ML22104A171

From kanterella
Jump to navigation Jump to search
Information Request for the Cyber Security Baseline Inspection, Notification to Perform Inspection 05000354/2022402
ML22104A171
Person / Time
Site: Hope Creek PSEG icon.png
Issue date: 04/14/2022
From: Glenn Dentel
Division of Operating Reactors
To: Carr E
Public Service Enterprise Group
Dentel G
References
IR 2022402
Download: ML22104A171 (8)


See also: IR 05000354/2022402

Text

April 14, 2022

Mr. Eric Carr

President and Chief Nuclear Officer

PSEG Nuclear, LLC - N09

P. O. Box 236

Hancocks Bridge, NJ 08038

SUBJECT:

HOPE CREEK GENERATING STATION - INFORMATION REQUEST FOR THE

CYBER SECURITY BASELINE INSPECTION, NOTIFICATION TO PERFORM

INSPECTION 05000354/2022402

Dear Mr. Carr:

On August 29, 2022, the U.S. Nuclear Regulatory Commission (NRC) will begin a baseline

inspection in accordance with Inspection Procedure (IP) 71130.10, Cyber Security, Revision 0

at Hope Creek Generating Station. The inspection will be performed to evaluate and verify your

ability to meet the requirements of the NRCs Cyber Security Rule, Title 10 of the Code of

Federal Regulations (10 CFR), Part 73, Section 54, Protection of Digital Computer and

Communication Systems and Networks. The onsite portion of the inspection will take place

August 29-September 2, 2022.

Experience has shown that baseline inspections are extremely resource intensive, both for the

NRC inspectors and the licensee staff. In order to minimize the inspection impact on the site

and to ensure a productive inspection for both parties, we have enclosed a request for

documents needed for the inspection. These documents have been divided into four groups.

The first group specifies information necessary to assist the inspection team in choosing the

focus areas (i.e., sample set) to be inspected by IP 71130.10. This information should be

made available either on an online repository (preferred) or digital media (CD/DVD) no later

than May 23, 2022. The inspection team will review this information and, by June 30, 2022, will

request the specific items that should be provided for review.

The second group of additional requested documents will assist the inspection team in the

evaluation of the critical systems and critical digital assets (CSs/CDAs), defensive architecture,

and the areas of the licensees Cyber Security Program selected for the cyber security

inspection. This information will be requested for review in the regional office prior to the

inspection by July 29, 2022, as identified above.

The third group of requested documents consists of those items that the inspection team will

review, or need access to, during the inspection. Please have this information available by the

first day of the onsite inspection, August 29, 2022.

The fourth group of information is necessary to aid the inspection team in tracking issues

identified as a result of the inspection. It is requested that this information be provided to the

E. Carr

2

lead inspector as the information is generated during the inspection. It is important that all of

these documents are up to date and complete in order to minimize the number of additional

documents requested during the preparation and/or the onsite portions of the inspection.

The lead inspector for this inspection is Amar Patel. We understand that our regulatory contact

for this inspection is Harry Balian of your organization. If there are any questions about the

inspection or the material requested, please contact the lead inspector at 610-337-5220 or via

e-mail at amar.patel@nrc.gov.

This letter does not contain new or amended information collection requirements subject to the

Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection

requirements were approved by the Office of Management and Budget, control number 3150-

0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a

request for information or an information collection requirement unless the requesting document

displays a currently valid Office of Management and Budget control number.

In accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding,

of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available

electronically for public inspection in the NRCs Public Document Room or from the Publicly

Available Records (PARS) component of the NRC's Agencywide Documents Access and

Management System (ADAMS). ADAMS is accessible from the NRC Web site at

http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

Glenn T. Dentel, Chief

Engineering Branch 2

Division of Operating Reactor Safety

Docket No. 05000354

License No. NPF-57

Enclosure:

Cyber Security Inspection Document Request

cc: Distribution via ListServ

Glenn T. Dentel

Digitally signed by Glenn T.

Dentel

Date: 2022.04.14 15:31:45

-04'00'

ML22104A171

SUNSI Review

Non-Sensitive

Sensitive

Publicly Available

Non-Publicly Available

OFFICE

RI/DORS

RI/DORS

NAME

APatel

GDentel

DATE

4/14/22

4/14/22

HOPE CREEK GENERATING STATION CYBER SECURITY INSPECTION DOCUMENT

REQUEST

Enclosure

Inspection Report: 05000354/2022402

Inspection Dates:

August 29-September 2, 2022

Inspection Procedure:

IP 71130.10, Cyber Security, Revision 0

Reference:

ML21330A088, Guidance Document for Development of the

Request for Information (RFI) and Notification Letter for

Full-Implementation of the Cyber Security Inspection, Revision 2

NRC Inspectors:

Amar Patel, Lead

Brandon Pinson

610-337-5220

610-337-5091

Amar.Patel@nrc.gov

Brandon.Pinson@nrc.gov

NRC Contractors:

Tim Marshall

Alex Prada

Timothy.Marshall@nrc.gov

Alexander.Prada@nrc.gov

I.

