2010 LASALLE COUNTY STATION INITIAL EXAMINATION MISCELLANEOUS CORRESPONDENCE
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION 111 2443 WARRENVILLE ROAD, SUiTE 210 LISLE, ILLlNlOlS 60532-4352 September 8, 2010 Mr. Michael J. Pacilio Senior Vice President, Exelon Generation Company, LLC President and Chief Nuclear Officer (CNO),
Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555
SUBJECT:
OPERATOR LICENSING EXAMINATION APPROVAL
Dear Mr. Pacilio:
The purpose of this letter is to confirm the final arrangements for the upcoming operator licensing examinations at the LaSalle County Station.
The U. S. Nuclear Regulatory Commission (NRC) has completed its review of the operator license applications in connection with this examination and separately provided a list of approved applicants to Mr. Joseph L. White, Training Director, LaSalle County Station.
Note that any examination waivers and appiication denials have been addressed in separate correspondence.
The NRC has approved the subject examinations and hereby authorizes you to administer the written examinations in accordance with Revision 9, Supplement I, of NUREG-1021, Operator licensing Examination Standards for Power Reactors, during the week of September 20, 2010. The NRC staff will administer the operating tests during the weeks of September 13 and 20, 201 0. This examination has undergone extensive review by my staff and representatives responsible for licensed operator training at your facility. Based on this review, I have concluded that the examination meets the guidelines of NUREG-1021 for content, operational, and discrimination validity. By administering this examination, you also agree that it meets NUREG-1021 guidelines, and is appropriate for measuring the qualifications of licensed operator applicants at your facility. If you determine that this examination is not appropriate for licensing operators at your facility, do not administer the examination and contact me at 630-829-9707.
Please contact your Chief Examiner, Mr. Dell McNeil, at 630-829-9737, if you have any questions or identify any errors or changes in the license level (RO or SRO) or type of examination (partial or complete written examination andlor operating test) specified for each applicant.
In accordance with I O CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.qov/readinq-rm/adams.html (the Public Electronic Reading Room).
Sincerely, ironori Peterson, Chief Operations Branch Division of Reactor Safety Docket Nos. 50-373; 50-374 License Nos. NPF-11; NPF-18
M. Pacilio I C RIII:DRS
] N RII1:DRS I N OFFICE RIII:DRS NAME JRKweiser:c&% DRMcNeil b ~ l \\
HPeterson &/
U DATE 09/0$/10 091d I1 0 09/ g./IO Vf I
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (AOAMS), accessible from the NRC Web site at http://www.nrc.qov/readinci-rm/adams.html (the Public Electronic Reading Room).
Sincerely, Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket Nos. 50-373; 50-374 License Nos. NPF-11; NPF-I 8 DISTRIBUTION:
Susan Bagley RidsNrrDorlLpl3-2 Resource RidsNrrPMLaSalle RidsNrrDirslrib Resource Steven Reynolds Steven Orth Jared Heck Allan Barker Carole Ariano Linda Linn DRPlll DRSlll Patricia Buckley Tammy Tomczak John McHale
+***+
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I l l 2443 WARRENVILLE ROAD, SUITE 2 10 LISLE, ILLINOIS 60532-4352 March 17, 2010 Mr. Charles G. Pardee Senior Vice President, Exelon Generation Company, LLC President and Chief Nuclear Officer (CNO), Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555
SUBJECT:
LASALLE COUNTY STATION CONFIRMATION OF INITIAL LICENSE EXAMINATION
Dear Mr. Pardee:
In a telephone conversation on March 3,2010, between Mr. M. Entwistle, Exam Author, and Mr. C. Moore, License Examiner, arrangements were made for the administration of licensing examinations at the LaSalle County Station during the weeks of September 13, 2010 and September 20, 2010. In addition, the NRC will make an examination validation visit to your facility the week of August 23, 201 0.
As agreed during the telephone conversation, your staff will prepare the examinations based on the guidelines in Revision 9, Supplement 1, of NUREG-1021, "Operator Licensing Examination Standards for Power Reactors." The NRC's regional office will discuss with your staff any changes that might be necessary before the examinations are administered.
To meet the above schedule, it will be necessary for your staff to furnish the examination outlines by May 5, 201 0. The written examinations, operating tests, and supporting reference materials identified in Attachment 3 to ES-201 will be due by July 21, 2010. Pursuant to Title I O, Section 55.40(b)(3), of the Code of Federal Regulations (10 CFR 55..40(b)(3)), an authorized representative of the facility licensee shall approve the outlines, examinations, and tests before they are submitted to the NRC for review and approval. All materials shall be complete and ready to use. We request that any personal, proprietary, sensitive unclassified, or safeguards information in your response be contained in a separate enclosure and appropriately marked. Any delay in receiving the required examination and reference materials, or the submittal of inadequate or incomplete materials, may cause the examinations to be rescheduled.
In order to conduct the requested written examinations and operating tests, it will be necessary for your staff to provide adequate space and accommodations in accordance with ES-402, and to make the simulation facility available on the dates noted above. In accordance with ES-302, your staff should retain the original simulator performance data (e.g., system pressures, temperatures, and levels) generated during the dynamic operating tests until the examination results are final.
Appendix E of NUREG-1021 contains a number of NRC policies and guidelines that will be in effect while the written examinations and operating tests are being administered.
To permit timely NRC review and evaluation, your staff should submit preliminary reactor operator and senior reactor operator license applications (Office of Management and Budget (OMB) approval number 3150-0090), medical certifications (OM6 approval number 31 50-0024),
and waiver requests (if any) (OM6 approval number 3150-0090) at least 30 days before the first examination date. If the applications are not received at least 30 days before the examination date, a postponement may be necessary. Signed applications certifying that all training has been completed should be submitted at least 14 days before the first examination date.
