ML092110628

From kanterella
Jump to navigation Jump to search
Notification of Licensed Operator Initial Examination 05000413-09-301 and 05000414-09-301
ML092110628
Person / Time
Site: Catawba  Duke Energy icon.png
Issue date: 07/30/2009
From: Widmann M
Division of Reactor Safety II
To: Morris J
Duke Energy Carolinas
References
IR-09-301
Download: ML092110628 (6)


See also: IR 05000413/2009301

Text

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION II

SAM NUNN ATLANTA FEDERAL CENTER

61 FORSYTH STREET, SW, SUITE 23T85

ATLANTA, GEORGIA 30303-8931

July 30, 2009

Mr. J. R. Morris

Site Vice President

Duke Energy Carolinas, LLC

Catawba Nuclear Station

4800 Concord Road

York, SC 29745-9635

SUBJECT:

CATAWBA NUCLEAR STATION - NOTIFICATION OF LICENSED OPERATOR

INITIAL EXAMINATION - 05000413/2009301 AND 05000414/2009301

Dear Morris:

In a telephone conversation on July 29, 2009, between Mr. Allen Orten, Operations Training

Manager, and Mr. Frank Ehrhardt, Senior Operations Engineer, arrangements were made for

the administration of licensing examinations at Catawba Nuclear Station. The operating test is

scheduled to be administered during the weeks of December 7 and December 14, 2009. The

written examination is scheduled to be administered during the week of December 14, 2009.

The on-site preparatory week is scheduled for the week of November 16, 2009.

As agreed during the telephone conversation, your staff will prepare both the operating test and

written examination based on the guidelines in Revision 9, Supplement 1, of NUREG-1021,

"Operator Licensing Examination Standards for Power Reactors." The U.S. Nuclear Regulatory

Commission (NRC) regional office will discuss with your staff any changes that might be

necessary before the examinations are administered. Your staff has also agreed to make

copies of all examination materials that are necessary for administering the examination.

To meet the above schedule, it will be necessary for your staff to furnish the operating test

outline by September 23, 2009. Mr. Ehrhardt provided the written examination outline to your

staff in February, 2009. The operating test, written examination, and the supporting reference

materials identified in Attachment 3 to ES-201 will be due by October 23, 2009. Pursuant to

Title 10, Section 55.40(b)(3), of the Code of Federal Regulations (10 CFR 55.40(b)(3)), an

authorized representative of the facility licensee shall approve the outline, examination, and test

before they are submitted to the NRC for review and approval. All materials shall be complete

and ready-to-use.

We request that any personal, proprietary, sensitive unclassified, or safeguards information in

your response be contained in a separate enclosure and appropriately marked. Any delay in

receiving the required examination and reference materials, or the submittal of inadequate or

incomplete materials, may cause the examinations to be rescheduled.

DEC

2

In order to conduct the requested written examinations and operating tests, it will be necessary

for your staff to provide adequate space and accommodations in accordance with ES-402, and

to make the simulation facility available on the dates noted above. In accordance with ES-302,

your staff should retain the original simulator performance data (e.g., system pressures,

temperatures, and levels) generated during the dynamic operating tests until the examination

results are final.

Appendix E of NUREG-1021 contains a number of NRC policies and guidelines that will be in

effect while the written examinations and operating tests are being administered.

To permit timely NRC review and evaluation, your staff should submit preliminary reactor

operator and senior reactor operator license applications (Office of Management and Budget

(OMB) approval number 3150-0090), medical certifications (OMB approval number 3150-0024),

and waiver requests (if any)(OMB approval number 3150-0090) at least 30 days before the first

examination date. If the applications are not received at least 30 days before the examination

date, a postponement may be necessary. Signed applications certifying that all training has

been completed should be submitted at least 14 days before the first examination date.

This letter contains information collections that are subject to the Paperwork Reduction Act of

1995 (44 U.S.C. 3501 et seq.). These information collections were approved by OMB, under

approval number 3150-0018, which expires on June 30, 2009. The public reporting burden for

this collection of information is estimated to average 500 hours0.00579 days <br />0.139 hours <br />8.267196e-4 weeks <br />1.9025e-4 months <br /> per response, including the time

for reviewing instructions, gathering and maintaining the data needed, writing the examinations,

and completing and reviewing the collection of information. Send comments on any aspect of

this collection of information, including suggestions for reducing the burden, to the Information

and Records Management Branch (T-6 F33), U.S. Nuclear Regulatory Commission,

Washington, DC 20555-0001, or by Internet electronic mail at infocollectsresource@nrc.gov;

and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-

0018), Office of Management and Budget, Washington, DC 20503.

