01, Revision 1, Inspection and Testing of Boral and Fast Start Surveillance Coupons from the LaSalle County Units 1 & 2 Stations RS-09-133, Attachment 6, LaSalle, Unit 2, Nuclear Power Station Spent Fuel Storage Pool Criticality Safety Analysis with Neutron Absorbing Inserts and Without Boraflex2009-08-31031 August 2009 Attachment 6, LaSalle, Unit 2, Nuclear Power Station Spent Fuel Storage Pool Criticality Safety Analysis with Neutron Absorbing Inserts and Without Boraflex RS-09-100, Additional Information Supporting the Request for a License Amendment to Revise Local Power Range Monitor Calibration Frequency2009-07-27027 July 2009 Additional Information Supporting the Request for a License Amendment to Revise Local Power Range Monitor Calibration Frequency RA09-012, Evaluation of the Water Spray System in the Overlab Area Fire Zone 4F32009-03-10010 March 2009 Evaluation of the Water Spray System in the Overlab Area Fire Zone 4F3 RS-09-037, Supplemental Information Concerning License Amendment to Allow Ganged Rod Drive Capability of the Rod Control Management System2009-03-0505 March 2009 Supplemental Information Concerning License Amendment to Allow Ganged Rod Drive Capability of the Rod Control Management System ML0900803852008-12-31031 December 2008 ANP-2789(NP), Revision 0, Atrium Tm 10XM Lead Test Assemblies for LaSalle Unit 2. RS-09-133, Attachment 5, Northeast Technology Corp. Report No. NET-259-03, Material Qualification of Alcan Composite for Spent Fuel Storage, Revision 52008-08-31031 August 2008 Attachment 5, Northeast Technology Corp. Report No. NET-259-03, Material Qualification of Alcan Composite for Spent Fuel Storage, Revision 5 ML0928102802008-08-31031 August 2008 Attachment 5, Northeast Technology Corp. Report No. NET-259-03, Material Qualification of Alcan Composite for Spent Fuel Storage, Revision 5 ML0821900132008-08-0707 August 2008 Monthly Operating Reports Second Quarter 2008 RS-08-091, Request for a License Amendment to Revise Local Power Range Monitor Calibration Frequency2008-07-25025 July 2008 Request for a License Amendment to Revise Local Power Range Monitor Calibration Frequency RS-08-063, Supplemental Information Concerning License Amendment to Allow Ganged Rod Drive Capability of the Rod Control Management System2008-05-13013 May 2008 Supplemental Information Concerning License Amendment to Allow Ganged Rod Drive Capability of the Rod Control Management System ML0634601312006-12-0707 December 2006 Attachment 11, Exelon/Amergen Response to the Request for Additional Information, EP-EAL-0611, Criteria for Choosing Containment Radiation Monitor Reading Indicative Loss of the RCS Barrier ML1011303712004-05-31031 May 2004 GE-NE-0000-0003-5526-02R1a, Rev, 1, Pressure-Temperature Curves for Exelon LaSalle Unit 1. ML0419501972004-05-31031 May 2004 GE-NE-0000-0003-5526-02R1a, Pressure-Temperature Curves for LaSalle Unit 1 and GE-NE-0000-0003-5526-01R1a, Pressure-Temperature Curves for LaSalle Unit 2, Non-proprietary ML0411400332004-03-0909 March 2004 Plant Specific ECCS Evaluation Changes - 10 CFR 50.46 Report ML0802902312004-02-12012 February 2004 Westinghouse Technical Bulletin: Information Regarding Recent Crossflow Ultrasonic Flow Measurement System Performance Observations, TB-04-4 RS-03-236, Transmittal of Non-Proprietary Version of Information Supporting Request for Amendment to Technical Specifications Section 5.6.5, Core Operating Limiits Report (Colr).2003-12-17017 December 2003 Transmittal of Non-Proprietary Version of Information Supporting Request for Amendment to Technical Specifications Section 5.6.5, Core Operating Limiits Report (Colr). RS-03-123, Response to Request for Additional Information to Support Request for Amendment to TS Table 3.3.5.1-1, Emergency Core Cooling System Instrumentation2003-06-26026 June 2003 Response to Request for Additional Information to Support Request for Amendment to TS Table 3.3.5.1-1, Emergency Core Cooling System Instrumentation ML0317703462003-06-17017 June 2003 Additional Information Regarding Notice of Proposed Amendments to Trust Agreement to Implement Assignment of Decommissioning Trust Funds for Exelon Generation Company, LLC RS-03-010, Supporting Documentation for Amendment to Technical Specifications Section 3.4.11, RCS Pressure and Temperature (P/T) Limits. Attachment 4, Table of Contents - Appendix F2003-01-31031 January 2003 Supporting Documentation for Amendment to Technical Specifications Section 3.4.11, RCS Pressure and Temperature (P/T) Limits. Attachment 4, Table of Contents - Appendix F 2023-06-30 |
Text
Retrieved from "https://kanterella.com/w/index.php?title=ML022940543&oldid=2688032"