This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget, approval number 3150-0018. The public reporting burden for this collection is estimated to average 500 hours0.00579 days <br />0.139 hours <br />8.267196e-4 weeks <br />1.9025e-4 months <br /> per response, including the time for reviewing instructions, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of these information collections, including suggestions for reducing the burden, to the Records and FOlAlPrivacy Services Branch (T-5 F52), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet electronic mail to INFOCOLLECTS@NRC.GOV; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (31 50-001 8), Office of Management and Budget, Washington, DC 20503.
The NRC may neither conduct nor sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OM6 control number.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at httrMmw.nrc.sov/readina-rm/adams.html (the Public Electronic Reading Room).
Thank you for your cooperation in this matter. Mr. Mike Entwistle, Exam Author, has been advised of the policies and guidelines referenced in this letter. If you have any questions regarding the NRC's examination procedures and guidelines, please contact Mr. Carl Moore, License Examiner, at 630-829-9732, or me at 630-829-9707.
Sincerely, U
Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket Nos. 50-373; 50-374 License Nos. NPF-11; NPF-18 cc: Distribution via ListServ
To permit timely NRC review and evaluation, your staff should submit preliminary reactor operator and senior reactor operator license applications (Office of Management and Budget (OMB) approval number 31 50-0090), medical certifications (OMB approval number 31 50-0024),
and waiver requests (if any) (OMB approval number 31 50-0090) at least 30 days before the first examination date. If the applications are not received at least 30 days before the examination date, a postponement may be necessary. Signed applications certifying that all training has been completed should be submitted at least 14 days before the first examination date.
This letter contains information collections that are subject to the Paperwork Reduction Act of 7995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget, approval number 3150-0018. The public reporting burden for this collection is estimated to average 500 hours0.00579 days <br />0.139 hours <br />8.267196e-4 weeks <br />1.9025e-4 months <br /> per response, including the time for reviewing instructions, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of these information collections, including suggestions for reducing the burden, to the Records and FOlAlPrivacy Services Branch (T-5 F52), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet electronic mail to INFOCOLLECTS@NRC.GOV; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (31 50-001 8)' Office of Management and Budget, Washington, DC 20503.
The NRC may neither conduct nor sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.qov/readinq-rm/adams.html (the Public Electronic Reading Room).
Thank you for your cooperation in this matter. Mr. Mike Entwistle, Exam Author, has been advised of the policies and guidelines referenced in this letter. If you have any questions regarding the NRC's examination procedures and guidelines, please contact Mr. Carl Moore, License Examiner, at 630-829-9732, or me at 630-829-9707.
Sin cere I y, Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket Nos. 50-373; 50-374 License Nos. NPF-11; NPF-18 cc: Distribution via ListServ DISTRIBUTION:
See next page DOCUMENT NAME: G:\\DRS\\WORK IN PROGRESS\\LAS 03-10 DRS OL EXAM CONFIRMATION.DOC To receive a copy of this document, indicate in the concurrence box "C" = Copy without attachlencl " E = Copy with attachlencl "N" = No copy OFFICE RIII:DRS RIII:DRS NAME CMoore:co H Peterson DATE 03/08/10 03/17/10 lo).
I '
1 OFFICIAL &CORD COPY
Letter to Mr. Charles G. Pardee from Mr. Hironori Peterson dated March XX, 2010.
SUBJECT:
LASALLE COUNTY STATION CONFIRMATION OF INITIAL LICENSE EXAMINATION DISTRIBUTION:
Susan Bagley RidsNrrDorlLpl3-2 Resource RidsNrrPMLaSalle RidsNrrDirslrib Resource Cynthia Pederson Steven Orth Jared Heck Allan Barker Carole Ariano Linda Linn DRPlll DRSlll Patricia Buckley Tammy Tomczak John McHale
RS-09-109 August 13,2009 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Braidwood Station, Units 1 and 2 Facility Operating License Nos. NPF-72 and NPF-77 NRC Docket Nos. STN 50-456 and STN 50-457 Byron Station, Units 1 and 2 Facility Operating License Nos. NPF-37 and NPF-66 NRC Docket Nos. STN 50-454 and STN 50-455 Clinton Power Station, Unit 1 Facility Operating License No. NPF-62 NRC Docket No. 50-461 Dresden Nuclear Power Station, Units 2 and 3 Renewed Facility Operating License Nos. DPR-19 and DPR-25 NRC Docket Nos. 50-237 and 50-249 Facility Operating License NOS. NPF-11 and NPF-18 NRC Docket Nos. 50-373 and 50-374 Limerick Generating Station, Units 1 and 2 Facility Operating License Nos. NPF-39 and NPF-85 NRC Docket Nos. 50-352 and 50-353 Oyster Creek Nuclear Generating Station Renewed Facility Operating License No. DPR-16 NRC Docket No. 50-219 Peach Bottom Atomic Power Station, Units 2 and 3 Renewed Facility Operating License Nos. DPR-44 and DPR-56 NRC Docket Nos. 50-277 and 50-278 Quad Cities Nuclear Power Station, Units 1 and 2 Renewed Facility Operating License Nos. DPR-29 and DPR-30 NRC Docket Nos. 50-254 and 50-265 Three Mile Island Nuclear Station, Unit 1 Facility Operating License No. DPR-50 NRC Docket No. 50-289 AUG 1 7 2009
1 t August 13,2009 U. S. Nuclear Regulatory Commission Page 2
Subject:
Reference:
Response to NRC Regulatory Issue Summary 2009-1 1, "Preparation and Scheduling of Operator Licensing Examinations" NRC Regulatory Issue Summary 2009-1 1, "Preparation and Scheduling of Operator Licensing Examinations," dated July 16, 2009 The referenced Regulatory Issue Summary (RIS) requested that facility licensees provide a proposed schedule of operator licensing examinations and an estimate of the number of candidates requiring initial operator license examinations for calendar years 2010 through 2013, and the number of candidates requiring Generic Fundamentals Examinations (GFEs) for calendar years 2010 and 201 1. Attachments 1 through 10 provide responses to RIS 2009-1 1 for the Exelon Generation Company, LLC (EGC) plants identified above. The requested information for each facility is provided on a separate NRC Form 536.
