Letter Sequence Approval |
---|
EPID:L-2022-LLR-0037, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations (Approved, Closed) |
|
MONTHYEARRS-22-046, Relief Requests Associated with the Sixth Inservice Inspection Interval2022-03-25025 March 2022 Relief Requests Associated with the Sixth Inservice Inspection Interval Project stage: Request RS-22-045, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations2022-03-25025 March 2022 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations Project stage: Request ML22103A2112022-04-12012 April 2022 NRR E-mail Capture - NRC Acceptance Review Dresden, Units 2 and 3 Request for Relief (16R-01) - EPID L-2022-LLR-0037 Project stage: Acceptance Review ML22199A2422022-07-13013 July 2022 NRR E-mail Capture - Draft RAI Dresden 2 and 3 Proposed Alternative Related to Sblc Nozzle Inspection for the Sixth Inservice Inspection Interval Project stage: Draft RAI ML22203A0442022-07-21021 July 2022 Request for Additional Information (RAI) Project stage: RAI RS-22-101, Response to Request for Additional Information Related to Relief Request I6R-01 Associated with the Sixth Inservice Inspection Interval2022-08-10010 August 2022 Response to Request for Additional Information Related to Relief Request I6R-01 Associated with the Sixth Inservice Inspection Interval Project stage: Response to RAI ML22335A5442022-12-20020 December 2022 Authorization and Safety Evaluation for Alternative Request I6R-01, Project stage: Approval 2022-04-12
[Table View] |
|
---|
Category:Code Relief or Alternative
MONTHYEARML23265A1322023-09-27027 September 2023 Proposed Alternative Request RV-03 Associated with the Sixth 10-Year Inservice Testing Interval ML23003A1782023-01-12012 January 2023 Authorization and Safety Evaluation for Alternative Request I6R-09 ML23004A1712023-01-0606 January 2023 Authorization and Safety Evaluation for Alternative Request I6R-10, ML22335A5442022-12-20020 December 2022 Authorization and Safety Evaluation for Alternative Request I6R-01, RS-22-099, Submittal of Upcoming Sixth Inservice Inspection Interval Relief Requests I6R-09 and I6R-102022-07-19019 July 2022 Submittal of Upcoming Sixth Inservice Inspection Interval Relief Requests I6R-09 and I6R-10 ML21230A2062021-09-0303 September 2021 Proposed Alternative to Use ASME OM Code Case OMN-28 ML21216A2202021-08-0505 August 2021 Proposed Alternative to Eliminate Certain Documentation Requirements for Pressure Retaining Bolting ML20269A2002020-09-30030 September 2020 Request to Use a Provision of Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI (EPID L2020-LLR-0117 ML20099D9552020-04-17017 April 2020 Request to Use Provisions in the 2013 Edition of the ASME Boiler and Pressure Vessel Code for Performing Non-Destructive Examinations ML20036D9622020-02-0404 February 2020 Dresden Nuclear Power Station, Nine Mile Point Nuclear Station, Peach Bottom Atomic Power Station, & Quad Cities Nuclear Power Station - Proposed Alternative to Extend Reactor Pressure Vessel Safety Relief Valve Testing Frequency ML19269C5342019-09-27027 September 2019 Proposed Alternative to Use Encoded Phased Array Ultrasonic Examination Techniques ML19161A2572019-06-0404 June 2019 BWR Fleet Msv/Srv - Testing Frequency Relief Request NRC Pre-Application Meeting June 4, 2019 ML19098A0342019-04-30030 April 2019 Units 1 and 2; Limerick, Units 1 and 2; Peach Bottom, Units 2 and 3, and Quad Cities, Units 1 and 2 - Revision to Approved Alternative to Use BWR Vessel and Internal Proj Guidelins JAFP-19-0023, Relief Request Associated with the Use of Encoded Phased Array Ultrasonic Examination Techniques in Lieu of Radiography for Ferritic and Austenitic Piping Welds2019-02-15015 February 2019 Relief Request Associated with the Use of Encoded Phased Array Ultrasonic Examination Techniques