Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
RS-18-038, Annual Property Insurance Status Report | 30 March 2018 | Annual Property Insurance Status Report | |
ML18094B057 | 29 March 2018 | E-Mail Sent 03/29/18 Information Request for LaSalle Unit 2 (DRS-M.Holmberg) | |
ML18086B221 | 27 March 2018 | Withdrawal of Submittal of Relief Request for an Alternative to the ASME Code - Revise Main Steam Isolation Valve Partial Stroke Testing Frequency | Surveillance Frequency Control Program Cold shutdown justification |
ML18082B381 | 23 March 2018 | Notification of an NRC Triennial Heat Sink Performance Inspection and Request for Information; Inspection Report 05000373/2018002; 05000374/2018002 (DRS-V.Petrella) | Ultimate heat sink Temporary Modification Aging Management Flow Induced Vibration |
RA18-016, Cycle 18 Core Operating Limits Report (COLR) | 22 March 2018 | Cycle 18 Core Operating Limits Report (COLR) | Safety Limit Minimum Critical Power Ratio MELLLA |
RA18-018, Request to Extend Enforcement Discretion Provided in Enforcement Guidance Memorandum 15-002 for Tornado-Generated Missile Protection Non-Conformances Identified in Response to Regulatory Issue Summary 2015-06, Tornado Missile.... | 20 March 2018 | Request to Extend Enforcement Discretion Provided in Enforcement Guidance Memorandum 15-002 for Tornado-Generated Missile Protection Non-Conformances Identified in Response to Regulatory Issue Summary 2015-06, Tornado Missile.... | Safe Shutdown Unanalyzed Condition High winds Ultimate heat sink Tornado Missile Enforcement Discretion FLEX Tornado Generated Missile Tornado Missile Protection Spent Fuel Pool Instrumentation TORMIS Tornado Missile Risk Evaluator |
ML18079A019 | 19 March 2018 | NRR E-mail Capture - Acceptance for Review of Application - License Amendment Request to Revise the TS SR 3.4.4.1 to Revise the Lower Setpoint Tolerances for Safety/Relief Valves (S/Rvs) (EPID-L-2018-LLA-0052) | |
ML18074A058 | 15 March 2018 | NRR E-mail Capture - Acceptance for Review of Application - License Amendment Request to Adopt TSTF-334-A (EPID-L-2018-LLA-0035) | Surveillance Frequency Control Program |
ML18074A059 | 15 March 2018 | NRR E-mail Capture - Acceptance for Review of Relief Request RV-02 in Conjunction with the LAR to Adopt TSTF-334-A (EPID-L-2018-LLA-0004) | |
ML18067A148 | 8 March 2018 | Enclosurequest for Additional Information (Letter to P. R. Simpson Request for Additional Information Regarding Exelon Generating Company, Llc'S Decommissioning Funding Plan Update for Independent Spent Fuel Storage Installation) | Decommissioning Funding Plan Authorized possession limits |
ML18067A149 | 8 March 2018 | Letter to P. R. Simpson Request for Additional Information Regarding Exelon Generating Company, Llc'S Decommissioning Funding Plan Update for Independent Spent Fuel Storage Installation | Decommissioning Funding Plan |
ML18067A237 | 8 March 2018 | NRR E-mail Capture - Exelon Generation Company, LLC - Acceptance of License Amendment Request to Revise Emergency Plan for Midwest Stations | |
ML18065A836 | 7 March 2018 | Summary of February 27, 2018, Meeting with Exelon Generation Company, LLC Planned Fleet License Amendment Request to Relocate Staff Qualification Requirements from TSs to the Quality Assurance Topical Report | |
ML18066A052 | 7 March 2018 | Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors | |
ML18066A128 | 6 March 2018 | NRC Participation in the LaSalle County Station Emergency Preparedness Exercise (DRS-D.Smith) | |
ML18065A204 | 6 March 2018 | Co., Emergency Plan Revision Summary Analysis and Revision 29 to EP-AA-1000, Exelon Nuclear Standardized Radiological Emergency Plan. | Safe Shutdown Fitness for Duty Health Physics Network High Radiation Area Offsite Dose Calculation Manual Met Tower Nuclear Accident Reporting System Severe Accident Management Guideline Earthquake Deep Dose Equivalent Fuel cladding Minimum staff Fire Protection Program Grace period Power change Siren |
IR 05000373/2017006 | 2 March 2018 | Annual Assessment Letter for LaSalle County Station, Units 1 and 2; Report 05000373/2017006; 05000374/2017006 | Cyber Security |
