Issue date | Title | Topic | |
---|---|---|---|
LR-N22-0094, Emergency Plan Document Revisions Implemented November 21, 2022 | 14 December 2022 | Emergency Plan Document Revisions Implemented November 21, 2022 | Fire Watch |
LR-N22-0091, Independent Spent Fuel Storage Installation, Report of 10 CFR 72.48 Changes, Tests, and Experiments | 2 December 2022 | Independent Spent Fuel Storage Installation, Report of 10 CFR 72.48 Changes, Tests, and Experiments | |
ML22335A041 | 1 December 2022 | Notification of Commercial Grade Dedication Inspection (05000354/2023011) and Request for Information | Commercial Grade Dedication |
ML22325A305 | 22 November 2022 | Summary of November 17, 2022, Pre Submittal Public Meeting with PSEG Nuclear LLC to Discuss Threshold Determination on Transferring Ownership of Portions of the Site | |
ML22319A243 | 17 November 2022 | Stations - Nuclear Regulatory Commission: Threshold Determination Pre-submittal Meeting on November 17, 2022 (EPID L-2022-LRM-0090) (Slides) | |
PMNS20221135, Public Meeting to Discuss Transfer of Ownership of Portions of the PSEG Nuclear Site | 3 November 2022 | Public Meeting to Discuss Transfer of Ownership of Portions of the PSEG Nuclear Site | |
ML22307A060 | 3 November 2022 | EN 56200 - Fairbanks Morse Re Basic Component Which Fails to Comply or Contains a Defect | |
IR 05000354/2022003 | 3 November 2022 | Integrated Inspection Report 05000354/2022003 | Internal Flooding Temporary Modification Functionality Assessment Scram Discharge Volume Operability Determination Fire Protection Program Downpower Coast down |
ML22298A054 | 24 October 2022 | Submittal of Updated Final Safety Analysis Report, Revision 33, 10 CFR 71.106 Review Results and 10 CFR 54.37(b) Review Results | Aging Management Open Phase Condition Scaffolding |
ML22297A227 | 24 October 2022 | Core Operating Limits Report, Reload 24, Cycle 25, Revision 22 | |
IR 05000354/2022301 | 24 October 2022 | Initial Operator Licensing Examination Report 05000354/2022301 | |
LR-N22-0086, Unit 2, Updated Final Safety Analysis Report, Revision 33 | 24 October 2022 | Unit 2, Updated Final Safety Analysis Report, Revision 33 | |
ML22297A229 | 17 October 2022 | Enclosure 2 - Hope Creek Generating Station Unit 1 Core Operating Limits Report (COLR) Cycle 25 | Shutdown Margin |
IR 05000354/2022402 | 14 October 2022 | Cyber Security Inspection Report 05000354/2022402 - Cover Letter Only | Cyber Security Affidavit |
ML22312A435 | 3 October 2022 | Exam Form 1.3-1 | |
LR-N22-0075, 2022 Annual 10 CFR 50.46 Report | 30 September 2022 | 2022 Annual 10 CFR 50.46 Report | |
LR-N22-0074, Emergency Plan Evacuation Time Estimate | 15 September 2022 | Emergency Plan Evacuation Time Estimate | Pandemic Coronavirus |
IR 05000354/2022012 | 8 September 2022 | Design Basis Assurance Inspection (Programs) Inspection Report 05000354/2022012 | Scram Discharge Volume Containment Hardened Vent Power-Operated Valves |
IR 05000354/2022005 | 31 August 2022 | Updated Inspection Plan for Hope Creek Generating Station (Report 05000354/2022005) | Fitness for Duty Commercial Grade Dedication Cyber Security License Renewal Exemption Request Power-Operated Valves Power Operated Valves COVID-19 COVID19 |
ML22194A817 | 10 August 2022 | Issuance of Amendment No. 232 Revise Surveillance Requirements for Electric Power Monitor Channels for Reactor Protection System and Power Range Neutron Monitoring System | Half scram Surveillance Frequency Control Program |
IR 05000354/2022002 | 10 August 2022 | Integrated Inspection Report 05000354/2022002 | Safe Shutdown Ultimate heat sink Internal Flooding Enforcement Discretion Probabilistic Risk Assessment Temporary Modification Functionality Assessment Finite Element Analysis Condition Adverse to Quality Significance Determination Process Operability Determination Through-Wall Leak Fire Protection Program |
ML23055A381 | 31 July 2022 | Exam Forms 2.3-1, 2.3-2, 3.4-1 | Probabilistic Risk Assessment Job Performance Measure |
ML22207A031 | 22 July 2022 | NRC-2022-000092 - Resp 1 - Final, Agency Records Subject to the Request Are Enclosed | |
ML22207A030 | 22 July 2022 | NRC-2022-000092 - Resp 1 - Final | |
IR 05000272/2022401 | 21 July 2022 | and Salem Nuclear Generating Station, Units 1 and 2 - Security Baseline Inspection Report 05000354/2022401, 05000272/2022401, and 05000311/2022401 (Cover Letter Only) | Affidavit |