In calendar year 2010, eight candidates are expected to take the dual-site Limited Senior Reactor Operator (LSRO) initial license examination as indicated on Attachment 6. The schedule for the indicated examination is as follows: the written examination and a portion of the operating examination will be given at Limerick Generating Station (LGS); the remainder of the operating examination will be completed at Peach Bottom Atomic Power Station (PBAPS). Since the LSRO examination is a dual-site examination that involves both LGS and PBAPS, rather than repeating the same information on both attachments, the examination scheduling information is provided on for LGS. Attachment 8 for PBAPS references Attachment 6 where appropriate.
There are no regulatory commitments contained within this letter. Should you have any questions about this letter, please contact Mitchel Mathews at (630) 657-2819.
censing and Regulatory Affairs - Completed NRC Form 536 for Braidwood Station - Completed NRC Form 536 for Byron Station - Completed NRC Form 536 for Clinton Power Station - Completed NRC Form 536 for Dresden Nuclear Power Station - Completed NRC Form 536 for LaSalle County Station - Completed NRC Form 536 for Limerick Generating Station - Completed NRC Form 536 for Oyster Creek Nuclear Generating Station - Completed NRC Form 536 for Peach Bottom Atomic Power Station - Completed NRC Form 536 for Quad Cities Nuclear Power Station 0 - Completed NRC Form 536 for Three Mile island Nuclear Station - Unit 1
NRC FORM 536 (10 2C08)
U S. NUCLEAR REGULATORY COMMISSION OPERATOR LICENSING EXAMINATION DATA IA. PROPOSED EXAMINATION PREPARATION SCHEDULE APPROVED BY OMB NO 3150-0131 EXPIRES 10/31/20 Estimated burden per res onse to comply with this voluntav informat collection request 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> ?his information col ection is used to plan budg and resources for operator examinations Send comments r ardln burc estimate lo the Records and FOINPdvacy Services Branch?
5 Fh), U Nuclear R ulatoiy Commission, Washmqton DC 2055!5-000!. or b inter e-mail to i3ocollects@nrc ov. and to the Desk Officer ORce 01 InLrmat and Regulatory Affairs NE8B-IO202 131504131), Office of Managernenr Budget, Washington. DC 20503 if a means used to impose an informat CoJection does not display a currently valid OMB control number, !he NRC IT not conducl or sponsor. and a person is not required to respond to, I information wllection I
o ESTIMATED NUMBER OF LICENSEE-PREPARED I
EXAMlNATlONS cy 2010 -
PROPOSED NUMBER cy 2011 cy 2012 cy 2013 1
1 ESTIMATED NUMBER OF EXAMINATIONS NRC-PREPARED 0
0 le. INITIAL OPERATOR LICENSE EXAMINATIONS 0
0 0
I PROPOSED NUMBER 0
NUMBEROFREACTOR OPERATORS I
7 0
5 NUMBER OF SENIOR REACTOR OPERATORS - INSTANT I
0 NUMBER OF SENIOR REACTOR OPERATORS - UPGRADE I
12 0
12 NUMBER OF SENIOR REACTOR OPERATORS - LIMITED I
0 I
2 0
2 I
PROPOSED DAlES 0
N/A N/A PRIMARY DATE I
0 0
0 06120/2011 N/A 03/24/2013 0711 11201 1 N/A 04/08/20 13 1
ALTERNATE DATE I
C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2010 CY 2011 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 21 0
0 0
0 0
0 19 CANDIDATES 1
cy 2012 -
cy 2013 -
NRC FORM 536 (10-2008)
PRINTED ON RECYCLED PAPER
Response to RIS 2009-1 1 PROPOSED NUMBER ESTIMATED NUMBER OF LICENSEE-PREPARED EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED EXAMINATIONS YRC FORM 536 1WMO81 U.S. NUCLEAR REGULATORY COMMISSION cy 2010 cy 2011 cy 2012 cy 2013 1
1 1
1 0
0 0
0 OPERATOR LICENSING EXAMINATION DATA c y 2010 -
PROPOSED NUMBER 8
NUMBER OF REACTOR OPERATORS 8
NUMBER OF SENIOR REACTOR OPERATORS - INSTANT 1
NUMBER OF SENIOR REACTOR OPERATORS - UPGRADE 0
NUMBER OF SENIOR REACTOR OPERATORS -LIMITED PROPOSED DATES 09/27/2010 PRIMARY DATE N/A ALTERNATE DATE
- AGILITY cy 201 1 cy 2012 c y 2013 0
0 6
6 6
6 1
0 0
0 0
0 09/26/2011 09/24/20 12 09/23/20 13 10/03/2011 1010 1 1201 2 1 0/07/2013 Byron Station, Units 1 and 2 Facility Operating License Nos. NPF-37 and NPF-66 NRC Docket Nos. STN 50-45.1 and STN 50-455 PROPOSED NUMBER ESTIMATED NUMBER OF CANDIDATES Page 1 of 1 APPROVED BY OMB. N O 3150-0131 EXPIRES 10131121 CY 2010 cy 2011 MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBEF 0
6 0
0 0
6 0
0 Eslimated burden per res onse to comply with this vo untary inlorma collection request 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> $his informaton co11eclion IS used to plan bud1 and resources for operator examinations Send comments 10 ardin bur sstlrnale to the Records and FOlNPrivacy Services Branch 1-5 F h ), I Nuclear R ulatory Commission. Washington, DC 20555-0004.
