Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML09286006730 September 2009Units 1 & 2 and Oconee, Units 1, 2, & 3 - License Amendment Request (LAR) Catawba and McGuire Containment Spray Nozzle and Oconee Reactor Building Spray and Cooling Systems Technical Specification Surveillance RequirementBoric Acid
Foreign Material Exclusion
Grace period
Manual Operator Action
ML09268062725 September 2009IR 05000413-09-007 & IR 05000414-09-007; 07/13/2009 - 09/16/2009; Catawba Nuclear Station, Units 1 & 2; Fire ProtectionSafe Shutdown
Fire impairment
Significance Determination Process
Fire Protection Program
Fire Watch
Hourly Fire Watch
IR 05000413/200900725 September 2009IR 05000413-09-007 & IR 05000414-09-007; 07/13/2009 - 09/16/2009; Catawba Nuclear Station, Units 1 & 2; Fire ProtectionSafe Shutdown
Fire impairment
Significance Determination Process
Fire Protection Program
Fire Watch
Hourly Fire Watch
ML09240031121 September 2009Issuance of Amendments Regarding Proposed Implementation of TSTF-511, Revision 0, Eliminate Working Hour Restrictions from Ts. 5.2.2 to Support Compliance with 10 CFR Part 26. Catawba Units 1& 2, McGuire, Units 1 & 2, Oconee, Units 1, 2, &Safe Shutdown
Fire Protection Program
ML10047064221 September 2009Reactor and Senior Reactor Operator Initial Examinations (Preliminary)Job Performance Measure
ML09254046010 September 2009Summary of Phone Call with Industry to Issues Related to Eccentricity of the Steam Generator Tube-to-Tubesheet Joints in the Finite Element Model Used for the Technical Basis of the Permanent Alternate Repair Criteria License Amendment Requ
ML0925900428 September 2009Technical Specifications (TS) And/Or Bases Sections: 3.3.2, Engineered Safety Feature Actuation System (ESFAS) Instrumentation 3.3.3, Post Accident Monitoring (Pam).Post Accident Monitoring
ML1100308448 September 2009E-mail from J. Tsao, NRC to E. Michel, NRC, Et Al; Subject: Ssf Asw Leak PdoOperability Determination
ML0923304413 September 2009Correction Letter for License Amendment Nos. 250 and 245, Regarding Adoption of Technical Specifications Task Force (TSTF)-448, Rev. 3, Control Room Habitability Program.
ML0925302403 September 2009Request to Amend Technical Specification (TS) 3.7.10: Control Room Area Ventilation SystemSafe Shutdown
Grace period
TAC:ME86692 September 2009
ML0924404671 September 2009Mid-Cycle Performance Review and Inspection Plan - Edwin I. Hatch Nuclear Plant
ML0924402741 September 2009Mid-Cycle Performance Review and Inspection Plan - Catawba Nuclear Station
ML0924402791 September 2009Inspection/Activity Plan 07/01/2009 - 12/31/2010
ML0924404691 September 2009Inspection/Activity Plan 07/01/2009 - 12/31/2010
ML09252003227 August 2009Response to Relief Request 09-GO-001 Request for Additional Information Regarding Requirements for Certain Buried Components of the Condenser Circulating Water System
ML09238039226 August 200908/11-12/2009-Summary of Meeting Re 2009 Us NRC Initial Exam Development Workshop
ML09230004526 August 2009Relief 09-CN-002 Regarding Weld Buildup on Reactor Vessel Hot Leg NozzlesWeld Overlay
Incorporated by reference
Liquid penetrant
Dissimilar Metal Weld
ML10173038425 August 2009Westinghouse LTR-SGMP-09-109 NP-Attachment, Response to NRC Request for Additional Information on H*: RAI #4; Model F and Model D5 Generators.Finite Element Analysis
Exclusive Use
Operational leakage
ML09238064925 August 2009Independent Spent Fuel Storage Installation, Notification of Registration of Spent Fuel Storage Casks
ML09343050625 August 2009License Amendment Request for Technical Specification 3.16.13, Ice Condenser Doors, Response to Request for Additional InformationGOTHIC
