Category:Decommissioning Plan DKTs 30
MONTHYEARML1023505262009-08-24024 August 2009 Decommissioning Plan/Supporting Documentation ML1018801782009-08-24024 August 2009 Decommissioning Plan/Supporting Documentation, Sequoyah 2009-08-24
[Table view] Category:40
MONTHYEARCNL-23-022, Decommissioning Funding Status Report2023-03-29029 March 2023 Decommissioning Funding Status Report CNL-21-074, Triennial Decommissioning Funding Plans for Independent Spent Fuel Storage Installations2021-12-17017 December 2021 Triennial Decommissioning Funding Plans for Independent Spent Fuel Storage Installations CNL-19-095, Application to Modify the Sequoyah Nuclear Plant Units 1 and 2 Technical Specification 3.3.1, Reactor Protection System Instrumentation, Turbine Trip Function on Low Fluid Oil Pressure (SQN-TS-19-04)2020-03-13013 March 2020 Application to Modify the Sequoyah Nuclear Plant Units 1 and 2 Technical Specification 3.3.1, Reactor Protection System Instrumentation, Turbine Trip Function on Low Fluid Oil Pressure (SQN-TS-19-04) CNL-19-008, Decommissioning Funding Status Report2019-03-26026 March 2019 Decommissioning Funding Status Report CNL-18-111, Triennial Decommissioning Funding Plans for Independent Spent Fuel Storage Installations (Isfsis)2018-12-13013 December 2018 Triennial Decommissioning Funding Plans for Independent Spent Fuel Storage Installations (Isfsis) ML18197A3072018-08-30030 August 2018 Issuance of Amendments Regarding Request to Change Technical Specification 3.3.1 and Surveillance Requirement 3.2.4 CNL-15-212, Triennial Decommissioning Funding Plans for Independent Spent Fuel Storage Installations (Isfsis)2015-12-17017 December 2015 Triennial Decommissioning Funding Plans for Independent Spent Fuel Storage Installations (Isfsis) ML13093A3722013-04-0101 April 2013 Decommissioning Funding Status Report ML12356A0392012-12-17017 December 2012 Decommissioning Funding Plans for Independent Spent Fuel Storage Installations ML1109600732011-03-31031 March 2011 Submittal of Decommissioning Funding Status Report ML1023505262009-08-24024 August 2009 Decommissioning Plan/Supporting Documentation ML1018801782009-08-24024 August 2009 Decommissioning Plan/Supporting Documentation, Sequoyah ML0909202152009-03-31031 March 2009 Submittal of Decommissioning Funding Status Report ML0532101902005-11-15015 November 2005 Decommissioning Funding Status Report - Browns Ferry, Sequoyah, and Watts Bar Nuclear Plants ML0330701382003-10-30030 October 2003 TVA - Decommissioning Funding Status Report - Browns Ferry (Bfn), Sequoyah (Sqn), and Watts Bar (WBN) Nuclear Plants - Supplemental Information 2023-03-29
[Table view] Category:50
MONTHYEARCNL-23-022, Decommissioning Funding Status Report2023-03-29029 March 2023 Decommissioning Funding Status Report CNL-21-074, Triennial Decommissioning Funding Plans for Independent Spent Fuel Storage Installations2021-12-17017 December 2021 Triennial Decommissioning Funding Plans for Independent Spent Fuel Storage Installations CNL-19-008, Decommissioning Funding Status Report2019-03-26026 March 2019 Decommissioning Funding Status Report CNL-18-111, Triennial Decommissioning Funding Plans for Independent Spent Fuel Storage Installations (Isfsis)2018-12-13013 December 2018 Triennial Decommissioning Funding Plans for Independent Spent Fuel Storage Installations (Isfsis) CNL-15-212, Triennial Decommissioning Funding Plans for Independent Spent Fuel Storage Installations (Isfsis)2015-12-17017 December 2015 Triennial Decommissioning Funding Plans for Independent Spent Fuel Storage Installations (Isfsis) ML13093A3722013-04-0101 April 2013 Decommissioning Funding Status Report ML12356A0392012-12-17017 December 2012 Decommissioning Funding Plans for Independent Spent Fuel Storage Installations ML1109600732011-03-31031 March 2011 Submittal of Decommissioning Funding Status Report ML1023505262009-08-24024 August 2009 Decommissioning Plan/Supporting Documentation ML1018801782009-08-24024 August 2009 Decommissioning Plan/Supporting Documentation, Sequoyah ML0909202152009-03-31031 March 2009 Submittal of Decommissioning Funding Status Report ML0532101902005-11-15015 November 2005 Decommissioning Funding Status Report - Browns Ferry, Sequoyah, and Watts Bar Nuclear Plants ML0330701382003-10-30030 October 2003 TVA - Decommissioning Funding Status Report - Browns Ferry (Bfn), Sequoyah (Sqn), and Watts Bar (WBN) Nuclear Plants - Supplemental Information 2023-03-29
[Table view] Category:70
MONTHYEARCNL-23-022, Decommissioning Funding Status Report2023-03-29029 March 2023 Decommissioning Funding Status Report CNL-21-074, Triennial Decommissioning Funding Plans for Independent Spent Fuel Storage Installations2021-12-17017 December 2021 Triennial Decommissioning Funding Plans for Independent Spent Fuel Storage Installations CNL-19-095, Application to Modify the Sequoyah Nuclear Plant Units 1 and 2 Technical Specification 3.3.1, Reactor Protection System Instrumentation, Turbine Trip Function on Low Fluid Oil Pressure (SQN-TS-19-04)2020-03-13013 March 2020 Application to Modify the Sequoyah Nuclear Plant Units 1 and 2 Technical Specification 3.3.1, Reactor Protection System Instrumentation, Turbine Trip Function on Low Fluid Oil Pressure (SQN-TS-19-04) CNL-19-008, Decommissioning Funding Status Report2019-03-26026 March 2019 Decommissioning Funding Status Report CNL-18-111, Triennial Decommissioning Funding Plans for Independent Spent Fuel Storage Installations (Isfsis)2018-12-13013 