Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML17146B249 | 31 March 2017 | Inspection Plan for Clinton Power Station for Triennial Fire Protection Baseline Inspection Report 2017 008 | Safe Shutdown Probabilistic Risk Assessment Multiple Spurious Operation Emergency Lighting B.5.b Mitigating Strategies Fire Protection Program |
RS-17-045, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations | 30 March 2017 | Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations | Decommissioning Funding Plan |
RS-16-046, Annual Property Insurance Status Report | 29 March 2017 | Annual Property Insurance Status Report | |
CAC:MF9470 | 28 March 2017 | ||
RS-17-049, Application to Revise Technical Specifications to Adopt TSTF-529 Clarify Use and Application Rules, Revision 4, Using the Consolidated Line Item Improvement Process | 28 March 2017 | Application to Revise Technical Specifications to Adopt TSTF-529 Clarify Use and Application Rules, Revision 4, Using the Consolidated Line Item Improvement Process | Safe Shutdown Time of Discovery Missed surveillance |
Press Release-III-17-003, NRC to Discuss Performance of Clinton Nuclear Power Station March 29 | 23 March 2017 | Press Release-III-17-003: NRC to Discuss Performance of Clinton Nuclear Power Station March 29 | |
IR 05000461/2017403 | 20 March 2017 | NRC Security Baseline Inspection Report 05000461/2017403 (Mez) (Cover Letter Only) | Affidavit |
ML17081A453 | 20 March 2017 | Part 21 - Plastic Jar Dedication Sampling | |
ML17067A372 | 16 March 2017 | March 7, 2017, Summary of Public Pre-Submittal Teleconference Meeting with Exelon Generation Company, LLC to Discuss Proposed License Amendment Request Regarding Residual Heat Removal System Operability in Mode 3 at Clinton Power Station, U | Condition Adverse to Quality |
IR 05000461/2017301 | 16 March 2017 | NRC Initial License Examination Report 05000461/2017301 | Job Performance Measure |
ML17076A338 | 16 March 2017 | Notification of NRC Baseline Inspection and Request for Information 05000461/2017002 | Nondestructive Examination Foreign Material Exclusion Scaffolding |
RS-17-044, Response to Request for Additional Information Regarding Proposed Alternative for the Use of Encoded Phased Array Ultrasonic Examination Techniques in Lieu of Radiography | 13 March 2017 | Response to Request for Additional Information Regarding Proposed Alternative for the Use of Encoded Phased Array Ultrasonic Examination Techniques in Lieu of Radiography | Hydrostatic Nondestructive Examination Incorporated by reference Dissimilar Metal Weld |
U-604326, Third Ten-Year Interval Inservice Testing Program Plan Revision 7 | 8 March 2017 | Third Ten-Year Interval Inservice Testing Program Plan Revision 7 | Safe Shutdown Packing leak Ultimate heat sink Stroke time Squib Incorporated by reference Scram Discharge Volume Excess Flow Check Valve Cold shutdown justification Power-Operated Valves Power Operated Valves Scaffolding Grace period |
CAC:MF9152 | 7 March 2017 | ||
ML17067A362 | 7 March 2017 | License Amendment Request; Mode 3 Applicability - Lpci/Sdc; NRC Pre-Submittal Teleconference - March 7, 2017 | Condition Adverse to Quality |
05000461/LER-2016-010 | 6 March 2017 | 1 OF 3 LER 16-010-01 for Clinton Power Station, Unit 1 RE: Failure to Complete Technical Specification Required Actions within the Completion Time Resulted in a Condition Prohibited by Technical Specifications | Surveillance Frequency Control Program Grace period |
RS-17-020, Response to RAI Concerning License Amendment Request to Revise Technical Specification Section 5.5.13, Primary Containment Leakage Rate Testing Program, for Permanent Extension of Type a and Type C Leak Rate Test Frequencies | 2 March 2017 | Response to RAI Concerning License Amendment Request to Revise Technical Specification Section 5.5.13, Primary Containment Leakage Rate Testing Program, for Permanent Extension of Type a and Type C Leak Rate Test Frequencies | High winds Mission time Tornado Missile Internal Flooding Probabilistic Risk Assessment Thermoset Large early release frequency TORMIS |
ML17061A674 | 2 March 2017 | Public Outreach/Open House to Discuss NRC 2016 End-of-Cycle Plant Performance Assessment of Clinton Power Station | |
IR 05000461/2016006 | 1 March 2017 | Annual Assessment Letter for Clinton Power Station, Unit 1 (Report 05000461/2016006) | |
ML17062A837 | 1 March 2017 | 5/29/2017 Notice of Significant Public Meeting to Discuss Nrc'S End-of-Cycle Assessment of the Clinton Power Station Performance for the 2016 Calendar Year | Open House |
RS-17-009, Board Resolutions Associated with Foreign Ownership, Control, or Influence | 1 March 2017 | Board Resolutions Associated with Foreign Ownership, Control, or Influence | |
ML17058A272 | 27 February 2017 | Annual Fatigue Report Form for 2016 | |