or b inte e-mail to i9ocollectsfiJnrc ov and to !he Desk Officer Office of Inkma and Regulatory Affairs. NE&-10202, (3150-0131),
Oflie of Management Budge!, Washington, DC 20503 If a means used lo impose an informa ColleCtton does no1 display a currenliy valid OMB control number, the NRC I no1 conduct or sponsor, and a person is not required lo respond to, information colteclion NRC REGION I I PRINTED ON RECYCLED PAPER
Response to RIS 2009-1 1 YRC FORM 531 b2005)
U.S. NUCLUR REGULATORY COMMISSION OPERATOR LICENSING EXAMINATION DATA APPROMD ey OMS. NO. 3150-0131 Estfmated burden ar res on-lo comply wlth thla voluntary lnlorma cdladPn requesl. ?hour. h a InkrmaUon mlkclbn m used lo plan bud(
and raLIow(I# for operator eromlnotbna Send cummontr ardm bur e a ~ m i l r io ma ~ a r d r a ~ 1 F O I A P ~ ~ V. ~ ~
swkea B~AT-~
F Q ~ ). i NudaarR ulabxyCommlrrm Wruhlr!gton DC 20565oOo of i n k m a H to I%cnlledr@nrc ov. And to the Disk O h r, Offiw'd I%ma end R s g u l ~ A t l P i c s. NE88.10202. (31504131), O*
d Mensgomm~,
Budget. Woah gvn, DC 20503. If a means used lo lmpcrs an Inform CDlleCllcn dma no1 dkpby a currently vnlld Oh48 conbul number, the NRC r no1 conduct or 6 onlor. and person Is not requlred lo rmpond to.
hf0mutbn cdec&n WIRES: 05311200 Page 1 of 1 PROPOSED NUMBER
~
~-
CY2013 -
CY201 2 -
CY 201 1 -
CY2010 -
Clinton Power Station, Unit 1 Facility Operating License No. NPF-62 NRC Docket No. 50-461 ESTIMATED NUMBER OF NRCPREPAREO U(AM1NATIONS 111 0
0 0
0
~
~
- 4. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER NUMBER OF REACTOR OPERATORS NUMBER OF SENIOR REACTOR OPERATORS - INSTANT NUMBER OF SENIOR REACTOR OPERATORS - UPGRADE NUMBER OF SENIOR REACTOR OPERATORS - LIMITED PROPOSEDDATES PRIMARY DATE ALTERNATE DATE CY2013 -
CY2012 -
CY 201 1 -
CY2010 -
6 6
0 6
0 4
0 4
0 2
0 2
0 0
0 0
10/25/2010 12/05/2011 N/A OW1 91201 3 11/01/2010 12/11/2011 N/A 08/26/2013 I
1 I
1 l
o I
ESTIMATED NUMBER OF LICENSEE-PREPARED EXAMINATIONS PROPOSED NUMBER ESTIMATED NUMBER OF CANDIDATES CY 2010 CY 2011 JUNE SEPTEMBE DECEMBER MARCH JUNE SEPTEMBER DECEMBER MARCH 0
0 9
0 0
0 0
0 NRC f M U l S 1 (g2005)
~~
PRINTED MJ RECYCLED PAPER
Response to RIS 2009-1 1 Page 1 of 1 OPERATOR LICE NSI NG EXAMINATION DATA APPROVED BY OMB. NO. 3150-0131 EXPIRES: 10131/201 Estimated burden per res onse to comply with this voluntary informatit collection request: t hour. This information wllection is used lo plan bud@
and resources for operator examinalions Send comments re ardin burd, estimate to the Records and FOlAiPrivacy Services Branch 8.5 F93). U.
Nuclear Re uiatory Commission. Washington, DC 20555-0001, or b interr e-maii to in?ocollects@nrc. ov. and lo the Desk Officer, Office of Inkrmati, and Regulatory Affairs. NE8B-10202, (31 50-0131). Office of Management a, Budget, Washington. DC 20503.
If a means used lo impose an informati<
collection does no1 display a currently valid OMB control number, the NRC m not conduct or sponsor. and a person is not required !o respond to, 11 information collection.
