Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML103060070 | 30 September 2010 | 0000-0124-0988, Revision 0, Evaluation of Indication in Peach Bottom, Unit 2 Vessel Closure Head Weld (CH-C-2) | |
ML102710178 | 29 September 2010 | Final Response to Task Interface Agreement - Peach Bottom Atomic Power Station Licensing Basis for Degraded Voltage Protection (TIA 2009-007) | Offsite Circuit |
ML102790129 | 28 September 2010 | Revision 6 to Core Operating Limits Report Reload 18, Cycle 19, Attachment 2, Non-Proprietary Version | Safety Limit Minimum Critical Power Ratio MELLLA |
ML102700185 | 27 September 2010 | Response to Confirmatory Order 1-2008-023, 1-2008-004, Dated 09-27-2010 | |
ML102700614 | 27 September 2010 | Part 21 60-Day Interim Report Notification: Failure to Include Seismic Input in Channel-Control Blade Interference Customer Guidance | Safe Shutdown Earthquake Operating Basis Earthquake Channel-control blade interference |
ML102730063 | 27 September 2010 | Notification of Potential Part 21 Report Concerning Failure to Include Seismic Input in Reactor Control Blade Customer Guidance | Safe Shutdown Earthquake Operating Basis Earthquake Channel-control blade interference |
RA-10-074, Company, LLC, Notification Letter Designating Exelon Station Balance of Plant Systems within the Cyber Security Rule Scope | 24 September 2010 | Company, LLC, Notification Letter Designating Exelon Station Balance of Plant Systems within the Cyber Security Rule Scope | Cyber Security |
ML102581132 | 22 September 2010 | Acknowledgement of Cyber Security Plan Supplement Based NEI 08-09, Revision 6 | Cyber Security |
ML102590516 | 16 September 2010 | NRC Investigation Report Nos. 1-2009-053 and 1-2009-046 Peach Bottom | |
ML102590500 | 16 September 2010 | Letter Notice of Violation (NRC Investigation Report No. I-2009-053) | |
TAC:ME2360 | 9 September 2010 | ||
ML102460251 | 3 September 2010 | Er 05000352/2010301, 05000353/2010301, 05000277/2010301, 05000278/2010301; July 21-29, 2010; Limerick Generating Station, Units 1 and 2, and Peach Bottom Atomic Power Station, Units 2 and 3; Initial Operator Licensing Examination Report | |
IR 05000277/2010301 | 3 September 2010 | Er 05000352/2010301, 05000353/2010301, 05000277/2010301, 05000278/2010301; July 21-29, 2010; Limerick Generating Station, Units 1 and 2, and Peach Bottom Atomic Power Station, Units 2 and 3; Initial Operator Licensing Examination Report | |
ML102520219 | 3 September 2010 | Part 21 - Failure to Include Seismic Input in Reactor Control Blade Customer Guidance | Safe Shutdown Earthquake Operating Basis Earthquake Channel-control blade interference |
ML102460537 | 2 September 2010 | Part 21 60-Day Interim Report Notification: Failure to Include Seismic Input in Channel-Control Blade Interference Customer Guidance | Safe Shutdown Earthquake Operating Basis Earthquake Channel-control blade interference |
ML111661880 | 1 September 2010 | Draft -Outlines (Folder 2) | Half scram |
ML102450036 | 1 September 2010 | IR 05000171-10-007, on 08/09/2010 - 08/12/2010, Peach Bottom Atomic Power Station, Unit 1, Delta, PA (Transmittal Letter) | |
IR 05000171/2010007 | 1 September 2010 | IR 05000171-10-007, on 08/09 - 08/12/10, Peach Bottom Atomic Power Station, Unit 1, Delta, PA (Report) | Offsite Dose Calculation Manual Process Control Program |
ML102440413 | 1 September 2010 | Mid-Cycle Assessment Letter 2010 - Peach Bottom Atomic Power Station, Units 2 and 3 | |
ML102380310 | 25 August 2010 | Response to Request for Additional Information Concerning the Safety Limit Minimum Critical Power Ratio Change License Amendment Request | Minimum Critical Power Ratio |
ML11245A045 | 25 August 2010 | Email from R. Guzman, NRR/DORL/LPL1-1 to J. Barr, Res/Dsa/Spb, Et. Al., Subject: Request for Additional Information from Peach Bottom for Soarca Project | Earthquake |
TAC:U01769 | 24 August 2010 | ||
ML102520084 | 23 August 2010 | and Peach Bottom Lsro - Final Qa/Related Forms (Folder 1) | |
ML102320320 | 20 August 2010 | 10 CFR 50.46 Annual Report | |
RS-10-139, Supplemental Information Concerning License Amendment to Allow Receipt & Storage of Low-Level Radioactive Waste | 20 August 2010 | Supplemental Information Concerning License Amendment to Allow Receipt & Storage of Low-Level Radioactive Waste | Fire Protection Program |