RS-17-161, Fleet License Amendment Request to Relocate Technical Specification Unit/Facility/Plant Staff Qualification ANSI N18.1-1971 and ANSl/ANS-3.1-1978 Requirements to the Exelon Quality Assurance Topical Report (QATR) | 1 March 2018 | Fleet License Amendment Request to Relocate Technical Specification Unit/Facility/Plant Staff Qualification ANSI N18.1-1971 and ANSl/ANS-3.1-1978 Requirements to the Exelon Quality Assurance Topical Report (QATR) | Coatings Fire Protection Program |
ML18058A523 | 1 March 2018 | Summary of February 26, 2018, Meeting with Exelon Generation Company, LLC Regarding Proposed Alternative to the Main Steam Isolation Valve Testing Requirements | Surveillance Frequency Control Program Cold shutdown justification |
RS-18-025, Submittal of Fitness for Duty Performance Data Reports for the Year 2017 | 28 February 2018 | Submittal of Fitness for Duty Performance Data Reports for the Year 2017 | Fitness for Duty |
RS-18-010, Tenth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-BeyondDesign-Basis External Events | 28 February 2018 | Tenth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-BeyondDesign-Basis External Events | High winds Safe Shutdown Earthquake FLEX Spent Fuel Pool Instrumentation |
NMP1L3206, Exelon Generation Co., Submittal of Emergency Plan Revision | 27 February 2018 | Exelon Generation Co., Submittal of Emergency Plan Revision | |
ML18054B359 | 27 February 2018 | Slide: NRC Pre-Submittal Meeting for Exelon Fleet LAR to Relocate TS Unit Staff Qualification ANSI Requirements to the QATR, February 27, 2018, Profile Info: Submitted by Frank Mascitelli | |
NMP1L3206, Co., Submittal of Emergency Plan Revision | 27 February 2018 | Co., Submittal of Emergency Plan Revision | |
RS-18-023, License Amendment Request to Revise the Technical Specifications (TS) Surveillance Requirement (SR) 3.4.4.1 to Revise the Lower Setpoint Tolerances for Safety/Relief Valves (S/Rvs) | 27 February 2018 | License Amendment Request to Revise the Technical Specifications (TS) Surveillance Requirement (SR) 3.4.4.1 to Revise the Lower Setpoint Tolerances for Safety/Relief Valves (S/Rvs) | Anticipated operational occurrence |
ML18058A790 | 27 February 2018 | Annual Fatigue Report Form for 2017 | |
ML18053A943 | 22 February 2018 | Annual Report Form for Drug and Alcohol Tests for 2017 | |
ML18053A759 | 22 February 2018 | Submittal of Exelon Cyber Security Plan Revisions | Cyber Security |
ML18051A169 | 20 February 2018 | NRR E-mail Capture - Acceptance for Review of Application Concerning License Amendment Request for Temporary Extensions to Technical Specifications Supporting Maintenance on Portions of the Core Standby Cooling System (EPID-L-2018-LLA-0012) | |
IR 05000373/2017004 | 13 February 2018 | NRC Integrated Inspection Report 05000373/2017004; 05000374/2017004 and Emergency Preparedness Annual Inspection Report 05000373/2017501; 5000374/2017501 | High winds High Radiation Area Ultimate heat sink Non-Destructive Examination Offsite Dose Calculation Manual Internal Flooding Enforcement Discretion Probabilistic Risk Assessment Temporary Modification Functionality Assessment Incorporated by reference Tornado-Generated Missile Significance Determination Process Job Performance Measure Operability Determination Fuel cladding Through Wall Leak Fire Protection Program Power change Operability Assessment Power Uprate |
ML18043A855 | 12 February 2018 | Annual Report Form for Drug and Alcohol Tests for 2017 | |
RA-18-008, Summary of Changes to Quality Assurance Topical Report, NO-AA-10 | 8 February 2018 | Summary of Changes to Quality Assurance Topical Report, NO-AA-10 | Safe Shutdown Fitness for Duty Shutdown Margin Non-Destructive Examination Offsite Dose Calculation Manual Commercial Grade Dedication Safe Shutdown Earthquake Coatings Nondestructive Examination Temporary Modification Cyber Security Condition Adverse to Quality Aging Management Process Control Program Operability Determination License Renewal Maintenance Rule Program Fire Protection Program |