FACILITY Dresden Nuclear Power Station, Units 2 and 3 Renewed Facility Operating License Nos. DPR-19 and DPR-25 I
NRC Docket Nos. SO-237 and 50-249 NRC REGION 111 IA. PROPOSED EXAMINATION PREPARATION SCHEDULE I PROPOSEDNUMBER I I
cy 2010 -
ESTIMATED NUMBER OF LICENSEE-PREPARED I
EXAMINATIONS 1
1 I
1 I
NRC-PREPARED 0
0 0
0 ESTIMATED NUMBER OF EXAMINATIONS le. lNiTlAL OPERATOR LICENSE EXAMINATIONS cy 2010 c y 201 1 cy 2012 c y 2013 PROPOSED NUMBER 2
3 3
3 NUMBER OF REACTOR OPERATORS NUMBER OF SENIOR REACTOR 6
9 9
9 OPERATORS - INSTANT 1
1 1
1 NUMBER OF SENIOR REACTOR OPERATORS - UPGRADE 0
0 0
0 NUMBER OF SENIOR REACTOR OPERATORS - LIMITED PROPOSED DATES PRIMARY DATE 03/08/2010 03/07/2011 03/05/2012 03/04/2013 ALTERNATE DATE 04/05/2010 04/04/2011 04/02/2012 04/01/2013 IC. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2010 CY 2011 PROPOSED NUMBER JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER MARCH ESTIMATED CANDIDATES NUMBER OF 0
0 0
12 0
0 0
12
~
NRC FORM 536 (lo-ZW8)
PAINTED ON RECYCLED PAPER
Response to RIS 2009-1 1 cy 2010 cy 2011 PROPOSED NUMBER ESTIMATED NUMBER OF EXAMINATIONS ESTIMATED NUMBER OF EXAMINATIONS LICENSEE-PREPARED 1
0 NRC-PREPARED 0
0 r
Page 1 of 1 cy 2012 cy 2013 1
0 0
0 NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION [APPROVED BY OMB: NO. 31504131 EXPIRES: 10/31/20 c y 2010 c y 2011 PROPOSED NUMBER 3
0 NUMBER OF REACTOR OPERATORS 11 0
NUMBER OF SENIOR REACTOR OPERATORS - INSTANT 0
0 NUMBER OF SENIOR REACTOR OPERATORS - UPGRADE 0
0 NUMBER OF SENIOR REACTOR OPERATORS - LIMITED PROPOSEDDATES PRIMARY DATE 09/14/2010 N/A ALTERNATE DATE 09/21/2010 N/A I
(lo-:oae) c y 2012 c y 2013 6
0 8
0 2
0 0
0 09/24/2012 N/A 10/01/2012 N/A OPERATOR LICENSING EXAMINATION DATA CY 2010 PROPOSED NUMBER JUNE SEPTEMBER DECEMBER MARCH ESTIMATED CANDIDATES NUMBER OF 0
0 0
0 Estimated burden per res onse to comply with this voluntary inlormati collection request 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> Chis Information collection is used to plan budgq and resources for operator exeminattons Send comments re ardin burd estimate to the Records and FOINPrivacy Services Branch 1-5 F13). U Nuclear Re utatory Commission. Washington, DC 20555-0001. o r b interr e-mail to in!ocollectsQnrc ov, and to the Desk Officer Office of InLrmati and Regulato Affairs NE8B-10202, (3150-0131). Office of Management a Budget, Washmgton. DC 20503 If a means used to impose an informati collection does not display a currently valkl OMB control number, the NRC m not conduct or sponsor. and a person is not required to respond to, t I
information collection c y 2011 MARCH JUNE SEPTEMBER DECEMBER 0
14 0
0 FACILITY LaSalle County Station, Units 1 and 2 Facility Operating License Nos. NPF-1 I and NPF-18 NRC Docket Nos. STN 50-373 and STN 50-374 NRC REGION 111 NRC FORM 536 (10-2WB)
PRINTED ON RECYCLED PAPER
Response to RIS 2009-1 1 Page 1 of 2 538 Ub. NUCLEAR OPERATOR UCENSING EXAMINATION DATA IF-
-w-m Llmerlek Cewrsthg Stattor, Uaib 1 and 2 F~cllity Operating Lkenrt Nor NPF-39 u d NPF-85 NRC Docket Nor. 50-352 and 56-39 A. PROPOSED EXAMINATION PREPARATION SCHEDULE I
I 1
cy 2013 -
PROPOSED NUMBER ESTIMATED NUMBER Of UCENSEESREPARED 1
0 1
0 u(AMIwn0Ns e
I o
I ESTIMATED NUMBER OF NRCPREPARED u(AMwnoNB
~-
'6. INITIAL OPERATOR LICENSE EXAMINATIONS cy 2010 cy 2011 cy 2012 cy 2013 PROPOSED NUMBER NUMBER OF REACTOR OPERATORS 6
0 11 0
7 0
S 0
NUMBER OF SENIOR REACTOR OPERATORS - INSTANT 5
0 2
0 NUMBER OF SENIOR REACTOR opERAToR8-UPGRADE e
0 0
0 NUMBER OF SENIOR REACTOR OPERATOAS -LIMITED I
PROPOSED DATES PRIMARY DATE 10/04/2010 N/A 10/01/2012 N/A 09/24tu)12 N/A ALTERNATE DATE l0/18nOlO N/A C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2e10 CY 2011 PROPOSED MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER NUMBER ESTIMATED CANDIDATES NUMBER O f 0
0 0
0 0
16 0
0 L
i I
I I
I I
I I
NRC F m
(10-20%)
PmMEDoNREcYcLEDPApER
OPERATOR LICENSING EXAMINATION DATA Estimated burden per res onse to comply with this voluntary informatic Col!ection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. {his information collection IS used lo plan bddge and resources for operator examinations. Send cnmments re ardln burdi estimate to the Records and FOlAlPrivacy Services Branch +-5 F83) U.
Nuclear Re uiatory Commission, Washington. DC 20555-OOO/. or b iniern e-mail to in&collects@nrc. ov, and to the Desk Officer, Office of In&vrnatic and Regulatory Affairs, NE&-10202.
(31504131). Office of Management ar Budget. Washington, DC 20503.
If a means usad to impose an informatic collection does not dlsplav a currenUv valid OMB control number. the NRC m; (10.:008) not conduct or sponsor: and a person is not requlred to respond to, i t information collecbon.
FACILITY NRC REGION PROPOSED NUMBER ESTIMATED NUMBER OF LICENSEE-PREPARED EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED EXAMINATIONS Limerick Generating Station, Units 1 and 2 Facility Operating License Nos. NPF-39 and NPF-85 NRC Docket Nos. 50-352 and 50-353 I
cy 2010 cy 2011 cy 2012 cy 2013 1
0 0
0 0
0 0
0 I
cy 2010 c y 2011 cy 2012 cy 2013 PROPOSED NUMBER 0
0 0
0 NUMBER OF REACTOR OPERATORS 0
0 0
0 NUMBER OF SENIOR REACTOR OPERATORS - INSTANT 0
0 0
0 NUMBER OF SENIOR REACTOR OPERATORS - UPGRADE 8
0 0
0 NUMBER OF SENIOR REACTOR OPERATORS - LIMITED PROPOSED DATES PRIMARY DATE 06/14/2010 N/A N/A N/A ALTERNATE DATE 06/07/2010 N/A N/A N/A C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE I
Page 2 of 2 Response to RIS 2009-1 1 NRC FORM 536 U.S.
