Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML18089A041 | 29 March 2018 | Notification of NRC Initial Operator Licensing Examination 05000382/2018301 | |
IR 05000382/2018405 | 28 March 2018 | Errata - Waterford Steam Electric Station, Unit 3 - NRC Material Control and Accounting Program Inspection Report 05000382/2018405 | Affidavit |
W3F1-2017-0050, License Amendment Request - Proposed Change to Technical Specification 3/4.7.4 for Ultimate Heat Sink Design Basis Update | 26 March 2018 | License Amendment Request - Proposed Change to Technical Specification 3/4.7.4 for Ultimate Heat Sink Design Basis Update | Safe Shutdown Ultimate heat sink Mission time Tornado Missile Functionality Assessment |
ML18085A694 | 26 March 2018 | Ref: Waterford Steam Electric Station, Unit 3, License Renewal Application - RAI Set 18 | |
ML18075A076 | 22 March 2018 | Transmittal of Final Waterford Steam Electric Station, Unit 3, Accident Sequence Precursor Report (Licensee Event Report 382-2017-002) | Past operability FLEX Significance Determination Process |
ML18080A020 | 20 March 2018 | NRR E-mail Capture - Waterford 3 - Acceptance Review of Relief Request W3-ISI-030 Regarding Charging Pipe Visual Inspection | |
ML18075A123 | 20 March 2018 | Entergy Nuclear Operations - March 20, 2018, Presentation Slides for Surveillance Frequency Control Program, UFSAR Change Considerations | Surveillance Frequency Control Program |
CNRO-2018-00011, Submittal of Joint Plant Access Shared Information Table | 19 March 2018 | Submittal of Joint Plant Access Shared Information Table | |
ML18081A119 | 15 March 2018 | Rosemount Nuclear Instruments, Inc., Submittal of Notification Under 10 CFR Part 21 for Certain Model 1154 and Model 1154 Serles H Pressure Transmitters and 01154-0153-0002 Amplifier Circuit Card Assemblies | |
Press Release-IV-18-002, NRC Issues Confirmatory Order to Entergy | 14 March 2018 | Press Release-IV-18-002: NRC Issues Confirmatory Order to Entergy | |
IR 05000416/2017014 | 12 March 2018 | Confirmatory Order, NRC Inspection Report 05000416/2017014, and NRC Investigation Reports 4-2016-004 and 4-2014-021 | Enforcement Discretion Exemption Request |
ML18068A087 | 9 March 2018 | Letter Notifying Entergy Operations, Inc. and Entergy Nuclear Operations, Inc., Are No Longer Members of the Nuclear Energy Institute Effective 02/01/2018 | |
W3F1-2018-0011, License Amendment Request to Update the Results for the Inadvertent Loading of a Fuel Assembly Into the Improper Position (Fuel Assembly Misload) Event | 8 March 2018 | License Amendment Request to Update the Results for the Inadvertent Loading of a Fuel Assembly Into the Improper Position (Fuel Assembly Misload) Event | |
L-2018-064, Submittal of Joint Composite Adversary Force | 8 March 2018 | Submittal of Joint Composite Adversary Force | |
ML18078A333 | 6 March 2018 | FEMA - After Action Report/Improvement Plan Exercise Date December 5-6, 2017, Radiological Emergency Preparedness (REP) Program for Waterford, Unit 3 | Fuel cladding Scaffolding |
ML18078A331 | 6 March 2018 | FEMA - Submittal of Radiological Emergency Preparedness After Action Report for the Ingestion Pathway Exercise Held on December 5-6, 2017, for Waterford, Unit 3 | |
ML18059A015 | 5 March 2018 | Summary of February 8, 2018, Category 1 Public Meeting with Entergy Operations, Inc., Regarding Planned License Amendment Request to Revise the Waterford Unit 3 Updated Final Safety Analysis Report Section 15.4.3.1 | |
IR 05000382/2017006 | 1 March 2018 | Annual Assessment Letter for Waterford Steam Electric Station Unit 3, (Report 05000382/2017006) | Cyber Security Open Phase Condition |
W3F1-2018-0013, Supplement to License Amendment Request for Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-501, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control. | 28 February 2018 | Supplement to License Amendment Request for Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-501, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control. | Shutdown Margin Surveillance Frequency Control Program Offsite Circuit |
