ML17083A365 | 31 March 2017 | Acceptance of Requested Licensing Action Relief Request to Utilize Code Case N-702 | |
ML17087A145 | 31 March 2017 | Acceptance of Requested Licensing Action Amendment to Adopt TSTF-542, Revision 2, Reactor Pressure Vessel Water Inventory Control | Water Inventory Control |
RS-17-045, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations | 30 March 2017 | Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations | Decommissioning Funding Plan |
RS-16-046, Annual Property Insurance Status Report | 29 March 2017 | Annual Property Insurance Status Report | |
RS-17-049, Application to Revise Technical Specifications to Adopt TSTF-529 Clarify Use and Application Rules, Revision 4, Using the Consolidated Line Item Improvement Process | 28 March 2017 | Application to Revise Technical Specifications to Adopt TSTF-529 Clarify Use and Application Rules, Revision 4, Using the Consolidated Line Item Improvement Process | Safe Shutdown Time of Discovery Missed surveillance |
CAC:MF9470 | 28 March 2017 | ||
ML17081A053 | 27 March 2017 | Summary of March 9, 2017, Meeting with Exelon Generation Company, LLC, Regarding License Amendment Request to Adopt Technical Specification Task Force (TSTF) Traveler TSTF-542 | Reactor Vessel Water Level Water Inventory Control Surveillance Frequency Control Program |
ML17080A439 | 27 March 2017 | Review of Steam Dryer Inspection Results | |
ML17079A384 | 24 March 2017 | Summary of the U.S. Nuclear Regulatory Commission Staff'S Review of the Spring 2016 Steam Generator Tube Inservice Inspections | |
ML17066A435 | 22 March 2017 | Staff Review of Mitigation Strategies Assessment Report of the Impact of the Reevaluated Seismic Hazard Developed in Response to the March 12, 2012, 50.54(f) Letter | Safe Shutdown Earthquake Fukushima Dai-Ichi |
NMP1L3134, Core Operating Limits Report | 21 March 2017 | Core Operating Limits Report | |
ML17081A453 | 20 March 2017 | Part 21 - Plastic Jar Dedication Sampling | |
ML17076A082 | 17 March 2017 | 4/20/2017 - Notice of Public Meeting - James A. FitzPatrick Nuclear Power Plant; Nine Mile Point Nuclear Generating Station | Open House |
ML17090A433 | 17 March 2017 | Memorandum of Understanding Regarding the Systematic Alien Verification for Entitlements (Save) Program | |
ML17079A318 | 17 March 2017 | Memorandum of Understanding Regarding the Systematic Alien Verification Tor Entitlements (Save) Program | |
ML17065A162 | 14 March 2017 | Request for Additional Information Regarding Proposed Alternative to Perform Pressure Isolation Valve Leakage Testing at Frequencies Consistent with 10 CFR Part 50, Appendix J | Grace period |
RS-17-044, Response to Request for Additional Information Regarding Proposed Alternative for the Use of Encoded Phased Array Ultrasonic Examination Techniques in Lieu of Radiography | 13 March 2017 | Response to Request for Additional Information Regarding Proposed Alternative for the Use of Encoded Phased Array Ultrasonic Examination Techniques in Lieu of Radiography | Hydrostatic Nondestructive Examination Incorporated by reference Dissimilar Metal Weld |
RS-17-027, Response to March 12, 2012, Request for Information Enclosure 2, Recommendation 2.1, Flooding, Required Response 3, Flooding Focused Evaluation Summary Submittal | 10 March 2017 | Response to March 12, 2012, Request for Information Enclosure 2, Recommendation 2.1, Flooding, Required Response 3, Flooding Focused Evaluation Summary Submittal | High winds Tornado Missile Hydrostatic FLEX Fukushima Dai-Ichi Flooding Focused Evaluation |
ML17055A451 | 9 March 2017 | Issuance of Amendment Partial Length Fuel Rod Burnup | |
ML17041A369 | 9 March 2017 | Letter to Those on the Attached List - Generic Letter 2016-01, Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools Following Review of Additional Information - Licensee-Reported Category 3 Plants (Batch 2) | |
NMP1L3137, Submittal of Relief Request NMP-RR-001 Concerning Nozzle-to-Vessel Weld and Inner Radii Examinations (Use of Code Case N-702) | 7 March 2017 | Submittal of Relief Request NMP-RR-001 Concerning Nozzle-to-Vessel Weld and Inner Radii Examinations (Use of Code Case N-702) | Hydrostatic Finite Element Analysis Pressure and Temperature Limits Report |
CAC:MF9381 | 7 March 2017 | ||