ML18008A123 | 6 February 2018 | Issuance of Amendments to Renewed Facility Operating Licenses Revision to Technical Specifications 2.1.1 for Minimum Critical Power Ratio Safety Limits (CAC Nos. MG0211 and MG0212; EPID L-2017-LLA-0279) | Reactor Vessel Water Level Anticipated operational occurrence Abnormal operational transient Minimum Critical Power Ratio Fuel cladding |
ML18053A176 | 31 January 2018 | Attachment 5B - LaSalle Clean Emergency Plan EP-AA-1000 Pages | Nuclear Accident Reporting System Severe Accident Management Guideline Minimum staff |
ML18053A175 | 31 January 2018 | Attachment 5A - LaSalle Marked-up Emergency Plan EP-AA-1000 Pages | Safe Shutdown Fitness for Duty Health Physics Network Nuclear Accident Reporting System Severe Accident Management Guideline Minimum staff |
RS-18-021, License Amendment Request for Approval of Changes to Emergency Plan EP-AA-1000 Staffing Requirements | 31 January 2018 | License Amendment Request for Approval of Changes to Emergency Plan EP-AA-1000 Staffing Requirements | Minimum staff |
ML18053A184 | 31 January 2018 | Enclosure 5 - LaSalle - Evaluation of Proposed Changes | Safe Shutdown Fitness for Duty Cyber Security Severe Accident Management Guideline Fuel cladding Minimum staff |
RS-18-021, Exelon Generation Co, LLC - License Amendment Request for Approval of Changes to Emergency Plan EP-AA-1000 Staffing Requirements | 31 January 2018 | Exelon Generation Co, LLC - License Amendment Request for Approval of Changes to Emergency Plan EP-AA-1000 Staffing Requirements | Minimum staff |
RS-18-014, Supplement to Request to Revise Technical Specifications 2.1.1 for Minimum Critical Power Ratio Safety Limits | 25 January 2018 | Supplement to Request to Revise Technical Specifications 2.1.1 for Minimum Critical Power Ratio Safety Limits | |
RS-18-009, License Amendment Request for Temporary Extensions to Technical Specifications Supporting Maintenance on Portions of the Core Standby Cooling System | 24 January 2018 | License Amendment Request for Temporary Extensions to Technical Specifications Supporting Maintenance on Portions of the Core Standby Cooling System | Safe Shutdown Ultimate heat sink Anticipated operational occurrence Surveillance Frequency Control Program Offsite Circuit |
ML18011B111 | 23 January 2018 | Relief from the Requirements of the ASME Code and OM Code Relief Requests I4R-04, Proposed Alternatives to Various Inservice Inspection Interval (ISI) Requirements of the American Society of Mechanical Engineers, Section XI, 2007 Edition | Incorporated by reference |
ML18022A105 | 22 January 2018 | NRR E-mail Capture - EPID-L-2017-LLA-0415--LaSalle Units 1 and 2, Results of Acceptance Review-Regarding License Amendment Request to Adopt TSTF-542, Rev 2 | Reactor Vessel Water Level Water Inventory Control |
ML18012A585 | 11 January 2018 | Information Request for an NRC Triennial 10 CFR 50.59 Baseline Inspection; Inspection Report 05000373/2018010; 05000374/2018010 (DRS-A.Dahbur) | |
Press Release-III-18-003, NRC Names New Resident Inspector at LaSalle Nuclear Power Plant | 10 January 2018 | Press Release-III-18-003: NRC Names New Resident Inspector at LaSalle Nuclear Power Plant | New Resident Inspector |
ML18003A247 | 8 January 2018 | Relief from the Requirements of the ASME Code and OM Code Relief Requests I4R-01 (CAC Nos. MF9758 and MF9759; EPID L-2017-LLR-0057) | Probabilistic Risk Assessment Incorporated by reference DM weld |
IR 05000373/2017010 | 4 January 2018 | Triennial Fire Protection Inspection Report 05000373/2017010 and 05000374/2017010 (DRS-A.Shaikh) | Hot Short Safe Shutdown Fire Barrier Operator Manual Action Emergency Lighting B.5.b Significance Determination Process B.5.b Mitigating Strategies Fire Protection Program Hourly Fire Watch |
ML17354A854 | 3 January 2018 | Approval of Alternative to the ASME Code Regarding Inspection of Hydrogen Recombiner System Piping - Relief Request I4R-08 (CAC Nos. MF9772 and MF9773; EPID L-2017-LLR-0036) | VT-2 Through-Wall Leak Scaffolding |
ML17355A057 | 2 January 2018 | Summary of December 7, 2017, Public Meeting with Exelon Generation Company, LLC, Regarding a Proposed License Amendment Request |