Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
NL-17-0434, Financial Assurance Requirements for Decommissioning Nuclear Power Reactors | 30 March 2017 | Financial Assurance Requirements for Decommissioning Nuclear Power Reactors | Decommissioning Funding Plan |
NL-17-0429, ISFSI Decommissioning Funding Plan Triennial Update | 30 March 2017 | ISFSI Decommissioning Funding Plan Triennial Update | Decommissioning Funding Plan |
CAC:MF9498 | 27 March 2017 | ||
NL-17-0218, Fukushima Near-Term Task Force Recommendation 2.1: Seismic Probabilistic Risk Assessment | 27 March 2017 | Fukushima Near-Term Task Force Recommendation 2.1: Seismic Probabilistic Risk Assessment | Safe Shutdown Ultimate heat sink Mission time Safe Shutdown Earthquake Internal Flooding Probabilistic Risk Assessment FLEX Fukushima Dai-Ichi Seismically rugged Design basis earthquake Large early release frequency Earthquake |
NL-17-0503, Nuclear Property Insurance Coverage as of April 1, 2017 | 24 March 2017 | Nuclear Property Insurance Coverage as of April 1, 2017 | |
NL-17-0058, Request to Revise Technical Specifications LCO 3.7.9 for a Change to Support Nuclear Service Cooling Water Transfer Pump Repairs | 24 March 2017 | Request to Revise Technical Specifications LCO 3.7.9 for a Change to Support Nuclear Service Cooling Water Transfer Pump Repairs | Ultimate heat sink Probabilistic Risk Assessment Large early release frequency Maintenance Rule Program Fuel cladding |
NL-17-0502, Licensee Guarantees of Payment of Deferred Premiums (10 CFR 40.21) | 24 March 2017 | Licensee Guarantees of Payment of Deferred Premiums (10 CFR 40.21) | |
IR 05000424/2017407 | 23 March 2017 | Notice of Violation, U.S. Nuclear Regulatory Commission Security Inspection Report 05000424/2017407 and 05000425/2017407 and Investigation Report 2-2015-043 | |
ML17079A101 | 23 March 2017 | NRC Pre-Submittal Meeting: Vogtle Electric Generating Plant - Units 1 and 2 License Amendment Request to Revise Technical Specification Surveillance Requirement 3.3.1.3 - March 23, 2017 | |
ML17075A034 | 22 March 2017 | Request for Additional Information | |
ML17081A453 | 20 March 2017 | Part 21 - Plastic Jar Dedication Sampling | |
ML17061A202 | 17 March 2017 | Request for Alternative RR-PR-03 Regarding Nuclear Service Cooling Water Pump Instrument Accuracy | |
ML17023A237 | 16 March 2017 | Issuance of Amendments Regarding the Adoption of NEI 99-01, Revision 6, Development of Emergency Action Levels for Non-Passive Reactors(Cac Nos. MF7460-MF7465) | High winds Ultimate heat sink Operating Basis Earthquake Spent Fuel Pool Instrumentation Earthquake Fuel cladding |
NL-17-0384, Response to EA-17-014, Preliminary White Finding and Related Apparent Violation from Inspection Report 05000424/2017503 and 05000425/2017503 | 16 March 2017 | Response to EA-17-014, Preliminary White Finding and Related Apparent Violation from Inspection Report 05000424/2017503 and 05000425/2017503 | Preliminary White Finding |
IR 05000424/2017405 | 16 March 2017 | NRC Cyber Security Follow Up Inspection (Inspection Report 05000424/2017405 and 05000425/2017405)- OUO Information Removed | Cyber Security Affidavit |
ML16141A140 | 14 March 2017 | Issuance of Amendments to Incorporate Southern Nuclear Operating Company Fleet Emergency Plan | |
ML16141A109 | 14 March 2017 | Issuance of Amendments Related to SNC Fleet Emergency Plan | |
NL-17-0232, Response to Request for Additional Information on Technical Specifications Change to Adopt Risk Informed Completion Times | 13 March 2017 | Response to Request for Additional Information on Technical Specifications Change to Adopt Risk Informed Completion Times | Functionality Assessment |
Press Release-II-17-006, NRC Names Senior Resident Inspector at Vogtle Nuclear Plant | 7 March 2017 | Press Release-II-17-006: NRC Names Senior Resident Inspector at Vogtle Nuclear Plant | |
ML17034A084 | 7 March 2017 | Request for Additional Information | Probabilistic Risk Assessment Offsite Circuit |
ML17038A129 | 2 March 2017 | Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving Proposed No Significant Hazards Consideration and Containing SUNSI and Order Imposing Procedures for Access to SUNSI - Publication Date: March 8, 201 | Hydrostatic Exemption Request Earthquake |
NRC-2017-0047, Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving Proposed No Significant Hazards Consideration and Containing SUNSI and Order Imposing Procedures for Access to SUNSI - Publication Date: March 8 | 2 March 2017 | Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving Proposed No Significant Hazards Consideration and Containing SUNSI and Order Imposing Procedures for Access to SUNSI - Publication Date: March 8, 201 | Hydrostatic Exemption Request Earthquake |
IR 05000424/2016006 | 1 March 2017 | Annual Assessment Letter for Vogtle Electric Generating Plant, Units 1 and 2 (Report 05000424/2016006 and 05000425/2016006) | Open Phase Condition Spent Fuel Pool Instrumentation |
ML17041A366 | 28 February 2017 | Summary of 2/7/17 Public Teleconference with Southern Nuclear Operating Company to Discuss Vogtle Electric Generating Plant, Units 1 and 2, Risk-Informed Technical Specification License Amendment Request | |
