Category:Environmental Report
MONTHYEARML23019A3432023-01-19019 January 2023 NPDES Biocide/Corrosion Treatment Plan Annual Report, Cy 2022 ML21028A5252021-01-28028 January 2021 NPDES Biocide/Corrosion Treatment Plan Annual Report, Cy 2020 ML18116A2872018-04-26026 April 2018 Annual Radioactive Effluent Release Report for 2017 Monitoring Period ML17346A1502017-12-12012 December 2017 Annual Non-Radiological Environmental Operating Report - 2017 ML15351A4132015-12-11011 December 2015 Annual Non-Radiological Environmental Operating Report CNL-14-085, Documents for the Environmental Review of License Renewal Application - Env 32014-05-27027 May 2014 Documents for the Environmental Review of License Renewal Application - Env 3 ML14118A3812014-04-16016 April 2014 Annual Radiological Environmental Operating Report ML13289A2562013-12-31031 December 2013 6.a.iv.3.7 SQN 2010 ML13289A2482013-10-28028 October 2013 6.a.iii.l.a SQN Fukushima DG, Diesel Pumps/Tow Truck List, Docketed Letter ML13289A1362013-09-20020 September 2013 Enclosuchart on Missing Record from 2000 Through 2003 ML13289A1142013-09-20020 September 2013 Enclosure 1: Chart on Temperature 2011 ML13289A1012013-09-20020 September 2013 Enclosure 1: Chart on Temperature 2007 ML13289A1152013-09-20020 September 2013 Enclosure 1: Chart on Temperature 2012 ML13289A1172013-09-20020 September 2013 Enclosugraphics and Charts on Years 2007 Through 2013 ML13289A0992013-09-20020 September 2013 Enclosudata and Chart on Drybulb Temperature (F) ML13289A1162013-09-20020 September 2013 Enclosure 1: Chart on Temperture 2013 ML13289A1222013-09-20020 September 2013 Enclosutemps 2010 ML13289A1232013-09-20020 September 2013 Enclosutemps 2011 ML13289A1242013-09-20020 September 2013 Enclosuflows & Stage 2009 ML13289A1282013-09-20020 September 2013 Enclosuflows & Stage 2013 ML13289A1252013-09-20020 September 2013 Enclosuflows & Stage 2010 ML13289A1262013-09-20020 September 2013 Enclosuflows & Stage 2011 ML13289A1332013-09-20020 September 2013 Enclosutemps 2013 ML13289A1212013-09-20020 September 2013 Enclosutemps 2009 ML13289A1322013-09-20020 September 2013 Enclosutemps 2012 ML13289A1302013-09-20020 September 2013 Enclosutemps 2008 ML13289A1292013-09-20020 September 2013 Enclosutemps 2007 ML13289A1272013-09-20020 September 2013 Enclosuflows & Stage 2012 ML13289A1122013-09-20020 September 2013 Enclosure 1: Chart on Temperature 2009 ML13289A1192013-09-20020 September 2013 Enclosuflows & Stage 2007 ML13289A1132013-09-20020 September 2013 Enclosuchart on Temperature 2010 ML13289A1182013-09-20020 September 2013 Enclosugraphics and Charts on Diffuser Discharge Temperature for Years 2007 Through 2012 ML13289A1112013-09-20020 September 2013 Enclosure 1: Chart on Temperature 2008 ML13289A1202013-09-20020 September 2013 Enclosuflows & Stage 2008 ML13289A0962013-09-20020 September 2013 Enclosuriver Temperature, 2007-2013 - Daily Max TUS_Comp_24-hr ML13289A1662013-07-30030 July 2013 Excel File Containing Velocity Measurements Recorded at Nine Locations on July 30-31, 2003 ML1316805732013-06-12012 June 2013 Tennessee Valley Authority - Sequoyah Nuclear Plant - NPDES Permit No. TN0026450 - Discharge Monitoring Report for May 2013 ML13289A0922013-05-31031 May 2013 Estimation of River Flow at Sequoyah Nuclear Plant for NPDES Thermal Compliance U.S. NRC RAI 1.b.i May, 2013 ML13289A2272013-05-13013 May 2013 6.a.ii.14 SQN Hours of Operation Annual Air Report 2012 ML13289A0942013-05-0202 May 2013 Plan (SQN) NPDES Permit No. TN0026450 - Application for Renewal ML13127A0042013-05-0202 May 2013 Tennessee Valley Authority (TVA) - Sequoyah Nuclear Plant (SQN) - NPDES Permit No. TN0026450 - Application for Renewal. Part 2 of 3 ML13289A1652013-04-30030 April 2013 WR2013-1-45-152, Study to Confirm the Calibration of the Numerical Model for the Thermal Discharge from Sequoyah Nuclear Plant as Required by NPDES Permit No. TN0026450 of March 2011, April 2013 ML13289A0952013-04-30030 April 2013 WR2013-1-45-152, Study to Confirm the Calibration of the Numerical Model for the Thermal Discharge from Sequoyah Nuclear Plant as Required by NPDES Permit No. TN0026450 of March 2011. ML13289A1002013-04-30030 April 2013 WR2013-1-45-152, Study to Confirm the Calibration of the