Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML22335A544 | 20 December 2022 | Authorization and Safety Evaluation for Alternative Request I6R-01, | VT-2 Pressure Boundary Leakage |
ML22354A262 | 20 December 2022 | NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of Request to Use Certain Provisions of the 2019 Edition of the ASME BPV Code, Section XI | |
ML22335A565 | 14 December 2022 | Audit Plan to Support the Review of Licensee'S Information Related to Equipment Qualification License Amendment Request for Transition to GNF3 Fuel | |
ML22293B805 | 30 November 2022 | Constellation Energy Generation, Llc_Fleet - Request to Authorize Use Honeywell Mururoa V4F1 R Supplied Air Suits | Mururoa |
IR 05000237/2022401 | 30 November 2022 | Security Baseline Inspection Report 05000237/2022401 and 05000249/2022401 (Cover Letter Only) | Affidavit |
RS-22-126, Constellation Energy Generation, LLC - Request to Use Provisions of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI | 30 November 2022 | Constellation Energy Generation, LLC - Request to Use Provisions of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI | Incorporated by reference |
ML22298A280 | 29 November 2022 | Authorization and Safety Evaluation for Alternative Request I6R-02 | VT-2 |
ML22325A121 | 21 November 2022 | NRR E-mail Capture - NRC Acceptance Review Re Dresden, Units 2 and 3 Request for Relief RV-02D (EPID L-2022-LLR-0075), RV-03 (EPID L-2022-LLR-0076), and RV-23H | |
ML22326A032 | 17 November 2022 | Core Operating Limits Report for Dresden Unit 3 Cycle 28 | Anticipated operational occurrence Minimum Critical Power Ratio MELLLA |
ML22320A559 | 16 November 2022 | 2022 Annual Report - Guarantees of Payment of Deferred Premiums | |
ML22318A184 | 15 November 2022 | Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection 05000237/2023401; 05000249/2023401 | Probabilistic Risk Assessment |
RS-22-121, Notice of Intent to Pursue Subsequent License Renewal Applications | 9 November 2022 | Notice of Intent to Pursue Subsequent License Renewal Applications | |
ML22300A253 | 3 November 2022 | Regulatory Audit Report to Support the Review of Amendments to Revise Criticality Safety Analysis Methodologies (Epids L-2022-LLA-0085, L-2021-LLA-0124, and L-2021-LLA-0159) | Exemption Request |
RS-22-117, Response to Request for Additional Information License Amendment Request Regarding New Fuel Storage Vault and Spent Fuel Storage Pool Criticality Methodologies | 3 November 2022 | Response to Request for Additional Information License Amendment Request Regarding New Fuel Storage Vault and Spent Fuel Storage Pool Criticality Methodologies | |
ML22306A217 | 2 November 2022 | Information Request to Support Upcoming Problem Identification and Resolution Inspection at Dresden Nuclear Power Station, Units 2 and 3 | Temporary Modification Aging Management Maintenance Rule Program |
RS-22-116, Submittal of Relief Requests Associated with the Sixth Inservice Testing Interval | 1 November 2022 | Submittal of Relief Requests Associated with the Sixth Inservice Testing Interval | Stroke time Power-Operated Valves |
ML22307A020 | 1 November 2022 | EN 56194 - Emerson - Notification Under 10 CFR Part 21 for Rosemount 3153N Series Pressure Transmitter with Rosemount 3159 Remote Seals with the LG1 Option | |
IR 05000237/2022003 | 31 October 2022 | Integrated Inspection Report 05000237/2022003 and 05000249/2022003 | High winds Packing leak Ultimate heat sink Commercial Grade Dedication Enforcement Discretion Temporary Modification Squib Functionality Assessment FLEX Significance Determination Process Operability Determination Fire Protection Program Downpower Coast down |
ML22301A090 | 28 October 2022 | NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of License Amendment Request to Adopt TSTF-301, Revision 2 | |
ML22179A291 | 27 October 2022 | Withdrawal of Proposed Alternative to Use ASME Code Case N-921 for the Sixth Inservice Inspection Intervals | Incorporated by reference |
ML22300A111 | 27 October 2022 | Withdrawal of Proposed Alternative I6R-08 Associated with Code Case N-921 for Sixth Inservice Inspection Intervals | |
ML22290A095 | 19 October 2022 | Constellation Energy Generation, LLC - Fleet Project Manager Reassignment | |
RS-22-115, Annual Report of Emergency Core Cooling System Evaluation Model Changes and Errors | 19 October 2022 | Annual Report of Emergency Core Cooling System Evaluation Model Changes and Errors | |
ML22285A225 | 17 October 2022 | NRC Analysis of Constellation Energy Generations Decommissioning Funding Status Report Docket Nos 50-010 and 50-171 | |
ML22290A084 | 13 October 2022 | NRR E-mail Capture - Dresden 2 and 3 - RAI License Amendment Request Regarding New Fuel Storage Vault and Spent Fuel Storage Pool Criticality Methodologies | |
