MONTHYEARNMP1L3570, Supplemental Information Letter - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation2024-02-0101 February 2024 Supplemental Information Letter - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation NMP1L3569, CFR 50.46 Annual Report2024-01-26026 January 2024 CFR 50.46 Annual Report NMP1L3566, Radiological Emergency Plan Document Revision. Includes EP-AA-1013, Revision 10, Radiological Emergency Plan Annex for Nine Mile Point Station2023-12-14014 December 2023 Radiological Emergency Plan Document Revision. Includes EP-AA-1013, Revision 10, Radiological Emergency Plan Annex for Nine Mile Point Station NMP1L3564, Supplemental Response to Part 73 Exemption Request - Withdrawal of Request for Exemption from 10 CFR 73, Subpart B, Preemption Authority Requirements2023-12-0707 December 2023 Supplemental Response to Part 73 Exemption Request - Withdrawal of Request for Exemption from 10 CFR 73, Subpart B, Preemption Authority Requirements NMP1L3563, Submittal of Relief Request I5R-12, Revision 0, Concerning the Installation of a Full Structural Weld Overlay on Reactor Pressure Vessel Recirculation Inlet Nozzle N2E Safe End-to-Nozzle Dissimilar Metal Weld (32-WD-208)2023-12-0404 December 2023 Submittal of Relief Request I5R-12, Revision 0, Concerning the Installation of a Full Structural Weld Overlay on Reactor Pressure Vessel Recirculation Inlet Nozzle N2E Safe End-to-Nozzle Dissimilar Metal Weld (32-WD-208) NMP1L3557, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-11-22022 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation NMP1L3554, Submittal of Revision 28 to the Final Safety Analysis Report (Updated), Fire Protection Design Criteria Document, 10CFR50.59 Evaluation Summary Report, 10CFR54.37(b) Aging Management Review, and Technical Specifications with Revised Bases2023-10-0606 October 2023 Submittal of Revision 28 to the Final Safety Analysis Report (Updated), Fire Protection Design Criteria Document, 10CFR50.59 Evaluation Summary Report, 10CFR54.37(b) Aging Management Review, and Technical Specifications with Revised Bases C NMP2L2851, Relief Request Associated with Successive Inspections for Generic Letter 88-01 / BWRVIP-75-A Augmented Examinations2023-08-25025 August 2023 Relief Request Associated with Successive Inspections for Generic Letter 88-01 / BWRVIP-75-A Augmented Examinations NMP1L3534, License Amendment Request - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation2023-08-18018 August 2023 License Amendment Request - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation NMP1L3545, Supplemental Information Letter to Adopt TSTF-505, Provide Risk- Informed Extended Completion Times - RITSTF Initiative 4b, Revision 2 and 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems .2023-08-0404 August 2023 Supplemental Information Letter to Adopt TSTF-505, Provide Risk- Informed Extended Completion Times - RITSTF Initiative 4b, Revision 2 and 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems . NMP1L3544, Fifth Inservice Inspection Interval, First Inservice Inspection Period 2023 Owner'S Activity Report for RFO-27 Inservice Examinations2023-07-14014 July 2023 Fifth Inservice Inspection Interval, First Inservice Inspection Period 2023 Owner'S Activity Report for RFO-27 Inservice Examinations NMP2L2846, Nine Mire Point Nuclear Station, Units 1 and 2, General License 30-day Cask Registration Notifications2023-07-0505 July 2023 Nine Mire Point Nuclear Station, Units 1 and 2, General License 30-day Cask Registration Notifications NMP1L3539, Day Commitment Response - Relief Request I5R-11 Concerning the Installation of a Weld Overlay on Reactor Pressure Vessel Recirculation Inlet Nozzle N2E Safe End-to-Nozzle Dissimilar Metal Weld (32-WD-208)2023-06-0909 June 2023 Day Commitment Response - Relief Request I5R-11 Concerning the Installation of a Weld Overlay on Reactor Pressure Vessel Recirculation Inlet Nozzle N2E Safe End-to-Nozzle Dissimilar Metal Weld (32-WD-208) NMP1L3523, Annual Radioactive Environmental Operating Report2023-05-12012 May 2023 Annual Radioactive Environmental Operating Report NMP1L3522, Independent Spent Fuel Storage Installation (ISFSI) - 2022 Radioactive Effluent Release Report2023-04-30030 April 2023 Independent Spent Fuel Storage Installation (ISFSI) - 2022 Radioactive Effluent Release Report NMP1L3525, Core Operating Limits Report2023-04-19019 April 2023 Core Operating Limits Report NMP1L3526, Submittal of Emergency Relief Request I5R-14 Concerning a Proposed Alternative Associated with N2E Safe End-to-Nozzle Dissimilar Metal Weld Repair with Laminar Indication2023-04-13013 April 2023 Submittal of Emergency Relief Request I5R-14 Concerning a Proposed Alternative Associated with N2E Safe End-to-Nozzle Dissimilar Metal Weld Repair with Laminar Indication NMP1L3520, Supplemental Information for License Amendment Request Application to Partially Adopt Technical Specification Task Force (TSTF) Traveler TSTF-568, Revision 22023-04-0404 April 2023 Supplemental Information for License Amendment Request Application to Partially Adopt Technical Specification Task Force (TSTF) Traveler TSTF-568, Revision 2 NMP1L3519, Submittal