ML092390391
ML092390391 | |
Person / Time | |
---|---|
Site: | Oconee, Mcguire, Catawba, McGuire |
Issue date: | 08/25/2009 |
From: | Pitesa J Duke Energy Carolinas |
To: | Document Control Desk, Office of Nuclear Reactor Regulation |
References | |
RIS-09-011 | |
Download: ML092390391 (5) | |
Text
JOHN W. (BILL) PITESA Ener Vice President Nuclear Support Nuclear Generation Duke Energy 526 South Church St.
Charlotte, NC 28202 Mailing Address:
EC07H / PO Box 1006 Charlotte, NC 28201-1006 August 25, 2009 704-382-7258 704-382-6056 fax U. S. Nuclear Regulatory Commission Washington, DC 20555-0001 ATTENTION: Document Control Desk
Subject:
Duke Energy Carolinas, LLC Oconee Nuclear Station, Units 1, 2, and 3 Docket Nos. 50-269, 50-270, 50-287 McGuire Nuclear Station, Units 1 and 2 Docket Nos. 50-369, 50-370 Catawba Nuclear Station, Units 1 and 2 Docket Nos. 50-413, 50-414 Response to NRC Regulatory Issue Summary 2009-11 Preparation and Scheduling of Operator Licensing Examinations On July 16, 2009, the NRC issued Regulatory Issue Summary (RIS) 2009-11, "Preparation and Scheduling of Operator Licensing Examinations." The subject RIS requested an update to the NRC on projected schedules for site-specific operator licensing examinations and on the estimated numbers of applicants planning to take operator licensing examinations and the NRC's generic fundamentals examinations (GFEs).
NRC Form 536, "Operator Licensing Examination Data" is attached as requested for Oconee, McGuire, and Catawba Nuclear Stations.
Please direct any questions to L. B. Jones at (704) 382-4753.
Sincerely, John W. (Bill) Pitesa Attachments www. duke-energy, corn
U. S. Nuclear Regulatory Commission August 25, 2009 Page 2 xc:
L. A. Reyes, Regional Administrator U. S. Nuclear Regulatory Commission, Region II Sam Nunn Atlanta Federal Center 61 Forsyth St., SW, Suite 23T85 Atlanta, GA 30303-8931 J. F. Stang, Senior Project Manager (ONS)
U.S. Nuclear Regulatory Commission 11555 Rockville Pike Mail Stop 0-8 G9A Rockville, MD 20852-2738 J. H. Thompson, Project Manager (CNS & MNS)
U. S. Nuclear Regulatory Commission 11555 Rockville Pike Mail Stop 0-8 G9A Rockville, MD 20852-2738 E. T. Riggs Acting NRC Senior Resident Inspector Oconee Nuclear Station J. B. Brady NRC Senior Resident Inspector McGuire Nuclear Station G. A. Hutto NRC Senior Resident Inspector Catawba Nuclear Station
COPY OF U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 10/31/2011 NRC FORM 536 (10-2008) Estimated burden per response to comply with this voluntary information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This information collection is used to plan budgets and resources for operator examinations. Send comments regarding burden estimate to the Records and FOIA/Privacy Services Branch (T-5 F53), U.S.
OPERATOR LICENSING Nuclear Regulatory Commission, Washington, DC 20555-0001, or by internet EXAMINATION DATA e-mail to infocollects@nrc.gov, and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0131), Office of Management and Budget, Washington, DC 20503. If a means used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.
