 Issue dateTitleTopic
ML13309A23030 September 2013Transcript of 10 CFR Petition Review Board Re(Garding) General Electric Mark I and II (Boiling Water Reactors) Bwrs, 09-30-2013, Pages 1-98(100)Safe Shutdown
Ultimate heat sink
Internal Flooding
Enforcement Discretion
Earthquake
Hardened vent
Backfit
NRC-2012-0186, G20100454 - Federal Register Notice 2.206 Petition (Pilgrim Watch) - Non-EQ Inaccessible Cables and Wiring at Pilgrim Nuclear Power Station26 September 2013G20100454 - Federal Register Notice 2.206 Petition (Pilgrim Watch) - Non-EQ Inaccessible Cables and Wiring at Pilgrim Nuclear Power StationAging Management
ML13255A18926 September 2013G20100454 Final Director'S Decision 2.206 (Pilgrim Watch) - Non-EQ Inaccessible Cables and Wiring at Pilgrim Nuclear Power StationAging Management
ML13255A19126 September 2013G20100454 - Transmittal Letter 2.206 Petition (Pilgrim Watch)-Non-EQ Inaccessible Cables and Wiring at Pilgrim Nuclear Power StationAging Management
ML13255A19326 September 2013G20100454 - Federal Register Notice 2.206 Petition (Pilgrim Watch) - Non-EQ Inaccessible Cables and Wiring at Pilgrim Nuclear Power StationAging Management
ML13263A00625 September 2013G20130461 Response to M.Lampert Pilgrim Watch 2.206 Petition - NRC Orders on Hardened Containment Vents (Pilgrim)Hardened vent
Backfit
ML13273A20219 September 2013Response to RIS 2013-06, Preparation and Scheduling of Operator Licensing Examinations.Generic Fundamentals Examination
ML13267A16019 September 2013Response to NRC Request for Additional Information - Pilgrim Nuclear Power Station PR-03 and PR-05 Fifth Ten-Year Inservice Testing (IST) Program
ML13263A21712 September 2013Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Seismic Aspects of Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident - 1.5 Year Response for CEUS SitesFukushima Dai-Ichi
Earthquake
ML13258A00210 September 2013G20130461 - Transcript of 9/10/13 Teleconference with Pilgrim Watch 10 CFR 2.206 Petition - Entergy Nuclear Operations, Inc. Pilgrim Nuclear Power Station, Orders Hardened Containment VentsContainment Hardened Vent
Backfit
ML13247A7876 September 2013Project Manager Reassignment
ML13253A3295 September 20139/5/13 Email from R.Guzman to J.Azulay Regarding 2.206 (Tim Judson) Petition Vermont Yankee, Fitzpatrick, and Pilgrim (G20130211)
IR 05000293/20130063 September 2013Revised Mid-Cycle Performance Review and Inspection Plan - Pilgrim Nuclear Power Station (Report 05000293-13-006)
ML13242A2103 September 2013Mid-Cycle Performance Review and Inspection Plan 2013 (ROP-14) - Pilgrim Nuclear Power Station (Report 05000293-13-006)
ML13267A23430 August 2013G20130629 - Pilgrim Watch'S 2.206 Petition to Pilgrim'S Emergency Preparedness Plans (MF2656)
ML13289A18129 August 2013Refueling Outage (RFO)-19 In-Service Inspection (ISI) Owner'S Activity Report (OAR-1) Submittal
ML13247A41128 August 2013Station'S First Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Stratgies for Beyond-Design-Basis External EventsFLEX
Containment Hardened Vent
ML13247A41228 August 2013Station'S First Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)Spent Fuel Pool Instrumentation
ML13219B13726 August 2013Extension of Branch Chief Reassignment
ML13233A36423 August 2013Establishment of Mitigation Strategies Directorate for Nuclear Regulatory Commission Review of Order EA-12-049Fukushima Dai-Ichi
ML13234A55921 August 2013Ltr to List of Addressees Re Clarification Regarding the Timing of Submittal of a Decommissioning Funding Plan Per 10 CFR 72.30(b) for Future Independent Spent Fuel Storage Installations (Isfsis)Decommissioning Funding Plan
ML13238A25321 August 2013Notification of Potential Part 21 Report - Foxboro Power Supply Potential Failures Due to Defective the Wraps and Holders
ML13234A34212 August 2013Response to Sections Iii.A, Iii.B, and Iii.C of the Order Related to Pilgrim Nuclear Power Station Independent Spent Fuel Storage Installation
