Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML03007011227 December 2002Handwritten Notes for Meeting on 09/26/2002
ML03007023227 December 2002Biological Assessment of Impact to Sea Turtles at Florida Power Corporation'S Crystal River Energy Complex, Revision 2Biofouling
3F1202-04, License Amendment Request 277, Revision 0, Bhtp Departure from Nucleate Boiling Correlation19 December 2002License Amendment Request #277, Revision 0, Bhtp Departure from Nucleate Boiling CorrelationOffsite Dose Calculation Manual
Anticipated operational occurrence
Fuel cladding
3F1202-08, Physical Security Plan, Revision 7-1119 December 2002Physical Security Plan, Revision 7-11
3F1202-07, Rescind Request for Exemption from Certain Requirements of 10 CFR 55.5919 December 2002Rescind Request for Exemption from Certain Requirements of 10 CFR 55.59
ML02352057711 December 2002Emergency Preparedness Unit Procedure REP-03A, Rev 3, Setup of the Emergency Operations Facility.Health Physics Network
3F1202-01, November 2002 Monthly Operating Report for Crystal River Unit 310 December 2002November 2002 Monthly Operating Report for Crystal River Unit 3
Press Release-02-140, NRC Approves Power Uprate for Crystal River 36 December 2002Press Release-02-140: NRC Approves Power Uprate for Crystal River 3Power Uprate
ML0233808004 December 2002License Amendment, Increase Maximum Steady-state Core Power Level from 2544 Megawatts Thermal (Mwt) to 2568 MwtSafe Shutdown
Ultimate heat sink
Anticipated operational occurrence
Hydrostatic
Aging Management
Stress corrosion cracking
Earthquake
Fire Protection Program
Power Uprate
TAC:MB67474 December 2002
ML0233802374 December 2002Environmental Assessment Exemption from 10 CFR 55.59
ML0234505594 December 2002February 5, 2003 Generic Fundamentals Examination Section, Administration of Written Operator Licensing ExamGeneric Fundamentals Examination
ML0234300624 December 2002Technical Specifications, Increase Maximum Steady-state Core Power Level from 2544 Megawatts Thermal (Mwt) to 2568 MwtShutdown Margin
Pressure Boundary Leakage
ML0233802914 December 2002Proprietary Information Review, Framatome Anp Request for Withholding Information from Public DisclosureExclusive Use
Affidavit
ML0233802584 December 2002Proprietary Information Review, Framatome Anp Request for Withholding Information from Public DisclosureExclusive Use
Affidavit
3F1202-03, Response to Request for Additional Information Regarding Fall 2001 Steam Generator Inspection2 December 2002Response to Request for Additional Information Regarding Fall 2001 Steam Generator InspectionStress corrosion cracking
Eddy Current Testing
Operational leakage
3F1102-11, Submittal of Non-Proprietary Information Proposed License Amendment Request 270, Revision 0 Power Uprate to 2568 Mwt.25 November 2002Submittal of Non-Proprietary Information Proposed License Amendment Request #270, Revision 0 Power Uprate to 2568 Mwt.Flow Induced Vibration
Power Uprate
Exclusive Use
ML02325002322 November 2002RAI, Bulletin 2002-01, Reactor Pressure Vessel Head Degradation & Reactor Coolant Pressure Boundary Integrity, 60-Day ResponseBoric Acid
VT-2
Stress corrosion cracking
Pressure Boundary Leakage
3F1102-08, Sea Turtle Mortality Report Submitted to the U. S. National Marine Fisheries Service19 November 2002Sea Turtle Mortality Report Submitted to the U. S. National Marine Fisheries Service
3F1102-07, Request for Exemption from Certain Requirements of 10 CFR 55.5918 November 2002Request for Exemption from Certain Requirements of 10 CFR 55.59Exemption Request
3F1102-06, Response to Request for Additional Information Proposed License Amendment Request 270, Revision 0, Power Uprate to 2568 Mwt.13 November 2002Response to Request for Additional Information Proposed License Amendment Request #270, Revision 0, Power Uprate to 2568 Mwt.Power Uprate
3F1102-01, October 2002 Monthly Operating Report for Crystal River Unit 313 November 2002October 2002 Monthly Operating Report for Crystal River Unit 3Downpower
ML02316036812 November 2002Withdrawal of Amendment Request
ML02318039311 November 2002Credit for Inappropriate Review Time on BAW-2374
ML02319004911 November 2002Credit for Inappropriate Review Time on BAW-2374
3F0612-07, Drawing E-101-111, Rev. 13, Architectural Roof Plan and Sections.4 November 2002Drawing E-101-111, Rev. 13, Architectural Roof Plan and Sections.
