Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML092750087 | 29 September 2009 | Response to Request for Additional Information Concerning - Technical Specifications Change 09-02 - W-STAR Alternate Repair Criteria for Steam Generator Tubes Cold Leg | |
ML092750086 | 29 September 2009 | Watts, Unit 1 - Decommissioning Funding Assurance - Additional Information | |
ML092750350 | 28 September 2009 | Bellefonte and Sequoyah, Units 1 & 2; Browns, Units 1, 2, & 3 and Watts, Units 1 & 2 - Nuclear Quality Assurance Plan, TVA-NQA-PLN89-A | Fitness for Duty Offsite Dose Calculation Manual Safe Shutdown Earthquake Coatings Nondestructive Examination B.5.b Process Control Program Fire Protection Program Grace period |
ML092710081 | 24 September 2009 | LAR - Revise TSs to Allow ST Tubing ARC (W*) | |
ML092740160 | 24 September 2009 | Comment (1) of Don C. Laster Opposing on Site Disposal of Contaminated Materials at the Sequoyah Fuels Site Located 2 Miles East of Gore Oklahoma | |
ML092740172 | 24 September 2009 | Map - Oklahoma Maps Sequoyah County Featuring the Cities of Muldrow, Sallisaw, Roland & Robert S. Kerr Lake | |
ML092740171 | 24 September 2009 | Map - Oklahoma Maps Sequoyah County Featuring the Cities of Muldrow, Sallisaw, Roland & Robert S. Kerr Lake | |
ML092610109 | 15 September 2009 | Submittal of Report in Accordance with 10 CFR 26.719(c)(1) for Drug and Alcohol Testing Errors | Fitness for Duty |
ML092590043 | 14 September 2009 | Bellefonte, Units 1 and 2, Change to Correspondence Addressee and Service List Update | |
ML092600185 | 14 September 2009 | Transmittal of Organization Topical Report, TVA-NPOD89-A | Fitness for Duty Nondestructive Examination Fire Protection Program |
ML092580096 | 11 September 2009 | Discharge Monitoring Report for August 2009 | |
TAC:ME1020 | 10 September 2009 | ||
ML092310224 | 10 September 2009 | Bellefonte Nuclear Plant, Units 1 & 2 - Submission of Revision 20 to Tennessee Valley Authority Nuclear Quality Assurance Plan. | |
ML092810111 | 9 September 2009 | Initial Exam Retake 2009-302 Final SRO Written Exam | Loop seal |
ML092520020 | 4 September 2009 | Decommissioning Funding Assurance | |
ML091940463 | 4 September 2009 | Enclosure 1 Summary of Conference Calls with Tennessee Valley Authority Regarding Decommission Funding Assurance | |
ML091940389 | 4 September 2009 | 06/30/2009-Summary of Conference Calls with Tennessee Valley Authority Regarding Decommissioning Funding Assurance, Browns Ferry, Sequoyah, Watts Bar | |
IR 05000327/2009403 | 2 September 2009 | NRC Security Inspection Report 05000327-09-403 and 05000328-09-403 | Affidavit |
ML092440651 | 1 September 2009 | Inspection/Activity Plan 03/01/2009 - 12/31/2010 | |
ML092440649 | 1 September 2009 | Mid-Cycle Performance Review and Inspection Plan - Sequoyah Nuclear Station Units 1 and 2 | |
ML092440296 | 28 August 2009 | American Society of Mechanical Engineers Inservice Inspection Program Relief Request 1-ISI-34 | |
IR 05000327/2009006 | 28 August 2009 | IR 05000327-09-006 & 05000328-09-006 on 07/13 - 07/17/2009 and 07/27 - 07/31/2009 for Sequoyah Nuclear Plant, Units 1 and 2: Biennial Inspection of the Identification and Resolution of Problems | Enforcement Discretion Condition Adverse to Quality Significance Determination Process Maintenance Rule Program |
ML092450037 | 28 August 2009 | Units 1 and 2, and Watts Bar, Units 1 and 2, Notification of Submittal of Latest Revision of Tva'S Organization Topical Report, TVA-NPOD89-A on 09/14/09, Instead of the Originally Planned Date 08/29/09 | |
ML092380392 | 26 August 2009 | 08/11-12/2009-Summary of Meeting Re 2009 Us NRC Initial Exam Development Workshop | |
