Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML22362A110 | 28 December 2022 | Energy Harbor Nuclear Corp. Submittals - Project Manager Reassignment | |
L-22-271, Emergency Plan | 20 December 2022 | Emergency Plan | Safe Shutdown Unanalyzed Condition Time of Discovery High winds Ultimate heat sink Grab sample Offsite Dose Calculation Manual Fire Barrier Time to boil Safe Shutdown Earthquake Internal Flooding Probabilistic Risk Assessment Operating Basis Earthquake Operator Manual Action Severe Accident Management Guideline Earthquake Fuel cladding Pressure Boundary Leakage Grace period Power change |
IR 05000440/2022405 | 20 December 2022 | Security Baseline Inspection Report 05000440/2022405 (Cover Letter Only) | Affidavit |
L-22-272, Supplement to License Amendment Request to Revise the Methodology Used for Flood Hazard Analysis (EPID L-2021-LLA-0067) and Withdrawal of Exemption Requests (EPIDs L-2021-LLE-0022 and L-2021-LLE-0023) | 16 December 2022 | Supplement to License Amendment Request to Revise the Methodology Used for Flood Hazard Analysis (EPID L-2021-LLA-0067) and Withdrawal of Exemption Requests (EPIDs L-2021-LLE-0022 and L-2021-LLE-0023) | Hydrostatic Exemption Request Earthquake |
L-22-263, Spent Fuel Storage Cask Registration | 12 December 2022 | Spent Fuel Storage Cask Registration | |
ML22333A790 | 6 December 2022 | Operator Licensing Examination Approval - Perry Nuclear Power Plant December 2022 | |
ML22336A122 | 5 December 2022 | Request for Information for the NRC Quadrennial Comprehensive Engineering Team Inspection: Inspection Report 05000440/2023010 | Stroke time Temporary Modification Aging Management Large early release frequency COVID-19 |
ML23038A143 | 1 December 2022 | 2.3-1 Examination Outline Quality Checklist | |
ML23038A158 | 1 December 2022 | 2.3-4 Written Examination Quality Checklist | |
ML23038A157 | 1 December 2022 | 2.3-2 Operating Test Quality Checklist | |
ML22341A032 | 30 November 2022 | 10 CFR Part 21 Notification from Curtiss-Wright Nuclear Division for Qualtech Np Supplied Eaton TRM5 Timing Relays | |
L-22-254, Emergency Plan for Perry Nuclear Power Plant, Including EAL Matrix Revision 22 | 18 November 2022 | Emergency Plan for Perry Nuclear Power Plant, Including EAL Matrix Revision 22 | Safe Shutdown Unanalyzed Condition Time of Discovery High winds Ultimate heat sink Grab sample Offsite Dose Calculation Manual Fire Barrier Time to boil Safe Shutdown Earthquake Internal Flooding Probabilistic Risk Assessment Operating Basis Earthquake Operator Manual Action Severe Accident Management Guideline Earthquake Fuel cladding Pressure Boundary Leakage Grace period Power change |
IR 05000440/2022003 | 8 November 2022 | Integrated Inspection Report 05000440/2022003 | Temporary Modification Functionality Assessment Operability Determination Fire Protection Program Power change Unidentified leakage |
L-22-250, Mid-Cycle Revision to the Core Operating Limits Report for Operating Cycle 19 | 8 November 2022 | Mid-Cycle Revision to the Core Operating Limits Report for Operating Cycle 19 | |
L-22-221, Supplement to Application to Revise the Technical Specifications to Adopt TSTF-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position | 18 October 2022 | Supplement to Application to Revise the Technical Specifications to Adopt TSTF-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position | Reactor Vessel Water Level Water Inventory Control Surveillance Frequency Control Program |
IR 05000440/2022501 | 17 October 2022 | Emergency Preparedness Biennial Exercise Inspection Report 05000440/2022501 | |
ML22252A221 | 30 September 2022 | Authorization and Safety Evaluation for Alternative Request IR-063 | Aging Management Subsequent License Renewal |
IR 05000440/2022010 | 29 September 2022 | Triennial Inspection of Evaluation of Changes, Tests and Experiments Baseline Inspection Report 05000440/2022010 | Fire Barrier Functionality Assessment |
ML22258A063 | 26 September 2022 | July 21, 2022, Perry Nuclear Plant, Unit 1 License Renewal Environmental Pre-Application Meeting Summary - Letter | |
ML22210A010 | 16 September 2022 | Energy Harbor Fleet- Issuance of Amendments Regarding Adoption of TSTF 554, Revise Reactor Coolant Leakage Requirements | Weld Overlay Surveillance Frequency Control Program Pressure Boundary Leakage |
L-22-184, Proposed Exam Cover Letter 2022 Signed | 14 September 2022 | Proposed Exam Cover Letter 2022 Signed | Job Performance Measure |
L-22-201, Submittal of Evacuation Time Estimates | 12 September 2022 | Submittal of Evacuation Time Estimates | Pandemic Coronavirus |
IA-22-029, Results of NRC Investigation Report No. 3-2021-007 | 2 September 2022 | Results of NRC Investigation Report No. 3-2021-007 | Fitness for Duty |
ML22241A036 | 29 August 2022 | NRR E-mail Capture - Perry Nuclear Power Plant - Acceptance of License Amendment Request to Adopt TSTF-541, Revision 2 | |