ML17062A491 | 3 March 2017 | NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding Fleet Alternative to RPV Threads in Flange Examination (CAC Nos. MF8712-MF8729) | |
ML17058A434 | 2 March 2017 | Acceptance of Requested Licensing Action Reduce Steam Dome Pressure in Reactor Core Safety Limits | |
RS-17-009, Board Resolutions Associated with Foreign Ownership, Control, or Influence | 1 March 2017 | Board Resolutions Associated with Foreign Ownership, Control, or Influence | |
IR 05000220/2016006 | 1 March 2017 | Annual Assessment Letter for Nine Mile Point Nuclear Station, Units 1 and 2 (Report 05000220/2016006 and 05000410/2016006) | Spent Fuel Pool Instrumentation |
CAC:MF9357 | 28 February 2017 | ||
NMP2L2640, License Amendment Request - Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control, Revision 2 | 28 February 2017 | License Amendment Request - Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control, Revision 2 | Shutdown Margin Reactor Vessel Water Level Ultimate heat sink Stroke time Water Inventory Control Post Accident Monitoring Operating Basis Earthquake Surveillance Frequency Control Program Scram Discharge Volume Power Operated Valves Fuel cladding Pressure Boundary Leakage Recently irradiated fuel Offsite Circuit Scaffolding |
ML17058A326 | 27 February 2017 | Annual Fatigue Report Form for 2016 | |
RS-17-023, Submittal of Annual 2016 Fitness for Duty Performance Data Reports | 27 February 2017 | Submittal of Annual 2016 Fitness for Duty Performance Data Reports | Fitness for Duty |
NMP2L2639, Supplement to License Amendment Request - Proposed Revision to Technical Specification in Response to GE Energy- Nuclear 10 CFR Part 21 Safety Communication SC05-03 | 17 February 2017 | Supplement to License Amendment Request - Proposed Revision to Technical Specification in Response to GE Energy- Nuclear 10 CFR Part 21 Safety Communication SC05-03 | |
ML17038A245 | 15 February 2017 | Reassignment of U.S. Nuclear Regulatory Commission Branch Chief - James Danna | |
ML17045A229 | 14 February 2017 | Annual Report Form for Drug and Alcohol Tests for 2016 | |
RA-17-007, Summary of Changes to Quality Assurance Topical Report NO-AA-10 | 8 February 2017 | Summary of Changes to Quality Assurance Topical Report NO-AA-10 | |
05000220/LER-2017-001 | 8 February 2017 | Manual Reactor Scram Due to Hiah Turbine Vibration LER 17-01-00 for Nine Mile Point Unit 1 RE: Manual Reactor Scram Due to High Turbine Vibration | |
NMP1L3129, LER 17-01-00 for Nine Mile Point Unit 1 Manual Reactor Scram Due to High Turbine Vibration | 8 February 2017 | LER 17-01-00 for Nine Mile Point Unit 1 Manual Reactor Scram Due to High Turbine Vibration | |
ML17037A713 | 6 February 2017 | Figure 14.4-2, Method of Identifying and Evaluating Accidents. | |
ML17037A461 | 6 February 2017 | Drawing 807E154TY, Revision 3, Leak Detection System Elementary Diagram. Sheet 3 | |
ML17037A663 | 6 February 2017 | Structural Comparison of Fault Zone in Boring Series T-4, Plate 6-12 | |
ML17037A715 | 6 February 2017 | Figure 6-3, Response Test Strip Chart for Unstable Condition. | |
ML17031A156 | 6 February 2017 | Staff Review of High Frequency Confirmation Associated with Reevaluated Seismic Hazard Implementing Near-Term Task Force Recommendation 2.1 | Safe Shutdown Earthquake Probabilistic Risk Assessment Fukushima Dai-Ichi |
ML17037A462 | 6 February 2017 | Drawing 807E154TY, Revision 3, Leak Detection System Elementary Diagram. Sheet 4 | |
ML17037A827 | 6 February 2017 | Drawing No. 12177-ESK-4CEC15 | |
ML17037A711 | 6 February 2017 | Figure 12.7-1b, Radiation Zones - Reactor Building. | |
ML17037A708 | 6 February 2017 | Figure .1.1-2, General Arrangement Reactor Building - Plans and Elevations. | |
ML17037A706 | 6 February 2017 | Figure 4.2-2A, Reactor Recirculation System Piping and Instrumentation Diagram | |
ML17037A659 | 6 February 2017 | Stratigraphic Correlation Chart Borings T-4-1 Through T-4-12, Plate 5-3 | |
ML17037A818 | 6 February 2017 | Drawing No. 12177-ESK-4CEC24 | |
ML17037A265 | 6 February 2017 | Response to Request for Information Concerning Regional Meteorological Conditions Characterizing Atmospheric Transport Processes within 50 Miles of the Plant | Anticipated operational occurrence |
ML17037C643 | 6 February 2017 | Figure 3.7-1, Make Water Treatment System |