Numerical Model for the Thermal Discharge from Sequoyah Nuclear Plant as Required by NPDES Permit No. TN0026450 of March 2011. ML13289A1742013-02-11011 February 2013 NPDES Permit No. TN0026459 - Annual Water Withdrawal Updated ML13289A1972013-02-11011 February 2013 1.e.iii.2.10, Sequoyah Nuclear Plant (Sqn), Annual Water Withdrawal Updates for 2013, NPDES Permit No. TN0026450-Discharge Monitoring Report (DMR) for January 2013 ML13289A1732013-02-0101 February 2013 NPDES Permit No. TN0026450 - Annual Water Withdrawal Update ML13024A0072013-01-0707 January 2013 License Renewal Application, Part 5 of 8 ML13024A0082013-01-0707 January 2013 License Renewal Application, Attachment a, Part 6 of 8 ML13024A0122013-01-0707 January 2013 License Renewal Application, Part 2 of 8 2023-01-19
[Table view] Category:Letter
MONTHYEARML24298A1172024-10-24024 October 2024 Cycle 26, 180-Day Steam Generator Tube Inspection Report CNL-24-074, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-10-23023 October 2024 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revisions 05000327/LER-2024-001, Reactor Trip Due to a Turbine Trip2024-10-17017 October 2024 Reactor Trip Due to a Turbine Trip ML24282B0412024-10-15015 October 2024 Request for Withholding Information from Public Disclosure for Sequoyah Nuclear Plant, Units 1 and 2 and Watts Bar Nuclear Plant, Units 1 and 2 ML24260A1682024-10-0404 October 2024 Regulatory Audit Summary Related to Request to Add and Revise Notes Related to Technical Specification Table 3.3.2-1, Function 5 ML24284A1072024-09-26026 September 2024 Affidavit for Request for Withholding Information from Public Disclosure for Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2 05000328/LER-2024-001, Reactor Trip Due to an Electrical Trouble Turbine Trip2024-09-25025 September 2024 Reactor Trip Due to an Electrical Trouble Turbine Trip CNL-24-060, Supplement to Request for Approval of the Tennessee Valley Authority Nuclear Quality Assurance Program Description2024-09-24024 September 2024 Supplement to Request for Approval of the Tennessee Valley Authority Nuclear Quality Assurance Program Description CNL-24-047, Decommitment of Flood Mode Mitigation Improvement Systems2024-09-24024 September 2024 Decommitment of Flood Mode Mitigation Improvement Systems ML24262A0602024-09-23023 September 2024 Summary of August 19, 2024, Meeting with Tennessee Valley Authority Regarding a Proposed Supplement to the Tennessee Valley Authority Nuclear Quality Assurance Plan ML24267A0402024-09-19019 September 2024 Cycle 27 Core Operating Limits Report Revision 0 ML24185A1742024-09-18018 September 2024 Cover Letter - Issuance of Exemption Related to Non-Destructive Examination Compliance Regarding Sequoyah Nuclear Plant Independent Spent Fuel Storage Installation CNL-24-065, Tennessee Valley Authority – Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-09-18018 September 2024 Tennessee Valley Authority – Central Emergency Control Center Emergency Plan Implementing Procedure Revisions ML24253A0152024-09-0808 September 2024 Emergency Plan Implementing Procedure Revisions ML24247A2212024-08-29029 August 2024 Notification of Deviation from Pressurized Water Reactor Owners Group (PWROG) Letter OG-21-160, NEI 03-08 Needed Guidance: PWR Lower Radial Support Clevis Insert X-750 Bolt Inspection Requirements, September 1, 2021 ML24247A1802024-08-28028 August 2024 Application to Revise the Fuel Handling Accident Analysis, to Delete Technical Specification 3.9.4, Containment Penetrations, and to Modify Technical Specification 3.3.6, Containment Ventilation Isolation Instrumentation for Sequoyah Nuclea IR 05000327/20240052024-08-26026 August 2024 Updated Inspection Plan for Sequoyah Nuclear Plant, Units 1 and 2 - Report 05000327/2024005 and 05000328/2024005 ML24239A3972024-08-23023 August 2024 Rssc Wire & Cable LLC Dba Marmon - Part 21 Final Notification - 57243-EN 57243 CNL-24-061, Supplement to Application to Revise Function 5 of Technical Specification Table 3.3.2-1, ‘Engineered Safety Feature Actuation System Instrumentation,’ for the Sequoyah and Watts Bar (SQN-TS-23-02 and WBN-TS-23-08),2024-08-19019 August 2024 Supplement to Application to Revise Function 5 of Technical Specification Table 