in Lieu of Radiography for Ferritic and Austenitic Piping Welds JAFP-18-0052, Proposed Alternative to Utilize Code Case N-8792018-05-30030 May 2018 Proposed Alternative to Utilize Code Case N-879 JAFP-18-0053, Proposed Alternative to Utilize Code Cases N-878 and N-8802018-05-30030 May 2018 Proposed Alternative to Utilize Code Cases N-878 and N-880 ML18022A6162018-01-24024 January 2018 Approval of Alternatives to the ASME Code Regarding Reactor Vessel Penetration N-11B - Relief Request 15R-11, Revision 3 (CAC No. MF9286; EPID L-2017-LLR-0004) (RS-17-014) RS-17-158, Fifth Inservice Inspection Interval Relief Request 15R-162017-11-0707 November 2017 Fifth Inservice Inspection Interval Relief Request 15R-16 ML17073A1212017-06-28028 June 2017 Issuance of Safety Evaluation Inservice Inspection Interval Proposed Alternative (I5R-08) ML17170A0132017-06-26026 June 2017 Proposed Alternative to Eliminate Examination of Threads in Reactor Pressure Vessel Flange (CAC Nos. MF8712-MF8729 and MF9548) ML16230A2372016-09-0606 September 2016 Fleet Request for Proposed Alternative to Use ASME Code Case N-513-4 (CAC Nos. MF7301-MF7322) ML15265A1642015-10-30030 October 2015 Request 14R-17 Relief from the Requirements of the ASME Code RS-15-126, Additional Information Supporting Relief Request I4R-17, Inservice Inspection Program Relief Request Regarding Examination Coverage for the Fourth Inservice Inspection Interval2015-05-21021 May 2015 Additional Information Supporting Relief Request I4R-17, Inservice Inspection Program Relief Request Regarding Examination Coverage for the Fourth Inservice Inspection Interval ML12121A6372012-05-10010 May 2012 Request to Use Code Case N-789 ML1206000112012-03-19019 March 2012 Request for Exemption from 10 CFR 50, Appendix R, Section Iii. L - Unacceptable with the Opportunity to Supplement JAFP-11-0112, Relief Request (RR-8), Alternative Examination Requirements for Nozzle-to-Vessel Shell Welds and Nozzle Inner Radius Sections Using American Society of Mechanical Engineers Code Case N-702 and BWRVIP-108NP2011-10-0303 October 2011 Relief Request (RR-8), Alternative Examination Requirements for Nozzle-to-Vessel Shell Welds and Nozzle Inner Radius Sections Using American Society of Mechanical Engineers Code Case N-702 and BWRVIP-108NP ML0929404362009-11-0303 November 2009 Alternative to Nozzle-to-Vessel Weld and Inner Radius Examinations RS-09-044, Request for Alternative to Nozzle-to-Vessel Weld and Inner Radius Examinations2009-03-13013 March 2009 Request for Alternative to Nozzle-to-Vessel Weld and Inner Radius Examinations ML0813305572008-06-27027 June 2008 Dresden/Quad Cities Relief Requests from 5-Year Test Interval for Main Steam Safety Valves ML0809803112008-04-30030 April 2008 Relief Request to Use Boiling Water Reactor Vessel & Internals Project Guidelines.. ML0723500872007-09-20020 September 2007 Relief, Request for Relief from ASME OM Code 5-year Test Interval Requirements ML0611103302006-05-0808 May 2006 Relief Request CR-28 for Third 10-Year Inservice Inspection Interval SVPLTR 05-0018, Relief Request CR-28, Inservice Inspection Program Relief Regarding Reactor Pressure Vessel Longitudinal Shell Weld Examination Coverage for Third 10-Year Inservice Inspection Interval2005-05-0606 May 2005 Relief Request CR-28, Inservice Inspection Program Relief Regarding Reactor Pressure Vessel Longitudinal Shell Weld Examination Coverage for Third 10-Year Inservice Inspection Interval ML0426005632004-10-19019 October 2004 Amendments, Main Steam Line Relief Valves and Associated Relief Requests. TAC Nos. MC1792, MC1793, MC1794, and MC1795 ML0423003862004-10-0101 October 2004 Relief Request, CR-26 for Third 10-Year Inservice Inspection Interval. TAC No MC3269 and MC3270 ML0423603442004-09-16016 September 2004 Relief Request, CR-27 