CAC:MF9710 | 26 February 2018 | ||
ML17171A128 | 26 February 2018 | Flood Focused Evaluation Assessment | Safe Shutdown Unanalyzed Condition Ultimate heat sink FLEX Fukushima Dai-Ichi |
ML18058A989 | 26 February 2018 | NRC Material Control and Accounting Program Inspection Report 05000382/2018405 | |
ML18058A056 | 23 February 2018 | Letter to J. Giddens Request for Additional Information Regarding Entergy Operations, Inc.'S Decommissioning Funding Plan Update | Decommissioning Funding Plan |
ML18058A057 | 23 February 2018 | Enclosurequest for Additional Information (Letter to J. Giddens Request for Additional Information Regarding Entergy Operations, Inc.'S Decommissioning Funding Plan Update) | Decommissioning Funding Plan Authorized possession limits |
W3F1-2018-0008, Request for NRC Alternative to ASME IWA-5211 Regarding Charging Pipe Visual Inspection, Relief Request W3-ISI-030 | 20 February 2018 | Request for NRC Alternative to ASME IWA-5211 Regarding Charging Pipe Visual Inspection, Relief Request W3-ISI-030 | Boric Acid VT-2 |
ML18048A007 | 17 February 2018 | Single Positive Test Form Collected on 04/05/2017 | |
ML18048A019 | 17 February 2018 | Annual Fatigue Report Form for 2017 | |
ML18048A018 | 17 February 2018 | Annual Report Form for Drug and Alcohol Tests for 2017 | |
ML18048A017 | 17 February 2018 | Single Positive Test Form Collected on 10/10/2017 | |
ML18048A016 | 17 February 2018 | Single Positive Test Form Collected on 07/31/2017 | |
ML18048A015 | 17 February 2018 | Single Positive Test Form Collected on 08/21/2017 | |
ML18048A014 | 17 February 2018 | Single Positive Test Form Collected on 07/26/2017 | |
ML18048A012 | 17 February 2018 | Single Positive Test Form Collected on 06/07/2017 | |
ML18048A008 | 17 February 2018 | Single Positive Test Form Collected on 03/06/2017 | |
ML18048A006 | 17 February 2018 | Single Positive Test Form Collected on 04/04/2017 | |
ML18048A005 | 17 February 2018 | Single Positive Test Form Collected on 03/27/2017 | |
ML18048A004 | 17 February 2018 | Single Positive Test Form Collected on 03/13/2017 | |
ML18048A003 | 17 February 2018 | Single Positive Test Form Collected on 03/08/2017 | |
ML18048A002 | 17 February 2018 | Single Positive Test Form Collected on 02/27/2017 | |
ML18048A001 | 17 February 2018 | Single Positive Test Form Collected on 02/14/2017 | |
ML18048A000 | 17 February 2018 | Single Positive Test Form Collected on 02/09/2017 | |
ML18048A009 | 17 February 2018 | Single Positive Test Form Collected on 05/08/2017 | |
ML18048A010 | 17 February 2018 | Single Positive Test Form Collected on 04/17/2017 | |
ML18048A011 | 17 February 2018 | Single Positive Test Form Collected on 05/16/2017 | |
ML18048A013 | 17 February 2018 | Single Positive Test Form Collected on 07/05/2017 | |
ML18052A069 | 16 February 2018 | NRR E-mail Capture - No RAIs for Raptor LAR Dated November 28, 2017 | |
W3F1-2018-0009, Spent Fuel Storage Radioactive Effluent Release Report for 2017 | 12 February 2018 | Spent Fuel Storage Radioactive Effluent Release Report for 2017 | Annual Radioactive Effluent Release Report |
ML18037B110 | 8 February 2018 | Presentation Slides for February 8 2018 Preapplication Meeting to Discuss Chapter 15 Fuel Misload | |
ML18039A972 | 8 February 2018 | Notification of Evaluations of Changes, Tests, and Experiments Inspection (05000382/2018002) and Request for Information | |
IR 05000382/2017004 | 7 February 2018 | NRC Integrated Inspection Report 05000382/2017004 | Offsite Dose Calculation Manual Anticipated operational occurrence Temporary Modification Functionality Assessment Significance Determination Process Operability Determination Maintenance Rule Program Fire Protection Program Operability Assessment Unidentified leakage Siren |