Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML10270061427 September 2010Part 21 60-Day Interim Report Notification: Failure to Include Seismic Input in Channel-Control Blade Interference Customer GuidanceSafe Shutdown Earthquake
Operating Basis Earthquake
Channel-control blade interference
ML10273006327 September 2010Notification of Potential Part 21 Report Concerning Failure to Include Seismic Input in Reactor Control Blade Customer GuidanceSafe Shutdown Earthquake
Operating Basis Earthquake
Channel-control blade interference
ML10295015124 September 20102010 LaSalle County Station Initial License Examination Proposed In- Plant JPMsJob Performance Measure
ML10295029524 September 20102010 LaSalle County Station Initial License Examination Administered Dynamic Simulator ScenariosGrab sample
Time to boil
Overtravel
Earthquake
Scaffolding
Power change
ML10295029924 September 20102010 LaSalle County Station Initial License Examination Administered Job Performance Measures (Jpms)Packing leak
High Radiation Area
Stroke time
Job Performance Measure
ML10298007424 September 20102010 LaSalle County Station Initial License Examination Form ES-201-1Job Performance Measure
ML10298008224 September 20102010 LaSalle County Station Initial License Examination ES-301-5 Form Revised
ML10298011224 September 20102010 LaSalle County Station Initial License Examination ES-301-6 Form
ML10298011824 September 20102010 LaSalle County Station Initial License Examination ES-401-9 Form
ML10298012524 September 20102010 Lasalle County Station Initial License Examination Operating Test Comments
ML10295017024 September 20102010 LaSalle County Station Initial License Examination Proposed Written ExaminationShutdown Margin
Reactor Vessel Water Level
Half scram
Ultimate heat sink
Squib
Locked High Radiation Area
Feedwater Controller Failure
Fuel cladding
ML10295016124 September 20102010 LaSalle County Station Initial License Examination Proposed Control Room JPMsStroke time
Job Performance Measure
ML10295014424 September 20102010 LaSalle County Station Initial License Examination Proposed Dynamic Simulator ScenariosGrab sample
Time to boil
Overtravel
Earthquake
Scaffolding
Power change
ML10295013724 September 20102010 LaSalle County Station Initial License Examination Proposed Administrative Topics JPMsPacking leak
High Radiation Area
Job Performance Measure
ML10294051424 September 20102010 LaSalle County Station Initial License Examination Outline Submission Examiner Standards FormsShutdown Margin
Locked High Radiation Area
Earthquake
RA-10-074, Company, LLC, Notification Letter Designating Exelon Station Balance of Plant Systems within the Cyber Security Rule Scope24 September 2010Company, LLC, Notification Letter Designating Exelon Station Balance of Plant Systems within the Cyber Security Rule ScopeCyber Security
NRC-2010-0309, FRN: General Notice. Biweekly Notice, Applications and Amendments to Facility Operating Licenses Involving No Significant Hazards Considerations, NRC-2010-030923 September 2010FRN: General Notice. Biweekly Notice, Applications and Amendments to Facility Operating Licenses Involving No Significant Hazards Considerations, NRC-2010-0309Hydrostatic
Exemption Request
ML10292031923 September 20102010 LaSalle County Station Initial License Examination Administered Written ExaminationShutdown Margin
Reactor Vessel Water Level
Half scram
Squib
Locked High Radiation Area
Feedwater Controller Failure
Earthquake
Fuel cladding
ML10267005723 September 2010FRN: General Notice. Biweekly Notice, Applications and Amendments to Facility Operating Licenses Involving No Significant Hazards Considerations, NRC-2010-0309Hydrostatic
Exemption Request
RA10-061, Unit 1 Cycle 14, Revision 1 Core Operating Limits Report (COLR)23 September 2010Unit 1 Cycle 14, Revision 1 Core Operating Limits Report (COLR)Minimum Critical Power Ratio
MELLLA
ML10258113222 September 2010Acknowledgement of Cyber Security Plan Supplement Based NEI 08-09, Revision 6Cyber Security
ML10258088220 September 2010Request for Additional Information Related to Request for License Amendment to Allow Receipt and Storage of low-level Radioactive WasteOffsite Dose Calculation Manual
Press Release-10-165, NRC Approves Increased Power Output for LaSalle Nuclear Power Plant20 September 2010Press Release-10-165: NRC Approves Increased Power Output for LaSalle Nuclear Power Plant
ML10183036116 September 2010License Amendment, Measurement Uncertainty Recapture Power UprateSafe Shutdown
Ultimate heat sink
Anticipated operational occurrence
Hydrostatic
Coatings
Earthquake
Power-Operated Valves