NUCLEAR REGULATORY COMMISSION 1 APPROVED BY OMB: NO. 3150-0131 EXPIRES: 10/31/2011 PROPOSED NUMBER ESTIMATED NUMBER OF CAN0 I DATES
~
~-
IA. PROPOSED EXAMINATION PREPARATION SCHEDULE CY 2010 cy 2011 MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER 0
0 0
0 0
0 0
0
~~
le. INITIAL OPERATOR LICENSE EXAMINATIONS NRC FORM 536 (lO-ZCO8)
PRINTED ON RECYCLED PAPER
Response to RIS 2009-1 1
~~
(NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION
[ lo-zooal APPROVED BY OMB NO 3150-0131 EXPIRES 10131,ZO Estimated burden per res onse to comply with this vo'untary informati co lection request 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> h i s information collection is used to plan budg end resources for operator examinations Send comments re ardin burd estimate to the Records and FOlAlPrivacy Services Branch 8 - 5 F h ) U Nuclear Re ulatory Commission Nashington, DC 205550001, or b interi e-mail to in?occliocts@nrc ov. And to the Desk Officer. Office of lnkrrneti and Regutato Affairs. YE&-10202, (3150-0131) Office of Management a Budget. Washmgton. DC 20503 If a means used to impose an informall collection does not display a currently valid OMB control number, the NRC rr not conduct or sponsor. and a person is not required to respond to t information collection OPE RATOR LlCENS ING EXAMINATION DATA Oyster Creek Nuclear Generating Station NRC Docket No. 50-219 Rcnewcd Facility Operating License No. DPR-16 I
PROPOSED NUMBER ESTIMATED NUMBER OF LICENSEE-PREPARED EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED EXAMINATIONS cy 2010 cy 2011 cy 2012 cy 2013 1
1 1
0 0
0 0
0 J
B. INITIAL OPERATOR LICENSE EXAMINATIONS cy 2010 cy 2011 cy 2012 cy 2013 PROPOSED NUMBER 6
6 6
0 NUMBER OF REACTOR OPERATORS 7
7 8
0 NUMBER OF SENIOR REACTOR OPERATORS - INSTANT 2
I 2
0 NUMBER OF SENIOR REACTOR OPERATORS - UPGRADE 0
0 0
0 NUMBER OF SENIOR REACTOR OPERATORS - LIMITED PROPOSED DATES 05/17/2010 0711 11201 1 05/28/2012 N/A PRIMARY DATE ALTERNATE DATE 05/24/2010 07/18/2011 06/04/2012 N/A C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2010 CY 2011 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED CANDIDATES NUMBER OF 13 0
0 0
14 0
0 0
PRINTED ON RECYCLED PAPER NRC FORM 536 (10-2008)
Response to RIS 2009-1 1 APPROVED BY OMB: NO. 31504131 EXPIRES: 10/31/201 Esllmated burden per res onse to comply with this voluntary informatlc collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. ?his information collection is used to plan budge and resources for operator examinations. Send comments r ardin burdc estimate to the Records and FOlNPrivacy Services Branch?-5 F!33),
U.:
Nuclear Re ulatory Commlssm Washington DC 20555-000 or b intern e-mail to in?ocollects@nrc. ov. and to the Desk Officer, Office'of ln&rmatic and Regulator Affairs NE&3-10202. (3150-0131), Omce of Management ar Budget, Washington, DC 20503.
If a means used to impose an informabc collection does not display a currently valid OMB control number. the NRC m:
not conduct or sponsor. and a person is not required to respond to, th information collection.
Attach men t 8 Page 1 of 1 PROPOSED NUMBER ESTIMATED NUMBER OF LICENSEE-PREPARED EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED EXAM1 NATIONS 0 P ERATOR LICENSING EXAMINATION DATA cy 2010 cy 2011 cy 2012 cy 2013 0
1 0
I 0
0 0
0 NRC FORM 536 (l&2008)
US. NUCLEAR REGULATORY COMMISSION FACILITY Peach Bottom Atom Power Station, Units 2 and 3 Renewed Facility Operating License Nos. DPR-44 and DPR-56 NRC Dockct Nos. 50-277 and 50-278 0
8 0
NUMBER OF SENIOR REACTOR OPERATORS - INSTANT 0
3 0
NUMBER OF SENIOR REACTOR OPERATORS - UPGRADE 0
0 NUMBER OF SENIOR REACTOR OPERATORS -LIMITED PROPOSED DATES 01/31/2011 N/A ALTERNATE DATE 03/21/2011 N/A PRIMARY DATE C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2010 CY 2011 cy 2010 -
PROPOSED NUMBER 0
NUMBER OF REACTOR OPERATORS NRC REGION 1
cy 2011 cy 2012 6
0 IA. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER ESTIMATED NUMBER OF CANDIDATES MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER 0
0 0
0 0
0 18 0
~
~
~
~~
le. INITIAL OPERATOR LICENSE EXAMINATIONS 8
10
~
2 0
0211 1/2013 02/04/2013
OPE RATOR Ll CENS IN G EXAMINATION DATA VRC FORM 536 lo-2008)
U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150.0131 EXPIRES: 10/31/20 Eslimaled burden per res onse to comply with lhis voluntary informat collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. ?his information collection is used to plan budg and resources for operalor examinations. Send comments re ardln bur(
estimate to the Records and FOINPrivacy Services Branch /q-5 F833). U Nuclear Re ulatory Commission Washington DC 20555600 or b infer e-mail lo in?ocollects@nrc ov bnd lo the Desk Officer. OMce of lnhmat and Regulatory Affairs. NEgB-iO202, (31504131).
