MONTHYEARL-24-002, Late LLRW Shipment Investigation Report Pursuant to 10 CFR 20, Appendix G2024-02-0202 February 2024 Late LLRW Shipment Investigation Report Pursuant to 10 CFR 20, Appendix G ML23342A1182024-01-0909 January 2024 Independent Spent Fuel Storage Installation Security Inspection Plan L-23-019, Proof of Financial Protection 10 CFR 140.152023-12-18018 December 2023 Proof of Financial Protection 10 CFR 140.15 ML23334A1822023-11-30030 November 2023 Biennial Report for the Defueled Safety Analysis Report Update, Technical Specification Bases Changes, 10 CFR 50.59 Evaluation Summary, and Regulatory Commitment Change Summary November 2021 Through October 2023 L-23-012, Master Decommissioning Trust Agreement Changes for Indian Point Nuclear Generating Units 1, 2 and 3, Pilgrim Nuclear Power Station, Palisades Nuclear Plant and the Non-Qualified Trust for Big Rock Point2023-11-13013 November 2023 Master Decommissioning Trust Agreement Changes for Indian Point Nuclear Generating Units 1, 2 and 3, Pilgrim Nuclear Power Station, Palisades Nuclear Plant and the Non-Qualified Trust for Big Rock Point ML23306A0992023-11-0202 November 2023 and Indian Point Energy Center, Notification of Changes in Schedule in Accordance with 10 CFR 50.82(a)(7) L-23-011, 10 CFR 72.48 Biennial Change Summary Report2023-10-27027 October 2023 10 CFR 72.48 Biennial Change Summary Report IR 05000293/20234012023-08-31031 August 2023 NRC Inspection Report No. 05000293/2023401 & 2023001 (Cover Letter Only) IR 05000293/20230022023-08-0404 August 2023 NRC Inspection Report No. 05000293/2023002 L-23-008, Correction to Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations Holtec Decommissioning International, LLC (HDI)2023-05-23023 May 2023 Correction to Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations Holtec Decommissioning International, LLC (HDI) ML23136A7792023-05-15015 May 2023 Annual Radiological Environmental Operating Report, January 1 Through December 31, 2022 ML23135A2152023-05-15015 May 2023 Annual Radioactive Effluent Release Report, January 1 Through December 31, 2022 L-23-004, HDI Annual Occupational Radiation Exposure Data Reports - 20222023-04-24024 April 2023 HDI Annual Occupational Radiation Exposure Data Reports - 2022 L-23-003, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations2023-03-31031 March 2023 Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations ML23088A0382023-03-29029 March 2023 Stations 1, 2, & 3, Palisades Nuclear Plant, and Big Rock Point - Nuclear Onsite Property Damage Insurance ML23069A2782023-03-13013 March 2023 Request for Scoping Comments Concerning the Environmental Review of Monticello Nuclear Generating Plant, Unit 1 Subsequent License Renewal Application ML22361A1022023-02-24024 February 2023 Reactor Decommissioning Branch Project Management Changes for Some Decommissioning Facilities and Establishment of Backup Project Manager for All Decommissioning Facilities IR 05000293/20220042023-02-15015 February 2023 NRC Inspection Report No. 05000293/2022004 ML22356A0712023-01-31031 January 2023 Issuance of Exemption for Pilgrim Nuclear Power Station ISFSI Regarding Annual Radioactive Effluent Release Report - Cover Letter ML22347A2782022-12-21021 December 2022 Independent Spent Fuel Storage Installation Security Inspection Plan Dated December 21, 2022 L-22-042, Oyster, Pilgrim, Indian Point, Palisades and Big Rock Point - Proof of Financial Protection 10 CFR 140.152022-12-14014 December 2022 Oyster, Pilgrim, Indian Point, Palisades and Big Rock Point - Proof of Financial Protection 10 CFR 140.15 L-22-041, Supplemental Information to Enhance Exemption Request Detail for Pilgrim ISFSI Annual Radioactive Effluent Release Report Due Date Extension2022-12-0909 December 2022 Supplemental Information to Enhance Exemption Request Detail for Pilgrim ISFSI Annual Radioactive Effluent Release Report Due Date Extension IR 05000293/20220032022-11-18018 November 2022 NRC Inspection Report No. 05000293/2022003 L-22-036, Decommissioning Trust Fund Agreement2022-11-0808 November 2022 Decommissioning Trust Fund Agreement ML22276A1762022-10-24024 October 2022 Decommissioning International Proposed Revisions to the Quality Assurance Program Approval Forms for Radioactive Material Packages ML22266A1922022-09-23023 September 2022 and Pilgrim Nuclear Power Station - Request to Withdraw Prior Submissions from NRC Consideration