Refueling Outage (RFO)-19 In-Service Inspection (ISI) Owners Activity Report (OAR-1) Submittal
ML13289A181
Person / Time
Site: Pilgrim
Issue date: 08/29/2013
From: Noyes D
Entergy Nuclear Operations
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
2.13.072
Download: ML13289A181 (6)


Text

vPEntergy-Entergy Nuclear Operations, Inc.

600 Rocky Hill Road Plymouth, MA 02360 Pilgrim Nuclear Power Station August 29, 2013 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 2055

SUBJECT:

Entergy Nuclear Operations, Inc Pilgrim Nuclear Power Station Docket No. 50-293 License NO. DPR-35 Pilgrim Refueling Outage (RFO)-19 In-Service Inspection (ISI) Owner's Activity Report (OAR-i) Submittal LETTER NUMBER:

2.13.072

Dear Sir or Madam,

By this letter Entergy submits to the NRC the attached Pilgrim Nuclear Power Station In-Service Inspection (ISI) Owner's Activity Report (OAR-i) for Operating Cycle 19.

This report has been prepared in accordance with ASME Section XI 2001 with 2003 addenda and NRC approved Code Case N-532-4, and has been certified by the Authorized Nuclear Inservice Inspector (ANII) attesting that all code-required examinations and repair/replacement activities at Pilgrim during Cycle 19 were performed in accordance with the requirements of the ASME XI Code.

There are no new commitments made in this letter.

If you have any questions regarding the information contained in this letter, please contact Pilgrim Licensing Manager, Joseph R. Lynch at (508) 830-8403.

Sincerely, Da~vid E.

4byes Director, Nuclear Safety Assurance

Attachment:

PNPS Owners Activity Report (OAR) for the Third Period of the' 4 th Interval, Engineering Report No. PNPS-RPT-13-00001, Rev. 0 (3 pages)

~4oqf

Entergy Nuclear Operations, Inc.

Entergy Letter No. 2.13.072 Pilgrim Nuclear Power Station Page 2 of 2 cc:

Mr. Richard Guzman, Project Manager Office of Nuclear Reactor Regulation Mail Stop: O-8C2 U.S. Nuclear Regulatory Commission 1 White Flint North 11555 Rockville Pike Rockville, MD 20852 Regional Administrator, Region 1 U.S. Nuclear Regulatory Commission 2100 Renaissance Blvd., Suite 100 King of Prussia, PA 19406-1415 Senior Resident Inspector Pilgrim Nuclear Power Station

Attachment to Entergy Letter No. 2.13.072 PNPS Owner's Activity Report (OAR-I) for the Third Period of the 4 th Interval (3 Dawies)

ATTACHMENT 9.1 SHEET i OF I ENGINEERINa REPORT COVER SHEET II II III Engineering Report No. PNPS-RPT-13-0001 Rev 0 Page 1

of 3 pages: 1 pages: 1 ENTERGY NUCLEAR Engineering Report Cover Sheet

'ýEntergy Engineering Report

Title:

PNPS OWNERS ACTIVITY REPORT (OAR) FOR THE THIRD PERIOD OF THE FOURTH INTERVAL New 0

Revision C]

Engineering Report Type:

Cancelled El Superseded Superseded by:

Applicable Site(s)

'PlI ANQ I IP2 0

AN02 IP3 0

ECH 5 JAFS E

GGNS

[I PNPS0 RBSL vyc WF3 Li WPoEIJ PLP Li]

EC No. N/A Report Origin:

0@ Entergy

[] Vendor Vendor Document No.: N/A Quality-Related:

ED Yes El No Prepared by:

Reviewed by Approved by::

Approved by Katie Bienvenue / k..

Responsible Engineer (Print Name/Sign)

Rich Pardee_/ "_-.

/

Date:

_-_/_3 Date 1

~g-L3 Reviewer (Print Name/Si*

Gauy Gustofson (HSB) I-mj,

ýDate:

ANII (Prnft Name/~~.