Affidavit
ML09239039125 August 2009Response to NRC Regulatory Issue Summary 2009-11 Preparation and Scheduling of Operator Licensing ExaminationsGeneric Fundamentals Examination
ML09229089218 August 2009Notice of Conference Call with Duke Energy Carolinas, LLC (Duke), Regarding Catawba Nuclear Station, Units 1 and 2 (Catawba 1 and 2) and McGuire Nuclear Station Units 1 and 2
ML09224025918 August 2009Review of Cycle 14 Steam Generator Tube Inservice Inspection Reports
TAC:ME146418 August 2009
ML09224027718 August 2009Withdrawal of an Amendment Request
ML09226058613 August 2009Technical Specifications (TS) And/Or Bases Sections: 3.3.2, Engineered Safety Feature Actuation System (ESFAS) Instrumentation 3.3.3, Post Accident Monitoring (PAM) Instrumentation 3.5.4, Refueling Water Storage.Post Accident Monitoring
ML13017A14813 August 2009CFR 71.95(c) 60-Day Shipping Cask Report, Redacted
ML10173039112 August 2009Westinghouse LTR-SGMP-09-100 NP-Attachment, Response to NRC Request for Additional Information on H*; Model F and Model D5 Steam Generators.Finite Element Analysis
Affidavit
Operational leakage
ML09225006812 August 2009Alleged Discrimination Against Employee for Reporting Safety Concerns (Office of Investigations Case Number 2-2009-008)Fire Watch
ML09233013311 August 2009Independent Spent Fuel Storage Installation (Isfsi), Notification of Registration of Spent Fuel Storage Casks CNOFCTKNO42
ML0921107955 August 2009Withdrawal of an Amendment Request
ML0921200555 August 2009Notice of Withdrawal of Application for Amendment to Facility Operating License
TAC:MD96764 August 2009
ML0920805164 August 2009Evaluation of Amendment 36 Quality Assurance Program
ML0921804073 August 2009Report Pursuant to 10 CFR 50.46, Changes to or Errors in an ECCS Evaluation Model
ML09194049130 July 2009Issuance of Amendments 250 and 245, Regarding Adoption of Technical Specifications Task Force (TSTF)-448, Rev. 3, Control Room Habitability Program.Safe Shutdown
Earthquake
Fire Protection Program
ML09211062830 July 2009Notification of Licensed Operator Initial Examination 05000413-09-301 and 05000414-09-301
TAC:MD924930 July 2009
IR 05000414/200900328 July 2009IR 05000413-9-003 & 05000414-09-003 on 04/01/09 - 06/30/08 for Catawba, Units 1 & 2Safe Shutdown
Packing leak
High Radiation Area
Fire Barrier
Probabilistic Risk Assessment
Locked High Radiation Area
Foreign Material Exclusion
Eddy Current Testing
Operability Determination
Open House
Unidentified leakage
ML09216059328 July 2009Units 1 and 2 - Withdrawal of License Amendment Request (LAR) for Technical Specifications 3.8.4, DC Sources-Operating, and 3.8.5, DC Sources-Shutdown
ML09211012028 July 2009Catawba Nuclear Station Units 1 & 2 -Update on the Status of the November 21, 2008 Request for Additional Information (RAI) and Additional Testing Pursuant to NRC Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Reci
ML09201013215 July 2009Nine-Month Supplemental (Post-Outage) Response to NRC Generic Letter 2008-01 (10CFR50.54f)
ML09201049814 July 2009Inservice Inspection Report and Steam Generator In-Service Inspection Summary Report for End of Cycle 16 Refueling OutageBoric Acid
Non-Destructive Examination
Weld Overlay
Hydrostatic
VT-2
Through-Wall Leakage
Dissimilar Metal Weld
Thermal fatigue
ML0919601768 July 2009Technical Specification (TS) And/Or Bases Sections: 3.3.2, Engineered Safety Feature Actuation System (ESFAS) Instrumentation, 3.3.3, Post Accident Monitoring (PAM) Instrumentation, 3.5.4, Refueling Water.Post Accident Monitoring
ML0919503551 July 2009License Amendment Request to Support Plant Modifications to the Nuclear Instrumentation System