ML23122A06531 December 2022Annual Radioactive Effluent Release ReportGrab sample
Offsite Dose Calculation Manual
Annual Radioactive Effluent Release Report
Annual Radiological Environmental Operating Report
ML23122A06831 December 2022Annual Radiological Environmental Operation ReportGrab sample
Offsite Dose Calculation Manual
Annual Radioactive Effluent Release Report
Annual Radiological Environmental Operating Report
ML22354A26220 December 2022NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of Request to Use Certain Provisions of the 2019 Edition of the ASME BPV Code, Section XI
ML22341A6048 December 2022Confirmation of Initial License Examination
IR 05000461/20224026 December 2022Security Baseline Inspection Report 05000461/2022402
RS-22-126, Constellation Energy Generation, LLC - Request to Use Provisions of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI30 November 2022Constellation Energy Generation, LLC - Request to Use Provisions of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XIIncorporated by reference
ML22293B80530 November 2022Constellation Energy Generation, Llc_Fleet - Request to Authorize Use Honeywell Mururoa V4F1 R Supplied Air SuitsMururoa
IR 05000461/202240328 November 2022Material Control and Accounting Program Inspection Report 05000461/2022403 (Public)Affidavit
ML22320A55916 November 20222022 Annual Report - Guarantees of Payment of Deferred Premiums
U-604740, Registration of Use of Casks to Store Spent Fuel15 November 2022Registration of Use of Casks to Store Spent Fuel
ML22263A47310 November 2022Issuance of Amendment No. 247 Adoption of TSTF-230, Revision 1
ML22292A03510 November 2022Issuance of Amendment No. 246 Secondary Containment and the Fuel Building Railroad Airlock (EPID L-2022- LLA-0055)Safe Shutdown
High winds
Tornado Missile
Tornado Missile Protection
IR 05000461/202200310 November 2022Integrated Inspection Report 05000461/2022003Grab sample
Offsite Dose Calculation Manual
Enforcement Discretion
Temporary Modification
Functionality Assessment
Significance Determination Process
Operability Determination
Fire Protection Program
Siren
RS-22-121, Notice of Intent to Pursue Subsequent License Renewal Applications9 November 2022Notice of Intent to Pursue Subsequent License Renewal Applications
ML22312A5368 November 2022Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection 05000461/2023401Probabilistic Risk Assessment
ML22307A0191 November 2022EN 56196 - NRC 10 CFR Part 21 Notification, Nutherm, Written Notification of Potential Defect Found in Nutherm/Sola Hevi-Duty Uninterruptible Power Supply (Ups), S4K2U1000-NM 191Reverse polarity
ML22301A17428 October 2022Global Nuclear Fuel Americas, LLC (GNF) - Part 21 60-Day Interim Report Notification: GNF3 Raised Water Rod (SC-22-04 Rt)
ML22301A09028 October 2022NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of License Amendment Request to Adopt TSTF-301, Revision 2
U-604738, Registration of Use of Casks to Store Spent Fuel21 October 2022Registration of Use of Casks to Store Spent Fuel
ML22290A09519 October 2022Constellation Energy Generation, LLC - Fleet Project Manager Reassignment
U-604728, October 1, 2021 Through September 30, 2022 Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report7 October 2022October 1, 2021 Through September 30, 2022 Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release ReportAnnual Radioactive Effluent Release Report
RS-22-092, Nine and Quad Cities - Application to Revise Primary Containment Isolation Instrumentation Technical Specifications in Accordance with TSTF-306, Revision 2, Add Action to LCO 3.3.6.1 to Give Option to Isolate the Penetration3 October 2022Nine and Quad Cities - Application to Revise Primary Containment Isolation Instrumentation Technical Specifications in Accordance with TSTF-306, Revision 2, Add Action to LCO 3.3.6.1 to Give Option to Isolate the PenetrationReactor Vessel Water Level
ML23122A06630 September 2022CY-CL-170-301, Revision 26, Offsite Dose Calculation ManualSafe Shutdown
Ultimate heat sink
Grab sample
Offsite Dose Calculation Manual
Met Tower
Annual Radioactive Effluent Release Report
Annual Radiological Environmental Operating Report
Power change
RS-22-107, Annual Report of Emergency Core Cooling System Evaluation Model Changes and Errors for Clinton Power Station29 September 2022Annual Report of Emergency Core Cooling System Evaluation Model Changes and Errors for Clinton Power Station
NMP1L3481, Constellation Energy Generation, LLC, 10 CFR 50, Appendix E - Development of Evacuation Time Estimates15 September 2022Constellation Energy Generation, LLC, 10 CFR 50, Appendix E - Development of Evacuation Time EstimatesPandemic
Coronavirus
ML22255A14012 September 2022Information Request to Support Upcoming Problem Identification and Resolution (Pi&R) Inspection at Clinton Power StationTemporary Modification
Aging Management
Maintenance Rule Program
