Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ULNRC-06341, Callaway Plant Unit 1 - Enclosure 8 - 10-Q Filed Period 9/30/2016 | 30 September 2016 | Callaway Plant Unit 1 - Enclosure 8 - 10-Q Filed Period 9/30/2016 | Grace period Power change |
ML16348A382 | 30 September 2016 | Enclosure 8 - 10-Q Filed Period 9/30/2016 | Grace period Power change |
ULNRC-06327, Operating Quality Assurance Manual (Oqam) Revision 32 | 28 September 2016 | Operating Quality Assurance Manual (Oqam) Revision 32 | Safe Shutdown Fitness for Duty Non-Destructive Examination Offsite Dose Calculation Manual Coatings Nondestructive Examination Temporary Modification Condition Adverse to Quality Process Control Program Fire Protection Program Grace period |
ML16278A471 | 22 September 2016 | Notification of 10 CFR Part 21 Condition, Masterpact Breaker Fail to Close | |
ML16281A270 | 22 September 2016 | Part 21 - Initial Notification of Masterpact Breaker Fail to Close | |
ML16258A043 | 14 September 2016 | Response to Notice of Violation (NRC Inspection Report 05000483/2016002) | Condition Adverse to Quality |
IR 05000483/2016005 | 12 September 2016 | Errata for Mid-Cycle Assessment Letter for Callaway Plant (Report 05000483/2016005) | Spent Fuel Pool Instrumentation |
ULNRC-06326, Reply to a Notice of Violation Inspection Report 05000-483/2016002 | 9 September 2016 | Reply to a Notice of Violation Inspection Report 05000-483/2016002 | Condition Adverse to Quality Significance Determination Process |
05000483/LER-2015-002 | 7 September 2016 | Manual Auxiliary Feedwater System Actuation LER 15-002-00 for Callaway, Unit 1, Regarding Manual Auxiliary Feedwater System Actuation | |
ML16243A513 | 1 September 2016 | Summary of August 25, 2016, Public Meeting with Wolf Creek Nuclear Operating Corporation and Amerenue Regarding a Proposed Application for a New Technical Specification for the Class 1E Electrical Equipment Air Conditioning System (MF8118 a | |
ML16237A033 | 31 August 2016 | Mid-Cycle Assessment Letter for Callaway Plant (Report 05000483/2016005) | Spent Fuel Pool Instrumentation |
IR 05000483/2016401 | 31 August 2016 | Non-Public Security Inspection Plan for Callaway Plant (NRC Physical Security Inspection Report Number 05000483/2016401) | |
ML16223A712 | 30 August 2016 | Relief Request No. 13R-08 from Code Case N-460, Alternative Examination Coverage for Class 1 and Class 2 Welds, for Piping Welds, Third 10-Year Inservice Inspection Interval | Incorporated by reference |
CAC:MF6729 | 30 August 2016 | ||
CAC:MF8118 | 25 August 2016 | ||
ML16236A095 | 25 August 2016 | and Wolf Creek Generating Station - August 25, 2016, Class 1E Electrical Equipment Air Conditioning System Pre-Application Meeting | Safe Shutdown |
ML16225A003 | 22 August 2016 | Status of NRC Operating Reactor Regulatory and Licensing Review Procedures | |
ML16197A010 | 22 August 2016 | Staff Observations of Testing for Generic Safety Issue 191 During a June 28 to June 30, 2016 Trip to the Alden Test Facility for Performance Contracting Inc. Strainer Tests | Grab sample Coatings |
ML16225A577 | 12 August 2016 | NRC Integrated Inspection Report 05000483/2016002 and Notice of Violation | Boric Acid Fitness for Duty High winds High Radiation Area Ultimate heat sink Hydrostatic Past operability Enforcement Discretion Nondestructive Examination VT-2 Functionality Assessment Locked High Radiation Area Condition Adverse to Quality Significance Determination Process Foreign Material Exclusion Earthquake Maintenance Rule Program Liquid penetrant Fire Protection Program |
IR 05000483/2016002 | 12 August 2016 | NRC Integrated Inspection Report 05000483/2016002 and Notice of Violation | Boric Acid Fitness for Duty High winds High Radiation Area Ultimate heat sink Non-Destructive Examination Hydrostatic Past operability Enforcement Discretion Nondestructive Examination VT-2 Functionality Assessment Locked High Radiation Area Condition Adverse to Quality Significance Determination Process Foreign Material Exclusion Operability Determination Earthquake Maintenance Rule Program Liquid penetrant Fire Protection Program Dissimilar Metal Weld GOTHIC Operability Assessment |
ULNRC-06322, Owner Activity Reports (OAR-1 Forms) for Cycle/Refuel 21 | 3 August 2016 | Owner Activity Reports (OAR-1 Forms) for Cycle/Refuel 21 | |
IR 05000483/2016007 | 1 August 2016 | NRC Evaluations of Changes, Tests, Experiments and Permanent Plant Modifications Baseline Inspection Report 05000483/2016007 | Commercial Grade Dedication Internal Flooding Significance Determination Process |
ML16194A360 | 11 July 2016 | Notification of NRC Triennial Heat Sink Performance Inspection 05000483/2016004 and Request for Information | Ultimate heat sink |
ULNRC-06321, Response to Request for Additional Information, Third 10-Year Interval Inservice Inspection Request for Relief No. I3R-08 | 7 July 2016 | Response to Request for Additional Information, Third 10-Year Interval Inservice Inspection Request for Relief No. I3R-08 | |
ULNRC-06311, Final Notification of Full Compliance with March 12, 2012, Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) | 6 July 2016 | Final Notification of Full Compliance with March 12, 2012, Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) | Safe Shutdown Earthquake Finite Element Analysis FLEX Spent Fuel Pool Instrumentation Earthquake |
ULNRC-06291, Supplement to Expedited Seismic Evaluation Process Report | 6 July 2016 | Supplement to Expedited Seismic Evaluation Process Report | Boric Acid Probabilistic Risk Assessment FLEX Fukushima Dai-Ichi Earthquake |
ULNRC-06310, Final Notification of Full Compliance with March 12, 2012 Commission Order Modifying License with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis (Order No. EA-12-049) | 6 July 2016 | Final Notification of Full Compliance with March 12, 2012 Commission Order Modifying License with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis (Order No. EA-12-049) | Safe Shutdown Boric Acid High winds Shutdown Margin Ultimate heat sink Mission time Tornado Missile Time to boil Safe Shutdown Earthquake Internal Flooding Operating Basis Earthquake FLEX B.5.b Fukushima Dai-Ichi Design basis earthquake Spent Fuel Pool Instrumentation Earthquake GOTHIC |