of Emergency Relief Request I5R-11 Concerning the Installation of a Weld Overlay on Reactor Pressure Vessel Recirculation Inlet Nozzle N2E Safe End-to-Nozzle Dissimilar Metal Weld (32-WD-208)2023-03-30030 March 2023 Submittal of Emergency Relief Request I5R-11 Concerning the Installation of a Weld Overlay on Reactor Pressure Vessel Recirculation Inlet Nozzle N2E Safe End-to-Nozzle Dissimilar Metal Weld (32-WD-208) NMP1L3516, Submittal of Emergency Relief Request I5R-11 Concerning the Installation of a Weld Overlay on Reactor Pressure Vessel Recirculation Inlet Nozzle N2E Safe End-to-Nozzle Dissimilar Metal Weld (32-WD-208)2023-03-29029 March 2023 Submittal of Emergency Relief Request I5R-11 Concerning the Installation of a Weld Overlay on Reactor Pressure Vessel Recirculation Inlet Nozzle N2E Safe End-to-Nozzle Dissimilar Metal Weld (32-WD-208) NMP1L3517, Proposed Alternative Associated with a Weld Overlay Repair to the Torus2023-03-29029 March 2023 Proposed Alternative Associated with a Weld Overlay Repair to the Torus NMP1L3518, Proposed Alternative to Utilize Specific Provisions of Code Case N-716-3, Alternative Classification and Examination Requirements Section XI, Division 12023-03-29029 March 2023 Proposed Alternative to Utilize Specific Provisions of Code Case N-716-3, Alternative Classification and Examination Requirements Section XI, Division 1 NMP1L3515, Submittal of Emergency Relief Request I5R-11 Concerning the Installation of a Weld Overlay on Reactor Pressure Vessel Recirculation Inlet Nozzle N2E Safe End-to-Nozzle Dissimilar Metal Weld (32-WD-208)2023-03-27027 March 2023 Submittal of Emergency Relief Request I5R-11 Concerning the Installation of a Weld Overlay on Reactor Pressure Vessel Recirculation Inlet Nozzle N2E Safe End-to-Nozzle Dissimilar Metal Weld (32-WD-208) NMP1L3513, Submittal of Emergency Relief Request I5R-11 Concerning the Installation of a Weld Overlay on Reactor Pressure Vessel Recirculation Inlet Nozzle N2E Safe End-to-Nozzle Dissimilar Metal Weld (32-WD-208)2023-03-24024 March 2023 Submittal of Emergency Relief Request I5R-11 Concerning the Installation of a Weld Overlay on Reactor Pressure Vessel Recirculation Inlet Nozzle N2E Safe End-to-Nozzle Dissimilar Metal Weld (32-WD-208) NMP1L3499, CFR 50.46 Annual Report2023-01-27027 January 2023 CFR 50.46 Annual Report NMP1L3482, License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b2022-12-15015 December 2022 License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b NMP1L3486, Radiological Emergency Plan Document Revision2022-12-15015 December 2022 Radiological Emergency Plan Document Revision NMP1L3484, Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Reatment of Structures, Systems and Components for Nuclear Power Reactors2022-12-15015 December 2022 Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Reatment of Structures, Systems and Components for Nuclear Power Reactors NMP1L3485, Proposed Alternative Associated with a Weld Overlay Repair to the Torus2022-12-0808 December 2022 Proposed Alternative Associated with a Weld Overlay Repair to the Torus NMP2L2823, Supplemental Information for License Amendment Request Revise Surveillance Requirements to Reduce Excessive Fast Starting of Emergency Diesel Generators2022-10-28028 October 2022 Supplemental Information for License Amendment Request Revise Surveillance Requirements to Reduce Excessive Fast Starting of Emergency Diesel Generators NMP1L3481, Constellation Energy Generation, LLC, 10 CFR 50, Appendix E - Development of Evacuation Time Estimates2022-09-15015 September 2022 Constellation Energy Generation, LLC, 10 CFR 50, Appendix E - Development of Evacuation Time Estimates NMP1L3477, License Amendment Request - Application to Partially Adopt Technical Specification Task Force (TSTF) Traveler TSTF-568, Revision 2, Revise Applicability of BWR/4 TS 3.6.2.5 and TS 3.6.3.2, to Revise.2022-08-12012 August 2022 License Amendment Request - Application to Partially Adopt Technical Specification Task Force (TSTF) Traveler TSTF-568, Revision 2, Revise Applicability of BWR/4 TS 3.6.2.5 and TS 3.6.3.2, to Revise. NMP1L3478, Response to Request for Additional Information - Relief Request Associated with Pump Periodic Verification Tests of Core Spray System Pumps2022-08-0505 August 2022 Response to Request for Additional Information - Relief Request Associated with Pump Periodic Verification Tests of Core Spray System Pumps NMP1L3469, Constellation Energy Company, LLC, Request for Use of Honeywell Mururoa V4F1 R Supplied Air Suits2022-06-30030 June 2022 Constellation Energy Company, LLC, Request for Use of Honeywell Mururoa V4F1 R Supplied Air Suits NMP1L3467, License Amendment Request - Revision to Alternative Source Term Calculation for Main Steam Isolation Valve (MSIV) Leakage and Non-MSIV Leakage2022-06-29029 June 2022 License Amendment Request - Revision to Alternative Source Term Calculation for Main Steam Isolation Valve (MSIV) Leakage and Non-MSIV Leakage NMP1L3465, Independent Spent Fuel Storage Installation - General License 30-day Cask Registration Notifications2022-06-17017 June 2022 Independent Spent Fuel Storage Installation - General License 30-day Cask Registration Notifications NMP1L3462, Independent Spent Fuel Storage Installation, General License 30-day Cask Registration Notifications2022-06-0909 June 2022 Independent Spent Fuel Storage Installation, General License 30-day Cask Registration Notifications NMP2L2799, License Amendment Request - Revise Surveillance Requirements to Reduce Excessive Fast Starting of Emergency Diesel Generators2022-05-24024 May 2022 License Amendment Request - Revise Surveillance Requirements to Reduce Excessive Fast Starting of Emergency Diesel Generators NMP2L2811, Fourth Inservice Inspection Interval, Second Inservice Inspection Period 2022 Owner'S Activity Report for RFO-18 Inservice Examinations2022-05-13013 May 2022 Fourth Inservice Inspection Interval, Second Inservice Inspection Period 2022 Owner'S Activity Report for RFO-18 Inservice Examinations NMP1L3459, 2021 Annual Radiological Environmental Operating Report2022-05-0808 May 2022 2021 Annual Radiological Environmental Operating Report NMP1L3457, 2021 Radioactive Effluent Release Report for Nine Mile Point Units 1 and 22022-04-30030 April 2022 2021 Radioactive Effluent Release Report for Nine Mile Point Units 1 and 2 NMP2L2805, Annual Environmental Operating Report2022-04-23023 April 2022 Annual Environmental Operating Report NMP2L2807, Core Operating Limits Report2022-04-0707 April 2022 Core Operating Limits Report NMP1L3458, Constellation Energy Generation, LLC, Annual Property Insurance Status Report2022-04-0101 April 2022 Constellation Energy Generation, LLC, Annual Property Insurance Status Report NMP1L3454, Relief Request Associated with Pump Periodic Verification Tests of Core Spray System Pumps2022-03-0202 March 2022 Relief Request Associated with Pump Periodic Verification Tests of Core Spray System Pumps NMP1L3447, Constellation Energy Generation, LLC - Response to Request for Additional Information - Proposed Relief Request Associated with Reactor Pressure Vessel Water Level Instrumentation Partial Penetration Nozzle Repairs2022-02-0202 February 2022 Constellation Energy Generation, LLC - Response to Request for Additional Information - Proposed Relief Request Associated with Reactor Pressure Vessel Water Level Instrumentation Partial Penetration Nozzle Repairs NMP1L3444, CFR 50.46 Annual Report2022-01-27027 January 2022 CFR 50.46 Annual Report NMP2L2794, Supplemental Information to Support Review of Nine Mile Point Nuclear Station, Unit 2, License Amendment Request to Adopt TSTF-582, Revision 02022-01-11011 January 2022 Supplemental Information to Support Review of Nine Mile Point Nuclear Station, Unit 2, License Amendment Request to Adopt TSTF-582, Revision 0 NMP2L2793, Supplemental Information - Relief Request Associated with Excess Flow Check Valves2021-12-17017 December 2021 Supplemental Information - Relief Request Associated with Excess Flow Check Valves NMP2L2789, Response to Request for Additional Information by the Office of Reactor Regulation to Support Review of License Amendment Request to Adopt TSTF-582, Revision 02021-12-16016 December 2021 Response to Request for Additional Information by the Office of Reactor Regulation to Support Review of License Amendment Request to Adopt TSTF-582, Revision 0 2024-02-01
[Table view] Category:Licensee Event Report (LER)
MONTHYEARML18018B1152018-01-18018 January 2018 Scram Summary 91-01 Relating to a Turbine Trip and Automatic Reactor Scram When the Main Transformer Phase B Developed an Internal Fault on August 13, 1991 ML18018B1122018-01-18018 January 2018 Scram Summary 91-01 Relating to an Event on August 13, 1991 Concerning a Turbine Trip and Automatic Reactor Scram When the Main Transformer Phase B Developed an Internal Fault 05000410/LER-2017-0022017-11-28028 November 2017 Secondary Containment Inoperable Due to Wind Conditions, LER 17-002-00 for Nine Mile Point Nuclear Station, Unit 2 Regarding Secondary Containment Inoperable Due to Wind Conditions 05000220/LER-2017-0032017-11-0202 November 2017 Automatic Reactor Scram due to Reactor Vessel Low Water Level, LER 17-003-00 for Nine Mile Point, Unit 1, Regarding Automatic Reactor Scram due to Reactor Vessel Low Water Level 05000410/LER-2017-0012017-10-0404 October 2017 1 OF 5, LER 17-001-00 for Nine Mile Point Nuclear Station, Unit 2, Regarding Automatic Reactor Scram due to High Reactor Pressure 05000220/LER-2017-0022017-05-18018 May 2017 Manual Reactor Scram Due to Pressure Oscillations, LER 17-002-00 for Nine Mile Point Nuclear Station, Unit 1 Regarding Manual Reactor Scram Due to Pressure Oscillations 05000220/LER-2017-0012017-02-0808 February 2017 Manual Reactor Scram Due to Hiah Turbine Vibration, LER 17-01-00 for Nine Mile Point Unit 1 RE: Manual Reactor Scram Due to High Turbine Vibration NMP1L3129, LER 17-01-00 for Nine Mile Point Unit 1 Manual Reactor Scram Due to High Turbine Vibration2017-02-0808 February 2017 LER 17-01-00 for Nine Mile Point Unit 1 Manual Reactor Scram Due to High Turbine Vibration 05000220/LER-2016-0022016-09-26026 September 2016 Isolation of both Emergency Condensers due to loss of UPS 162B, LER 16-002-00 for Nine Mile Point, Unit 1, Regarding Isolation of Both Emergency