 Issue dateTitleTopic
LR-N22-0094, Emergency Plan Document Revisions Implemented November 21, 202214 December 2022Emergency Plan Document Revisions Implemented November 21, 2022Fire Watch
LR-N22-0091, Independent Spent Fuel Storage Installation, Report of 10 CFR 72.48 Changes, Tests, and Experiments2 December 2022Independent Spent Fuel Storage Installation, Report of 10 CFR 72.48 Changes, Tests, and Experiments
ML22335A0411 December 2022Notification of Commercial Grade Dedication Inspection (05000354/2023011) and Request for InformationCommercial Grade Dedication
ML22325A30522 November 2022Summary of November 17, 2022, Pre Submittal Public Meeting with PSEG Nuclear LLC to Discuss Threshold Determination on Transferring Ownership of Portions of the Site
ML22319A24317 November 2022Stations - Nuclear Regulatory Commission: Threshold Determination Pre-submittal Meeting on November 17, 2022 (EPID L-2022-LRM-0090) (Slides)
PMNS20221135, Public Meeting to Discuss Transfer of Ownership of Portions of the PSEG Nuclear Site3 November 2022Public Meeting to Discuss Transfer of Ownership of Portions of the PSEG Nuclear Site
ML22307A0603 November 2022EN 56200 - Fairbanks Morse Re Basic Component Which Fails to Comply or Contains a Defect
IR 05000354/20220033 November 2022Integrated Inspection Report 05000354/2022003Internal Flooding
Temporary Modification
Functionality Assessment
Scram Discharge Volume
Operability Determination
Fire Protection Program
Downpower
Coast down
ML22298A05424 October 2022Submittal of Updated Final Safety Analysis Report, Revision 33, 10 CFR 71.106 Review Results and 10 CFR 54.37(b) Review ResultsAging Management
Open Phase Condition
Scaffolding
ML22297A22724 October 2022Core Operating Limits Report, Reload 24, Cycle 25, Revision 22
IR 05000354/202230124 October 2022Initial Operator Licensing Examination Report 05000354/2022301
LR-N22-0086, Unit 2, Updated Final Safety Analysis Report, Revision 3324 October 2022Unit 2, Updated Final Safety Analysis Report, Revision 33
ML22297A22917 October 2022Enclosure 2 - Hope Creek Generating Station Unit 1 Core Operating Limits Report (COLR) Cycle 25Shutdown Margin
IR 05000354/202240214 October 2022Cyber Security Inspection Report 05000354/2022402 - Cover Letter OnlyCyber Security
Affidavit
ML22312A4353 October 2022Exam Form 1.3-1
LR-N22-0075, 2022 Annual 10 CFR 50.46 Report30 September 20222022 Annual 10 CFR 50.46 Report
LR-N22-0074, Emergency Plan Evacuation Time Estimate15 September 2022Emergency Plan Evacuation Time EstimatePandemic
Coronavirus
IR 05000354/20220128 September 2022Design Basis Assurance Inspection (Programs) Inspection Report 05000354/2022012Scram Discharge Volume
Containment Hardened Vent
Power-Operated Valves
IR 05000354/202200531 August 2022Updated Inspection Plan for Hope Creek Generating Station (Report 05000354/2022005)Fitness for Duty
Commercial Grade Dedication
Cyber Security
License Renewal
Exemption Request
Power-Operated Valves
Power Operated Valves
COVID-19
COVID19
ML22194A81710 August 2022Issuance of Amendment No. 232 Revise Surveillance Requirements for Electric Power Monitor Channels for Reactor Protection System and Power Range Neutron Monitoring SystemHalf scram
Surveillance Frequency Control Program
IR 05000354/202200210 August 2022Integrated Inspection Report 05000354/2022002Safe Shutdown
Ultimate heat sink
Internal Flooding
Enforcement Discretion
Probabilistic Risk Assessment
Temporary Modification
Functionality Assessment
Finite Element Analysis
Condition Adverse to Quality
Significance Determination Process
Operability Determination
Through-Wall Leak
Fire Protection Program
ML23055A38131 July 2022Exam Forms 2.3-1, 2.3-2, 3.4-1Probabilistic Risk Assessment
Job Performance Measure
ML22207A03122 July 2022NRC-2022-000092 - Resp 1 - Final, Agency Records Subject to the Request Are Enclosed
ML22207A03022 July 2022NRC-2022-000092 - Resp 1 - Final
IR 05000272/202240121 July 2022and Salem Nuclear Generating Station, Units 1 and 2 - Security Baseline Inspection Report 05000354/2022401, 05000272/2022401, and 05000311/2022401 (Cover Letter Only)Affidavit
ML22194A84015 July 2022Correction Letter of Relief Request No. HR-I4R-220 Reactor Pressure Vessel Water Level Instrumentation Partial Penetration Nozzle RepairsNondestructive Examination