ML22213A036 | 29 August 2022 | Safety Pre-Application Meeting Summary | Aging Management |
IR 05000440/2022005 | 26 August 2022 | Updated Inspection Plan for Perry Nuclear Power Plant (Report 05000440/2022005) | Commercial Grade Dedication Exemption Request Coronavirus |
ML22234A148 | 22 August 2022 | Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information | Job Performance Measure |
ML22228A191 | 18 August 2022 | Energy Harbor Nuclear Corp. Submittals - Project Manager Reassignment | |
L-22-050, Summary of Changes to the Energy Harbor Nuclear Corp. Quality Assurance Program Manual | 9 August 2022 | Summary of Changes to the Energy Harbor Nuclear Corp. Quality Assurance Program Manual | Offsite Dose Calculation Manual Nondestructive Examination Temporary Modification Condition Adverse to Quality Aging Management Process Control Program License Renewal Pandemic Grace period |
IR 05000440/2022002 | 8 August 2022 | Integrated Inspection Report 05000440/2022002 | High winds High Radiation Area Ultimate heat sink Offsite Dose Calculation Manual Temporary Modification Zebra Mussel Functionality Assessment Operability Determination Fire Protection Program Scaffolding Substantial potential for an overexposure Overexposure |
L-20-239, Application to Revise the Technical Specifications to Adopt TSTF-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position | 5 August 2022 | Application to Revise the Technical Specifications to Adopt TSTF-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position | Reactor Vessel Water Level Water Inventory Control Surveillance Frequency Control Program |
IR 05000440/2022420 | 4 August 2022 | Security Baseline Inspection Report 05000440/2022420 - Cover Letter | Affidavit |
ML23038A148 | 29 July 2022 | Day Letter Signed | |
IR 05000440/2022402 | 21 July 2022 | Security Baseline Inspection Report 05000440/2022402 | |
ML22200A222 | 21 July 2022 | License Renewal Application - Safety Pre-Application Meeting July 21, 2022 (Perry Slides) | Incorporated by reference Aging Management Exemption Request |
ML22199A023 | 21 July 2022 | July 21, 2022, Perry Nuclear Power Plant License Renewal Environmental Pre-application Public Meeting - NRC Slides | Environmental Justice |
ML22199A035 | 21 July 2022 | July 21, 2022, Perry Nuclear Power Plant License Renewal Environmental Pre-application Public Meeting - Energy Harbor Slides | |
PMNS20220611, Pre-Application Meeting for License Renewal Application - Perry, Unit 1 (Safety) | 20 July 2022 | Pre-Application Meeting for License Renewal Application - Perry, Unit 1 (Safety) | |
ML22201A005 | 19 July 2022 | License Renewal Application - Safety Pre-Application Meeting July 21, 2022 (NRC Slides) | |
L-22-171, Response to Request for Additional Information Regarding Proposed Inservice Inspection Alternative IR-063 | 14 July 2022 | Response to Request for Additional Information Regarding Proposed Inservice Inspection Alternative IR-063 | Weld Overlay |
ML22189A177 | 13 July 2022 | Closeout of Bulletin 2012 01, Design Vulnerability in Electric Power System | Open Phase Condition |
ML22187A259 | 12 July 2022 | Issuance of Relief Proposed Alternative Request Vr 12, Revision 0, Associated with the Fourth 10-Year Inservice Testing Interval | Incorporated by reference |
PMNS20220690, Pre-Application Meeting for License Renewal Application - Perry, Unit 1 (Environmental) | 5 July 2022 | Pre-Application Meeting for License Renewal Application - Perry, Unit 1 (Environmental) | |
ML22182A444 | 2 July 2022 | Information Request for NRC Triennial Evaluations of Changes, Tests, and Experiments (50.59) Baseline Inspection Report 05000440/2022010 | Probabilistic Risk Assessment |
ML22136A113 | 21 June 2022 | Issuance of Relief Proposed Alternative Requests VR-10, Revision 0, and VR-11, Revision 0, Associated with the Fourth 10-Year Inservice Testing Interval (EPIDs L-2021-LLR-0096; L-2021-LLR-0097) | Incorporated by reference |
ML22167A100 | 16 June 2022 | NRR E-mail Capture - Perry Nuclear Power Plant - Delay in Issuance of License Amendment and Exemptions Regarding Revising the Methodology Used for Flood Hazard Analysis (EPIDs No.L-2021-LLA-0067, L-2021-LLE-0022, L-2021-LLE-0023) | |
IR 05000440/2022404 | 9 June 2022 | Security Baseline Inspection Report 05000440/2022404 | |
L-22-099, Supplement to License Amendment Request to Revise the Methodology Used for Flood Hazard Analysis | 1 June 2022 | Supplement to License Amendment Request to Revise the Methodology Used for Flood Hazard Analysis | Unanalyzed Condition Shutdown Margin High Radiation Area Tornado Missile Hydrostatic |
ML22147A037 | 31 May 2022 | Summary of the May 19, 2022, Public Outreach to Discuss the NRC 2021 End of Cycle Plant Performance Assessment of Perry Nuclear Power Plant | Open House |
L-22-057, Annual Financial Report - Affidavit | 25 May 2022 | Annual Financial Report - Affidavit |