Condensers due to Loss of UPS 1628 05000220/LER-2016-0012016-07-12012 July 2016 Secondary Containment Inoperable Due to Simultaneous Opening of Airlock Doors, LER 16-001-00 for Nine Mile Point Nuclear Station Unit 1 Regarding Secondary Containment Inoperable Due to Simultaneous Opening of Airlock Doors 05000410/LER-2016-0012016-06-0606 June 2016 Secondary Containment Inoperable Due to Simultaneous Opening of Airlock Doors, LER 16-001-00 for Nine Mile Point, Unit 2, Regarding Secondary Containment Inoperable Due to Simultaneous Opening of Airlock Doors 05000410/LER-2015-0032016-03-31031 March 2016 Primary Containment Isolation Function for some valves not maintained during Surveillance Testing, LER 15-003-01 for Nine Mile Point, Unit 2, Regarding Primary Containment Isolation Function For Some Valves Not Maintained During Surveillance Testing ML1005504842010-02-15015 February 2010 Special Report: Inoperable Suppression Chamber Water Level Instrumentation ML0903605172009-01-21021 January 2009 Special Report: Inoperable Channel of Suppression Chamber Water Level Instrumentation ML0534802052005-12-0202 December 2005 Special Report for Nine Mile Point Unit 1 Re Channel #12 of the Containment Hydrogen Monitoring System Inoperable ML0515400362005-05-24024 May 2005 Special Report, Channel #11 of the Containment Hydrogen Monitoring Inoperable for Scheduled Preventive Maintenance ML0509602422004-12-17017 December 2004 Final Precursor Analysis - NMP-1 Grid Loop ML0509602522004-12-17017 December 2004 Final Precursor Analysis - NMP-2 Grid Loop ML0434304492004-11-22022 November 2004 Special Report for Nine Mile Point, Unit 1 Regarding Channel #12 of the Containment Hydrogen Monitoring System Removed from Service for Planned Maintenance ML0425300732004-08-27027 August 2004 Special Report for Nine Mile Point Unit 1 Re Channel #11 of the Containment Hydrogen Monitoring System Inoperable for Scheduled Preventive Maintenance ML0418105152004-06-18018 June 2004 Revised Special Report for Nine Mile Point, Unit 1 Re Channel #12 of the Containment Hydrogen Monitoring System Inoperable ML0413204992004-05-0404 May 2004 Special Report for Nine Mile Point Unit 1 Regarding Inoperability of Channel #12 of the Containment Hydrogen Monitoring System ML0410603992004-04-0707 April 2004 Special Report, Channel #11 of the Containment Hydrogen Monitoring System Inoperable for Scheduled Corrective Maintenance ML0336404932003-12-19019 December 2003 Special Report Regarding Channel #11 Containment Hydrogen Monitoring System Being Inoperable for Scheduled Preventive Maintenance ML0221303572002-07-23023 July 2002 Special Report for Nine Mile Point Unit 2 Re Noble Gas Activity Monitoring Instrumentation Inoperable for Greater than 72 Hours ML18018B1112000-03-0707 March 2000 LER 99-019-01 Supplement 1, for Nine Mile Point, Unit 2, Regarding Two Standby Liquid Control Valves Not Tested as Required by Technical Specification 4.0.5 and LER 99-010-01, Supplement 1, Unit 2 Reactor Trip Due to a Feedwater Master .. ML18018B0771997-12-29029 December 1997 Letter Replying to Notice of Violation as Contained in NRC Inspection Report 50-220/97-07 and 50-410/97-07 ML18018B1171991-09-0404 September 1991 NRC UPS Meeting ML18018B2511978-09-29029 September 1978 LER 78-034-00 for Nine Mile Point, Unit 2, Regarding an Environmental Contractor Obtaining 22 Hourly Fish Impingement Samples, and One Two-Hour Sample, Which Is Contrary to the Technical Specification Requiring 24 Hourly Samples ML18018B2521978-08-24024 August 1978 LER 78-030-00, 78-031-00, and 78-032-00 for Nine Mile Point Unit 1 Regarding, Respectively, Unavailability of Feedwater Pump 29-03 While Its Pump Seals Were Replaced, Unavailability of Liquid Poison Pump NP02A While a Frozen Valve .. ML18018B2531978-07-28028 July 1978 LER 78-029-00 for Nine Mile Point, Unit 2, Regarding Discovery of High Drywell Pressure Switches RE04A, RE04B, and RE04C with Setpoints Less Conservative than the Technical Specifications ML18018B2541978-07-25025 July 1978 LER 78-028-00 for Nine Mile Point Unit 1 Regarding Discovery of the Allowable Test Interval of TS 4.1.4c for the Core Spray Power-Operated Valves Had Been Exceeded ML18018B2551978-07-13013 July 1978 LERs 78-025-00, 78-026-00, and 78-027-00 for Nine Mile Point Unit 1 Regarding, Respectively, Discovery of RE04D with a Setpoint of 3.70 PSIG, Discovery of Numerous Small Leaks in Small Sample and Instrument Pipes, and Discovery of RE22D wit ML18018B2561978-06-21021 June 1978 LER 78-024-00 for Nine Mile Point Unit 1 Regarding Discovery That Test N1-St-Q2,4,5,7,8,9, and 10 Had Not Been Performed During a Review of Quarterly Surveillance Test Results ML18018B2571978-06-12012 June 1978 LERs 78-020-00, 78-021-00, 78-022-00, and 78-023-00 for Nine Mile Point Unit 1 Regarding, Respectively, Discovery of RE18A with a Setpoint of 135 Inches Wc, Discovery of RE04A and RE04B with a Setpoint of 3.65 PSIG, Discovery of Turbine ... ML18018B2591978-06-0101 June 1978 LER 78-019-00 for Nine Mile Point Unit 1 Regarding Discovery That Hydraulic Snubber 31-HS-1 Had Failed and Was Empty of Hydraulic Fluid and Disconnected from Its Anchor at the Feedwater Pipe ML18018B2581978-05-26026 