3F1002-06, Response to Request for Additional Information Proposed License Amendment Request 270, Revision 0, Power Uprate to 2568 Mwt31 October 2002Response to Request for Additional Information Proposed License Amendment Request #270, Revision 0, Power Uprate to 2568 MwtFlow Accelerated Corrosion
Power Uprate
ML02310056330 October 2002Plan Operating Manual, Emergency Plan Implementing ProcedureHigh Radiation Area
ML03007017225 October 2002Summary Report - Ncrs Initiated Since 10/18/2002
ML03007022424 October 2002Superintendent Shift Operations' Log, 0700-1500
3F1002-04, Withdrawal of License Amendment Request (LAR) 27, Revised Improved Technical Specification (ITS) 3.7.18, for Two Inoperable Control Complex Chillers24 October 2002Withdrawal of License Amendment Request (LAR) #27, Revised Improved Technical Specification (ITS) 3.7.18, for Two Inoperable Control Complex Chillers
ML02297062623 October 2002IR 05000302-02-003, on 09/28/02 for Crystal River Nuclear PlantSafe Shutdown
Fitness for Duty
High Radiation Area
Offsite Dose Calculation Manual
Fire Barrier
Contraband
Probabilistic Risk Assessment
Temporary Modification
Significance Determination Process
Annual Radioactive Effluent Release Report
Annual Radiological Environmental Operating Report
Operability Determination
Flow Induced Vibration
3F1002-05, License Amendment Request 276, Revision 0, Use of M5 Advanced Alloy Fuel Cladding.23 October 2002License Amendment Request #276, Revision 0, Use of M5 Advanced Alloy Fuel Cladding.Offsite Dose Calculation Manual
Exemption Request
Fuel cladding
IR 05000302/200200323 October 2002IR 05000302-02-003, on 06/30/2002 - 09/28/2002, Florida Power Corp, Crystal River Unit 3, One Finding in Problem Identification & Resolution
ML03007009217 October 2002E-mail D. Jones to J. Addison, M. Annacone, W. Bandhauer, A. Barnes, J. Beck, D. Deboer, J. Ferguson, B. Foster, L. Gagne, M. Hime, J. Huegel, D. Jones, T. Jones, M. Kelly, W. Kisner, G. Mccallum, C. Mckeown, Et Al, Turtle Reporting Changes
3F1002-03, License Amendment Request 272, Revision 0 Revision to Improved Technical Specifications 3.3.15 Reactor Building (RB) Purge Isolation-High Radiation, Bases 3.7.15 Spent Fuel Assembly Storage, 3.9.3 Containment Penetration,.11 October 2002License Amendment Request #272, Revision 0 Revision to Improved Technical Specifications 3.3.15 Reactor Building (RB) Purge Isolation-High Radiation, Bases 3.7.15 Spent Fuel Assembly Storage, 3.9.3 Containment Penetration,.Offsite Dose Calculation Manual
Recently irradiated fuel
3F1002-01, September 2002 Monthly Operating Report for Crystal River Unit 310 October 2002September 2002 Monthly Operating Report for Crystal River Unit 3Downpower
ML0323407033 October 2002Slides of Meeting Between NRC, Framatome and Crystal River on Mark-B-HTP DesignExemption Request
ML0228000921 October 2002Closed Meeting Summary - Security Issues at Brunswick, Crystal River, Shearon Harris & H.B. Robinson Plants