ML22272A0352022-09-22022 September 2022 S. Lynch-Benttinen Letter Regarding U.S. Citizen Intent to Sue U.S. Fish and Wildlife and NOAA Fisheries Representing the Endangered Species (Na Right Whale) Which Will Be Adversely Affected by Holtec International Potential Actions ML22269A4202022-09-22022 September 2022 Citizen Lawsuit ML22241A1122022-08-29029 August 2022 Request for Exemption from 10 CFR 72.212(a)(2), (b)(2), (b)(3), (b)(4), (B)(5)(i), (b)(11), and 72.214 for Pilgrim ISFSI Annual Radioactive Effluent Release Report IR 05000293/20220022022-08-12012 August 2022 NRC Inspection Report No. 05000293/2022002 ML22215A1772022-08-0303 August 2022 Decommissioning International (HDI) Proposed Revisions to the Quality Assurance Program Approval Forms for Radioactive Material Packages ML22206A1512022-08-0101 August 2022 NRC Office of Investigations Case Nos. 1-2022-002 & 1-2022-006 ML22221A2592022-08-0101 August 2022 LTR-22-0217-1-NMSS - Town of Duxbury Letter Opposing the Irradiated Water Release from Pilgrim (Docket No. 05000293) ML22193A1662022-07-28028 July 2022 LTR-22-0154-1 - Heather Govern, VP, Clean Air and Water Program, Et Al., Letter Regarding Radioactive Wastewater Disposal from the Pilgrim Nuclear Power Station (Docket No. 05000293) ML22175A1732022-07-28028 July 2022 LTR-22-0153-1 - Response Letter to D. Turco, Cape Downwinders, from A. Roberts, NRC, Regarding Holtec-Pilgrim Plans to Dump One Million Gallons of Radioactive Waste Into Cape Cod Bay ML22154A4882022-06-0101 June 2022 Letter from Conservation Law Foundation Regarding Irradiated Water Release from Pilgrim ML22154A1622022-05-26026 May 2022 Letter and Email from Save Our Bay/Diane Turco Regarding Irradiated Water Release from Pilgrim ML22136A2602022-05-16016 May 2022 Submittal of Annual Radiological Environmental Operating Report for January 1 Through December 31, 2021 ML22136A2572022-05-16016 May 2022 Submittal of Annual Radioactive Effluent Release Report for January 1 Through December 31, 2021 ML22102A0932022-05-12012 May 2022 LTR-22-0067 Response to Matthew P. Levesque, President, Barnstable Town Council Regarding Irradiated Water Release from Pilgrim IR 05000293/20220012022-05-11011 May 2022 NRC Inspection Report No. 05000293/2022001 ML22104A0542022-04-30030 April 2022 LTR-22-0093 Response to Sheila Lynch-Benttinen, Regarding Irradiated Water Release from Pilgrim L-22-026, Occupational Radiation Exposure Data Report - 20212022-04-29029 April 2022 Occupational Radiation Exposure Data Report - 2021 ML22152A2592022-04-25025 April 2022 Zaccagnini Letter Dated 04/25/22 ML22152A2642022-04-19019 April 2022 Flynn Letter Dated 04/19/22 ML22091A1062022-04-0101 April 2022 Nuclear Onsite Property Damage Insurance (10 CFR 50.54(w)(3)) L-22-022, and Indian Point Nuclear Generating Stations 1, 2, & 3 - Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations - Holtec.2022-03-25025 March 2022 and Indian Point Nuclear Generating Stations 1, 2, & 3 - Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations - Holtec. ML22130A6762022-03-14014 March 2022 Decola Ltr Dtd 03/14/22 Re Potential Discharge of Radioactive Water from Pilgrim Nuclear Power Station ML22041B0762022-03-0707 March 2022 03-07-22 - Letter to the Honorable William R. Keating, Responds to Letter Regarding Proposed Release of Irradiated Water at Pilgrim Nuclear Power Station Into Cape Cod Bay ML22054A2962022-02-23023 February 2022 Annual ISFSI Radioactive Effluent Release Report for 2021 2024-02-02
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BOULEVARD, SUITE 100 KING OF PRUSSIA, PENNSYLVANIA 19406-2713 August 8, 2013 Town Of Duxbury Nuclear Advisory Committee c/o Ms. Mary Lampert (co-chair) 878 Tremont ST Duxbury, MA 02332
Dear Ms. Lampert:
On behalf of the U.S. Nuclear Regulatory Commission (NRC), I am responding to your July 17, 2013, email and a subsequent August 5, 2013, email that were sent to the Region I, Regional Administrator. Your emails referred to a July 15 notice of unusual event (NOUE) declared at Pilgrim due to a loss of control room annunciators. Your first email forwarded a letter you signed on behalf of the Town of Duxbury (MA) Nuclear Advisory Committee. Specifically, you expressed concerns with Entergys ability to continue to safely operate the reactor with the loss of annunciators. We have reviewed the comments and questions and have provided responses in the enclosed document.
