Ameren MISSOURI Callaway Plant August 3,2016 ULNRC-06322 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001 10 CfR 50.55a Ladies and Gentlemen:
DOCKET NUMBER 50-483 CALLAWAY PLANT UNIT 1 UNION ELECTRIC CO.
RENEWED FACILITY OPERATING LICENSE NPF-30 OWNERS ACTIVITY REPORTS (OAR-i FORMS) FOR CYCLE/REFUEL 21 Please find enclosed the Owners Activity Reports (OAR-i forms) for Cycle 21 and Refuel 21 activities at Callaway Plant. The reports are submitted pursuant to the provisions of the applicable revisions of ASME Boiler and Pressure Vessel Code Case N-532, Alternative Requirements to Repair and Replacement Documentation Requirements and Inservice Summary Report Preparation and Submission.
The OAR-i forms enclosed are associated with the following Cycle 21 and Refuel 21 activities at Callaway Plant:
1.
Inservice Inspection (151) and Repair/Replacement activities for the first period of the fourth ISI Program interval, and 2.
Containment Inservice Inspection pursuant to ASME Section XL subsection IWE for the third period of the second IWE Program interval.
Each enclosed OAR-i form includes a listing of items with identified flaws or relevant conditions that required evaluation for continued service (Table 1) and an abstract of repair/replacement activities required for continued service (Table 2).
In accordance with Revision 0 of the Fourth Interval ISI Program Plan, the OAR-i form for the ISI and Repair/Replacement activities is submitted in accordance with Code Case N-532-5. Similarly, in accordance with Revision 3 of the IWE Program Plan, the OAR-i form for the Containment Inservice Inspection activities is submitted in accordance with Code Case N-532-4.
P.O. Box 620 Fulton, IVIO 65251 AnerenJVIissouri.coni
ULNRC-06322 August 3, 2016 Page 2 This letter does not contain new commitments. If there are any questions, please contact Jim Kovar at (314) 225-1478.
Sincerely, JPKI ger C. Wink Manager, Regulatory Affairs
Enclosure:
OAR-i forms (2)
ULNRC-06322 August 3,2016 Page 3 cc:
Mr. Kriss M. Kennedy Regional Administrator U. S. Nuclear Regulatory Commission Region IV 1600 East Lamar Boulevard Arlington, IX 76011-4511 Senior Resident Inspector Callaway Resident Office U.S. Nuclear Regulatory Commission 8201 NRC Road Steedman, MO 65077 Mr. L. John Klos Project Manager, Callaway Plant Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Mail Stop 08H4 Washington, DC 20555-000 1
ULNRC-06322 August 3,2016 Page 4 Index and send hardcopy to QA file A160.0761 Hardcopy:
Certrec Corporation 6100 Western Place, Suite 1050 Fort Worth, TX 76107 (Certrec receives ALL attachments as long as they are non-safeguards and may be publicly disclosed.)
Electronic distribution for the following can be made via Other Situations ULNRC Distribution:
F. M. Diya T. E. Herrmann B. L. Cox R. C. Wink T. B. Elwood A. W. Alley Corporate Communications NSRB Secretary STARS Regulatory Affairs Mr. Jay Silberg (Pillsbury Winthrop Shaw Pittman LLP)
Missouri Public Service Commission
CALLAWAY NUCLEAR PLANT FORM OAR-1 OWNER'S ACTIVITY REPORT Report Number 21 Plant Callaway Energy Center, P. 0. Box 620, Fulton, MO 65251 Unit No.
--~___,,.......,..,....,...-- Commercial service date Pf applicable)
Current inspection interval Current inspection period Edition and Addenda of Section XI applicable to the inspection plans Date and revision of inspection plans 12/19/1984 Refueling outage no.
4th (1st, 2nd, 3rd. 4th. other) 1st (1st. 2nd. 3rd) 2007 Edition with 2008 Addenda 1/19/2016, Revision 0 Edition and Addenda of Section XI applicable to repair/replacement activities, if different than the inspection plans Ins ection Ian Code Cases used N-532-5 (If applicable)
CERTIFICATE OF CONFORMANCE 21 Same as I certify that (a) the statements made in this report are correct; (b) the examinations and tests meet the Inspection Plan as required by the ASME Code,Section XI; and (c) the repair/replacement activities and evaluations supporting the completion of 21 (refueling outage number) conform to the requirements of Section XI.