Office of Management i Budget, Washington, DC 20503. If a means used to impose an informal coilection does not display a currently valid OMB conlroi number, fhe NRC n not conduct or sponsor, and a person is not required to respond to, I informalion coliection.
Quad Cities Nuclear Power Station, Units 1 and 2 NRC Docket Nos. 50-254 and 50-265 Renewed FaciUty Operating License Nos. DPR-29 and DPRJO Ill PROPOSED NUMBER ESTIMATED NUMBER OF LICENSEE-PREPARED EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED EXAMINATIONS cy 2010 cy 2011 cy 2012 cy 2013 0
1 1
1 0
0 0
0
~
B. INITIAL OPERATOR LICENSE EXAMINATIONS cy 2010 cy 201 1 cy 2012 cy 2013 0
6 4
3 PROPOSED NUMBER NUMBER OF REACTOR OPERATORS 0
11 10 10 NUMBER OF SENIOR REACTOR OPERATORS - INSTANT 0
0 1
1 NUMBER OF SENIOR REACTOR OPERATORS - UPGRADE 0
0 0
0 NUMBER OF SENIOR REACTOR OPERATORS - LIMITED PROPOSEDDATES N/A 05NOl2011 03/12/2012 0411 512013 ALTERNATE DATE N/A 06/13/2011 03/26/20 1 2 04/29/2013 PRIMARY DATE C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2010 CY 2011 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF CANDIDATES 0
0 0
14 0
0 0
0 NRC FORM 536 (10-2008)
PRINTED ON RECYCLED PAPER
Response to RIS 2009-1 1
- NRC FORM 5511 U.8. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB NO. 3160-0131 EXPIRES: 1001120' Estlmstad burden p r roi ongo to compiy with lhli voluntary infomath
~
~
b n
ruquasc 1 how. hhh, htonnalbn coitacthln is used to p!+n wdpl and remurcea for operebn ensmlnstkna. Send armrnanb r u d bud o a l l ~ b lo lhe Recorda and FOIAiPrivacy Ssfvtcea Branch?-5 2 3 ). U Nuckar R ul.!ory Commbsion, Washington, OC 2O555000 e-mall!o I%collecwnrc v, and la Ihs Dedc O h r. OfRw'$&!%
end W U h I O A(ralrs. NE&-10202, (3150-0131), OmcS d MMagNfmnl o EUdgrl, W a & & t W, DC 20503.
If 0 metM Ulpd lo hpors an hformetl cdkctlon h a
no! display a c m U y WU, OMB mh'd number, tho NRC rn not condud or sponsor, and I person IS no! roqulred lo respond to. u hltonne!hn colbctm.
(rams)
OPERATOR LICENSING EXAMINATION DATA 0 Page 1 of 1 A. PROPOSED EXAMINATION PREPARATION SCHEDULE cy 2010 cy 2011 cy 2012 cy 2013 1
1 0
1 I_
PROPOSED NUMBER ESTIMATED NUMBER OF EXAMINATIONS ESTIMATED NUMBER OF NRCPREPARED 0
0 0
0 EXAMINATIONS LICENSEE-PREPARED B. INITIAL OPERATOR LICENSE EXAMINATIONS c y 2010 c y 2011 c y 2012 cy 2013 1
10 0
9 -
PROPOSED NUMBER NUMBER OF REACTOR OPERATORS 1
10 0
8 NUMBER OF SENIOR REACTOR OPERATORS - INSTANT 0
1 0
1 NUMBER OF SENtOR REACTOR OPERATORS - UPGRADE 0
0 0
0 NUMBER OF SENIOR REACTOR OPERATORS - LIMITED PROPOSED DATES PRIMARY OAT 0112 11201 0 09/12/2011 N/A O9/09/2 013 ALTERNATE DATE 01/28/2010 09/19/2011 N/A 0911 til2013 C, PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE cy 2010 FACILITY Three,Mile Island Nuclear Station, Unit 1 FacUty Operatfng Llcense no. DPRJO I
NRC Docket No. 50-289
October 7, 2008 Mr. Charles G. Pardee Chief Nuclear Officer and Senior Vice President Exelon Generation Company, LLC 4300 Winfield Road Warrenville IL 60555
SUBJECT:
CONFIRMATION OF REQUESTED INITIAL OPERATOR LICENSE EXAMINATIONS: NRC REGION Ill EXELON STATIONS
Dear Mr. Pardee:
In a letter dated July 22, 2008, (RS-08-092) your staff responded to Regulatory Issue Summary 2008-16 and requested we schedule initial license operator examinations for the Exelon Nuclear Plants. In a separate letter dated July 11, 2008, (KKM-08-001) the Quad Cities Nuclear Power Station Training Manager requested a change to the start date of the Stations 2009 examination. This letter confirms scheduling of the requested examinations at the Region Ill power plants and the change requested for the Quad Cities Nuclear Power Station 2009 examination. We have tentatively scheduled the requested examinations to occur as follows:
On-site validation of the examinations is tentatively scheduled to occur approximately three weeks before each scheduled examination. In the unlikely event that we are unable to support the examination during the scheduled weeks, we will inform you and the affected stations training department immediately upon discovery of such conditions and make arrangements to administer the examination at a mutually acceptable date.
We understand that your staff will develop the proposed examinations unless we discover it is necessary for the NRC to develop an examination. Because the examinations have greater than nine anticipated applicants, each examination is scheduled for two weeks. Please inform us if the number of candidates declines below ten for any examination as this will impact the examination schedule. Please inform us at your earliest opportunity if you discover a need to change any of the dates of the scheduled examinations.