NL-17-0231, Annual Fitness for Duty Program Performance Data | 27 February 2017 | Annual Fitness for Duty Program Performance Data | Fitness for Duty |
ML17058A127 | 24 February 2017 | NRR E-mail Capture - Vogtle Electric Generating Plant, Units 1 and 2 - Request for Additional Information (CAC Nos. ME9555 and ME9556) | Probabilistic Risk Assessment Offsite Circuit |
ML17037D050 | 17 February 2017 | and 2; Request to Use Asme Code Case OMN-18 as an Alternative to Inservice Testing Requirements (CAC Nos. MF8188 and MF8189) | Boric Acid Incorporated by reference |
ML17030A094 | 16 February 2017 | Summary of Public Meeting with Southern Nuclear Operating Company, Inc. to Discuss the Incorporation of a Seismic PRA Into the 10 CFR 50.69 Program | Safe Shutdown Probabilistic Risk Assessment FLEX |
ML17030A428 | 15 February 2017 | Summary of Meeting with Vogtle 1 & 2 Regarding License Amendment Request to Implement Risk-Informed Technical Specification Completion Times | |
ML17039A907 | 15 February 2017 | Summary of Meeting with Southern Nuclear Operating Company to Discuss Vogtle Electric Generating Plant, Units 1 and 2, Risk-Informed Technical Specification License Amendment Request | |
ML17033A023 | 14 February 2017 | Request for One-Time Exception to Nuclear Reactor Regulation Office Instructions LIC-109, LIC-101, and LIC-500 Acceptance Review Criteria | Exemption Request |
ML17045A546 | 14 February 2017 | NRR E-mail Capture - Acceptance Review for Vogtle Alternative Request VEGP-ISI-ALT-13 | |
NL-17-0153, Units 1 and 2 - Transmittal of Response to Apparent Violation in NRC Inspection Report 05000424,425/2016407 and Investigation Report No. 2-2015-043, EA-16-137 | 10 February 2017 | Units 1 and 2 - Transmittal of Response to Apparent Violation in NRC Inspection Report 05000424,425/2016407 and Investigation Report No. 2-2015-043, EA-16-137 | |
ML17040A515 | 9 February 2017 | Notification of Inspection and Request for Information | Boric Acid Nondestructive Examination Incorporated by reference Liquid penetrant |
ML16354A048 | 9 February 2017 | Environmental Assessments and Finding of No Significant Impacts to Southern Nuclear Operating Co., Inc | License Renewal |
IR 05000424/2017503 | 8 February 2017 | NRC Inspection Report Number 05000424/2017503 and 05000425/2017503, Preliminary White Finding and Related Apparent Violation | Significance Determination Process Preliminary White Finding |
ML17039A962 | 8 February 2017 | NRR E-mail Capture - SNC Slides for Feb 7, 2017, Public Meeting | |
IR 05000424/2016004 | 7 February 2017 | NRC Integrated Inspection Report 05000424/2016004 and 05000425/2016004 and Followup Assessment Letter | Internal Flooding Functionality Assessment Significance Determination Process Operability Determination Fire Protection Program |
ML17037A175 | 3 February 2017 | NRR E-mail Capture - Vogtle Electric Generating Plant, Units 1 and 2 - Request for Additional Information (CAC Nos. ME9555 and ME9556) | Ultimate heat sink Offsite Circuit |
ML17034A367 | 1 February 2017 | Notification of Licensed Operator Initial Examination 05000325/2017301 and 05000324/2017301 | |
ML17032A279 | 27 January 2017 | Annual Letter - Generic Fundamentals Examination (GFE) Section of the Written Operator Licensing Examination for 2017 | Generic Fundamentals Examination |
CAC:MF9136 | 26 January 2017 | ||
ML17006A109 | 26 January 2017 | Alternative to Inservice Inspection Regarding Reactor Pressure Vessel Threads Inflange Inspection | Incorporated by reference |
NL-17-0101, Proposed Alternative VEGP-ISI-AL T-13 in Accordance with 10 CFR 50.55a(z)(2) to Extend B-N-2 and B-N-3 Inservice Inspection Examinations Schedule | 26 January 2017 | Proposed Alternative VEGP-ISI-AL T-13 in Accordance with 10 CFR 50.55a(z)(2) to Extend B-N-2 and B-N-3 Inservice Inspection Examinations Schedule | Aging Management |
ML17027A018 | 24 January 2017 | NRR E-mail Capture - Draft RAI for Vogtle 4b LAR - the Use of a Risk Informed Completion Time (Rict) | Ultimate heat sink Probabilistic Risk Assessment Offsite Circuit |
ML17026A100 | 23 January 2017 | Emergency Preparedness Inspection and Request for Information | |
ML17026A414 | 20 January 2017 | C&D Technologies, Inc. - Part 21 - Plastic Jar Dedication Sampling | |
IR 05000424/2016407 | 18 January 2017 | U.S. Nuclear Regulatory Commission Security Inspection Report 05000424/2016407 and 05000425/2016407 and Investigation Report No. 2-2015-043; and Apparent Violation | Fitness for Duty Affidavit |
ML17017A499 | 17 January 2017 | NRR E-mail Capture - NRC Acceptance Review for Vogtle Amendment Request Regarding TSTF-522 | |
ML16291A030 | 13 January 2017 | Issuance of Amendments the Adoption of TSTF-65-A, Rev. 1, Use of Generic Titles for Utility Positions (CAC Nos. MF7466, MF7467, MF7468, MF7469, MF7470, & MF7471) | High Radiation Area Offsite Dose Calculation Manual Surveillance Frequency Control Program Annual Radiological Environmental Operating Report Fire Protection Program |