NL-17-0503, Nuclear Property Insurance Coverage as of April 1, 2017

From kanterella
Jump to navigation Jump to search
Nuclear Property Insurance Coverage as of April 1, 2017
ML17083B001
Person / Time
Site: Hatch, Vogtle, Farley  Southern Nuclear icon.png
Issue date: 03/24/2017
From: Hutto J
Southern Nuclear Operating Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
NL-17-0503
Download: ML17083B001 (2)


Text

~ Southern Nuclear J.J.Hutto Regulatory Affairs Director 40 Inverness Center Parkway Post Oflice Box 1295 Birmingham. AL 35242 205 992 5872 tel 205 992 760 I fax jjhutto@southemco.com M.~R 2 4 20i7 Docket Nos. : 50-321 50-348 50-424 NL-17-0503 50-366 50-364 50-425 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555-0001 Edwin I Hatch Nuclear Plant- Units 1 and 2 Joseph M. Farley Nuclear Plant- Units 1 and 2 Vogtle Electric Generating Plant- Units 1 and 2 Nuclear Property Insurance Coverage as of April 1, 2017 Ladies and Gentlemen:

In accordance with the nuclear property insurance reporting requirement specified in 10 CFR 50.54(w)(3), the current levels and sources of insurance on Edwin I. Hatch Nuclear Plant, Joseph M. Farley Nuclear Plant, and Vogtle Electric Generating Plant are hereby submitted.

The policies held by Alabama Power Company and Georgia Power Company (including the co-owner licensees as the insured), respectively, are:

Primary Coverage Insurance Nuclear Electric Insurance $1,500,000,000 Ltd. - NEIL Primary Property Policy No.: Farley: P17-001, Hatch: P17-023, Vogtle: P17-024 Excess Coverage Insurance Nuclear Electric Insurance $1,250,000,000 excess Ltd.- NEIL Excess Property of $1,500,000,000 (Note 1)

Policy No.: Farley: X17-001, Hatch: X17-018, Vogtle: X17-074 Note 1: The excess property insurance limits shown are for property damage following a nuclear incident.

Excess Non-Nuclear Property Insurance Nuclear Electric Insurance $750,000,000 excess Ltd.- NEIL Excess Property of $1,500,000,000 (Note 2)

Policy No.: Farley: NSIC17-001, Hatch: NSIC17-023, Vogtle: NSIC17-024 Note 2: The excess non-nuclear property insurance limits shown are for property damage following a non-nuclear incident.

U. S. Nuclear Regulatory Commission NL-17-0503 Page 2 The policies listed above provide a total nuclear property coverage limit of $2,750,000,000

($2,250,000,000 for a non-nuclear event) for each site. In either case, this exceeds

$1 ,060,000,000, which is the minimum amount of property insurance required by 10 CFR 50.54.

This letter contains no NRC commitments. If you have any questions, please contact Ken McElroy at (205) 992-7369.

Respectfully submitted, J.J. Hutto Regulatory Affairs Director JJH/RMJ cc: Southern Nuclear Operating Company Mr. S. E. Kuczynski, Chairman, President & CEO Mr. D. G. Bost, Executive Vice President & Chief Nuclear Officer Mr. D. R. Madison, Vice President - Farley Mr. D. R. Vineyard, Vice President- Hatch Mr. B. K. Taber, Vice President- Vogtle 1 & 2 Mr. R. D. Gayheart, Fleet Operations General Manager Mr. M. D. Meier, Vice President- Regulatory Affairs Mr. B. J. Adams, Vice President- Engineering Ms. B. L. Taylor, Regulatory Affairs Manager- Farley Mr. G. L. Johnson, Regulatory Affairs Manager- Hatch Mr. D. D. Sutton, Regulatory Affairs Manager- Vogtle 1 & 2 RType: CFA04.054; CHA02.004; CVC7000 U.S. Nuclear Regulatory Commission Ms. C. Haney, Regional Administrator Mr. S. A. Williams, NRR Senior Project Manager- Farley Mr. P. K. Niebaum, Senior Resident Inspector- Farley Mr. M. D. Orenak, NRR Project Manager- Vogtle 1 & 2 Mr. M. F. Endress, Senior Resident Inspector- Vogtle 1 & 2 Mr. D. H. Hardage, Senior Resident Inspector- Hatch Mr. R. Hall, NRR Senior Project Manager- Hatch