3.3.2-1, ‘Engineered Safety Feature Actuation System Instrumentation,’ for the Sequoyah and Watts Bar (SQN-TS-23-02 and WBN-TS-23-08), IR 05000327/20240022024-07-31031 July 2024 Integrated Inspection Report 05000327/2024002 and 05000328/2024002 ML24211A0572024-07-29029 July 2024 Submittal of Emergency Plan Implementing Procedure Revision ML24211A0542024-07-29029 July 2024 Operator License Examination Report ML24211A0412024-07-26026 July 2024 Unit 1 Cycle 26 Refueling Outage - 90-Day Inservice Inspection Summary Report ML24199A0012024-07-22022 July 2024 Clarification and Correction to Exemption from Requirement of 10 CFR 37.11(c)(2) ML24172A1342024-07-15015 July 2024 Exemptions from 10 CFR 37.11(C)(2) (EPID L-2023-LLE-0024) - Letter ML24191A4652024-07-0909 July 2024 Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations ML24177A0282024-06-25025 June 2024 Emergency Plan Implementing Procedure Revisions ML24176A0222024-06-24024 June 2024 Retraction of Interim Report of a Deviation or Failure to Comply – Transducer Model 8005N ML24089A1152024-06-21021 June 2024 Transmittal Letter, Environmental Assessments and Findings of No Significant Impact Related to Exemption Requests from 10 CFR 37.11(c)(2) ML24145A0852024-05-30030 May 2024 1B-B Diesel Generator Failure - Final Significance Determination Letter ML24145A1052024-05-29029 May 2024 301 Exam Approval Letter ML24134A1762024-05-13013 May 2024 Submittal of 2023 Annual Radiological Environmental Operating Report CNL-24-040, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-05-0808 May 2024 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revisions ML24128A0352024-05-0707 May 2024 Providing Supplemental Information to Apparent Violation ML24120A0582024-04-26026 April 2024 10 CFR 50.46 Annual Report for Sequoyah Nuclear Plant Units 1 and 2 ML24116A2612024-04-25025 April 2024 Interim Report of a Deviation or Failure to Comply - Transducer Model 8005N ML24114A0482024-04-23023 April 2024 Annual Radioactive Effluent Release Report for 2023 Monitoring Period CNL-24-037, Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Unit 1 and 2, Nuclear Quality Assurance Plan, TVA-NQA-PLN89-A, Revision 422024-04-22022 April 2024 Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Unit 1 and 2, Nuclear Quality Assurance Plan, TVA-NQA-PLN89-A, Revision 42 ML24144A2322024-04-20020 April 2024 Tennessee Multi-Sector Permit (Tmsp), 2024 Annual Discharge Monitoring Report for Outfalls SW-3, SW-3, and SW-9 ML24144A2362024-04-20020 April 2024 Discharge Monitoring Report (Dmr), March 2024 ML24089A0882024-04-18018 April 2024 – Exemption from Select Requirements of 10 CFR Part 73; Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting ML24102A1212024-04-18018 April 2024 Summary of Conference Call with Tennessee Valley Authority Regarding Sequoyah Nuclear Plant, Unit 1 Spring 2024 Steam Generator Tube Inspections CNL-24-024, Hydrologic Engineering Center River Analysis System Project Milestone Status Update2024-04-17017 April 2024 Hydrologic Engineering Center River Analysis System Project Milestone Status Update CNL-24-033, Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-04-17017 April 2024 Central Emergency Control Center Emergency Plan Implementing Procedure Revisions IR 05000327/20240012024-04-17017 April 2024 Integrated Inspection Report 05000327/2024001 and 05000328/2024001 ML24109A0272024-04-16016 April 2024 Cycle 27 Core Operating Limits Report Revision 0 CNL-23-006, Application to Modify Technical Specifications 3.8.1, AC Sources – Operating, and 3.8.2, AC Sources – Shutdown, for Sequoyah Nuclear Plant (SQN-TSC-22-03)2024-04-15015 April 2024 Application to Modify Technical Specifications 3.8.1, AC Sources – Operating, and 3.8.2, AC Sources – Shutdown, for Sequoyah Nuclear Plant (SQN-TSC-22-03) ML24106A0502024-04-12012 April 2024 Discharge Monitoring Report (Dmr), February 2024 ML24100A0162024-04-11011 April 2024 Request for Regulatory Conference (Tennessee Valley Authority - Sequoyah Nuclear Plant) CNL-24-020, Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Units 1 and 2, Request for Approval of Quality Assurance Program Description and Application to Revise the Technical Specifications Associated with QAPD Requirements2024-04-0101 April 2024 Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Units 1 and 2, Request for Approval of Quality Assurance Program Description and Application to Revise the Technical Specifications Associated with QAPD Requirements 2024-09-08
