Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML22342B280 | 28 December 2022 | Issuance of Amendments Adoption of TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling, Revision 1 | |
ML22354A081 | 20 December 2022 | Inservice Inspection Request for Information | Nondestructive Examination Scaffolding |
ML22354A258 | 15 December 2022 | 10_RBS-2022-12 Post-Exam Comments | |
ML23004A192 | 14 December 2022 | 11_RBS-2022-12 Public Forms | |
IR 05000458/2022010 | 12 December 2022 | Triennial Fire Protection Inspection Report 05000458/2022010 | Safe Shutdown Fire Barrier Fire impairment Temporary Modification Significance Determination Process Fire Protection Program Fire Watch Scaffolding |
ML22340A672 | 6 December 2022 | Request to Update ASME Code Relief Request Safety Evaluations with NRC Approved Revision of BWRVIP Guidelines (GG-ISI-020, and RBS-ISI-019) | |
ML22314A138 | 23 November 2022 | Nrc Initial Operator Licensing Examination Approval 05000458/2022301 | |
PMNS20221160, Notice of Closed Meeting with Entergy Operations Inc. to Discuss Security Program Strategy Changes Applicable to the Entergy Fleet | 4 November 2022 | Notice of Closed Meeting with Entergy Operations Inc. to Discuss Security Program Strategy Changes Applicable to the Entergy Fleet | |
IR 05000458/2022003 | 3 November 2022 | and Independent Spent Fuel Storage Installation Integrated Inspection Report 05000458/2022003 and 07200049/2022001 | Safe Shutdown Hydrostatic Enforcement Discretion Temporary Modification Functionality Assessment Condition Adverse to Quality Significance Determination Process Job Performance Measure Operability Determination Severe Accident Management Guideline Fire Protection Program |
ML22266A062 | 29 September 2022 | Entergy Fleet Submittals - Project Manager Reassignment | |
ML22265A180 | 27 September 2022 | Proposed Alternative to the Requirements of ASME Code of Operation and Maintenance of Nuclear Power Plants for Pressure Isolation Valve Testing Frequency | Incorporated by reference Power-Operated Valves |
RBG-48198, Report of Changes and Errors to 10CFR50.46 | 22 September 2022 | Report of Changes and Errors to 10CFR50.46 | |
IR 05000458/2022402 | 12 September 2022 | NRC Security Inspection Report 05000458/2022402 (Full Report) | |
ML22231B176 | 7 September 2022 | Pre-Submittal Meeting - 10 CFR 50.69 and TSTF-505 License Amendment Requests (EPID L-2022-LRM-0065) (Slides) | Safe Shutdown Earthquake Internal Flooding Probabilistic Risk Assessment FLEX |
PMNS20220868, Notice of Meeting with Entergy Operations, Inc. to Discuss Planned License Amendment Requests for River Bend Station, Unit 1 | 31 August 2022 | Notice of Meeting with Entergy Operations, Inc. to Discuss Planned License Amendment Requests for River Bend Station, Unit 1 | |
ML22235A108 | 19 August 2022 | RBS Emergency Preparedness (EP) Exercise Inspection October 2022 RFI | Coronavirus |
RBG-48187, Notification of Spent Fuel Cask Use | 15 August 2022 | Notification of Spent Fuel Cask Use | |
IR 05000458/2022002 | 9 August 2022 | Integrated Inspection Report 05000458/2022002 | Reactor Vessel Water Level Internal Flooding Enforcement Discretion Probabilistic Risk Assessment Temporary Modification Functionality Assessment FLEX Significance Determination Process Operability Determination Continuous fire watch Fire Protection Program Fire Watch Grace period Downpower |
ML22221A223 | 3 August 2022 | Security Baseline Inspection Report Cover Letter Only | |
ML22206A015 | 21 July 2022 | NRR E-mail Capture - Entergy (Grand Gulf, River Bend, and Waterford-3) - Acceptance Review of the RR EN-RR-22-001, Case N-752, Risk-informed Cat & Treatment for Repair/Replacement Activities in Class 2 & 3 Systems | |
ML22188A174 | 19 July 2022 | Issuance of Amendment No. 211 Add License Condition Concerning Receipt, Possession, and Use of Byproduct Materials | |
RBG-48184, Notification of Spent Fuel Cask Use | 18 July 2022 | Notification of Spent Fuel Cask Use | |
ML22186A076 | 5 July 2022 | Information Request, Security IR 2022402 | |
ML22181B114 | 30 June 2022 | Relief Request Number EN-RR-22-001 - Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and Treatment for Repair/ Replacement Activities in Class 2 and 3 Systems, Section XI, Division | Non-Destructive Examination Internal Flooding Probabilistic Risk Assessment Large early release frequency |
ML22175A065 | 30 June 2022 | Notification of Inspection (NRC Inspection Report 05000458/2022004) and Request for Information | |
ML22180A061 | 29 June 2022 | Notification of an NRC Fire Protection Baseline Inspection (NRC Inspection Report 05000458/2022010) and Request for Information | Safe Shutdown Commercial Grade Dedication Hydrostatic Probabilistic Risk Assessment Temporary Modification Aging Management Job Performance Measure Fire Protection Program |
RBG-48178, Notification of Spent Fuel Cask Use | 29 June 2022 | Notification of Spent Fuel Cask Use | |