RS-22-092, Nine and Quad Cities - Application to Revise Primary Containment Isolation Instrumentation Technical Specifications in Accordance with TSTF-306, Revision 2, Add Action to LCO 3.3.6.1 to Give Option to Isolate the Penetration | 3 October 2022 | Nine and Quad Cities - Application to Revise Primary Containment Isolation Instrumentation Technical Specifications in Accordance with TSTF-306, Revision 2, Add Action to LCO 3.3.6.1 to Give Option to Isolate the Penetration | Reactor Vessel Water Level |
ML22270A103 | 27 September 2022 | Notification of NRC Baseline Inspection and Request for Information (05000249/2022004) | Nondestructive Examination Aging Management Foreign Material Exclusion Scaffolding |
ML22258A188 | 15 September 2022 | NRR E-mail Capture - Acceptance Review: Dresden 2 and 3 License Amendment Request to Revise Technical Specification 3.1.4, | |
NMP1L3481, Constellation Energy Generation, LLC, 10 CFR 50, Appendix E - Development of Evacuation Time Estimates | 15 September 2022 | Constellation Energy Generation, LLC, 10 CFR 50, Appendix E - Development of Evacuation Time Estimates | Pandemic Coronavirus |
ML22258A187 | 13 September 2022 | NRR E-mail Capture - NRC Acceptance Review Dresden, Units 2 and 3, Amendment Request - Transition to GNF3 Fuel | |
ML22252A031 | 12 September 2022 | Confirmation of Initial License Examination | |
ML22257A107 | 7 September 2022 | Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report | Annual Radioactive Effluent Release Report |
SVPLTR 22-0037, Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report | 7 September 2022 | Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report | Annual Radioactive Effluent Release Report |
IR 05000237/2022012 | 6 September 2022 | Triennial Inspection of Evaluation of Changes, Tests and Experiments Baseline Inspection Report 05000237/2022012 and 05000249/2022012 | |
RS-22-066, License Amendment Request to Revise Technical Specification 3.1.4, Control Rod Scram Times | 25 August 2022 | License Amendment Request to Revise Technical Specification 3.1.4, Control Rod Scram Times | Anticipated operational occurrence |
IR 05000237/2022005 | 22 August 2022 | Updated Inspection Plan for Dresden Nuclear Power Station (Report 05000237/2022005; 05000249/2022005) | Commercial Grade Dedication Operator Manual Action Open Phase Condition Exemption Request Coronavirus |
RS-22-093, Advisement of Leadership Changes for Constellation Energy Generation, LLC and Submittal of Updated Standard Practice Procedures Plans | 18 August 2022 | Advisement of Leadership Changes for Constellation Energy Generation, LLC and Submittal of Updated Standard Practice Procedures Plans | |
RS-22-065, License Amendment Request Regarding Transition to GNF3 Fuel | 18 August 2022 | License Amendment Request Regarding Transition to GNF3 Fuel | Anticipated operational occurrence |
ML22229A076 | 16 August 2022 | NRR E-mail Capture - NRC Acceptance Review Dresden, Units 2 and 3 Request for Relief 16R-10 | |
ML22229A075 | 16 August 2022 | NRR E-mail Capture - NRC Acceptance Review Dresden, Units 2 and 3 Request for Relief 16R-09 | |
RS-22-101, Response to Request for Additional Information Related to Relief Request I6R-01 Associated with the Sixth Inservice Inspection Interval | 10 August 2022 | Response to Request for Additional Information Related to Relief Request I6R-01 Associated with the Sixth Inservice Inspection Interval | VT-2 |
ML22222A105 | 10 August 2022 | Notice of Withdrawal of Margrethe Kearney | |
IR 05000237/2022002 | 8 August 2022 | Integrated Inspection Report 05000237/2022002; 05000249/2022002 and 07200037/2022002 and Exercise of Enforcement Discretion | Unanalyzed Condition Packing leak Tornado Missile Commercial Grade Dedication Internal Flooding Enforcement Discretion Temporary Modification Functionality Assessment Operability Determination Earthquake Liquid penetrant Fire Protection Program Downpower |
IR 05000010/2022001 | 8 August 2022 | NRC Inspection Report No. 05000010/2022001(DNMS) - Dresden Nuclear Power Station, Unit 1 | Fire Barrier New Project Manager Fire Protection Program |
ML22214A004 | 2 August 2022 | Audit Plan to Support the Review of Amendments to Revise Criticality Safety Analysis Methodologies (Epids L-2022-LLA-0085, L-2021-LLA-0124, and L-2021-LLA-0159) | |
ML22269A411 | 25 July 2022 | Attachment 5 - Dresden Nuclear Station-Development of Evacuation Time Estimates | Pandemic Coronavirus |
ML22200A096 | 22 July 2022 | Request for Withholding Information from Public Disclosure | |
ML22203A044 | 21 July 2022 | Request for Additional Information (RAI) | VT-2 |
ML22200A078 | 19 July 2022 | NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request to Use Honeywell Mururoa V4F1 R Supplied Air Suits | Mururoa |
RS-22-099, Submittal of Upcoming Sixth Inservice Inspection Interval Relief Requests I6R-09 and I6R-10 | 19 July 2022 | Submittal of Upcoming Sixth Inservice Inspection Interval Relief Requests I6R-09 and I6R-10 | Non-Destructive Examination Incorporated by reference Moisture barrier |