ML17146B24931 March 2017Inspection Plan for Clinton Power Station for Triennial Fire Protection Baseline Inspection Report 2017 008Safe Shutdown
Probabilistic Risk Assessment
Multiple Spurious Operation
Emergency Lighting
B.5.b Mitigating Strategies
Fire Protection Program
RS-17-045, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations30 March 2017Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage InstallationsDecommissioning Funding Plan
RS-16-046, Annual Property Insurance Status Report29 March 2017Annual Property Insurance Status Report
CAC:MF947028 March 2017
RS-17-049, Application to Revise Technical Specifications to Adopt TSTF-529 Clarify Use and Application Rules, Revision 4, Using the Consolidated Line Item Improvement Process28 March 2017Application to Revise Technical Specifications to Adopt TSTF-529 Clarify Use and Application Rules, Revision 4, Using the Consolidated Line Item Improvement ProcessSafe Shutdown
Time of Discovery
Missed surveillance
Press Release-III-17-003, NRC to Discuss Performance of Clinton Nuclear Power Station March 2923 March 2017Press Release-III-17-003: NRC to Discuss Performance of Clinton Nuclear Power Station March 29
IR 05000461/201740320 March 2017NRC Security Baseline Inspection Report 05000461/2017403 (Mez) (Cover Letter Only)Affidavit
ML17081A45320 March 2017Part 21 - Plastic Jar Dedication Sampling
ML17067A37216 March 2017March 7, 2017, Summary of Public Pre-Submittal Teleconference Meeting with Exelon Generation Company, LLC to Discuss Proposed License Amendment Request Regarding Residual Heat Removal System Operability in Mode 3 at Clinton Power Station, UCondition Adverse to Quality
IR 05000461/201730116 March 2017NRC Initial License Examination Report 05000461/2017301Job Performance Measure
ML17076A33816 March 2017Notification of NRC Baseline Inspection and Request for Information 05000461/2017002Nondestructive Examination
Foreign Material Exclusion
Scaffolding
RS-17-044, Response to Request for Additional Information Regarding Proposed Alternative for the Use of Encoded Phased Array Ultrasonic Examination Techniques in Lieu of Radiography13 March 2017Response to Request for Additional Information Regarding Proposed Alternative for the Use of Encoded Phased Array Ultrasonic Examination Techniques in Lieu of RadiographyHydrostatic
Nondestructive Examination
Incorporated by reference
Dissimilar Metal Weld
U-604326, Third Ten-Year Interval Inservice Testing Program Plan Revision 78 March 2017Third Ten-Year Interval Inservice Testing Program Plan Revision 7Safe Shutdown
Packing leak
Ultimate heat sink
Stroke time
Squib
Incorporated by reference
Scram Discharge Volume
Excess Flow Check Valve
Cold shutdown justification
Power-Operated Valves
Power Operated Valves
Scaffolding
Grace period
CAC:MF91527 March 2017
ML17067A3627 March 2017License Amendment Request; Mode 3 Applicability - Lpci/Sdc; NRC Pre-Submittal Teleconference - March 7, 2017Condition Adverse to Quality
05000461/LER-2016-0106 March 20171 OF 3
LER 16-010-01 for Clinton Power Station, Unit 1 RE: Failure to Complete Technical Specification Required Actions within the Completion Time Resulted in a Condition Prohibited by Technical Specifications
Surveillance Frequency Control Program
Grace period
RS-17-020, Response to RAI Concerning License Amendment Request to Revise Technical Specification Section 5.5.13, Primary Containment Leakage Rate Testing Program, for Permanent Extension of Type a and Type C Leak Rate Test Frequencies2 March 2017Response to RAI Concerning License Amendment Request to Revise Technical Specification Section 5.5.13, Primary Containment Leakage Rate Testing Program, for Permanent Extension of Type a and Type C Leak Rate Test FrequenciesHigh winds
Mission time
Tornado Missile
Internal Flooding
Probabilistic Risk Assessment
Thermoset
Large early release frequency
TORMIS
ML17061A6742 March 2017Public Outreach/Open House to Discuss NRC 2016 End-of-Cycle Plant Performance Assessment of Clinton Power Station
IR 05000461/20160061 March 2017Annual Assessment Letter for Clinton Power Station, Unit 1 (Report 05000461/2016006)
ML17062A8371 March 20175/29/2017 Notice of Significant Public Meeting to Discuss Nrc'S End-of-Cycle Assessment of the Clinton Power Station Performance for the 2016 Calendar YearOpen House
RS-17-009, Board Resolutions Associated with Foreign Ownership, Control, or Influence1 March 2017Board Resolutions Associated with Foreign Ownership, Control, or Influence
ML17058A27227 February 2017Annual Fatigue Report Form for 2016