[Table view] |
Text
Tennessee Valley Authority Post Office Box 2000 Soddy Daisy,- Tennessee 37384-2000 Timothy P. Cleary Site Vice President Sequoyah Nuclear Plant July 24, 2009 Randy Slater State of Tennessee Department of Environment & Conservation Division of Underground Storage Tanks Chattanooga Environmental Field Office 540'McCallie Avenue, Suite 550 Chattanooga, Tennessee 37402 Dear Mr. Slater' SEQUOYAH NUCLEAR PLANT (SQN) FACILITY NO. 0-330628 - REPORT REQUEST FOR
SUMMARY
OF FAILURE OF PRESSURE TEST FOR PIPING ASSOCIATED WITH UNDERGROUND STORAGE TANKS (USTs)
Enclosed for your review is a summary of the incident and investigation to date involving the failure of a pressure test for piping associated with SQN's USTs, per your request to Stephanie Howard on July 10, 2009.
If you have any questions or need additional information, please contact Stephanie Howard at (423) 843-6700 or Ann Hurt at (423) 843-6714 of Sequoyah's Environmental staff.
Sincerely, Timothy Cleary Enclosure cc (Enclosure):
U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 printed on recycled paper
ENCLOSURE SEQUOYAH NUCLEAR PLANT REPORT REQUEST FOR
SUMMARY
OF FAILURE OF PRESSURE TEST FOR PIPING ASSOCIATED WITH UNDERGROUND STORAGE TANKS (USTs)
Incident Description On Friday June 26, 2009 at approximately 1430, a section of piping that supplies no. 2 diesel fuel from SQN's Fuel Oil Storage Tanks (FOSTs) to underground storage tanks ('7 day tanks'" failed a pressure test. The test was confirmed later that day and on June 27th. The section of piping is four inches in diameter and 180 feet long. These USTs are deferred per Tennessee Department of Environment and Conservation (TDEC) Rule 1200-1-15-.01(b)3. Because of the deferral, TDEC Rule 1200-1-15-.06 Petroleum Release Response, Remediation and Risk Management applies. Initial response actions per. 1200-1-15-.06(3) were completed including notification to TDEC Chattanooga Environmental Field Office Division of Underground Storage Tanks and the Nuclear Regulatory Commission on Monday morning June 29, 2009. It should be noted that no drinking water supplies are within one-tenth mile of the petroleum site. Furthermore, visual inspections of surrounding soils and water revealed no diesel fuel contamination, including free product and vapor hazards, from the suspected piping breach. The UST system was taken out of service when the confirmatory pressure test was completed on Satur~day June 27. The last successful pressure test on this. section of piping was in April of 2008. Thirteen diesel fuel transfers have occurred since the last successful pressure test. Sequoyah Environmental staff has maintained verbal and email communication with TDEC Chattanooga Environmental Field Office Division of Underground Storage Tanks.
Investigation Note: Oxygen levels and Lower Explosive Limit (LEL) for gases have been in acceptable ranges during all confined space monitoring conducted in excavation locations.
- 1. On Tuesday, June 30, two areas (Sites 1 and 3) were excavated in preparation for ultrasonic testing of the piping. The coating and the piping were in excellent condition at these excavation sites. There were no indications of Vapor, free product, or other diesel fuel contamination.
- 2. On Wednesday July 1, Structural Integrity (SI) began ultrasonic pipe testing using Guided Wave technology. The first location was inside the diesel generator building (Site 6). The second area was a midpoint along the sidewalk outside the building (Site 3). The third location was near the FOSTs (Site 1). The data collected did not give SI a full scan of the pipe:. Two additional areas were then excavated (Sites 2 & 4). Site 4, had an obvious odor of diesel when the backfill around the piping was exposed. Further testing at these additional sites resulted in inconclusive results. SI then conducted a, rudimentary "over the line survey" and although not conclusive showed a possible indication of a piping breach.
