Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML22362A11028 December 2022Energy Harbor Nuclear Corp. Submittals - Project Manager Reassignment
L-22-271, Emergency Plan20 December 2022Emergency PlanSafe Shutdown
Unanalyzed Condition
Time of Discovery
High winds
Ultimate heat sink
Grab sample
Offsite Dose Calculation Manual
Fire Barrier
Time to boil
Safe Shutdown Earthquake
Internal Flooding
Probabilistic Risk Assessment
Operating Basis Earthquake
Operator Manual Action
Severe Accident Management Guideline
Earthquake
Fuel cladding
Pressure Boundary Leakage
Grace period
Power change
IR 05000440/202240520 December 2022Security Baseline Inspection Report 05000440/2022405 (Cover Letter Only)Affidavit
L-22-272, Supplement to License Amendment Request to Revise the Methodology Used for Flood Hazard Analysis (EPID L-2021-LLA-0067) and Withdrawal of Exemption Requests (EPIDs L-2021-LLE-0022 and L-2021-LLE-0023)16 December 2022Supplement to License Amendment Request to Revise the Methodology Used for Flood Hazard Analysis (EPID L-2021-LLA-0067) and Withdrawal of Exemption Requests (EPIDs L-2021-LLE-0022 and L-2021-LLE-0023)Hydrostatic
Exemption Request
Earthquake
L-22-263, Spent Fuel Storage Cask Registration12 December 2022Spent Fuel Storage Cask Registration
ML22333A7906 December 2022Operator Licensing Examination Approval - Perry Nuclear Power Plant December 2022
ML22336A1225 December 2022Request for Information for the NRC Quadrennial Comprehensive Engineering Team Inspection: Inspection Report 05000440/2023010Stroke time
Temporary Modification
Aging Management
Large early release frequency
COVID-19
ML23038A1431 December 20222.3-1 Examination Outline Quality Checklist
ML23038A1581 December 20222.3-4 Written Examination Quality Checklist
ML23038A1571 December 20222.3-2 Operating Test Quality Checklist
ML22341A03230 November 202210 CFR Part 21 Notification from Curtiss-Wright Nuclear Division for Qualtech Np Supplied Eaton TRM5 Timing Relays
L-22-254, Emergency Plan for Perry Nuclear Power Plant, Including EAL Matrix Revision 2218 November 2022Emergency Plan for Perry Nuclear Power Plant, Including EAL Matrix Revision 22Safe Shutdown
Unanalyzed Condition
Time of Discovery
High winds
Ultimate heat sink
Grab sample
Offsite Dose Calculation Manual
Fire Barrier
Time to boil
Safe Shutdown Earthquake
Internal Flooding
Probabilistic Risk Assessment
Operating Basis Earthquake
Operator Manual Action
Severe Accident Management Guideline
Earthquake
Fuel cladding
Pressure Boundary Leakage
Grace period
Power change
IR 05000440/20220038 November 2022Integrated Inspection Report 05000440/2022003Temporary Modification
Functionality Assessment
Operability Determination
Fire Protection Program
Power change
Unidentified leakage
L-22-250, Mid-Cycle Revision to the Core Operating Limits Report for Operating Cycle 198 November 2022Mid-Cycle Revision to the Core Operating Limits Report for Operating Cycle 19
L-22-221, Supplement to Application to Revise the Technical Specifications to Adopt TSTF-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position18 October 2022Supplement to Application to Revise the Technical Specifications to Adopt TSTF-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated PositionReactor Vessel Water Level
Water Inventory Control
Surveillance Frequency Control Program
IR 05000440/202250117 October 2022Emergency Preparedness Biennial Exercise Inspection Report 05000440/2022501
ML22252A22130 September 2022Authorization and Safety Evaluation for Alternative Request IR-063Aging Management
Subsequent License Renewal
IR 05000440/202201029 September 2022Triennial Inspection of Evaluation of Changes, Tests and Experiments Baseline Inspection Report 05000440/2022010Fire Barrier
Functionality Assessment
ML22258A06326 September 2022July 21, 2022, Perry Nuclear Plant, Unit 1 License Renewal Environmental Pre-Application Meeting Summary - Letter
ML22210A01016 September 2022Energy Harbor Fleet- Issuance of Amendments Regarding Adoption of TSTF 554, Revise Reactor Coolant Leakage RequirementsWeld Overlay
Surveillance Frequency Control Program
Pressure Boundary Leakage
L-22-184, Proposed Exam Cover Letter 2022 Signed14 September 2022Proposed Exam Cover Letter 2022 SignedJob Performance Measure
L-22-201, Submittal of Evacuation Time Estimates12 September 2022Submittal of Evacuation Time EstimatesPandemic
Coronavirus
IA-22-029, Results of NRC Investigation Report No. 3-2021-0072 September 2022Results of NRC Investigation Report No. 3-2021-007Fitness for Duty
ML22241A03629 August 2022NRR E-mail Capture - Perry Nuclear Power Plant - Acceptance of License Amendment Request to Adopt TSTF-541, Revision 2