for Third 10-Year Inservice Inspection Interval. TAC No. MC3268 ML0405603992004-03-25025 March 2004 Relief Request, Third 10-Year Inservice Inspection Interval, for Approval of a Flaw Evaluation for Dresden Nuclear Power Station (Dnps), Unit 2, So That the Affected Weld Could Be Left as Is Without Repair ML0327308692003-10-0202 October 2003 Relief Request for Fourth 10-Year Inservice Testing Interval, MB8741, MB8742, MB8743, MB8744, MB8745, and MB8746 ML0323704802003-09-0404 September 2003 Relief Request, Fourth 10-Year Inservice Inspection Interval RS-03-157, Additional Information Regarding Inservice Testing Program Relief Requests2003-08-0606 August 2003 Additional Information Regarding Inservice Testing Program Relief Requests ML0316110032003-07-0101 July 2003 Relief Request, CR-25 for Third 10-Year Inservice Inspection Interval RS-03-101, Additional Information Regarding Inservice Inspection Program Relief Request I4R-022003-05-29029 May 2003 Additional Information Regarding Inservice Inspection Program Relief Request I4R-02 RS-02-187, Request for Relief from Certain Requirements of 10 CFR 50.55a(g)(4)(ii) Regarding Control Rod Drive Housing Welds (Relief Request Number CR-25)2002-10-25025 October 2002 Request for Relief from Certain Requirements of 10 CFR 50.55a(g)(4)(ii) Regarding Control Rod Drive Housing Welds (Relief Request Number CR-25) ML0225902032002-10-0404 October 2002 Relief Request, PR-22 for Third 10-year Inservice Inspection Interval (MB4030, MB4031) 2023-09-27
[Table view] Category:Safety Evaluation
MONTHYEARML23305A1402023-12-13013 December 2023 Units 1 & 2; Nine Mile Point, Unit 2; Peach Bottom, Units 2 & 3; and Quad Cities, Units 1 and 2 - Issuance of Amendments to Adopt Traveler TSTF-580 ML23269A0662023-09-28028 September 2023 Proposed Alternative Request RV-23H Associated with the Sixth 10-Year Inservice Testing Interval ML23265A1322023-09-27027 September 2023 Proposed Alternative Request RV-03 Associated with the Sixth 10-Year Inservice Testing Interval ML23205A1362023-09-20020 September 2023 Proposed Alternative Request RV-02D Associated with the Sixth IST Interval ML23174A1502023-08-0303 August 2023 Issuance of Amendment Nos. 282 and 275 Control Rod Scram Times ML23144A3142023-07-0606 July 2023 Issuance of Amendment Nos. 281 and 274 Transition to GNF3 Fuel (EPID L-2022-LLA-0121) - Nonproprietary ML23114A2522023-04-28028 April 2023 Request to Use a Provision of a Later Edition of the ASME Boiler & Pressure Vessel Code, Section XI ML23081A0382023-04-25025 April 2023 County, 1 & 2; Nine Mile Point, 2; and Quad Cities, 1 & 2 - Issuance of Amendments to Adopt TSTF-306, Rev. 2, Add Action to LCO 3.3.6.1 to Give Option to Isolate the Penetration ML23032A3602023-03-22022 March 2023 Issuance of Amendment Nos. 279 and 272 New Fuel Storage Vault and Spent Fuel Storage Pool Criticality Methodologies ML22335A5442022-12-20020 December 2022 Authorization and Safety Evaluation for Alternative Request I6R-01, ML22293B8052022-11-30030 November 2022 Constellation Energy Generation, Llc_Fleet - Request to Authorize Use Honeywell Mururoa V4F1 R Supplied Air Suits ML22298A2802022-11-29029 November 2022 Authorization and Safety Evaluation for Alternative Request I6R-02 ML22090A0862022-04-29029 April 2022 Amendments to Adopt TSTF-541,Rev.2,Add Exceptions to Surveillance Requirements for Valves,Dampers Locked in Actuated Position ML22094A0012022-04-15015 April 2022 Constellation Energy Generation, LLC - Proposed Alternative for Repair of Water Level Instrumentation Partial Penetration Nozzles (Epids L-2021-LLR-0057 and L-2021-LLR-0058) ML21347A0382022-01-13013 January 2022 Issuance of Amendments to Revise Reactor Coolant Leakage Requirements ML21267A3172021-12-13013 December 2021 Proposed Alternative to Eliminate Certain Documentation