(see Attachment 1)
- 3. On Thursday July 2, excavation continued at an additional area Site 5. Near the pipe, the backfill once again had an odor of diesel. A 45 deg piping bend also explained the difficulties in performing the ultrasonic test in this section of piping. Based on engineering assessment after excavating several locations, this appeared to be the area of concern.
- 4. On Friday July 3, additional backfill and clay were removed to expose five welds:
four welds on the 45 and 90 that lead'into the building (Site 5) and one weld on the straight run of pipe (Site 4). The coal tar tape around the four welds had deteriorated over time. A pressure test was run once again and all five welds were tested using Snoop. Bubbles were formed and gas could be heard escaping from one of the locations. (see Attachments 2, 3, and 4)
- 5. On Monday July 6, the coating was removed from the affected area. The coal tar was brittle and cracking. The leak location was found at the 12 o'clock position on the weld at the connection of the 90 to the straight run that enters the building (Site 5). The remaining weldalong the circumference of the pipe appeared to be in good condition. Three other welds that were uncovered in Site 5 looked good as well. An area in the base material in the general area of the weld failure had some shallow pitting on the surface, but did not look substantial.
- 6. On Tuesday July 7, ultrasonic testing (UT) was performed on accessible areas of the pipe that have been exposed. Nominal thickness for four inch Schedule 40.
pipe is 0.237 inch. The lowest area found with UT was 0.225 inch, basically nominal wall thickness after 30 years of service. -The depth of the largest outer diameter (OD) pit was only 0.0625 inch, a minimum wall thickness of 0.1745 inch at that location. Based on a minimum wall criteria of 0.3Tnom, base metal thickness of the pipe was acceptable.
- 7. On Saturday July *11, the weld was repaired. Prior to repair, 100 gallons of diesel fuel were removed from the piping. The capacity of the piping is approximately
.117 gallons (15.7 cubic feet). A pressure test was then conducted on the pipe.
Although the weld repair passed, the pressure test failed, indicating a second leak in the piping.
- 8. On Wednesday July 15, a pressure test was conducted at the location of the repaired weld'to determine if the second leak was between the USTs and the repaired weld. The pressure test confirmed the location of the second leak between the repaired weld and the USTs.,
- 9. On Thursday July 16, a pressure test was conducted at the location of the repaired Weld to confirm the integrity of the pipe between the repaired weld and the FOSTs. The pressure test passed, confirming no leaks between the repaired weld and the FOSTs. Walk downs were also conducted to determine the tentative location of upstream and- downstream gradient sampling locations. The engineering reviews of these locations are still in process.
- 10. On Friday July 17, the section of piping determined to have the second leak was exposed. Another through-wall OD originating pit was found, with two other significant pits close by. All of these were found in the base metal. Maintenance is in the process of clamping this hole and performing a pressure test to insure
'this is the last leak location. (see Attachment 5)
J11. On Saturday July 18, repair at second leak location was completed. Pressure test was performed and found acceptable.
- 12. On Monday July 20, second pressure test on line was performed and found acceptable. Soil that contains diesel fuel continues to be'removed.
- 13. On Tuesday July 21, question asked about whether or not coal tar wrap contains asbestos. Work stopped and samples taken. Coal tar is currently contained in a 55-gallon drum, in diesel contaminated soil pile, and at excavation sites.
- 14. On Wednesday July 22, samples confirm that coal tar wrap contains greater than one percent chrysotile asbestos. From July 1 to 15, approximately 10 linear feet had been removed. Less than 1 pound released to the environmental, majority is non-friable, class III.
- 15. On Thursday July 23, Chattanooga Hamilton County Air Pollution Control Bureau was notified per SQN annual asbestos permit A-123008 of unexpected asbestos containing material that was found.
- 16. On Friday July 24, abatement and cleanup of asbestos begins.
- 17. Upcoming Events include:
- Complete asbestos abatement e Excavate additional welds in piping to visually inspect for corrosion
- Finalize schedule for field activities
ATTACHMENT 1 TANKS SECURITY FENCE x .x x z
-J II -
LEAK LOCATIONS z_._
K-4 ow
sw N,
4- N; 44 r,
.I tv'
~'v.
'4'--
Aq~
N 2~. -
4 vc~ : ~S
~' t>itjv
~
0
$< Atk
t< -
'kat A
4%.~~~I %AYV$ýk~~.k
'C 4 Cf
Mcxchr I¸*-
44
. I,* *L,,,
fro 4..