CNRO-2017-00009, Entergy Nuclear Operations, Inc. - Decommissioning Funding Status Report Per 10 CFR 50.75(f)(1) and 10 CFR 50.82(a)(8)(v)31 March 2017Entergy Nuclear Operations, Inc. - Decommissioning Funding Status Report Per 10 CFR 50.75(f)(1) and 10 CFR 50.82(a)(8)(v)Decommissioning Funding Plan
Exemption Request
ML17082A28331 March 2017Issuance of Amendment Application for Order to Transfer Renewed Facility Operating License, Independent Spent Fuel Storage Installation General License, and Conforming Amendment from Entergy Nuclear to Exelon Generation CAC No. MF8293)Safe Shutdown
Cyber Security
Preemption Authority
Fire Protection Program
ML17090A18831 March 2017ISFSI - Notification of Completion of License Transfer and Request to Continue Processing Pending NRC Actions Previously Requested by EntergyExemption Request
CAC:MG001431 March 2017
CNRO-2017-00007, Nuclear Property Damage Insurance (10 CFR 50.54(w)(3))30 March 2017Nuclear Property Damage Insurance (10 CFR 50.54(w)(3))
RS-16-046, Annual Property Insurance Status Report29 March 2017Annual Property Insurance Status Report
ML17067A46927 March 2017Staff Assessment of Response to 10 CFR 50.54(f) Information Request - Flood Causing Mechanism ReevaluationUltimate heat sink
Hydrostatic
FLEX
Fukushima Dai-Ichi
Earthquake
ML17086A20527 March 2017Notification of Expected Date of Transfer of Nuclear Unit to Exelon Generation Company, LLC, Notification of Satisfactory Documentary Evidence of Insurance, and Notification of Receipt of All Required Regulatory Approvals
ML17090A40024 March 2017Part 21 - Failure of Power Supplies to Meet Voltage Stability SpecificationsUnanalyzed Condition
Fitness for Duty
Mission time
ML17044A07223 March 2017G20120172 - Closure Letter to Gunter, Et Al 2.206 Petition on Containment Ventilation for James A. FitzPatrick Nuclear Power PlantFukushima Dai-Ichi
Containment Hardened Vent
ML17086A02223 March 2017Part 21 - Failure of Power Supplies to Meet Voltage Stability SpecificationsUnanalyzed Condition
Fitness for Duty
Mission time
ML17072A34222 March 2017Staff Review of Spent Fuel Pool Evaluation Associated Wit Reevaluated Seismic Hazard Implementing near-Term Task Force Recommendation 2.1Safe Shutdown Earthquake
Fukushima Dai-Ichi
ML17081A45320 March 2017Part 21 - Plastic Jar Dedication Sampling
ML17076A08217 March 20174/20/2017 - Notice of Public Meeting - James A. FitzPatrick Nuclear Power Plant; Nine Mile Point Nuclear Generating StationOpen House
JAFP-17-0022, Transmittal of Emergency Plan Updates17 March 2017Transmittal of Emergency Plan Updates
ML17069A44016 March 2017Response Regarding Phase 2 Staffing Submittal Associated with Near-Term Task Force Recommendation 9.3 Related to the Fukushima Dai-Ichi Nuclear Power Plant AccidentFukushima Dai-Ichi
Minimum staff
JAFP-17-0015, Emergency Plan Updates15 March 2017Emergency Plan UpdatesHealth Physics Network
High Radiation Area
Deep Dose Equivalent
JAFP-17-0015, James A. FitzPatrick Nuclear Power Plant - Transmittal of Emergency Plan Updates15 March 2017James A. FitzPatrick Nuclear Power Plant - Transmittal of Emergency Plan Updates
ML17074A58815 March 2017Core Operating Limits Report, Revision 30 (Cycle 23)
ML17066A30015 March 2017Transmittal of Emergency Plan Updates
JAFP-17-0020, Enclosure 2, James A. Fitzpatrick Nuclear Power Plant Core Operating Limits Report, Revision 30 (Non-Proprietary)15 March 2017Enclosure 2, James A. Fitzpatrick Nuclear Power Plant Core Operating Limits Report, Revision 30 (Non-Proprietary)
05000333/LER-2017-00113 March 2017Vent Line Socket Weld Failure
LER 17-001-00 for James A. Fitzpatrick Nuclear Power Plant RE: Vent Line Socket Weld Failure
Weld Overlay
Through-Wall Leak
Through Wall Leak
Unidentified leakage
Operational leakage
JAFP-17-0023, Submittal of the Final Ultrasonic Test Results on the 24-10-130 Weld Overlay9 March 2017Submittal of the Final Ultrasonic Test Results on the 24-10-130 Weld OverlayWeld Overlay