May 1978 LER 78-009-01 for Nine Mile Point Unit 1 Regarding Replacement of Explosive Charges in the TIP Shear Valves with New Charges and the Resulting Unsatisfactory Ohmmeter Continuity Test for Acceptable Electric Contact ML18018B2601978-04-24024 April 1978 LER 78-018-00 for Nine Mile Point Unit 1 Regarding Discovery of Main Steam High Flow Switch with a Setpoint of 106.2 PSI, Which Is Above the Technical Specification ML18018B2611978-04-0707 April 1978 LERs 78-014,00, 78-016-00, and 78-016-00 for Nine Mile Point Unit 1 Regarding, Respectively, Discovery That the Fuel Transfer Pump on 102 D/G Would Not Fill the Day Tank, Discovery of RE18C with a Setpoint of 129 Inches Wc, and RE04B .. ML18018B2621978-03-28028 March 1978 LER 78-014-00 and LER 78-015-00 for Nine Mile Point Unit 1 Regarding, Respectively, Discovery That the Fuel Transfer Pump in 102 D/G Would Not Fill the Day Tank and Discovery That #12 Control Room Air Treatment Fan Would Not Run ML18018B2631978-03-16016 March 1978 LER 78-011-00, LER 78-012-00 and LER 78-013-00 for Nine Mile Point, Unit 1 Re Technical Specification Violations of Section 3.6.2 ML18018B2641978-03-0101 March 1978 LER 78-007-00, LER 78-008-00, LER 78-009-00 and LER 78-010-00 for Nine Mile Point, Unit 1 Re Technical Specification Violations of Listed Sections ML18018B2651978-02-24024 February 1978 LER 78-006-00 for Nine Mile Point, Unit 1 Re During Steady State Operation, Performance of Surveillance Test IC-75 Found a Trip Setpoint of 22.5 Inches Water on One Vacuum Switch in the Vacuum Relief System from the Pressure Suppression Cha ML18018B2661978-02-0707 February 1978 LER 78-004-00 and LER 78-005-00 for Nine Mile Point, Unit 1 Re During Unit Shutdown, Reserve Power Breaker on Power Board II Failed to Close in After Loss of Normal Power and During Plant Outage While Marking Up Outside MSIV 01-03 Discovere ML18094A0301978-01-31031 January 1978 LER 1978-003-03 for Nine Mile Point Unit 1 Re Surveillance Test Found Main Steam High Flow Switch with Setpoint of 107.5 PSI ML18018B1221978-01-31031 January 1978 LER 78-002-00 for Nine Mile Point 1 Regarding Drywell High Pressure Switch RE04A Setpoint Drift and LER 78-003-00 ML18018B2701978-01-13013 January 1978 Submittal of Licensee Event Report LER 78-01 Concerning Delta Temperature of the Discharge Water Exceeded Environmental Tech. Spec ML18094A0291978-01-13013 January 1978 LER 1978-001-00 for Nine Mile Point Station Unit 1 Re Delta Temperature of Discharge Water Exceeded Specification 2.1.5 of Environmental Tech Specs ML18018B1361977-07-21021 July 1977 LER 77-032-00 for Nine Mile Point Unit 1 Regarding a Water Phase Material Sample in the Reactor Vessel Inspection Lapse During Refueling ML18018B1421977-07-14014 July 1977 LER 77-029-00, 77-030-00, 77-031-00, 77-034-00, & 77-035-00 for Nine Mile Point Unit 1 Low-Low-Low Level Set Point Out of Specs on RE-18A, Vacuum Switch Trip & Reset Point on Torus Relief Valves Out of Specs, Weld Leak in Emergency Condense 2018-01-18
[Table view] |
Text
p:i: . 7 r+7 Exelon Generation 10 CFR 50.73 NMP1L3129 February 8, 2017 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Nine Mile Point Nuclear Station, Unit 1 Renewed Facility Operating License No. DPR-63 Docket No. 50-220
Subject:
NMP1 Licensee Event Report 2017-001, Manual Reactor SCRAM Due to High Turbine Vibration
There are no regulatory commitments contained in this letter.
Should you have any questions regarding the information in this submittal, please contact Dennis Moore, Site Regulatory Assurance Manager, at (315) 349-5219.
Respectfully, Robert E. Kreider Jr.
Plant Manager, Nine Mile Point Nuclear Station.
Exelon Generation Company, LLC REK/RSP
Enclosure:
NMP1 Licensee Event Report 2017-001, Manual Reactor SCRAM Due to High Turbine Vibration cc: NRG Regional Administrator, Region I NRG Resident Inspector NRG Project Manager
Enclosure NMP1 Licensee Event 2017-001, Manual Reactor SCRAM Due to High Turbine Vibration Nine Mile Point Nuclear Station, Unit 1 Renewed Facility Operating License No. DPR-63
NRCFORM 366 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0104 EXPIRES: 10/31/2018 (06-2016)
..l "~~. .
'\ ...... '/
.1>._
LICENSEE EVENT REPORT (LER)
(See Page 2 for required number of digits/characters for each block)
Estimated burden per response to comply with this mandatory collection request: 80 hours9.259259e-4 days <br />0.0222 hours <br />1.322751e-4 weeks <br />3.044e-5 months <br />.
Reported lessons learned are incorporated into the licensing process and fed back to industry.
Send comments regarding burden estimate to the FOIA, Privacy and Information Collections Branch (T-5 F53), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by e-mail to lnfocollects.Resource@nrc.gov, and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0104), Office of Management and Budget, Washington, DC 20503. If a (See NUREG-1022, R.3 for instruction and guidance for completing this form means used to impose an information collection does not display a currently valid OMB control htt12://www.nrc.gov/reading-rm/doc-collections/nuregs/staff/sr1022/r3D number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.