-Woods/

Z4 Steve Date:

5//7/0 Supervisor / Manager (Print Name/Sign)

FORM OAR-1 OWNER'S ACTIVITY REPORT Report Number PNPS-RPT-13-0001 Pilafrl Nuclear Power Station Plant Unit No.

1 (If applicable)

Current Inspection Interval Commercial Service Date June 8, 1972 4th' e Refueling Outage Number 19 (1", 2"ý r, 4'ý oter)

Current Inspection Period 3rd (July 1, 2012 - June 30, 2015)

Edition and Addenda of Section XI applicable to the Inspection Plans 1998 Edition, 2000 Addenda Date / Revision of Inspection Plans September 17. 2012 PNPS ISI Program Plan, No. SEP-ISI-PNPS-001 rev 1 Edition and Addenda of Section XI applicable to repair/replacement activities, if different than the inspection plans 2001 Edition, 2003 Addenda Code Cases used:

None CERTIFICATE OF CONFORMANCE I certify that (a) the statements made in this report are correct; (b) the examinations and tests, meet the Inspection Plan as required by the ASME Code,Section X); and (c) the repair/replacement activities and evaluations supporting the completion of 19 conform to the requirements of Section )I (refueling outage number)

Signed iDate,,

(Owner or Owner's deignee. Mide) R. Pardee Sr Engineer - EP&C CERTIFICATE OF INSERVICE INSPECTION 1, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of FA and employed by HSB-CT of Hartford, Connecticut have inspected the items described in this Owner's Activity Report, and state that to the best of my knowledge and belief, the Owner has performed all activities represented by this report in accordance with the requirements of Section XI By signing this certificate neither the Inspector nor his employer makes any warranty expressed or implied concerning the repair/

replacement activities and evaluation described In this report. Furthermore, neither the Inspector nor his employer shall be liable In any manner r any p I

or property damage or a loss of any kind arIsing from or connected with this Inspection 2

0-J.,

Commissions 3

s-J I A 301(e e*"'

,"nspectr's Signature)

National Board, State, Province, and Endorsements Date

FOURTH INTERVAL PNPS-RPT-13-0001 ATTACHMENT 2 THIRD PERIOD REFUEL OUTAGE 19 TABLE 1 ITEMS WITH FLAWS OR RELEVANT CONDITIONS THAT REQUIRED EVALUATION FOR CONTINUED SERVICE Examination Category and Item Number Item Description Evaluation Description During the ASME Section XI Visual (VT-1) examination of the RPV Closure Head Washers at Accepted for continued service. The stud locations, 5,14,16,18,19 & 22, linear indications are not fatigue or indications which exceed ASME Section XI stress corrosion cracks and Acceptance standard contained in IWB-3515.1 therefore are not expected to grow were documented this outage. These indications during future operation. There are B-G-1 were recorded in RFO18 and no changes were no operational concerns from the noted in the size of the previously recorded identified indications during this inspection which is indications associated with the documented in reports, PNPS-RF019-031 and continued permanent use of the 032. These indications on the washers identified washers.

were accepted for use as-is and documented in I_

Condition Report PNP-2011-1907.

TABLE 2 ABSTRACT OF REPAIR/REPLACEMENT ACTIVITIES REQUIRED FOR CONTINUED SERVICE Code Class Item Description Date Repair/Replacement Description Of Work Completed Plan Number 3

Replacement TBCCW 'A' Heat Exchanger E-122 3/27/12 259925A Channel Weld Repair 1

Replacement H2-1-SS 11 Low on fluid, replaced 5/7/13 349451 with rebuilt spare I

Replacement HIO-1-SS21 Low on fluid, replaced 5/8/13 349450 with rebuilt spare I

Replacement MSIV A0203-2C pilot poppet/stem 5/19/13 351593 replaced due to scored stem I

Replacement Replace LPRM's in RFO19 6/10/13 52363629 (EC41601) 3 Replacement TBCCW 'B' Heat Exchanger E-122 11/30/11 293345A Channel Weld Repair I

Replacement Replace Main Steam safety relief 12/27/11 299451 valve SRV203-3C