Information Requested for In-Office Preparation

The initial request for information (i.e., first RFI) concentrates on providing the inspection

team with the general information necessary to select appropriate components and

Cyber Security Program (CSP) elements to develop a site-specific inspection plan. The

first RFI is used to identify the list of critical systems and critical digital assets

(CSs/CDAs) plus operational and management (O&M) security control portions of the

CSP to be chosen as the sample set required to be inspected by the cyber security

inspection procedure. The first RFIs requested information is specified below in Table

RFI #1. The Table RFI #1 information is requested to be provided to the regional office

by May 23, 2022, or sooner, to facilitate the selection of the specific items that will be

reviewed during the onsite inspection weeks.

The inspection team will examine the returned documentation from the first RFI and

identify/select specific systems and equipment (e.g., CSs/CDAs) to provide a more

focused follow-up request to develop the second RFI. The inspection team will submit

the specific systems and equipment list to your staff by June 30, 2022, which will identify

the specific systems and equipment that will be utilized to evaluate the CSs/CDAs,

defensive architecture, and the areas of the licensees CSP selected for the cyber

security inspection. We request that the additional information provided from the second

RFI be made available to the regional office prior to the inspection by July 29, 2022.

HOPE CREEK GENERATING STATION CYBER SECURITY INSPECTION

DOCUMENT REQUEST

2

The required Table RFI 1 information shall be provided on an online repository

(preferred) or digital media (CD/DVD) to the lead inspector by May 23, 2022. The

preferred file format for all lists is a searchable Excel spreadsheet file. The information

should be indexed and hyper-linked to facilitate ease of use. If you have any questions

regarding this information, please call the inspection team leader as soon as possible.

Table RFI #1

Section 3,

Paragraph Number/Title:

IP Ref

1

A list of all Identified Critical Systems and Critical Digital Assets -

highlight/note any additions, deletions or reclassifications due to new

guidance from white papers, changes to NEI 10-04, 13-10, etc. since the last

cyber security inspection.

Overall

2 A list of EP and Security onsite and offsite digital communication systems

Overall

3 Network Topology Diagrams to include information and data flow for

critical systems in levels 2, 3 and 4 (If available)

Overall

4 Ongoing Monitoring and Assessment program documentation

03.01(a)

5 The most recent effectiveness analysis of the Cyber Security Program

03.01(b)

6 Vulnerability screening/assessment and scan program documentation

03.01(c)

7

Cyber Security Incident response documentation, including incident

detection, response, and recovery documentation as well as contingency

plan development and implementation, including any program

documentation that requires testing of security boundary device

functionality

03.02(a)

and

03.04(b)

8 Device Access and Key Control documentation

03.02(c)

9 Password/Authenticator documentation

03.02(c)

10 User Account/Credential documentation

03.02(d)

11 Portable Media and Mobile Device control documentation, including kiosk

security control assessment/documentation

03.02(e)

12

Design change/ modification program documentation and a List of all

design changes that affected CDAs that have actually been installed and

completed since the last cyber security inspection, including either a

summary of the design change or the 50.59 documentation for the change.

03.03(a)

13 Supply Chain Management documentation including any security impact

analysis for new acquisitions

03.03(a),

(b) and

(c)

14 Configuration Management documentation including any security impact

analysis performed due to configuration changes since the last inspection

03.03(a)

and (b)

15 Cyber Security Plan and any 50.54(p) analysis to support changes to the

plan since the last inspection

03.04(a)

16 Cyber Security Metrics tracked (if applicable)

03.06 (b)

17 Provide documentation describing any cyber security changes to the access

authorization program since the last cyber security inspection.

Overall

18 Provide a list of all procedures and policies provided to the NRC with their

descriptive name and associated number (if available)

Overall

19 Performance testing report (if applicable)

03.06 (a)

HOPE CREEK GENERATING STATION CYBER SECURITY INSPECTION

DOCUMENT REQUEST

3

In addition to the above information please provide the following:

(1) Electronic copy of the UFSAR and technical specifications.

(2) Name(s) and phone numbers for the regulatory and technical contacts.

(3) Current management and engineering organizational charts.

Based on this information, the inspection team will identify and select specific systems

and equipment (e.g., CSs/CDAs) from the information requested by Table RFI #1 and

submit a list of specific systems and equipment to your staff by June 30, 2022, for the

second RFI (i.e., RFI #2).