- 1. FACILITY NAME 2. DOCKET NUMBER .PAGE Nine Mile Point Unit 1 05000220 1 OF6
- 4. TITLE l\A::in11::il ~ - 1r ~l"'r::Jm nr It:> tn Hinh Tt trhim Vihr::itinn
- 5. EVENT DATE 6. LER NUMBER 7. REPORT DATE 8. OTHER FACILITIES INVOLVED MONTH DAY YEAR YEAR ISEQUENTIAL NUMBER I REV NO.
MONTH DAY YEAR FACILITY NAME NA DOCKET NUMBER NA FACILITY NAME DOCKET NUMBER 12 10 2016 2017 - 01 00 02 08 2017 NA NA
- 9. OPERATING MODE 11. THIS REPORT IS SUBMITTED PURSUANT TO THE REQUIREMENTS OF 10 CFR §: /Check all that aooly) 1 D 20.2201 (b) D 20.2203(a)(3)(i) D 50.73(a)(2)(ii)(A) D 50.73(a)(2)(viii)(A) p 20.2201 (d) D 20.2203(a)(3)(ii) D so.73(a)(2)(ii)(B) D 50.73(a)(2)(viii)(B)
D 20.2203(a)(1) D 20.2203(a)(4) D so.73(a)(2)(iii) D 50.73(a)(2)(ix)(A)
D 20.2203(a)(2)(i) D 50.36(c)(1 )(i)(A) [8J 50.73(a)(2)(iv)(A) D 50.73(a)(2)(x)
- 10. POWER LEVEL D 20.2203(a)(2)(ii) D 50.36(c)(1 )(ii)(A) D 50.73(a)(2)(v)(A) D 73.71 (a)(4)
D 20.2203(a)(2)(iii) D 50.36(c)(2) D 50.73(a)(2)(v)(B) D 73.71 (a)(5) 97 D 20.2203(a)(2)(iv) D so.46(a)(3)(ii) D 50.73(a)(2)(v)(C) D 73.77(a)(1)
D 20.2203(a)(2)(v) D 50.73(a)(2)(i)(A) D 50.73(a)(2)(v)(D) D 73.77(a)(2)(i)
D 20.2203(a)(2)(vi) .0 50.73(a)(2)(i)(B) D 50.73(a)(2)(vii) D 73.77(a)(2)(ii)
D 50.73(a)(2)(i)(C) 00THER Specify in Abstract below or in NRC Form 366A
- 12. LICENSEE CONTACT FOR THIS LER ICENSEE CONTACT rELEPHONE NUMBER (Include Area Code)
Dennis Moore, Site Requlatorv Assurance Manaqer (315)349-5219
- 13. COMPLETE ONE LINE FOR EACH COMPONENT FAILURE DESCRIBED IN THIS REPORT MANU- REPORTABLE MANU- REPORTABLE CAUSE SYSTEM COMPONENT CAUSE SYSTEM COMPONENT FACTURER TOEPIX FACTURER TOEPIX B TA PSF GE y x EA CNTR GE ~
- 14. SUPPLEMENTAL REPORT EXPECTED 15. EXPECTED MONTH DAY YEAR SUBMISSION D YES (If yes, complete 15. EXPECTED SUBMISSION DATE) [8J NO DATE NA NA NA ABSTRACT (Limit to 1400 spaces, i.e., approximately 15 single-spaced typewritten lines)
On December 10, 2016 at 08:48, Nine Mile Point Unit 1 performed a manual scram of the reactor due to increased vibrations on the main turbine. Following the scram, the High Pressure Coolant Injection (HPCI)
System automatically initiated. This event is reportable under 10 CFR 50.72(b)(2)(iv)(B) and 10 CFR 50.72(b )(3)(iv)(A) as any event or condition that resulted in a manual or automatic actuation of any of the systems listed in 10 CFR 50.72(b)(3)(iv)(B).
During performance of a load drop to 95% power in support of Turbine Stop Valve Testing, main turbine bearing vibrations rose on several bearings. The Unit 1 Reactor was scrammed and the main turbine was secured when main bearing #1 reached procedural limits. The root cause of the event was a steam leak from a threaded pipe/cap connection that was not seal welded when originally supplied from the manufacturer. The connection
!has now been seal welded.
A combination of tight tolerance in conjunction with the location of the steam leak resulted in the vibrations when power level was changed.
rrhe event described in this LER is documented in the plant's corrective action program.
NRG FORM 366A (06-2016)
NRC FORM 366A U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0104 EXPIRES: 10/31/2018 (06-2016)
Estimated burden per response to comply with this mandatory collection request: 80 hours9.259259e-4 days <br />0.0222 hours <br />1.322751e-4 weeks <br />3.044e-5 months <br />.
/""-<.'.'\. Reported lessons learned are incorporated into the licensing process and fed back to industry.
f~</f.* LICENSEE EVENT REPORT (LER) Send comments regarding burden estimate to the FOIA, Privacy and Information Collections
\~l~
"* ..... ,; CONTINUATION SHEET Branch (T-5 F53), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by e-mail to lnfocollects.Resource@nrc.gov, and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0104), Office of Management and Budget, Washington, DC 20503. If a (See NUREG-1022, R.3 for instruction and guidance for completing this form means used to impose an information collection does not display a currently valid OMB control htto://www.nrc.gov/readinq-rm/doc-collections/nureqs/staff/sr1022/r3{J number, the NRG may not conduct or sponsor, and a person is not required to respond to, the information collection.
- 1. FACILITY NAME 2. DOCKET NUMBER 3. LER NUMBER YEAR I SEQUENTIAL I REV Nine Mile Point Unit 1 05000220 NUMBER NO.
2017 001 - 00 NARRATIVE
- r. DESCRIPTION OF EVENT A. PRE-EVENT PLANT CONDITIONS:
Prior to the event, Nine Mile Point Unit 1 (NMPl) was operating at 100% with Operations performing a load drop to 95% to support turbine stop valve testing and control rod pattern adjustment.