A supplementary letter will be sent to each stations training department director approximately 120 days prior to the initial examination. The letter will provide the director with the chief examiners name, an outline of examination security expectations, a list of the materials required by the NRC to conduct the examination, and it will reconfirm the examination dates and the number of candidates you have in the training program. If you have any questions concerning this information, please contact Mr. Dell McNeil of my staff at 630-829-9737.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the Electronic Reading Room page of the NRCs public Web site at http://www.nrc.qov/reading-rm/adams.html.
Sin cere I y,
Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket Nos. 50-456; 50-457 License Nos. NPF-72; NPF-77 cc:
Site Vice President - Braidwood Station Plant Manager - Braidwood Station Regulatory Assurance Manager - Braidwood Station Chief Operating Officer and Senior Vice President Senior Vice President - Midwest Operations Senior Vice President - Operations Support Vice President - Licensing and Regulatory Affairs Director - Licensing and Regulatory Affairs Manager Licensing - Braidwood, Byron and LaSalle Associate General Counsel Document Control Desk - Licensing Assistant Attorney General J. Klinger, State Liaison Officer, Illinois Emergency Management Agency Chairman, Illinois Commerce Commission Site Training Director - Braidwood Station
C. Pardee OFFICE NAME DATE RI1I:DRS I
R1II:DRS RII1:DRS JKweiser:co DMcNeil HPeterson 10/02/08 10/02/08 10/07/08 A supplementary letter will be sent to each station's training department director approximately 120 days prior to the initial examination. The letter will provide the director with the chief examiner's name, an outline of examination security expectations, a list of the materials required by the NRC to conduct the examination, and it will reconfirm the examination dates and the number of candidates you have in the training program. If you have any questions concerning this information, please contact Mr. Dell McNeil of my staff at 630-829-9737.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the Electronic Reading Room page of the NRC's public Web site at http://www.nrc.gov/readinq-rm/adams.html.
Sincerely, Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket Nos. 50-456; 50-457 License Nos. NPF-72; NPF-77 cc:
Site Vice President - Braidwood Station Plant Manager - Braidwood Station Regulatory Assurance Manager - Braidwood Station Chief Operating Officer and Senior Vice President Senior Vice President - Midwest Operations Senior Vice President - Operations Support Vice President - Licensing and Regulatory Affairs Director - Licensing and Regulatory Affairs Manager Licensing - Braidwood, Byron and LaSalle Associate General Counsel Document Control Desk - Licensing Assistant Attorney General J. Klinger, State Liaison Officer, Illinois Emergency Management Agency Chairman, Illinois Commerce Commission Site Training Director - Braidwood Station See Attached Distributions
Docket Nos. 50-454; 50-455 License Nos. NPF-37; NPF-66 cc:
Site Vice President - Byron Station Plant Manager - Byron Station Regulatory Assurance Manager - Byron Station P. Schmidt, State Liaison Officer, State of Wisconsin Chairman, Illinois Commerce Commission Site Training Director - Byron Station
- 6. Quigley, Byron Station Docket No. 50-461 License No. NPF-62 cc:
Site Vice President - Clinton Power Station Plant Manager - Clinton Power Station Regulatory Assurance Manager - Clinton Power Station Manager Licensing - Clinton, Dresden and Quad Cities Site Training Director - Clinton Power Station Docket Nos. 50-237; 50-249 License Nos. DPR-19; DPR-25 cc:
Site Vice President - Dresden Nuclear Power Station Plant Manager - Dresden Nuclear Power Station Regulatory Assurance Manager - Dresden Nuclear Power Station Site Training Director - Dresden Nuclear Power Station Docket Nos. 50-373; 50-374 License Nos. NPF-11; NPF-18 cc:
Site Vice President - LaSalle County Station Plant Manager - LaSalle County Station Regulatory Assurance Manager - LaSalle County Station Site Training Director - LaSalle County Station Docket Nos. 50-254; 50-265 License Nos. DPR-29; DPR-30 cc:
Site Vice President - Quad Cities Nuclear Power Station Plant Manager - Quad Cities Nuclear Power Station Regulatory Assurance Manager -
Vice President - Law and Regulatory Affairs D. Tubbs, Manager of Nuclear Associate General Counsel M. Rasmusson, State Liaison Officer, State of Iowa Chief Radiological Emergency Preparedness Section, Site Training Director - Quad Cities Nuclear Power Station Quad Cities Nuclear Power Station Dept. of Homeland Security
Letter to Charles G. Pardee from Hironori Peterson dated October 7, 2008
SUBJECT:
CONFIRMATION OF REQUESTED INITIAL OPERATOR LICENSE EXAMINATIONS: NRC REGION Ill EXELON STATIONS DISTRIBUTION:
Russell Gibbs Tamara Bloomer Meghan Thorpe-Kavanaugh Joel Wiebe Stephen Sands Christopher Gratton RidsNrrDirslrib Resource Mark Satorius Kenneth OBrien Jared Heck Roland Lickus Carole Ariano Linda Linn Patricia Buckley DRPlll DRSlll Patricia Buckley Tammy Tomczak
Janet Kweiser From:
Sent:
To:
Subject:
Attachments:
Carmen Olteanu Tuesday, October 21, 2008 11 2 2 AM Russell Gibbs; Tamara Bloomer; Meghan Thorpe-Kavanaugh; Joel Wiebe; Stephen Sands; Christopher Gratton; RidsNrrDirslrib Resource; Mark Satorius; Kenneth OBrien; Jared Heck; Carole Ariano; Linda Linn; Patricia Buckley; DRPIII; DRSIII; Patricia Buckley; Tammy Tomczak Exelon Letter Re Confirmation of Initial Exam Exelon 100708 DRS 0L.doc The subject document has been completed and has been submitted to DPC to be declared in ADAMS. A Word copy of the document has been attached and the document has been assigned Accession
- ML082880559.