ML092440805 | 25 August 2009 | Tennessee Valley Authority, Notification of Primary Contact Change Update | Fitness for Duty |
ML101880178 | 24 August 2009 | Decommissioning Plan/Supporting Documentation, Sequoyah | |
ML102350526 | 24 August 2009 | Decommissioning Plan/Supporting Documentation | |
ML092330782 | 21 August 2009 | Notificaiton of Licensed Operator Initial Examination 50-327/10-301 and 50-328/10-301 | |
ML092290727 | 19 August 2009 | Review of the 2008 Refueling Outage Steam Generator Tube Inservice Inspection Report | |
ML092310547 | 17 August 2009 | American Society of Mechanical Engineers Section Xl Inservice Inspection Program - Withdrawal of Relief Requests | |
ML092310545 | 17 August 2009 | Response to NRC Regulatory Issue Summary 2009-11, Preparation and Scheduling of Operator Licensing Examinations | Generic Fundamentals Examination |
ML092300090 | 14 August 2009 | Response to Request for Additional Information Concerning - Technical Specifications Change 09-02 - W-STAR Alternate Repair Criteria for Steam Generator Tubes Cold Leg | |
ML091610719 | 14 August 2009 | License Amendment, Issuance of Amendments Regarding Revisions to the Ice Condenser Licensing Basis (TS 08-06) | Safe Shutdown Earthquake Operating Basis Earthquake Earthquake |
ML13289A207 | 13 August 2009 | Plnat - Annual Water Withdrawal Updates for 2009 | |
ML092260591 | 13 August 2009 | Discharge Monitoring Report for July 2009 | |
ML092020349 | 13 August 2009 | Request for Additional Information Regarding the Upgrade of Emergency Core Cooling System Requirements Per NUREG-1431 | |
ML092310659 | 11 August 2009 | Calculation No. B00000000-01717-0210-00006, Rev. 00, CRC Reactivity Calculations for Sequoyah Unit 2, Attachment I, Page 1 Through 333 | Fuel cladding |
ML092310672 | 11 August 2009 | Calculation No. B00000000-01717-0210-00006, Rev. 00, CRC Reactivity Calculations for Sequoyah Unit 2, Attachment I, Page 334 of 656 Through Attachment VI | |
ML092220377 | 5 August 2009 | Expected Submittal Dates for License Renewal Applications | |
ML092160411 | 30 July 2009 | Decommissioning Funding Assurance | |
ML092110187 | 24 July 2009 | Facility No. 0-330628 - Report Request for Summary of Failure of Pressure Test for Piping Associated with Underground Storage Tanks (Usts) | |
ML092080450 | 24 July 2009 | Cycle 16 (U1C16) 90-Day Inservice Inspection (ISI) Summary Report | |
ML092080447 | 24 July 2009 | 90 Day Follow-up Response to NRC Generic Letter (GL) 2008-01: Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems | |
ML092080195 | 23 July 2009 | Change to Primary Correspondence Addressee | |
IR 05000327/2009003 | 23 July 2009 | IR 05000327-09-003 and 05000328-09-003, on 04/01/2009 - 06/30/2009; Sequoyah Nuclear Plant, Units 1 and 2; Event Followup | Boric Acid High Radiation Area Non-Destructive Examination Fire Barrier Weld Overlay Enforcement Discretion VT-2 Locked High Radiation Area Significance Determination Process Foreign Material Exclusion Process Control Program DM weld Power change Unidentified leakage |
ML091910188 | 15 July 2009 | Request for Additional Information (RAI) Regarding the Proposal to Change the Scope of the Steam Generator Tube Inspections | |
ML091970056 | 14 July 2009 | Discharge Monitoring Report for June 2009 | |
ML091900341 | 14 July 2009 | Summary of Conference Calls with the Tennessee Valley Authority Regarding Decommission Funding Assurance | |
ML091910483 | 9 July 2009 | Response to Request for Additional Information Regarding the Steam Generator Tube Inservice Inspection Report for the Cycle 15 Refueling Outage | |
ML091870423 | 1 July 2009 | 10 CFR 71.95 Report of Non-Compliance with Certificate of Compliance USA/9319/B(U)F-96, Revision 1, Model Nos. MAP-12/MAP-13 Packages |