Requirements for Pressure Retaining Bolting (6th ISI Interval) (Epids L-2021-LLR 0029, 0030) ML21307A3422021-12-0707 December 2021 Issuance of Amendments to Adopt Reactor Pressure Vessel Water Inventory Control Enhancements (EPIDs L-2020-LLA-0253 and L-2020-LLA-0254) ML21277A2482021-11-16016 November 2021 Letter with Enclosure 4, Safety Evaluation for Transfer of Licenses and Draft Conforming License Amendments (Public Version) ML21230A2062021-09-0303 September 2021 Proposed Alternative to Use ASME OM Code Case OMN-28 ML21076A3712021-08-17017 August 2021 Approval of Certified Fuel Handler Training and Retraining Program ML21216A2202021-08-0505 August 2021 Proposed Alternative to Eliminate Certain Documentation Requirements for Pressure Retaining Bolting ML21166A1682021-06-25025 June 2021 ML21033A5302021-04-0101 April 2021 Issuance of Amendments to Adopt Technical Specifications Task Force TSTF-566, Revise Actions for Inoperable RHR Shutdown Cooling Subsystems ML21013A0052021-02-0404 February 2021 Issuance of Amendments to Adopt Technical Specifications Task Traveler TSTF-568, Revise Applicability of BWR/4 TS 3.6.2.5 and TS 3.6.3.2 ML21028A6732021-02-0303 February 2021 Request to Use a Provision of Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI (EPID L-2020-LLR-011 ML21005A0612021-01-14014 January 2021 Proposed Alternatives to Extend the Safety Relief Valve Testing Interval (EPID L-2020-LLR-0014 Through L-2020-LLR-0018) ML20287A1302020-11-0505 November 2020 Review of Quality Assurance Program Changes ML20265A2402020-10-23023 October 2020 Issuance of Amendment Nos. 272 and 265 to Increase Allowable Main Steam Isolation Valve Leakage ML20269A2002020-09-30030 September 2020 Request to Use a Provision of Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI (EPID L2020-LLR-0117 ML20153A8042020-07-31031 July 2020 Co. - Issuance of Amendments Revising Emergency Action RA3 ML20141L6362020-07-10010 July 2020 Issuance of Amendments Based on TSTF-427,Allowance for Nontechnical Specification Barrier Degradation on Supported System Operability,Rev 2 ML20134H9402020-07-0808 July 2020 Issuance of Amendments Revising the High Radiation Area Administrative Controls ML20021A0702020-04-0606 April 2020 Issuance of Amendments to Delete License Conditions for Decommissioning Trusts ML19331A7252020-02-14014 February 2020 Issuance of Amendments Revising Emergency Action Levels ML20008D2762020-01-13013 January 2020 Safety Evaluation in Support of Request for Relief Associated with the Fifth Ins)Inservice Inspection Interval Relief Request I5R-04, Revision 2 ML19301A3392019-12-0404 December 2019 Issuance of Amendments to Revise Technical Specification 2.1.1, Reactor Core Safety Limits, the Minimum Critical Power Ration Safety Limits ML19269C5342019-09-27027 September 2019 Proposed Alternative to Use Encoded Phased Array Ultrasonic Examination Techniques ML19192A2442019-07-18018 July 2019 Proposed Alternative to Use ASME Code Cases N-878 and N-880 ML19098A0342019-04-30030 April 2019 Units 1 and 2; Limerick, Units 1 and 2; Peach Bottom, Units 2 and 3, and Quad Cities, Units 1 and 2 - Revision to Approved Alternative to Use BWR Vessel and Internal Proj Guidelins ML19036A5862019-03-21021 March 2019 Issuance of Amendments to Revise the Emergency Response Organization Staffing Requirements ML18304A3652019-01-16016 January 2019 2. Issuance of Amendments to Revise the Average Power Range Monitor Requirements ML18254A3672018-10-29029 October 2018 County 1 & 2; and Quad Cities 1 & 2 - Issuance of Amendments 220, 259, 252, 231, 217, 271 and 266 to Revise Technical Specification Requirements for Inoperable Snubbers ML18206A2822018-08-0202 August 2018 Issuance of Amendments to Relocate the Staff Qualification Requirements ML18137A2712018-06-29029 June 2018 Issuance