Signed Date CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and J.
,....,.c.
employed by iL.4 H.,,.+r..
S"cr.... 6.;)<, x..,pcc.\\:... ""°'..... s11 of Co-P*--1 ~(: lo.....c.c~ -'cvt-have inspected the items described in this Owner's Activity Report, and state that. to the best of my knowledge and belief, the Owner has performed all activities represented by this report in accordance with the requirements of Section XI.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the repair/
replacement activities and evaluation described in this report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.
Inspector's Signature p *'" l\\1l~ \\
Date 'l
- 2
- 2.0 It.
Commission Page 1 of2 l'11'HANI I 11'\\QOS"O'l National Board, State, Province, and Endorsements
Code Class 2
CALLAWAY NUCLEAR PLANT TABLE 1 ITEMS WITH FLAWS OR RELEVANT CONDITIONS THAT REQUIRED EVALUATION FOR CONTINUED SERVICE Examination Category Item Description Evaluation Description and Item Number None TABLE 2 ABSTRACT OF REPAIR/REPLACEMENT ACTIVITIES REQUIRED FOR CONTINUED SERVICE Item Description Description of Work Date Completed Repair/Replacement Plan Number Weld repair was performed on a failed socket weld NPS 2 pipe to elbow joining an NPS 2 pipe with a 90° elbow. This connection was later removed and the 12/1/2014 14006129 socket weld failure.
configuration was replaced during a modification to the system, per Job 13005672.
Page 2 of2
CALLAWAY NUCLEAR PLANT FORM OAR-1 OWNER'S ACTIVITY REPORT Report Number 21 Plant Unit No.
Callaway Energy Center, P. 0. Box 620, Fulton, MO 65251 Commercial service date
---,,,(il,...a-pp"'"Hcab
...,..,.le.,..) --
1_21_1_9/_1_98_4____ Refueling outage no.
Current Inspection interval 2nd (IWE Program) (IWE Program)
(1st, 2nd, 3rd, 41h. other)
Current inspection period 3n1 (IWE Program)
( 1 SI, 2nd, 3rd) 21 Edition and Addenda of Section XI applicable to the inspection plans 2001 E dilion with 2003 Addenda ( IWE Program)
Dale and revision of inspection plans IWE Program: 12/0B/2009, Rev. 3 Edition and Addenda of Section XI applicable lo repair/replacement acliviUes, if different than the inspection plans Inspection plan Code Cases used N-532-4 (111pplicable)
CERTIFICATE OF CONFORMANCE Sarne as I certify that (a) the statements made In this report are correct; (b) the examinations and tests meet the Inspection Plan as required by the ASME Code,Section XI; and (c) the repair/replacement activities and evaluations supporting the completion of 21 (relulllng outage number) confo
- Plt::E.TI 5 )-(I RGIJ R !)153q,- Date Owner or Owners Deslgnee, Tiiie lws e..NG1 NE.E.
CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission Issued by the National Board of Boiler and Pressure Vessel Inspectors and employed by 11... W....f(..J Sh""' C!i.:\\tr S'.. vu-#.',,..,.,..J l_,'""'c~f
'*"'Q"'""f o-f:' Co-&'~~~.... ~
have inspected the items described in this Owner's Activity Report. and state that, to the best of my knowledge and belief, the Owner has performed all activities represented by this report in accordance with the requirements of Seclion XI.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the repair/
replacement activilies and evalualion described in this report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.
Commission Inspector's Slgnalura
(>:'\\,,,.. 'If Nalional Board, Slate, Province, and Endorsemenls Date
~- 'l.* 1.0 Y.
Page I of2
Code Class None CALLAWAY NUCLEAR PLANT TABLE 1 ITEMS WITH FLAWS OR RELEVANT CONDITIONS THAT REQUIRED EVALUATION FOR CONTINUED SERVICE Examination Category Item Description Evaluation Description and Item Number None TABLE 2 ABSTRACT OF REPAIR/REPLACEMENT ACTIVITIES REQUIRED FOR CONTINUED SERVICE Item Description Description of Work Date Completed Repair/Replacement Plan Number Page2 of2