Liquid penetrant
Through Wall Leak
Dissimilar Metal Weld
Press Release-17-008, NRC Approves License Transfer of FitzPatrick Nuclear Plant3 March 2017Press Release-17-008: NRC Approves License Transfer of FitzPatrick Nuclear Plant
IR 05000333/20160061 March 2017Annual Assessment Letter for James A. Fitzpatrick Nuclear Power Plant (Report 05000333/2016006)
ML17041A2741 March 2017Federal Register Notice - Order Approving Direct License Transfer of FitzPatrick Power Plant from Entergy Nuclear FitzPatrick, LLC and Entergy Nuclear Operations, Inc. to Exelon Generation Company, LLC
ML17041A1961 March 2017LTR with Order Approving Direct Transfer of Renewed Facility Operating License and Independent Spent Fuel Storage Installation General License and Conforming AmendmentSafe Shutdown
Cyber Security
Decommissioning Funding Plan
Preemption Authority
Fire Protection Program
ML17059C54328 February 2017Single Positive Test Form Collected on 08/23/2016
ML17059C53728 February 2017Annual Report Form for Drug and Alcohol Tests for 2016
ML17059C56628 February 2017Single Positive Test Form Collected on 08/23/2016
ML17059C54528 February 2017Single Positive Test Form Collected on 11/17/2016
JAFP-17-0017, Eighth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond Design Basis External Events28 February 2017Eighth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond Design Basis External EventsTime to boil
Internal Flooding
FLEX
Tornado Generated Missile
Spent Fuel Pool Instrumentation
Containment Hardened Vent
Frazil ice
ML17059C56928 February 2017Single Positive Test Form Collected on 11/17/2016
JAFP-17-0019, Submittal of Fitness for Duty Program Performance Report and Fatigue Management for 201628 February 2017Submittal of Fitness for Duty Program Performance Report and Fatigue Management for 2016Fitness for Duty
JAFP-17-0018, Eighth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)28 February 2017Eighth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)Time to boil
Reserve Station Service Transformer
FLEX
Design basis earthquake
Spent Fuel Pool Instrumentation
Earthquake
ML17059C57228 February 2017Single Positive Test Form Collected on 12/05/2016
ML17059C56228 February 2017Annual Report Form for Drug and Alcohol Tests for 2016
ML17059C54128 February 2017Single Positive Test Form Collected on 07/25/2016
ML17059C57128 February 2017Single Positive Test Form Collected on 11/17/2016
ML17059C57328 February 2017Annual Fatigue Report Form for 2016
ML17059C54428 February 2017Single Positive Test Form Collected on 09/27/2016
ML17059C56828 February 2017Single Positive Test Form Collected on 09/27/2016
ML17059C54028 February 2017Single Positive Test Form Collected on 01/06/2016
ML17059C56428 February 2017Single Positive Test Form Collected on 07/25/2016
ML17059C56328 February 2017Single Positive Test Form Collected on 01/06/2016
JAFP-17-0008, Transmittal of Emergency Plan Updates17 February 2017Transmittal of Emergency Plan UpdatesSafe Shutdown
Minimum staff
ML17033A10715 February 2017Reassignment of U.S. Nuclear Regulatory Commission Branch Chief - James Danna
IR 05000333/201600414 February 2017Integrated Inspection Report 05000333/2016004Time of Discovery
Fire Barrier
Stroke time
Commercial Grade Dedication
Internal Flooding
Past operability
Temporary Modification
Functionality Assessment
Condition Adverse to Quality
Residual transfer
Corrosion bonding
Significance Determination Process
Operability Determination
Frazil ice
Reasonable doubt of operability
Grace period
Downpower
Coast down
ML17047A62114 February 2017Exit Meeting for the 4th Quarter 2016Residual transfer
Frazil ice
Reasonable doubt of operability
ML17031A2808 February 2017Summary of Teleconference with Entergy Nuclear Operations, Inc. Regarding Verbal Authorization for Relief Request RR-21 for the James A. Fitzpatrick Nuclear Power PlantNon-Destructive Examination
Weld Overlay
Dissimilar Metal Weld