of Amendments Regarding Permanent Extension of Type a and Type C Leak Rate Test Frequencies (Cac. Nos. MF9687 and MF9688; EPID L-2017-LLA-0228) (RS-17-060) ML18079A3822018-04-27027 April 2018 Safety Evaluation Regarding Implementation of Hardened Containment Vents Capable of Operation Under Severe Accident Conditions Related to Order EA-13-109 ML18060A3242018-03-0909 March 2018 Relief Request I5R-16 Approval of Alternative to Use the Performance Demonstration Initiative Program for Weld Overlay Inspection Qualifications ML18022A6162018-01-24024 January 2018 Approval of Alternatives to the ASME Code Regarding Reactor Vessel Penetration N-11B - Relief Request 15R-11, Revision 3 (CAC No. MF9286; EPID L-2017-LLR-0004) (RS-17-014) ML17272A7832018-01-0808 January 2018 Issuance of Amendments to Adopt TSTF-542 TS Changes (CAC Nos. MF9295 and MF9296; EPID L-2017-LLA-0176) ML17121A0492017-10-30030 October 2017 Safety Evaluation by the Office of Nuclear Reactor Regulation for the Proposed Alternative for the Use of Encoded Phased Array Ultrasonic Examination Techniques in Lieu of Radiography ML17163A3552017-08-31031 August 2017 Calvert Cliff, Clinton, Dresden, LaSalle, Limerick, Nine Mile Point, Peach Bottom, Quad Cities, R. E. Ginna, and Three Miles Island - Issuance of Amendments to Adopt TSTF-529, Clarify Use and Application Rules(Cac Nos. MF9470-MF9490) 2023-09-28
[Table view] |
Text
December 20, 2022 DRESDEN NUCLEAR POWER STATION, UNITS 2 AND 3 - AUTHORIZATION AND SAFETY EVALUATION FOR ALTERNATIVE REQUEST I6R-01, (EPID: L-2022-LLR-0037)
LICENSEE INFORMATION Recipients Name and Address: Mr. David P. Rhoades Senior Vice President Constellation Energy Generation, LLC President and Chief Nuclear Officer Constellation Nuclear 4300 Winfield Road Warrenville, IL 60555 Licensee: Constellation Energy Generation, LLC Plant Name and Units: Dresden Nuclear Power Station (Dresden), Units 2 and 3 Docket Nos.: 50-237 and 50-249 APPLICATION INFORMATION Submittal Date: March 25, 2022 Submittal Agencywide Documents Access and Management System (ADAMS) Accession No.: ML22084A615 Supplement Date: August 10, 2022 Supplement ADAMS Accession No.: ML22223A087 Applicable Code Edition and Addenda: The code of record for the sixth 10-year ISI interval is 2017 Edition of the ASME Code,Section XI.
Applicable Inservice Inspection (ISI) Program Interval and Interval Start/End Dates: The sixth 10-year ISI interval is scheduled to begin on January 20, 2023, and end on January 19, 2033.
Alternative Provision: The licensee requested an alternative under Title 10 of the Code of Federal Regulations (10 CFR) 50.55a(z)(2).
ISI Requirement: For American Society of Mechanical Engineers Boiler and Pressure Vessel Code (ASME BPV Code) Class 1 nozzles, the ISI requirements are specified in paragraph IWB-2411 of the ASME BPV Code,Section XI, which requires the licensee to perform volumetric examinations of the inside radii of reactor pressure vessel nozzles as specified in ASME BPV Code,Section XI, Table IWB-2500-1 (Examination Category B-D) once every 10-year ISI interval.
Examination Category B-D, Item No. B3.100, Nozzle Inside Radius Section Note (7) of Table IWB-2500-1 (B-D) allows a VT-1 visual examination of the nozzle inner radius in accordance with IWB-2500(g) in lieu of the volumetric examination. IWB-2500(g) references mathematical criteria in IWB-2500(f), which must be met in order to perform the visual examination in lieu of the volumetric examination. The U.S. Nuclear Regulatory Commission (NRC) conditioned IWB-2500(f) and (g) in 10 CFR 50.55a(b)(2)(xxi)(B) to require, in part, that the licensee maintain records demonstrating that the criteria in IWB-2500(f) are met, in the case that the licensee elects to perform the visual examination in lieu of the volumetric examination.