ML22193A20414 July 2022Operator Licensing Examination Approval
ML22194A05213 July 2022NRR E-mail Capture - Acceptance Review - Hope Creek, Salem 1 and 2 - Relocate Staff Qualification Requirements to Licensee Quality Assurance Topical Report
ML22187A1777 July 2022Requalification Program Inspection
ML22187A1466 July 2022Joint Annual Assessment Meeting for Pa/Md/Nj/Ny Nuclear Power Plants - Meeting Summary
ML22181A1255 July 2022Issuance of Relief Request No. HR I4R-220 Reactor Pressure Vessel Water Level Instrumentation Partial Penetration Nozzle RepairsNondestructive Examination
LR-N22-0051, License Amendment Request to Relocate Technical Specification Facility/Unit Staff Qualification Requirements to Quality Assurance Topical Report22 June 2022License Amendment Request to Relocate Technical Specification Facility/Unit Staff Qualification Requirements to Quality Assurance Topical Report
IR 05000272/202250114 June 2022and Salem Nuclear Generating Station, Units 1 and 2 - Emergency Preparedness Biennial Exercise Inspection Report 05000354/2022501, 05000272/2022501, and 05000311/2022501Earthquake
Siren
ML22187A0658 June 2022Joint Annual Assessment Meeting for Pa/Md/Nj/Ny Nuclear Power Plants - NRC Presentation SlidesCoronavirus
ML22153A12626 May 2022News Release-I-22-007: NRC Schedules Webinar to Discuss 2021 Safety Performance at Maryland, New Jersey, New York, Pennsylvania Nuclear Power Plants
ML22132A00426 May 2022PSEG Pre-submittal Meeting Slides - May 26, 2022
LR-N22-0044, Emergency Plan Document Revisions Implemented November, 202119 May 2022Emergency Plan Document Revisions Implemented November, 2021
ML22131A22111 May 2022Notice of Public Meeting (Webinar) - Joint Annual Assessment Meeting for Pa/Md/Nj/Ny Nuclear Power Plants (Bv, CC, FP, Gn, Hc, Lm, NMP, Pb, SAL, & Sus)
IR 05000354/20220012 May 2022Integrated Inspection Report 05000354/2022001Stroke time
Internal Flooding
Temporary Modification
Functionality Assessment
Operability Determination
Fire Protection Program
Power change
Downpower
LR-N22-0040, 2021 Annual Radiological Environmental Operating Report28 April 20222021 Annual Radiological Environmental Operating ReportOffsite Dose Calculation Manual
Annual Radioactive Effluent Release Report
Annual Radiological Environmental Operating Report
Annual Radiological Effluent Release Report
Tritium
LR-N22-0041, 2021 Annual Radioactive Effluent Release Report (Rerr)28 April 20222021 Annual Radioactive Effluent Release Report (Rerr)Grab sample
Offsite Dose Calculation Manual
Annual Radioactive Effluent Release Report
Annual Radiological Environmental Operating Report
Process Control Program
Annual Radiological Effluent Release Report
Backfit
LR-N22-0039, Emergency Plan Document Revisions Implemented March 24, 202221 April 2022Emergency Plan Document Revisions Implemented March 24, 2022High winds
Earthquake
Pressure Boundary Leakage
ML22104A17114 April 2022Information Request for the Cyber Security Baseline Inspection, Notification to Perform Inspection 05000354/2022402Cyber Security
ML22103A06613 April 2022Information Request to Support Design-Basis Capability of Power-Operated Valves Inspection; Inspection Report 05000354/2022012Squib
Power-Operated Valves
Weak link
LR-N22-0023, Guarantees of Payment of Deferred Premiums21 March 2022Guarantees of Payment of Deferred Premiums
ML22076A05017 March 2022and Salem Generating Station, Units 1 and 2 - Annual Property Insurance Status Report
IR 05000354/202201016 March 2022Triennial Fire Protection Inspection Report 05000354/2022010Safe Shutdown
Probabilistic Risk Assessment
Fire impairment
Significance Determination Process
Fire Protection Program
Fire Watch
LR-N22-0027, Comment (7) of David J. Mannai on Operational Leakage15 March 2022Comment (7) of David J. Mannai on Operational LeakagePressure Boundary Leakage
ML21348A71314 March 2022Issuance of Amendment No. 231 Revision of Technical Specification Limits for Ultimate Heat SinkSafe Shutdown
Ultimate heat sink
Anticipated operational occurrence
Safe Shutdown Earthquake
Surveillance Frequency Control Program
Recently irradiated fuel
ML22060A05711 March 2022Closeout of Bulletin 2012 01, Design Vulnerability in Electric Power SystemOpen Phase Condition