ML102300709 | 18 August 2010 | No Significant Hazards Consideration Determination for the Exelon Cyber Security License Amendment Request Supplement Dated July 23, 2010 | Cyber Security Fuel cladding |
ML110450420 | 16 August 2010 | Technical Evaluation to Verify the Adequacy of the Peach Bottom Atomic Power Station Spent Fuel Pool (SFP) Storage Rack Criticality Margins Dated August 16, 2010 (Non-Proprietary Version) | |
ML102310079 | 16 August 2010 | Supplemental Information for License Amendment Request Concerning Non-Conservative Technical Specification Associated with Amount of Liquid Nitrogen Storage | |
ML102290088 | 16 August 2010 | Draft RAI | Minimum Critical Power Ratio |
ML102250435 | 13 August 2010 | RAI Response Date Extension of PBAPS and LSCS LLRW LAR RAIs - LaSalle and Peach Bottom | |
ML11256A290 | 12 August 2010 | Email from R. Guzman, NRR/DORL/LPL1-1 to J. Barr, Res/Dsa/Spb, Subject: FW: Soarca Weekly Team Meeting | |
ML102240309 | 5 August 2010 | FEMA, Submittal of Final Report for Peach Bottom Preparedness Exercise (Pennsylvania), June 22, 2010 | |
IR 05000277/2010003 | 5 August 2010 | IR 05000277-10-003 & 05000278-10-003 on 04/01/10 - 06/30/10 for Peach Bottom Atomic Power Station NRC Integrated Inspection Report | Ultimate heat sink Internal Flooding Nondestructive Examination Zebra Mussel Multiple Spurious Operation Functionality Assessment Operability Determination Fuel cladding |
ML12024A518 | 5 August 2010 | E-mail from R. Bavol, Secy to J. Giessner, Region III; Subject: Response: Possible Future Commission Meetings | |
ML102070427 | 2 August 2010 | Letter to Michael Pacilio - Peach Bottol Unit 1 - Revised Power Reactor Security Rule | Enforcement Discretion Exemption Request |
ML102140387 | 30 July 2010 | Nuclear Regulatory Commission Biweekly Notice - Applications and Amendments to Facility Operating Licenses Involving No Significant Hazards Considerations - Publication Date of August 10, 2010 | Safe Shutdown Boric Acid Anticipated operational occurrence Cyber Security Surveillance Frequency Control Program Exemption Request Fuel cladding Backfit |
ML102110320 | 30 July 2010 | Monitoring Well Sample Results | |
ML102140080 | 28 July 2010 | Company, LLC (Egc), Response to NRC Regulatory Issue Summary 2010-08, Preparation and Scheduling of Operator Licensing Examinations. | Generic Fundamentals Examination |
ML102070025 | 27 July 2010 | Summary of Category 1 Meeting with Exelon to Discuss Re-Submittal of Its Cyber Security Plan | Cyber Security |
IR 05000277/2010502 | 27 July 2010 | IR 05000277-10-502, 05000278-10-502, on 06/21-06/25/10; Peach Bottom Atomic Power Station; Exercise Evaluation; Emergency Action Level and Emergency Plan Changes; Emergency Preparedness Performance Indicators | |
ML102100464 | 27 July 2010 | Comment (28) of Brian Sullivan on Behalf of Harford County Emergency Operations Opposing NUREG-0654/FEMA-REP-1/Rev. 1 Supplement 3, Guidance for Protective Action Recommendations for General Emergencies | |
ML102070161 | 23 July 2010 | Supplement to the Request for Amendment to Technical Specification 3.1.7, Standby Liquid Control (SLC) System | Safe Shutdown Probabilistic Risk Assessment Large early release frequency Fuel cladding |
ML101110324 | 23 July 2010 | Fleet - Request to Use Specific Provisions from a Later Edition of American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI | Incorporated by reference Liquid penetrant |
NEI 08-09, Re-Submittal of the Exelon Cyber Security Plan | 23 July 2010 | Re-Submittal of the Exelon Cyber Security Plan | Cyber Security Incorporated by reference |
ML102150454 | 23 July 2010 | Letter Dated July 23, 2010 Advising Completion of Actions Re Peach Bottom Confirmatory Order | |
TAC:ME4298 | 23 July 2010 | ||
ML100880085 | 21 July 2010 | Fleet - Acceptance Review Implementation of Emergency Action Level Schemes Developed from NEI 99-01m Rev. 5 | |
ML102010423 | 20 July 2010 | and Peach Bottom Atomic Power Station: Limited Senior Reactor Operator Requalification Program Inspection | |
ML102020244 | 15 July 2010 | Response to Request for Additional Information Concerning the Safety Limit Minimum Critical Power Ratio Change License Amendment Request | Shutdown Margin Safety Limit Minimum Critical Power Ratio |
ML102420204 | 9 July 2010 | and Peach Bottom Lsro - Final Outlines (Folder 3) | Shutdown Margin Test box Recently irradiated fuel |