RS-17-023, Submittal of Annual 2016 Fitness for Duty Performance Data Reports | 27 February 2017 | Submittal of Annual 2016 Fitness for Duty Performance Data Reports | Fitness for Duty |
ML17053A276 | 22 February 2017 | Scheduling of Initial Operator License Examinations - Clinton Power Station, Unit 1 | |
ML17027A038 | 22 February 2017 | Issuance of Amendment Regarding Inservice Leak and Hydrostatic Testing Operations | Anticipated operational occurrence Hydrostatic |
U-604310, 2017 Clinton Power Station Initial Licensed Operator Examination Outline Submittal Letter | 9 February 2017 | 2017 Clinton Power Station Initial Licensed Operator Examination Outline Submittal Letter | |
ML17128A088 | 9 February 2017 | 2017 Clinton Power Station Initial Licensed Operator Examination Forms ES-D-1 | Overtravel Earthquake Power change |
ML17128A082 | 9 February 2017 | 2017 Clinton Power Station Initial Licensed Operator Examination Forms ES-301-2 | |
ML17128A077 | 9 February 2017 | 2017 Clinton Power Station Initial Licensed Operator Examination Forms ES-401-1 and -3 | |
ML17128A072 | 9 February 2017 | 2017 Clinton Power Station Initial Licensed Operator Examination Forms ES-301-1 | |
ML17116A113 | 9 February 2017 | 2017 Clinton Power Station Initial Licensed Operator Examination As-Administered Scenarios | Loop seal Safe Shutdown Earthquake MELLLA Overtravel Earthquake Power change |
ML17116A101 | 9 February 2017 | 2017 Clinton Power Station Initial Licensed Operator Examination As-Administered JPMs | High Radiation Area Offsite Dose Calculation Manual Locked High Radiation Area Job Performance Measure |
ML17116A081 | 9 February 2017 | 2017 Clinton Power Station Initial Licensed Operator Examination As-Administered Written Exam | Hot Short Safe Shutdown Reactor Vessel Water Level Packing leak Half scram Ultimate heat sink Temporary Modification Squib Nuclear Accident Reporting System Scram Discharge Volume MELLLA Spiral reload Power change Coast down |
ML17108A444 | 9 February 2017 | 2017 Clinton Power Station Initial Licensed Operator Examination Proposed Operating Test | Loop seal High Radiation Area Offsite Dose Calculation Manual Safe Shutdown Earthquake Locked High Radiation Area Job Performance Measure MELLLA Overtravel Earthquake Power change |
ML17108A428 | 9 February 2017 | 2017 Clinton Power Station Initial Licensed Operator Examination Proposed Written Exam | Hot Short Safe Shutdown Reactor Vessel Water Level Packing leak Half scram Ultimate heat sink Temporary Modification Squib Nuclear Accident Reporting System Scram Discharge Volume MELLLA Spiral reload Power change Coast down |
IR 05000461/2016004 | 9 February 2017 | NRC Integrated Inspection Report and Exercise of Enforcement Discretion 05000461/2016004, 05000461/2016501 and 07201046/2016003 | Unanalyzed Condition High winds Reactor Vessel Water Level Non-Destructive Examination Fire Barrier Stroke time Internal Flooding Hydrostatic Enforcement Discretion Temporary Modification Significance Determination Process Operability Determination Maintenance Rule Program Fire Protection Program |
ML17103A286 | 9 February 2017 | 2017 Clinton Power Station Initial Licensed Operator Examination Outline No Changes Memo | |
ML17103A279 | 9 February 2017 | 2017 Clinton Power Station Initial Licensed Operator Examination Operating Exam Comments and Responses | |
ML17108A402 | 9 February 2017 | 2017 Clinton Power Station Initial Licensed Operator Examination Form ES-401-6 | |
ML17103A263 | 9 February 2017 | 2017 Clinton Power Station Initial Licensed Operator Examination Forms ES-401-9 | |
ML17103A252 | 9 February 2017 | 2017 Clinton Power Station Initial Licensed Operator Examination Forms ES-401-4 | |
ML17108A478 | 9 February 2017 | 2017 Clinton Power Station Initial Licensed Operator Examination Form ES-301-4 | |
ML17123A044 | 9 February 2017 | 2017 Clinton Power Station Initial Licensed Operator Examination Form ES-201-2 | |
ML17103A339 | 9 February 2017 | 2017 Clinton Power Station Initial Licensed Operator Examination No Post-Exam Comments Memo | |
ML17108A467 | 9 February 2017 | 2017 Clinton Power Station Initial Licensed Operator Examination Form ES-301-3 | |
ML17103A306 | 9 February 2017 | 2017 Clinton Power Station Initial Licensed Operator Examination Form Es 201-1 | Job Performance Measure |
ML17108A484 | 9 February 2017 | 2017 Clinton Power Station Initial Licensed Operator Examination Forms ES-301-6 | |
ML17108A487 | 9 February 2017 | 2017 Clinton Power Station Initial Licensed Operator Examination Proposed Exam Submittal Letter | Job Performance Measure |
ML17123A057 | 9 February 2017 | 2017 Clinton Power Station Initial Licensed Operator Examination Forms ES-301-5 | |
ML17103A318 | 9 February 2017 | 2017 Clinton Power Station Initial Licensed Operator Examination Forms ES-201-3 |