ML22213A03629 August 2022Safety Pre-Application Meeting SummaryAging Management
IR 05000440/202200526 August 2022Updated Inspection Plan for Perry Nuclear Power Plant (Report 05000440/2022005)Commercial Grade Dedication
Exemption Request
Coronavirus
ML22234A14822 August 2022Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for InformationJob Performance Measure
ML22228A19118 August 2022Energy Harbor Nuclear Corp. Submittals - Project Manager Reassignment
L-22-050, Summary of Changes to the Energy Harbor Nuclear Corp. Quality Assurance Program Manual9 August 2022Summary of Changes to the Energy Harbor Nuclear Corp. Quality Assurance Program ManualOffsite Dose Calculation Manual
Nondestructive Examination
Temporary Modification
Condition Adverse to Quality
Aging Management
Process Control Program
License Renewal
Pandemic
Grace period
IR 05000440/20220028 August 2022Integrated Inspection Report 05000440/2022002High winds
High Radiation Area
Ultimate heat sink
Offsite Dose Calculation Manual
Temporary Modification
Zebra Mussel
Functionality Assessment
Operability Determination
Fire Protection Program
Scaffolding
Substantial potential for an overexposure
Overexposure
L-20-239, Application to Revise the Technical Specifications to Adopt TSTF-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position5 August 2022Application to Revise the Technical Specifications to Adopt TSTF-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated PositionReactor Vessel Water Level
Water Inventory Control
Surveillance Frequency Control Program
IR 05000440/20224204 August 2022Security Baseline Inspection Report 05000440/2022420 - Cover LetterAffidavit
ML23038A14829 July 2022Day Letter Signed
IR 05000440/202240221 July 2022Security Baseline Inspection Report 05000440/2022402
ML22200A22221 July 2022License Renewal Application - Safety Pre-Application Meeting July 21, 2022 (Perry Slides)Incorporated by reference
Aging Management
Exemption Request
ML22199A02321 July 2022July 21, 2022, Perry Nuclear Power Plant License Renewal Environmental Pre-application Public Meeting - NRC SlidesEnvironmental Justice
ML22199A03521 July 2022July 21, 2022, Perry Nuclear Power Plant License Renewal Environmental Pre-application Public Meeting - Energy Harbor Slides
PMNS20220611, Pre-Application Meeting for License Renewal Application - Perry, Unit 1 (Safety)20 July 2022Pre-Application Meeting for License Renewal Application - Perry, Unit 1 (Safety)
ML22201A00519 July 2022License Renewal Application - Safety Pre-Application Meeting July 21, 2022 (NRC Slides)
L-22-171, Response to Request for Additional Information Regarding Proposed Inservice Inspection Alternative IR-06314 July 2022Response to Request for Additional Information Regarding Proposed Inservice Inspection Alternative IR-063Weld Overlay
ML22189A17713 July 2022Closeout of Bulletin 2012 01, Design Vulnerability in Electric Power SystemOpen Phase Condition
ML22187A25912 July 2022Issuance of Relief Proposed Alternative Request Vr 12, Revision 0, Associated with the Fourth 10-Year Inservice Testing IntervalIncorporated by reference
PMNS20220690, Pre-Application Meeting for License Renewal Application - Perry, Unit 1 (Environmental)5 July 2022Pre-Application Meeting for License Renewal Application - Perry, Unit 1 (Environmental)
ML22182A4442 July 2022Information Request for NRC Triennial Evaluations of Changes, Tests, and Experiments (50.59) Baseline Inspection Report 05000440/2022010Probabilistic Risk Assessment
ML22136A11321 June 2022Issuance of Relief Proposed Alternative Requests VR-10, Revision 0, and VR-11, Revision 0, Associated with the Fourth 10-Year Inservice Testing Interval (EPIDs L-2021-LLR-0096; L-2021-LLR-0097)Incorporated by reference
ML22167A10016 June 2022NRR E-mail Capture - Perry Nuclear Power Plant - Delay in Issuance of License Amendment and Exemptions Regarding Revising the Methodology Used for Flood Hazard Analysis (EPIDs No.L-2021-LLA-0067, L-2021-LLE-0022, L-2021-LLE-0023)
IR 05000440/20224049 June 2022Security Baseline Inspection Report 05000440/2022404
L-22-099, Supplement to License Amendment Request to Revise the Methodology Used for Flood Hazard Analysis1 June 2022Supplement to License Amendment Request to Revise the Methodology Used for Flood Hazard AnalysisUnanalyzed Condition
Shutdown Margin
High Radiation Area
Tornado Missile
Hydrostatic
ML22147A03731 May 2022Summary of the May 19, 2022, Public Outreach to Discuss the NRC 2021 End of Cycle Plant Performance Assessment of Perry Nuclear Power PlantOpen House
L-22-057, Annual Financial Report - Affidavit25 May 2022Annual Financial Report - Affidavit