ML13225A55712 August 2013Rescission of Certain Security Orders Concerning Spent Nuclear Fuel in Transit
ML13220A8378 August 2013Response Letter - M. Lampert, Pilgrim Watch, Email Pilgrim NOUE on 7/15/13 Due to Loss of Annunciators
ML13220B0888 August 2013Notification Letter for the Requalification Program Inspection
IR 05000293/20130038 August 2013IR 05000293-13-003; 04/01/2013 - 06/30/2013; Pilgrim Nuclear Power Station; Refueling and Other Outage ActivitiesHigh Radiation Area
Non-Destructive Examination
Fire Barrier
Stroke time
Water Inventory Control
Internal Flooding
Enforcement Discretion
Nondestructive Examination
Temporary Modification
Functionality Assessment
Locked High Radiation Area
Significance Determination Process
Operability Determination
Liquid penetrant
Scaffolding
Power change
ML13154A3317 August 2013G20130211 - Federal Register Notice - 2.206 Petition from Tim Judson Financial Qualifications Fitzpatrick/Vermont Yankee/Pilgrim
ML13154A3137 August 2013G20130211 Letter to Timothy Judson 2.206 Financial Qualifications Fitzpatrick/Vermont Yankee/Pilgrim
ML13161A2862 August 2013Acknowledgement Letter for 60 Day Response to Issuance of Seismic Guidance Related to the NTTF Recommendation 2.1, Seismic ReevaluationsProbabilistic Risk Assessment
Earthquake
ML13206A4271 August 2013Online Reference Portal for Nuclear Regulatory Commission Review of Fukushima Near Term Task Force Related Documents
ML13205A03431 July 2013G20130491/LTR-13-0570 - Michelle Colletti Singleton Email Pilgrim Nuclear Power Plant Concerns - NSIR Response
ML13210A45226 July 2013LTR-13-0641 - Mary Lampert, Ltr. Pilgrim Watch'S Follow-up to PRB Meeting of 07/19/13, Pilgrim Watch 2.206 Petition to Immediately Suspend Operating License of Pilgrim Until Provisions of EA-12-050 & EA-13-109 Fully Implemented, Vents AugmeBackfit
ML13210A45426 July 2013LTR-13-0641 - Mary Lampert, Ltr. Pilgrim Watch'S Follow-up to PRB Meeting of 07/19/13, Pilgrim Watch 2.206 Petition to Immediately Suspend the Operating License of Pilgrim Station Until the Provisions of EA-12-050 & EA-13-109 Fully Implemen
ML13198A46526 July 2013G20130174 - Closeout Letter to Michael Mulligan 2.206 Petition - Pilgrim Safety Relief ValvesUnanalyzed Condition
Condition Adverse to Quality
ENOC-13-00023, Response to Request for Additional Information, 2013 Decommissioning Fund Status Report - Entergy Nuclear Operations, Inc23 July 2013Response to Request for Additional Information, 2013 Decommissioning Fund Status Report - Entergy Nuclear Operations, Inc
ML13205A25122 July 2013G20130211 - 7/22/13 E-mail from J.Azulay to R.Guzman - Supplemental Information to 2.206 Petition Financial Qualifications Fitzpatrick/Vermont Yankee/PilgrimEarthquake
Power change
ML13207A14219 July 2013Response to Request for Additional Information for the Overall Integrated Plan in Response to the Commission Order Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool InstrumentationSafe Shutdown Earthquake
Finite Element Analysis
FLEX
Spent Fuel Pool Instrumentation
ML13232A12718 July 2013Seismic Walkdown Report Update - Entergy'S Updated Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Re Seismic Aspects of Recommendation 2.3 of the Near-Term Task Force Review of Insights from Fukushima Dai-ichi AccidentFukushima Dai-Ichi
IR 05000293/201300717 July 2013IR 05000293-13-007 and Notice of Violation, 02/02/2012, Pilgrim NRC Investigation Report 1-2012-013License Renewal
ML13203A34715 July 2013G20130461 - Transcript of 10 CFR 2.206 Petition Review Board Re Entergy Nuclear Operations, Inc. Pilgrim Watch, Teleconference 07/15/2013, Pages 1-33, Orders Hardened Containment VentsBackfit
ML13179A4625 July 2013Entergy Nuclear Operations, Inc., Decommissioning Funding Status Report Request for Additional Information Regarding the Decommissioning Funding Status Report
ML13182A4251 July 2013Request for Additional Information E-mail from R.Guzman to W.Lobo PR-03 and PR-05 Fifth Ten-Year Inservice Testing (IST) Program