II.

Additional Information Requested to be Available Prior to Inspection.

As stated in Section I above, the inspection team will examine the returned

documentation requested from Table RFI #1 and submit the list of specific systems and

equipment to your staff by June 30, 2022, for the second RFI (i.e., RFI #2). The second

RFI will request additional information required to evaluate the CSs/CDAs, defensive

architecture, and the areas of the licensees CSP selected for the cyber security

inspection. The additional information requested for the specific systems and equipment

is identified in Table RFI #2.

The Table RFI 2 information shall be provided to the lead inspector by July 29, 2022.

The preferred file format for all lists is a searchable Excel spreadsheet. The information

should be indexed and hyper-linked to facilitate ease of use. If you have any questions

regarding this information, please call the inspection team leader as soon as possible.

Table RFI #2

Section 3,

Paragraph Number/Title:

Items

For the system(s) chosen for inspection provide:

1 Ongoing Monitoring and Assessment activity performed on the system(s)

03.01(a)

2 All Security Control Assessments for the selected system(s)

03.01(a)

3

All vulnerability screenings/assessments associated with or scans

performed on the selected system(s) since the last cyber security

inspection

03.01(c)

4

Documentation (including configuration files and rules sets) for Network-

based Intrusion Detection/Protection Systems (NIDS/NIPS), Host-based

Intrusion Detection Systems (HIDS), and Security Information and Event

Management (SIEM) systems for system(s) chosen for inspection)

03.02(b)

5

Documentation (including configuration files and rule sets) for intra-

security level firewalls and boundary devices used to protect the selected

system(s)

03.02(c)

6 Copies of all periodic reviews of the access authorization list for the

selected systems since the last inspection

03.02(d)

7 Baseline configuration data sheets for the selected CDAs

03.03(a)

8 Documentation on any changes, including Security Impact Analyses,

performed on the selected system(s) since the last inspection

03.03(b)

HOPE CREEK GENERATING STATION CYBER SECURITY INSPECTION

DOCUMENT REQUEST

4

Table RFI #2

Section 3,

Paragraph Number/Title:

Items

9 Copies of the purchase order documentation for any new equipment

purchased for the selected systems since the last inspection

03.03(c)

10 Copies of any reports/assessment for cyber security drills performed since

the last inspection.

03.02(a)

03.04(b)

11 Copy of the individual recovery plan(s) for the selected system(s) including

documentation of the results the last time the backups were executed.

03.02(a)

03.04(b)

12

Corrective actions taken as a result of cyber security incidents/issues to

include previous NRC violations and Licensee Identified Violations since

the last cyber security inspection

03.04(d)

13 For the selected systems, provide design change/modification packages

including completed work orders since the last cyber security inspection

03.03(a)

III.

Information Requested to be Available on First Day of Inspection

For the specific systems and equipment identified in Section II above, provide the

following RFI (i.e., Table 1ST Week Onsite) to the team by August 29, 2022, the first day

of the inspection.

Table 1ST Week Onsite

Section 3,

Paragraph Number/Title:

Items

1 Any cyber security event reports submitted in accordance with 10 CFR

73.77 since the last cyber security inspection

03.04(a)

2

Updated Copies of corrective actions taken as a result of cyber security

incidents/issues, to include previous NRC violations and Licensee

Identified Violations since the last cyber security inspection, as well as

vulnerability-related corrective actions

03.04(d)

In addition to the above information please provide the following:

(1) Copies of the following documents do not need to be solely available to the

inspection team as long as the inspectors have easy and unrestrained access

to them.

a. UFSAR, if not previously provided;

b. Original FSAR Volumes;

c. Original SER and Supplements;

d. Quality Assurance Plan;

e. Technical specifications, if not previously provided; and

f.

Latest IPE/PRA Report.

HOPE CREEK GENERATING STATION CYBER SECURITY INSPECTION

DOCUMENT REQUEST

5

(2) Vendor Manuals, Assessment and Corrective Actions:

a. The most recent Cyber Security Quality Assurance audit and/or

self-assessment; and

b. Corrective action documents (e.g., condition reports, including status of

corrective actions) generate as a result of the most recent Cyber Security

Quality Assurance audit and/or self-assessment.

IV.

Information Requested To Be Provided Throughout the Inspection

(1) Copies of any corrective action documents generated as a result of the

inspection teams questions or queries during the inspection.

(2) Copies of the list of questions submitted by the inspection team members and

the status/resolution of the information requested (provided daily during the

inspection to each inspection team member).

If you have any questions regarding the information requested, please contact the inspection

team leader.