The NRC may not conduct or sponsor, and a person is not required to respond to, a collection

of information unless it displays a currently valid OMB control number.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its

enclosures will be available electronically for public inspection in the NRC Public Document

Room or from the Publicly Available Records (PARS) component of the NRCs document

system (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-

rm.adams.html (the Public Electronic Reading Room).

DEC

3

Thank you for your cooperation in this matter. Mr. Orten has been advised of the policies and

guidelines referenced in this letter. If you have any questions regarding the NRC's examination

procedures and guidelines, please contact Mr. Ehrhardt at (404) 562-4611, (Internet E-mail:

Frank.Ehrhardt@nrc.gov), or me at (404) 562-4550, (Internet E-mail: Malcolm.Widmann@nrc.gov).

Sincerely,

/MAD RA for/

Malcolm T. Widmann, Chief

Operations Branch

Division of Reactor Safety

Docket Nos.: 50-413, 50-414

License Nos.: NPF-358, NPF-52

cc: (See Page 4)

_________________________

X SUNSI REVIEW COMPLETE FJE

OFFICE

RII:DRS

RII:DRP

SIGNATURE

FJE /RA/

JHB /RA/

NAME

FErhardt

JBartley

DATE

07/30/2009

07/30/2009

E-MAIL COPY?

YES

NO YES

NO YES

NO YES

NO YES

NO YES

NO YES

NO

DEC

4

cc:

Randy D. Hart

Regulatory Compliance Manager

Duke Energy Carolinas, LLC

Electronic Mail Distribution

R. L. Gill, Jr.

Manager

Nuclear Regulatory Issues & Industry Affairs

Duke Energy Carolinas, LLC

Electronic Mail Distribution

Dhiaa M. Jamil

Group Executive and Chief Nuclear Officer

Duke Energy Carolinas, LLC

Electronic Mail Distribution

Kathryn B. Nolan

Senior Counsel

Duke Energy Corporation

526 South Church Street-EC07H

Charlotte, NC 28202

Lisa F. Vaughn

Associate General Counsel

Duke Energy Corporation

526 South Church Street-EC07H

Charlotte, NC 28202

David A. Repka

Winston Strawn LLP

Electronic Mail Distribution

North Carolina MPA-1

Suite 600

P.O. Box 29513

Raleigh, NC 27525-0513

Susan E. Jenkins

Director, Division of Waste Management

Bureau of Land and Waste Management

S.C. Department of Health and

Environmental Control

Electronic Mail Distribution

County Manager of York County

York County Courthouse

York, SC 29745

R. Mike Gandy

Division of Radioactive Waste Mgmt.

S.C. Department of Health and

Environmental Control

Electronic Mail Distribution

Beverly O. Hall

Chief, Radiation Protection Section

Department of Environmental Health

N.C. Department of Environmental

Commerce & Natural Resources

Electronic Mail Distribution

Vanessa Quinn

Federal Emergency Management Agency

500 C Street, SW

Room 840

Washington, DC 20472

Steve Weatherman, Operations Analyst

North Carolina Electric Membership

Corporation

Electronic Mail Distribution

Piedmont Municipal Power Agency

Electronic Mail Distribution

Peggy Force

Assistant Attorney General

State of North Carolina

P.O. Box 629

Raleigh, NC 27602

DEC

5

Letter to J. R. Morris from Malcolm T. Widmann dated July 30, 2009

SUBJECT:

CATAWBA NUCLEAR STATION - NOTIFICATION OF LICENSED OPERATOR

INITIAL EXAMINATION - 05000413/2009301 AND 05000414/2009301

Distribution w/encl:

C. Evans, RII

L. Slack, RII

OE Mail

RIDSNRRDIRS

PUBLIC

A. Adams, NRR

RidsNrrPMCatawba Resource