Fire Protection Program
ML10259045816 September 2010Letter 09/16/10 LaSalle Unit 2 Smart Sample Request for InformationNondestructive Examination
Control of Heavy Loads
ML10309063013 September 20102010 Lasalle County Station Initial Examination Administrative Files
ML10309062013 September 20102010 LaSalle County Station Initial Examination Proposed Exam FilesJob Performance Measure
ML1030906488 September 20102010 LaSalle County Station Initial Examination Miscellaneous CorrespondenceGeneric Fundamentals Examination
ML1025303408 September 2010Ltr. 09/08/2010 LaSalle Re Operator Licensing Examination Approval
ML1017506256 September 2010Issuance of Amendments Application of Alternative Source TermHigh winds
High Radiation Area
Safe Shutdown Earthquake
Post Accident Monitoring
Squib
Foreign Material Exclusion
Earthquake
Maintenance Rule Program
ML1025202193 September 2010Part 21 - Failure to Include Seismic Input in Reactor Control Blade Customer GuidanceSafe Shutdown Earthquake
Operating Basis Earthquake
Channel-control blade interference
ML1024605372 September 2010Part 21 60-Day Interim Report Notification: Failure to Include Seismic Input in Channel-Control Blade Interference Customer GuidanceSafe Shutdown Earthquake
Operating Basis Earthquake
Channel-control blade interference
ML1024400601 September 2010Mid-Cycle Performance Review and Inspection Plan - LaSalle County Station, Units 1 and 2
ML10237128925 August 2010Environmental Non-Routine Event Report
RS-10-140, Supplemental Information Concerning License Amendment to Allow Receipt and Storage of Low-Level Radioactive Waste at LaSalle County Station, Units 1 and 220 August 2010Supplemental Information Concerning License Amendment to Allow Receipt and Storage of Low-Level Radioactive Waste at LaSalle County Station, Units 1 and 2
ML10231050920 August 2010Request for Additional Information Related to Exelon Generation Company'S Request to Incorporate Revised Pressure/Temperature Curves
ML10230070918 August 2010No Significant Hazards Consideration Determination for the Exelon Cyber Security License Amendment Request Supplement Dated July 23, 2010Cyber Security
Fuel cladding
ML10225043513 August 2010RAI Response Date Extension of PBAPS and LSCS LLRW LAR RAIs - LaSalle and Peach Bottom
ML10225019212 August 2010Memo C Lipa, Response to Region-III Technical Assistance Request - LaSalle Station and Byron Station Independent Spent Fuel Storage Installation (ISFSI) Pad Seismic Design REGION-III TAR ML101680320 Dated 6-4-2010
ML10225021312 August 2010Enclosure - Response to Technical Assistance Request - LaSalle Station and Byron Station Independent Spent Fuel Storage Installation (ISFSI) Pad Seismic Design REGION-III TAR ML101680320Safe Shutdown Earthquake
Tornado Generated Missile
Earthquake
IR 05000373/201050210 August 2010IR 05000373-10-502, 05000374-10-502; 07/26/2010 - 07/30/2010; LaSalle County Station, Units 1 and 2; Baseline Emergency Preparedness Biennial Exercise InspectionSignificance Determination Process
IR 05000373/20100036 August 2010IR 05000373-10-003, 05000374-10-003, on 04/01/2010 - 06/30/2010; LaSalle County Station, Units 1 & 2; Operability EvaluationsInternal Flooding
Hydrostatic
Probabilistic Risk Assessment
Temporary Modification
Significance Determination Process
Fire Protection Program
Overexposure
RS-10-134, Additional Information Supporting Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program3 August 2010Additional Information Supporting Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled ProgramSurveillance Frequency Control Program
ML1103901693 August 2010Additional Information Supporting Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled ProgramSurveillance Frequency Control Program
ML10214008028 July 2010Company, LLC (Egc), Response to NRC Regulatory Issue Summary 2010-08, Preparation and Scheduling of Operator Licensing Examinations.Generic Fundamentals Examination
ML10207002527 July 2010Summary of Category 1 Meeting with Exelon to Discuss Re-Submittal of Its Cyber Security PlanCyber Security
TAC:ME429823 July 2010
NEI 08-09, Re-Submittal of the Exelon Cyber Security Plan23 July 2010Re-Submittal of the Exelon Cyber Security PlanCyber Security
Incorporated by reference
ML10111032423 July 2010Fleet - Request to Use Specific Provisions from a Later Edition of American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XIIncorporated by reference
Liquid penetrant
PNO-III-10-012, A - Update LaSalle, Units 1 & 2, Leakage of Tritium from Onsite Storage Tank22 July 2010PNO-III-10-012A - Update LaSalle, Units 1 & 2, Leakage of Tritium from Onsite Storage Tank