A loss of control room annunciators results in the declaration of the lowest level of a classified plant event, an NOUE. While not desirable, the loss of annunciators was considered in plant design and operations and Entergy responded appropriately by implementing a preexisting abnormal procedure that addresses these conditions. Although Entergy remained in the NOUE to ensure that the condition would not recur, the loss of annunciators was relatively short lived, in that, the annunciators returned to a functional condition within two hours. Additionally, throughout the event, an alternate means of control room alarm receipt was available through a sequence of events recorder that has a bell to announce alarm receipt to the control room operators. Finally, Entergy had more operators on shift than required by Pilgrims technical specifications, during this event, to monitor plant parameters.
Please be assured that the NRC was aware of the event and that the residents responded to the Pilgrim site to observe Entergys response actions in a timely manner. In addition, a technical expert from the NRC regional office reviewed the issue, the availability of plant parameter monitoring, and Entergys resolution of this issue. Please note that shutting down the plant or introducing a plant transient while the annunciators were not functional was not required by station procedures or NRC regulations and would have complicated the operators' response.
M. Lampert 2 The NRC staff independently concluded that, throughout this event, Entergy operated the plant safely and in accordance with the conditions in the plants license and technical specifications.
Thank you for your continued interest in these matters.
Sincerely,
/RA/
Fred L. Bower, Acting Chief Reactor Projects Branch 5 Division of Reactor Projects
Enclosure:
NRC Response to Pilgrim Annunciator Concerns
ML13220A837 Non-Sensitive Publicly Available SUNSI Review Sensitive Non-Publicly Available OFFICE klm RI/DRP RI/DRP RI/DRP NAME EKeighley/EMK FBower/FLB DRoberts/DJR DATE 8/7/13 8/7/13 8/8/13 What information allows operators to still be able to monitor plant parameters using control room panels, if the annunciators are unavailable?
The information provided by the annunciators is also provided by the sequence of events recorder (located in the main control room), as well as by direct indication on control room panels and chart recorders, and local control panels and local alarm panels.
What information is provided by the annunciators that is not provided by other parameters?
The annunciators provide a visual and audible indication of changes in plant conditions, which can be verified through direct indication on control room panels, chart recorders, the sequence of events recorder and local alarm panels.
What is the significance of what is provided by other means? How does information provided by other means compare in significance to the information provided by the annunciators?
The annunciator system is a method for identifying changes in plant conditions and parameters through alarm panel lights and an alarm bell; however, the operators receive the same information by monitoring direct indications on control room panels, chart recorders, the sequence of events recorder and local alarm panels.
What is the basis for Entergy or the NRC to assume that the annunciators will not fail again?
Entergy utilized vendor support, Instrument and Controls (I&C) technicians and engineering personnel to troubleshoot the issue. In addition, Entergy has installed temporary data logging test equipment on the annunciator system power supplies and the digital output to the annunciator modules to identify any potential issues. While no definitive cause has been found for the annunciator system malfunction and there is no guarantee a similar event could not recur, additional methods of monitoring plant parameters provide operators alternate means to maintain awareness of changing plant conditions.
Is Pilgrim in analog or digital? If it is in analog, is Pilgrim able to get replacement parts?
Pilgrims main control room annunciator system is a stand-alone microprocessor based digital system. The digital system has two principle outputs, one to the overhead visual annunciator modules, and a second output to the sequence of events recorder. During the malfunction, the annunciators stopped responding for a short period of time, while the sequence of events recorder continued to work normally.
Enclosure