ML22250A3406 September 2022Letter Dated 9/6/22 Re NRC Office of Investigations Report No. 3-2021-009
IR 05000461/202200522 August 2022Updated Inspection Plan for Clinton Power Station (Report 05000461/2022005)Operator Manual Action
Open Phase Condition
Exemption Request
Coronavirus
RS-22-093, Advisement of Leadership Changes for Constellation Energy Generation, LLC and Submittal of Updated Standard Practice Procedures Plans18 August 2022Advisement of Leadership Changes for Constellation Energy Generation, LLC and Submittal of Updated Standard Practice Procedures Plans
ML22222A10510 August 2022Notice of Withdrawal of Margrethe Kearney
ML22214A0042 August 2022Audit Plan to Support the Review of Amendments to Revise Criticality Safety Analysis Methodologies (Epids L-2022-LLA-0085, L-2021-LLA-0124, and L-2021-LLA-0159)
IR 05000461/202200227 July 2022Integrated Inspection Report 05000461/2022002Temporary Modification
Functionality Assessment
FLEX
Operability Determination
Fire Protection Program
RS-22-089, Additional Information Supporting Request for License Amendment to Revise the Secondary Containment Design Basis to Credit the Fuel Building Railroad Airlock25 July 2022Additional Information Supporting Request for License Amendment to Revise the Secondary Containment Design Basis to Credit the Fuel Building Railroad AirlockHigh winds
ML22200A07819 July 2022NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request to Use Honeywell Mururoa V4F1 R Supplied Air SuitsMururoa
ML22269A40718 July 2022Attachment 4 - Clinton Power Station-Development of Evacuation Time EstimatesPandemic
Coronavirus
ML22186A1508 July 2022Closeout of Bulletin 2012-01, Design Vulnerability in Electric Power SystemOpen Phase Condition
NMP1L3469, Constellation Energy Company, LLC, Request for Use of Honeywell Mururoa V4F1 R Supplied Air Suits30 June 2022Constellation Energy Company, LLC, Request for Use of Honeywell Mururoa V4F1 R Supplied Air SuitsMururoa
ML22199A06628 June 2022News Release-III-22-020: NRC Names New Resident Inspector at Clinton Nuclear Power PlantNew Resident Inspector
ML22173A03821 June 2022NRR E-mail Capture - Request for Additional Information (RAI) Regarding Clinton License Amendment Request for Secondary Containment Design Basis (L-2022-LLA-0055)
ML22165A19014 June 2022NRR E-mail Capture - NRC Acceptance Review of Clinton Request to Adopt TSTF-230 (L-2022-LLA-0076)
ML22165A19114 June 2022NRR E-mail Capture - NRC Acceptance Review of Clinton Request to Adopt TSTF-269 (L-2022-LLA-0077)
CNL-22-064, Response to Request for Additional Information Regarding Tennessee Valley Authority License Amendment Request to Revise Emergency Plan Implementing Procedure Regarding Seismic Event Emergency Action Level Change9 June 2022Response to Request for Additional Information Regarding Tennessee Valley Authority License Amendment Request to Revise Emergency Plan Implementing Procedure Regarding Seismic Event Emergency Action Level ChangeSafe Shutdown Earthquake
Operating Basis Earthquake
Earthquake
IR 05000461/20220106 June 2022Design Basis Assurance Inspection (Teams) Inspection Report 05000461/2022010Boric Acid
Internal Flooding
Probabilistic Risk Assessment
Cyber Security
Condition Adverse to Quality
Significance Determination Process
Surveillance Frequency Control Program
Large early release frequency
Through-Wall Leak
Through-Wall Leakage
Power Uprate
RS-22-060, Request for License Amendment to Adopt TSTF-230, Revision 1, Add New Condition B to LCO 3.6.2.3, RHR Suppression Pool Cooling24 May 2022Request for License Amendment to Adopt TSTF-230, Revision 1, Add New Condition B to LCO 3.6.2.3, RHR Suppression Pool Cooling
IR 05000461/202240124 May 2022Security Baseline Inspection Report 05000461/2022401
RS-22-061, Request for License Amendment to Adopt TSTF-269, Revision 2, Allow Administrative Means of Position Verification for Locked or Sealed Valves24 May 2022Request for License Amendment to Adopt TSTF-269, Revision 2, Allow Administrative Means of Position Verification for Locked or Sealed ValvesHigh Radiation Area
Hydrostatic
Recently irradiated fuel
ML23089A01824 May 2022NRR E-mail Capture - Clinton Power Station Acceptance Review Results - Submittal of Preliminary Decommissioning Cost Estimate and Spent Fuel Management Plan
ML22140A29123 May 2022Summary of Public Outreach to Discuss the NRC 2021 End-Of-Cycle Plant Performance Assessment of Clinton, Unit 1, and Lasalle, Units 1 and 2
ML22216A22119 May 20222 to Updated Safety Analysis Report, Appendix E, Figures Part 1 of 2_Redacted
ML22139A25519 May 2022Constellation Radiological Emergency Plan Addendum and Procedure RevisionSafe Shutdown
High winds
Ultimate heat sink
Fire Barrier
Safe Shutdown Earthquake
Internal Flooding
Operating Basis Earthquake
Operator Manual Action
Nuclear Accident Reporting System
FLEX
B.5.b
Earthquake
Fuel cladding
Pressure Boundary Leakage
Power change