B. Event:
On December 10, 2016 at 08:48, Nine Mile Point Unit 1 performed a manual scram of the reactor due to increased vibrations on the main turbine. This was performed during a load drop to 95% reactor power to facilitate turbine stop valve testing and rod line adjustments. At 95% reactor power operations noted rising vibrations on the main turbine bearings. The reactor was manually scrammed and the main turbine was secured as the observed vibrations reached procedural limits. Following the scram, as designed, HPCI initiated on low Reactor Pressure Vessel (RPV) water level due to the initial RPV level shrink. HPCI was secured following recovery of RPV water level above the low level scram setpoint of 53 inches.
There was no impact on Nine Mile Point Unit 2 (NMP2) from this event.
Operations performed the ENS notification (#52425) required by 10 CFR 50.72(b)(2)(iv)(B) and 10 CFR 50.72(b)(3)(iv)(A) for the manual reactor scram and for the expected HPCI initiation due to the Main Turbine Trip. This notification met the 4 hour4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> and 8 hour9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> reporting requirements. This LER is being submitted pursuant to the requirements of 10 CFR 50.73(a)(2)(iv)(A).
C. INOPERABLE STRUCTURES, COMPONENTS, OR SYSTEMS THAT CONTRIBUTED TO THE EVENT:
None NRG FORM 366A (06-2016)
Page 2 of 6
NRC FORM 366A U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0104 EXPIRES: 10/31/2018 (06-2016)
~~~. LICENSEE EVENT REPORT (LER)
Estimated burden per response to comply with this mandatory collection request: BO hours.
Reported lessons learned are incorporated into the licensing process and fed back to industry.
' ~.. ~ Send comments regarding burden estimate to the FOIA, Privacy and Information Collections
- \:*.....*il=f Branch (T-5 F53), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by e-mail CONTINUATION SHEET to lnfocollects.Resource@nrc.gov, and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0104), Office of Management and Budget, Washington, DC 20503. If a (See NUREG-1022, R.3 for instruction and guidance for completing this form means used to impose an information collection does not display a currently valid OMB control http://www.nrc.gov/reading-rm/doc-collections/nuregs/staff/sr1022/r3D number, the NRG may not conduct or sponsor, and a person is not required to respond to, the information collection.
- 1. FACILITYNAME 2. DOCKET NUMBER 3. LER NUMBER YEAR I SEQUENTIAL I REV Nine Mile Point Unit 1 05000220 NUMBER NO.
2017 001 - 00 D. DATES AND APPROXIMATE TIMES OF MAJOR OCCURRENCES:
The times below all occurred on December 10, 2016.
08:00- Operations commences lo.ad drop from 100% to 95% to facilitate turbine stop valve testing and perform a control rod pattern adjustment.
08: 10 - The elevated vibrations are first observed and Operations talce action in an effort to mitigate vibrations by returning the plant to pre-transient conditions.
08:48:04 - Vibration levels approach procedurally limited thresholds and operations performs a manual scram of the reactor and manually trip the turbine.
08:48:09 - HPCI actuation signal received on RPV Low Level.
08:48: 14 - Expected generator lock-out is received and initiates the fast transfer of Power Board 11 and 12. Power Board 11 fast transfers as expected; however, Power Board 12 fails to fast transfer.
Power Board 12 is re-energized 16 minutes later at 09:04 08:48: 14 -HCPI 11 Train initiates, level is restored above 53 inches (RPV Low Level Setpoint) and initiation signal reset less than 1 minute after at 08:49.
E. OTHER SYSTEMS OR SECONDARY FUNCTIONS AFFECTED:
Power Board 12 failed to fast transfer following the turbine trip due to high resistance on feeder breaker (R122) auxiliary contacts. This resulted in HPCI 12 train not starting following the manual trip of the main turbine. The failure to fast transfer also resulted in the loss of associated, non-safety related, downstream loads on Power Board 12. Power Board 12 was re-energized 16 minutes later at 09:04.
F. METHOD OF DISCOVERY:
This change in condition was immediately recognized by Operations during the load drop to 95%
based on the close monitoring of plant conditions and adherence to station procedures.
NRG FORM 366A (06-2016) Page 3 of 6
NRC FORM 366A U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0104 EXPIRES: 10/31/2018 (06-2016)
Estimated burden per response to comply with this mandatory collection request: BO hours.
/"', Reported lessons learned are incorporated into the licensing process and fed back to industry.
-c~~. . ~
1-.~
LICENSEE EVENT REPORT {LER) Send comments regarding burden estimate to the FOIA, Privacy and Information Collections il
\. ..... *' CONTINUATION SHEET Branch (T-5 F53), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by e-mail to lnfocollects.Resource@nrc.gov, and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0104), Office of Management and Budget, Washington, DC 20503. If a (See NUREG-1022, R.3 for instruction and guidance for completing this form means used to impose an information collection does not display a currently valid OMB control http://www.nrc.gov/reading-rm/doc-collections/nuregs/staff/sr1022/r3L) number, the NRG may not conduct or sponsor, and a person is not required to respond to, the information collection.
- 1. FACILITYNAME 2. DOCKET NUMBER 3. LER NUMBER YEAR I SEQUENTIAL I REV Nine Mile Point Unit 1 05000220 NUMBER NO.
2017 .001 -00 G. MAJOROPERATORACTION:
Based on the monitoring of plant conditions and in accordance with station procedures Operators performed the following; manually scramed the reactor, manually tripped the main turbine, and energized Power Board 12 at 09:04 following the failure to fast transfer.