December 2018 Triennial Decommissioning Funding Plans for Independent Spent Fuel Storage Installations (Isfsis) ML18197A3072018-08-30030 August 2018 Issuance of Amendments Regarding Request to Change Technical Specification 3.3.1 and Surveillance Requirement 3.2.4 CNL-15-212, Triennial Decommissioning Funding Plans for Independent Spent Fuel Storage Installations (Isfsis)2015-12-17017 December 2015 Triennial Decommissioning Funding Plans for Independent Spent Fuel Storage Installations (Isfsis) ML13093A3722013-04-0101 April 2013 Decommissioning Funding Status Report ML12356A0392012-12-17017 December 2012 Decommissioning Funding Plans for Independent Spent Fuel Storage Installations ML1109600732011-03-31031 March 2011 Submittal of Decommissioning Funding Status Report ML1023505262009-08-24024 August 2009 Decommissioning Plan/Supporting Documentation ML1018801782009-08-24024 August 2009 Decommissioning Plan/Supporting Documentation, Sequoyah ML0909202152009-03-31031 March 2009 Submittal of Decommissioning Funding Status Report ML0532101902005-11-15015 November 2005 Decommissioning Funding Status Report - Browns Ferry, Sequoyah, and Watts Bar Nuclear Plants ML0330701382003-10-30030 October 2003 TVA - Decommissioning Funding Status Report - Browns Ferry (Bfn), Sequoyah (Sqn), and Watts Bar (WBN) Nuclear Plants - Supplemental Information 2023-03-29
[Table view] |
Text
5roo o9,0Y'.2,¢ o o
" Document Type: DecoPzissionin2 Plan/Sulporting Documentation August. 24, 2009 Steve McCamy, POB 2A-SQN Q
- SEQUOYAH NUCLEAR PLANT - RECORDS OF SPILLS AND UNUSUAL OCCURENCES IMPORTANT TO DECOMMISSIONING. Memorandum for inclusion in 10CFR50.75(g)(1) required decommissioning rile.
This memorandum documents the identification and evaluation of a radioactive spill and unusual occurrence to outdoor environs of the plant site. The time frame of the
"- evaluation involves the spread of contamination from the unit I Refueling Water Storage Tank (RWST) moat to the ground immediately outside of the moat.
The following information is relevant to decommissioning and is contained in an
. Event Log:
o " 1. Unit I RWST moat drain
>, Time of Occurrence July 30, 2009 at 0755
- \ ' Event: The Unit I and Unit 2 RWST Moats are not protected from rain water intrusion.
Prior moat spills and moat samples have indicated that the moats are sources of radioactive contamination to include tritium. To keep radioactive material from getting S into the environment the bottom drains were capped and sump pumps were installed to pump the rain water to the Auxiliary Building Sump. The overflow drain was left unplugged to prevent water from damaging equipment. A catch containment was S/-- installed at the out fall of the overflow drain to catch any water that might exit the drain.
Another sump pump was installed in the catch containment to pump out any water that collected in the catch containment to the Auxiliary Building Sump.
Sometime prior to July 30 the ground fault interrupters that connect the sump pumps to the plant electrical system tripped shutting off power to the sump pumps. Since the pumps were not working when it started raining on July 30 the moat filled with water. At 0755 the moat was full of water and water started flowing out the overflow drain and into the catch containment. The sump pump in the catch containment could not keep up with the water flowing from the overflow drain and water started backing up in the catch containment. When the water reached the top of the containment it started flowing onto the ground. Approximately ten gallons of rain water flowed out of the catch containment onto the ground before the event stopped. Chemistry and Radiation Protection sampled the water from in the catch containment. The results of the samples from the catch container are Tritium at 6.64E-4 micro Curie/ ml and Total Gamma emitter's at 1.1 3E-6 micro Curie /ml.
Intonn&atiui intinis record was deleted in C- /C(C)#/ /0 .P- - ' /U .y
I The Unit 2 RWST Moat did not experience this because the sump pumps worked correctly.
The following specifies are provided to characterize the spill data thus far:
" Chemistry, Operations, and Radiation Protection logs were reviewed. From this log information the volume of water transferred from the moat to the ground was estimated to be approximately ten gallons.
" Spill Water Principal gamma emitters: (See attached analysis sheets)
" Spill water Tritium; (See attached analysis sheets)
SPP-5.14, Guide for Communicating Inadvertent Radiological Spills/Leaks to Outside Agencies, Section 3.2A States that any spill greater then 100 gallons or any spill containing greater than 20,000 picoCuries/liter has to be reported to outside agencies.
This incident does not meet either on of theses criteria this event does not have to be reported to any outside agencies.
Remediation performed: No soil excavation performed. Area included in Radiation Protection quarterly surveys of outside environs. RMD-FO-035.
Documentation: See attached appendix's of documentation.
Appendix 1, Spill water principal gamma emitters and tritium analysis.
Michael F. Halter Radiation Protection Support Manager.
SB2A-SQN
""i (
Outside of Scope
Qutside ot scope Outside of Sqope Outside of Scope Outtide of Scope Outside of Spope OutSide of Scope Outside of Scope Outside of Scope Outsisle of Scope
[Outside of Scope Outside of Scope
[Outside of Scope Outsiide of Scope Outside of, Scope OWtside of Scope Outside of ScOpe
Outside of Sdope