RS-17-023, Submittal of Annual 2016 Fitness for Duty Performance Data Reports27 February 2017Submittal of Annual 2016 Fitness for Duty Performance Data ReportsFitness for Duty
ML17053A27622 February 2017Scheduling of Initial Operator License Examinations - Clinton Power Station, Unit 1
ML17027A03822 February 2017Issuance of Amendment Regarding Inservice Leak and Hydrostatic Testing OperationsAnticipated operational occurrence
Hydrostatic
U-604310, 2017 Clinton Power Station Initial Licensed Operator Examination Outline Submittal Letter9 February 20172017 Clinton Power Station Initial Licensed Operator Examination Outline Submittal Letter
ML17128A0889 February 20172017 Clinton Power Station Initial Licensed Operator Examination Forms ES-D-1Overtravel
Earthquake
Power change
ML17128A0829 February 20172017 Clinton Power Station Initial Licensed Operator Examination Forms ES-301-2
ML17128A0779 February 20172017 Clinton Power Station Initial Licensed Operator Examination Forms ES-401-1 and -3
ML17128A0729 February 20172017 Clinton Power Station Initial Licensed Operator Examination Forms ES-301-1
ML17116A1139 February 20172017 Clinton Power Station Initial Licensed Operator Examination As-Administered ScenariosLoop seal
Safe Shutdown Earthquake
MELLLA
Overtravel
Earthquake
Power change
ML17116A1019 February 20172017 Clinton Power Station Initial Licensed Operator Examination As-Administered JPMsHigh Radiation Area
Offsite Dose Calculation Manual
Locked High Radiation Area
Job Performance Measure
ML17116A0819 February 20172017 Clinton Power Station Initial Licensed Operator Examination As-Administered Written ExamHot Short
Safe Shutdown
Reactor Vessel Water Level
Packing leak
Half scram
Ultimate heat sink
Temporary Modification
Squib
Nuclear Accident Reporting System
Scram Discharge Volume
MELLLA
Spiral reload
Power change
Coast down
ML17108A4449 February 20172017 Clinton Power Station Initial Licensed Operator Examination Proposed Operating TestLoop seal
High Radiation Area
Offsite Dose Calculation Manual
Safe Shutdown Earthquake
Locked High Radiation Area
Job Performance Measure
MELLLA
Overtravel
Earthquake
Power change
ML17108A4289 February 20172017 Clinton Power Station Initial Licensed Operator Examination Proposed Written ExamHot Short
Safe Shutdown
Reactor Vessel Water Level
Packing leak
Half scram
Ultimate heat sink
Temporary Modification
Squib
Nuclear Accident Reporting System
Scram Discharge Volume
MELLLA
Spiral reload
Power change
Coast down
IR 05000461/20160049 February 2017NRC Integrated Inspection Report and Exercise of Enforcement Discretion 05000461/2016004, 05000461/2016501 and 07201046/2016003Unanalyzed Condition
High winds
Reactor Vessel Water Level
Non-Destructive Examination
Fire Barrier
Stroke time
Internal Flooding
Hydrostatic
Enforcement Discretion
Temporary Modification
Significance Determination Process
Operability Determination
Maintenance Rule Program
Fire Protection Program
ML17103A2869 February 20172017 Clinton Power Station Initial Licensed Operator Examination Outline No Changes Memo
ML17103A2799 February 20172017 Clinton Power Station Initial Licensed Operator Examination Operating Exam Comments and Responses
ML17108A4029 February 20172017 Clinton Power Station Initial Licensed Operator Examination Form ES-401-6
ML17103A2639 February 20172017 Clinton Power Station Initial Licensed Operator Examination Forms ES-401-9
ML17103A2529 February 20172017 Clinton Power Station Initial Licensed Operator Examination Forms ES-401-4
ML17108A4789 February 20172017 Clinton Power Station Initial Licensed Operator Examination Form ES-301-4
ML17123A0449 February 20172017 Clinton Power Station Initial Licensed Operator Examination Form ES-201-2
ML17103A3399 February 20172017 Clinton Power Station Initial Licensed Operator Examination No Post-Exam Comments Memo
ML17108A4679 February 20172017 Clinton Power Station Initial Licensed Operator Examination Form ES-301-3
ML17103A3069 February 20172017 Clinton Power Station Initial Licensed Operator Examination Form Es 201-1Job Performance Measure
ML17108A4849 February 20172017 Clinton Power Station Initial Licensed Operator Examination Forms ES-301-6
ML17108A4879 February 20172017 Clinton Power Station Initial Licensed Operator Examination Proposed Exam Submittal LetterJob Performance Measure
ML17123A0579 February 20172017 Clinton Power Station Initial Licensed Operator Examination Forms ES-301-5
ML17103A3189 February 20172017 Clinton Power Station Initial Licensed Operator Examination Forms ES-201-3