H. SAFETY SYSTEM RESPONSES:
All safety systems responded as expected. The HPCI 11 Train initiated. HPCI is a flow control mode of the normal feed water system and is not an emergency core cooling system. At Nine Mile Point Unit 1, a HPCI system actuation signal on low reactor pressure vessel (RPV) level is normally received following a reactor scram, due to level shrink. HPCI 12 Train did.not start due to Power Board 12 failing to fast transfer. Operations energized Power Board 12 at 09:04 IL CAUSE OF THE EVENT:
The root cause of the event was a steam leak from a threaded pipe/cap connection that was not seal welded when originally supplied from the manufacturer. During the performance of the load drop the pre-existing steam leak and the dynamic conditions within that area created a condition in which internal clearances were reduced resulting in an internal rub on the HP Turbine. This, in turn, resulted in increased vibrations to the limits prescribed in the operating procedure.
NRG FORM 366A (06*2016) Page 4 of 6
NRC FORM 366A U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMS: NO. 3150-0104 EXPIRES: 10/31/2018 (06-2016)
.~¥~. LICENSEE EVENT REPORT (LER)
Estimated burden per response to comply with this mandatory collection request: 80 hours9.259259e-4 days <br />0.0222 hours <br />1.322751e-4 weeks <br />3.044e-5 months <br />.
Reported lessons learned are incorporated into the licensing process and fed back to industry.
Send comments regarding burden estimate to the FOIA, Privacy and Information Collections
- ~J
~ ......; CONTINUATION SHEET Branch (T-5 F53), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by e-mail to lnfocollects.Resource@nrc.gov, and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0104), Office of Management and Budget, Washington, DC 20503. If a (See NUREG-1022, R.3 for instruction and guidance for completing this form means used to impose an information collection does not display a currently valid OMB control http://www.nrc.gov/readinq-rm/doc-collections/nureqs/staff/sr1022/r30 number, the NRG may not conduct or sponsor, and a person is not required to respond to, the information collection.
- 1. FACILITY NAME 2. DOCKET NUMBER 3. LEA NUMBER SEQUENTIAL REV Nine Mile Point Unit 1 05000220 YEAR I NUMBER I NO.
2017 001 -00 III. ANALYSIS OF THE EVENT:
This event was reported under 10 CFR 50.72 (b)(2)(iv)(B) for the manual scram and 10 CFR 50.72(b)(3)(iv)(A) as any event or condition that resulted in a manual or automatic actuation of any of the systems listed in 10 CFR 50.72(b)(3)(iv)(B) due to the High Pressure Cooling Injection (HPCI) actuating during this event. The HPCI 11 Train initiated and performed as designed. HPCI is flow a control mode of the normal feedwater system and is not an emergency core cooling system. At Nine Mile Point Unit 1, a HPCI system *actuation signal on low reactor pressure vessel (RPV) level is normally received following a reactor scram, due to level shrink. HPCI 12 Train did not start due to Power Board 12 failing to fast transfer; operations energized Power Board 12 at 09:04. There was no actual nuclear safety consequences associated with this event and all other safety systems and balance of plant equipment operated as expected.
IV. CORRECTIVE ACTIONS:
A. ACTION TAKEN TO RETURN AFFECTED SYSTEMS TO PRE-EVENT NORMAL STATUS:
HCPI initiation signal was reset, Power board 12 was restored.
B. ACTION TAKEN OR PLANNED TO PREVENT RECURRENCE:
- 1. Leaking pipe/cap was seal welded. The remaining connections were inspected and verified tight.
- 2. Remaining pipe/cap connections will be seal welded during the next refueling outage.
- v. ADDITIONAL INFORMATION:
A. FAILED COMPONENTS:
Threaded pipe/cap connection in HP Turbine area Power Board 12, Feeder Breaker R122 Auxiliary Contacts NRC FORM 366A (06-2016) Page 5 of 6
.. NRC FORM 366A (06-2016)
U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0104 EXPIRES: 10/31/2018 Estimated burden per response to comply with this mandatory collection request: BO hours.
!'¥.\
\
/"""
.....:l:
LICENSEE EVENT REPORT (LER)
CONTINUATION SHEET Reported lessons learned are incorporated into the licensing process and fed back to industry.
Send comments regarding burden estimate to the FOIA, Privacy and Information Collections Branch (T-5 F53), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by e-mail
(\4 *' to lnfocollects.Resource@nrc.gov, and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0104), Office of Management and Budget, Washington, DC 20503. If a (See NUREG-1022, R.3 for instruction and guidance for completing this fomi means used to impose an information collection does not display a currently valid OMB control httQ://www.nrc.gov/reading-mi/doc-collections/nuregs/staff/sr10221r3D number, the NRG may not conduct or sponsor, and a person is not required to respond to, the information collection.
- 1. FACILITY NAME 2. DOCKET NUMBER 3. LER NUMBER SEQUENTIAL REV Nine Mile Point Uni.t 1 05000220 YEAR I NUMBER I NO.
2017 001 -00 B. PREVIOUS LERS ON SIMILAR EVENTS:
None C. THE ENERGY INDUSTRY IDENT1FICATION SYSTEM (EIIS) COMPONENT FUNCTION IDENT1FIER AND SYSTEM NAME OF EACH COMPONENT OR SYSTEM REFERRED TO IN THIS LER:
Component IEEE 803 IEEE 805 High Pressure Coolant Injection System --- SJ Main Turbine TRB JJ Power Board 12 JX EA PB 12 Breaker R122 Aux. Contacts CNTR EA Reactor Vessel RPV AD Threaded Pipe/Cap Connection PSF TA D. SPECIAL COMMENTS:
None NRG FORM 366A (06-2016) Page 6 of 6