ML22194A840 | 15 July 2022 | Correction Letter of Relief Request No. HR-I4R-220 Reactor Pressure Vessel Water Level Instrumentation Partial Penetration Nozzle Repairs | Nondestructive Examination |
ML22193A204 | 14 July 2022 | Operator Licensing Examination Approval | |
ML22194A052 | 13 July 2022 | NRR E-mail Capture - Acceptance Review - Hope Creek, Salem 1 and 2 - Relocate Staff Qualification Requirements to Licensee Quality Assurance Topical Report | |
ML22187A177 | 7 July 2022 | Requalification Program Inspection | |
ML22187A146 | 6 July 2022 | Joint Annual Assessment Meeting for Pa/Md/Nj/Ny Nuclear Power Plants - Meeting Summary | |
ML22181A125 | 5 July 2022 | Issuance of Relief Request No. HR I4R-220 Reactor Pressure Vessel Water Level Instrumentation Partial Penetration Nozzle Repairs | Nondestructive Examination |
LR-N22-0051, License Amendment Request to Relocate Technical Specification Facility/Unit Staff Qualification Requirements to Quality Assurance Topical Report | 22 June 2022 | License Amendment Request to Relocate Technical Specification Facility/Unit Staff Qualification Requirements to Quality Assurance Topical Report | |
IR 05000272/2022501 | 14 June 2022 | and Salem Nuclear Generating Station, Units 1 and 2 - Emergency Preparedness Biennial Exercise Inspection Report 05000354/2022501, 05000272/2022501, and 05000311/2022501 | Earthquake Siren |
ML22187A065 | 8 June 2022 | Joint Annual Assessment Meeting for Pa/Md/Nj/Ny Nuclear Power Plants - NRC Presentation Slides | Coronavirus |
ML22153A126 | 26 May 2022 | News Release-I-22-007: NRC Schedules Webinar to Discuss 2021 Safety Performance at Maryland, New Jersey, New York, Pennsylvania Nuclear Power Plants | |
ML22132A004 | 26 May 2022 | PSEG Pre-submittal Meeting Slides - May 26, 2022 | |
LR-N22-0044, Emergency Plan Document Revisions Implemented November, 2021 | 19 May 2022 | Emergency Plan Document Revisions Implemented November, 2021 | |
ML22131A221 | 11 May 2022 | Notice of Public Meeting (Webinar) - Joint Annual Assessment Meeting for Pa/Md/Nj/Ny Nuclear Power Plants (Bv, CC, FP, Gn, Hc, Lm, NMP, Pb, SAL, & Sus) | |
IR 05000354/2022001 | 2 May 2022 | Integrated Inspection Report 05000354/2022001 | Stroke time Internal Flooding Temporary Modification Functionality Assessment Operability Determination Fire Protection Program Power change Downpower |
LR-N22-0040, 2021 Annual Radiological Environmental Operating Report | 28 April 2022 | 2021 Annual Radiological Environmental Operating Report | Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report Annual Radiological Effluent Release Report Tritium |
LR-N22-0041, 2021 Annual Radioactive Effluent Release Report (Rerr) | 28 April 2022 | 2021 Annual Radioactive Effluent Release Report (Rerr) | Grab sample Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report Process Control Program Annual Radiological Effluent Release Report Backfit |
LR-N22-0039, Emergency Plan Document Revisions Implemented March 24, 2022 | 21 April 2022 | Emergency Plan Document Revisions Implemented March 24, 2022 | High winds Earthquake Pressure Boundary Leakage |
ML22104A171 | 14 April 2022 | Information Request for the Cyber Security Baseline Inspection, Notification to Perform Inspection 05000354/2022402 | Cyber Security |
ML22103A066 | 13 April 2022 | Information Request to Support Design-Basis Capability of Power-Operated Valves Inspection; Inspection Report 05000354/2022012 | Squib Power-Operated Valves Weak link |
LR-N22-0023, Guarantees of Payment of Deferred Premiums | 21 March 2022 | Guarantees of Payment of Deferred Premiums | |
ML22076A050 | 17 March 2022 | and Salem Generating Station, Units 1 and 2 - Annual Property Insurance Status Report | |
IR 05000354/2022010 | 16 March 2022 | Triennial Fire Protection Inspection Report 05000354/2022010 | Safe Shutdown Probabilistic Risk Assessment Fire impairment Significance Determination Process Fire Protection Program Fire Watch |
LR-N22-0027, Comment (7) of David J. Mannai on Operational Leakage | 15 March 2022 | Comment (7) of David J. Mannai on Operational Leakage | Pressure Boundary Leakage |
ML21348A713 | 14 March 2022 | Issuance of Amendment No. 231 Revision of Technical Specification Limits for Ultimate Heat Sink | Safe Shutdown Ultimate heat sink Anticipated operational occurrence Safe Shutdown Earthquake Surveillance Frequency Control Program Recently irradiated fuel |
ML22060A057 | 11 March 2022 | Closeout of Bulletin 2012 01, Design Vulnerability in Electric Power System | Open Phase Condition |