ML22167A088 | 24 June 2022 | Summary of June 14, 2022, Public Meeting with Entergy Operations, Inc. to Discuss Upcoming Relief Request to Use Code Case N-752 for Grand Gulf Nuclear Station, Unit 1, River Bend Station, Unit 1, and Waterford Steam Electric Station, Unit | |
ML22173A037 | 21 June 2022 | NRR E-mail Capture - Entergy (Grand Gulf and River Bend) - Acceptance Review of the License Amendment Request to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling | |
ML22164A801 | 13 June 2022 | Entergy Fleet (GGNS, RBS, and WF-3) - Code Case N-752 RR 6-14-22 Pre-Submittal Public Meeting Presentation Slides | |
PMNS20220554, Meeting Notice with Entergy Operations, Inc. Regarding a Presubmittal of a Relief Request for Grand Gulf Nuclear Station, Unit 1, River Bend Station, Unit 1, and Waterford Steam Electric Station, Unit 3 | 9 June 2022 | Meeting Notice with Entergy Operations, Inc. Regarding a Presubmittal of a Relief Request for Grand Gulf Nuclear Station, Unit 1, River Bend Station, Unit 1, and Waterford Steam Electric Station, Unit 3 | |
ML22147A093 | 6 June 2022 | 2021 Annual Assessment Public Meeting Summary | Pandemic Coronavirus COVID-19 |
IR 05000458/2022011 | 2 June 2022 | Design Basis Assurance Inspection (Programs) Inspection Report 05000458/2022011 | Significance Determination Process Operability Determination Power-Operated Valves Weak link |
CNRO-2022-00015, Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling Using the Consolidated Line-Item Improvement Process | 26 May 2022 | Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling Using the Consolidated Line-Item Improvement Process | Surveillance Frequency Control Program |
RBG-48166, Supplement to Special Report for Tritium Discovered Onsite | 12 May 2022 | Supplement to Special Report for Tritium Discovered Onsite | |
ML22104A222 | 12 May 2022 | Issuance of Amendments Revise Technical Specifications to Adopt TSTF 554 | Shutdown Margin Packing leak Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report Surveillance Frequency Control Program Process Control Program Pressure Boundary Leakage |
PMNS20220467, Public Webinar to Discuss the Nuclear Regulatory Commission'S 2021 Annual Assessment of Safety Performance at Region IV Plants | 3 May 2022 | Public Webinar to Discuss the Nuclear Regulatory Commission'S 2021 Annual Assessment of Safety Performance at Region IV Plants | |
ML22111A328 | 2 May 2022 | FOF Cover Letter 2022 | |
ML22083A124 | 28 April 2022 | Arkansas, Units 1 and 2; Grand Gulf Nuclear Station; River Bend Station; and Waterford Steam Electric Station - Issuance of Amendments Revise Technical Specifications to Adopt TSTF-541, Revision 2 | Ultimate heat sink Water Inventory Control Surveillance Frequency Control Program Recently irradiated fuel |
IR 05000458/2022001 | 27 April 2022 | Integrated Inspection Report 05000458/2022001 | High winds Half scram Internal Flooding Enforcement Discretion Temporary Modification Functionality Assessment Condition Adverse to Quality Significance Determination Process Scram Discharge Volume Operability Determination Fire Protection Program Power change Downpower |
RBG-48148, 2021 Annual Radiological Environmental Operating Report | 27 April 2022 | 2021 Annual Radiological Environmental Operating Report | Time of Discovery Grab sample Offsite Dose Calculation Manual Annual Radiological Environmental Operating Report Chernobyl |
RBG-48149, 2021 Annual Radioactive Effluent Release Report | 27 April 2022 | 2021 Annual Radioactive Effluent Release Report | Grab sample Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report Process Control Program Tritium |
ML22104A078 | 14 April 2022 | Annual Report for Entergy Quality Assurance Program Manual Changes Under 10 CFR 50.54(a)(3), 10 CFR 71.106, and 10 CFR 72.140(d). Notification of Application of Approved Appendix B to 10 CFR 72 Subpart G | Safe Shutdown Non-Destructive Examination Coatings Temporary Modification Process Control Program Fire Protection Program Grace period |
ML22088A255 | 29 March 2022 | Change for NRC Distribution Lists Re Entergy'S Vice President, Regulatory Assurance | |
ML22026A489 | 22 March 2022 | Issuance of Amendment Nos. 225, 225, 227, 227, and 148, Respectively, Regarding Issues Identified in Westinghouse Documents (EPID L-2021-LLA-0066) Nonproprietary | Anticipated operational occurrence Nonconservative Technical Specifications Fire Protection Program Power change |
ML22081A299 | 21 March 2022 | Entergy Operations, Inc - Summary of Property Damage Insurance Coverage | |
ML22075A344 | 16 March 2022 | Response to Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations | |
ML22073A189 | 14 March 2022 | River Bend Nuclear Station; and Waterford Steam Electric Station, Unit 3 - Proof of Financial Protection (10 CFR 140.15) | |
IR 05000458/2021006 | 2 March 2022 | Annual Assessment Letter (Report 05000458/2021006) | Fitness for Duty Exemption Request Power-Operated Valves COVID-19 |
ML22054A202 | 23 February 2022 | Single Positive Test Form Collected on 05/05/2021 |