FACILITY NRC REGION Oconee Nuclear Station II A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED CY10 CY11 CY12 CY13 NUMBER ESTIMATED NUMBER OF 2 2 2 2 LICENSEE-PREPARED EXAMINATIONS ESTIMATED NUMBER OF 0 0 0 0 NRC-PREPARED EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED CYlO CY 11 CY12 CY13 NUMBER NUMBER OF REACTOR 6 5 6 6 6 6 6 6 OPERATORS NUMBER OF SENIOR 2 3 0 2 2 2 2 2 REACTOR OPERATORS -
INSTANT NUMBER OF SENIOR 1 1 3 1 1 1 1 1 REACTOR OPERATORS -
UPGRADE NUMBER OF SENIOR 0 0 0 0 0 0 0 0 REACTOR OPERATORS -
LIMITED PROPOSED DATES PRIMARY DATE 03/29/10 10/25/10 04/24/11 10/02/11 06/10/12 12/16/12 06/23/13 12/15/13 ALTERNATE DATE N/A N/A 05/08/11 10/16/11 06/24/12 12/02/12 06/16/13 12/08/13 already already scheduled scheduled C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE)
PROPOSED CY10 CY 11 NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED 8 0 0 8 8 0 0 8 NUMBER OF CANDIDATES COPY OF NRC FORM 536 (10-2008)
NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 10/31/2011 (10-2008) Estimated burden per response to comply with this voluntary information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This information collection is used to plan budgets and resources for operator examinations. Send comments regarding burden estimate to the Records and FOINAPrivacy Services Branch (T-5 F53), U.S.
OPERATOR LICENSING Nuclear Regulatory Commission, Washington, DC 20555-0001, or b internet e-mail to infocollects@nrc.gov, and to the Desk Officer, Office of Inrmation EXAMINATION DATA and Regulatory Affairs, NEOB-10202, (3150-0131), Office of Management and Budget, Washington, DC 20503. If a means used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.
FACILITY NRC REGION McGuire Nuclear Station lI A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 10 CY 11 Cy 12 Cy 13 ESTIMATED NUMBER OF LICENSEE-PREPARED 1 1 1 1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 10 CY 11 Cy 12 Cy 13 NUMBER OF REACTOR 7 11 8 6 OPERATORS NUMBER OF SENIOR REACTOR 1 1 4 4 OPERATORS - INSTANT NUMBER OF SENIOR REACTOR OPERATORS - UPGRADE 2 4 5 7 NUMBER OF SENIOR REACTOR 0 0 0 0 OPERATORS - LIMITED PROPOSED DATES PRIMARY DATE 08/02/2010 08/01/2011 07/30/2012 07/29/2013 ALTERNATE DATE 07/06/2010 08/15/2011 08/20/2012 08/19/2013 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 10 CY 11 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 12 0 0 0 12 0 0 0 CANDIDATES NRC FORM 536 (10-2008) PRINTED ON RECYCLED PAPER
NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 10/31/2011 (10-2008) Estimated burden per response to comply with this voluntary information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This information collection is used to plan budgets and resources for operator examinations. Send comments regarding burden estimate to the Records and FOIA/Privacy Services Branch (T-5 F53), U.S.
OPERATOR LICENSING Nuclear Regulatory Commission, Washington, DC 20555-0001, or by internet e-mail to infocollects@nrc.gov, and to the Desk Officer, Office of Information EXAMINATION DATA and Regulatory Affairs, NEOB-10202, (3150-0131), Office of Management and Budget, Washington, DC 20503. If a means used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.
FACILITY NRC REGION Catawba Nuclear Station 11 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 10 CY 11 Cy 12 Cy 13 ESTIMATED NUMBER OF LICENSEE-PREPARED 1 1 1 1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 10 CY 11 Cy 12 CY 13 NUMBER OF REACTOR 7 7 7 7 OPERATORS NUMBER OF SENIOR REACTOR 2 2 2 2 OPERATORS - INSTANT NUMBER OF SENIOR REACTOR 3 3 3 3 OPERATORS - UPGRADE NUMBER OF SENIOR REACTOR 0 0 0 0 OPERATORS - LIMITED PROPOSED DATES PRIMARY DATE 12/06/2010 12/05/2011 12/03/2012- 12/02/2013 ALTERNATE DATE 12/13/2010 12/12/2011 12/10/2012 12/09/2013 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 10 CY 11 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 9 0 0 0 9 0 0 CANDIDATES NRC FORM 536 (10-2008) PRINTED ON RECYCLED PAPER