Brief Description of the Proposed Alternative: In Section 4 of I6R-01, Reason for Request, and Figure 16R-01.1, the licensee described the geometric configuration of the Dresden, Units 2 and 3, standby liquid control (SBLC) nozzles. The licensee stated that performing the required volumetric examination of the SBLC nozzles would result in a hardship or unusual difficulty without a compensating increase in the level of quality and safety. The licensee proposed to perform a VT-2 visual examination of the SBLC nozzle as part of the Class 1 leakage test and maintain compliance with technical specification surveillance requirements for reactor coolant pressure boundary leakage, as an alternative to the volumetric examination.
For additional details on the licensees request, please refer to the documents located at the ADAMS Accession Nos. identified above.
STAFF EVALUATION The NRC staff evaluated the alternative request I6R-01 pursuant to 10 CFR 50.55a(z)(2). The staffs evaluation focused on whether compliance with the specified requirements of 10 CFR 50.55a(g), or portions thereof, would result in a hardship or unusual difficulty, without a compensating increase in the level of quality and safety.
Hardship Justification The licensee cited several hardships for this case, including the need for low-angle ultrasonic probes, complex metallurgy due to the unique socket configuration of the nozzle, the lack of qualified ultrasonic equipment, and high dose exposure to the plant personnel performing the examination. The NRC staff reviewed these factors and determined that, taken all together, they do constitute a hardship.
As part of its review of the proposed alternative, the staff requested additional information on materials of construction, the examination history of the nozzle-to-vessel weld, the examination history of the subject nozzle inner radius, and the potential to perform a VT-1 examination in accordance with IWB-2500(g) of Section XI. In response, the licensee submitted the supplement dated August 10, 2022. The supplement stated that the reactor pressure vessel plates were fabricated out of SA-302 Grade B low-alloy steel and that the SBLC nozzle forging was fabricated out of SA-336 low-alloy steel. The licensee stated that the nozzle-to-vessel weld has
received four ultrasonic examinations with no identified indications. The licensee stated that, while the SBLC nozzle inner radius has not received ultrasonic examination, it has received the VT-2 examination. The licensee further stated that plant personnel have not identified any relevant conditions or signs of leakage as part of the VT-2 examination. Finally, the licensee stated that performance of the VT-1 in accordance with IWB-2500(g) of Section XI also presents a hardship due to the removal of vessel internal components that would be required to access to the SBLC nozzle inner radius location.
The examination history of the nozzle-to-vessel weld provides confidence in the performance of the nozzle inner radius since it was constructed with the similar materials and it experiences a similar environment as the nozzle inner radius location. Regarding the potential for a VT-1 examination, the NRC staff determined that removal of various lower plenum vessel internal components to perform the examination does constitute a hardship. Overall, the staff finds that the licensees responses in the supplement dated August 10, 2022, are acceptable.
CONCLUSION The NRC staff has determined that complying with the specified requirements described in the licensees request would result in hardship or unusual difficulty without a compensating increase in the level of quality and safety.
The proposed alternative and the past examination history included in the supplement provide reasonable assurance about the structural integrity of the SBLC nozzle-to-vessel welds.
The NRC staff concludes that the licensee has adequately addressed the regulatory requirements set forth in 10 CFR 50.55a(z)(2).
The NRC staff authorizes the use of alternative request I6R-01, at Dresden, Units 2 and 3, for the sixth 10-year ISI interval which is scheduled to begin on January 20, 2023, and end on January 19, 2033.
All other ASME Code,Section XI, requirements for which an alternative was not specifically requested and authorized remain applicable, including third-party review by the Authorized Nuclear Inservice Inspector.
Principal Contributor: M. Benson, NRR Date: December 20, 2022 Digitally signed by Nancy Nancy L. L. Salgado Date: 2022.12.20 Salgado 13:00:45 -05'00' Nancy L. Salgado, Chief Plant Licensing Branch III Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation cc: Listserv
ML22335A544 OFFICE NRR/DORL/LPL3/PM NRR/DORL/LPL3/LA NRR/DNRL/NVIB/BC (A) NRR/DORL/LPL3/BC NAME SArora SRohrer DWidrevitz NSalgado DATE 11/30/2022 12/5/2022 11/18/2022 12/20/2022