E-mail from J. Tsao, NRC to E. Michel, NRC, Et Al; Subject: Ssf Asw Leak Pdo
ML110030844
Person / Time
Site: Oconee, Catawba  Duke Energy icon.png
Issue date: 09/08/2009
From: John Tsao
Office of Nuclear Reactor Regulation
To: Eric Michel, Sabisch A
NRC/RGN-II
References
FOIA/PA-2011-0021
Download: ML110030844 (2)


Text

Stamm, Eric From:

Tsao, John Sent:

Tuesday, September 08, 2009 11:19 AM To:

Michel, Eric; Sabisch, Andrew Cc:

Franke, Mark; Lake, Louis; Riggs, Eric; Ottenberg, Geoffrey; Stang, John

Subject:

RE: SSF ASW leak PDO Duke forwarded a draft relief request to John Stang, the PM, regarding the ASW pipe. I will be reviewing the relief request. John is setting up a phone call with the licensee this week on the relief request.

Thanks.

John Original Message -----

From: Michel, Eric Sent: Tuesday, September 08, 2009 10:02 AM To: Sabisch, Andrew Cc: Tsao, John; Franke, Mark; Lake, Louis; Riggs, Eric; Ottenberg, Geoffrey

Subject:

RE: SSF ASW leak PDO

Andy, In the big scheme of things John and I believe the PDO is ok, but there are a few issues/questions we have.

None of them are of a big enough concern that we're questioning the operability determination. We want to discuss these with you and see if we should be considering any follow up. No wooden plugs this time.

Eric Original Message -----

From: Sabisch, Andrew Sent: Sunday, September 06, 2009 6:21 PM To: Michel, Eric

Subject:

SSF ASW leak PDO

Eric, Wanted to follow-up'with you to see if there was any additional information we could provide or if you were still looking at a phone call on the repairs / assessment that they have done on the current thru-wall leak on the ASW piping...... hope they are not looking at some of the left-over wooden plugs from Catawba....

Let me know when you get in Tuesday or via E-mail sooner if you are checking from home what we can do for you and John.

Andy Andrew T. Sabisch U.S. Nuclear Regulatory Commission Senior Resident Inspector Oconee Nuclear Station 7812B Rochester Highway, Seneca, SC 29672 1,

3(17

(p) 864-885-3001 / (C) 803-554-3630 From: Michel, Eric Sent: Tuesday, September 01, 2009 1:34 PM To: Riggs, Eric Cc: Tsao, John; Franke, Mark; Sabisch, Andrew

Subject:

SSF ASW leak PDO

Eric, John and I have both taken a look the PDO for the SSF ASW leak. John's comments are attached. I've got three comments:
1. 90-05 requires augmented inspections (Enclosure 1.C.4). Specifically it calls for the inspection of 10 most susceptible (and accessible) locations for high energy lines. How is this being accomplished?
2. In the vicinity of the flaw how have they attempted to locate other flaws? I don't think the use of their wall thickness measurements is adequate to detect flaws with a "pinhole" geometry. Flaws in the vicinity of the TW leak may affect the 90-05 analysis.
3. We understand that the ID of the pipe is coated. Was surface prep necessary on the ID to accommodate UT? Please describe the surface condition of the pipe for the exam.

We'd like to have a quick call with you once you've had a chance to take a look at the comments, just to make sure we're all on the same page and see how we'd like to proceed. Sometime this week, if you can support (understand you guys are busy with the SRI turnover and the feed control valve from this morning), would be good on this end. Thanks.

Eric 2