2017 Clinton Power Station Initial Licensed Operator Examination As-Administered JPMs
ML17116A101
Person / Time
Site: Clinton Constellation icon.png
Issue date: 02/09/2017
From: Chuck Zoia
Operations Branch III
To:
Exelon Generation Co
Shared Package
ML16308A463 List:
References
Download: ML17116A101 (253)


Text

CLINTON POWER STATION Job Performance Measure Complete an SRV Actuation Report JPM Number: JPM407 Revision Number: 02 Date: 8/25/16 Developed By: T. Jennings 8/25/16 Instructor Date Validated By: Michael Antonelli 10/26/16 SME or Instructor Date Reviewed By: Jim Lucas 11/15/16 Operations Representative Date Approved By: Tony Jennings 11/15/16 Training Department Date JPM407 R2 RO Admin JPM 1.docx Retain approved Master Copy per SRRS 3D.126/3D.111

JPM Number: JPM407 - Rev 02 Clinton Power Station Job Performance Measure (JPM)

JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.

Prior to JPM usage, revalidate JPM using steps 8 and 12 below.

________ 1. Task description and number, JPM description and number are identified.

________ 2. Knowledge and Abilities (K/A) references are included.

________ 3. Performance location specified. (in-plant, control room, simulator, or other)

________ 4. Initial setup conditions are identified.

________ 5. Initiating cue (and terminating cue if required) are properly identified.

________ 6. Task standards identified and verified by SME review.

________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk

(*).

________ 8. Verify the procedure(s) referenced by this JPM reflects the current revision:

Procedure CPS 3831.01 Rev: 6b Procedure CPS 3831.01D002 Rev: 6 Procedure CPS 3831.01F001 Rev: 4

________ 9. Verify cues both verbal and visual are free of conflict.

________ 10. Verify performance time is accurate

________ 11. If the JPM cannot be performed as written with proper responses, then revise the JPM.

________ 12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:

SME / Instructor Date SME / Instructor Date SME / Instructor Date Page 2 of 18

JPM Number: JPM407 - Rev 02 Clinton Power Station Job Performance Measure (JPM)

Revision Record (Summary)

Revision Date Description 00 NA New JPM number and updated revisions (10110001SAF01) 01 2/22/11 Updated for procedure revision.

02 8/23/16 Updated procedure references and made editorial changes throughout.

Page 3 of 18

JPM Number: JPM407 - Rev 02 Clinton Power Station Job Performance Measure (JPM)

Simulator Setup Instructions

1. No simulator setup is required for this JPM.

Page 4 of 18

JPM Number: JPM407 - Rev 02 Clinton Power Station Job Performance Measure (JPM)

READ TO THE OPERATOR I will explain the initial conditions, which step(s) to simulate or discuss, and provide the initiating cues. When you complete the task successfully, the objective of this Job Performance Measure will be satisfied.

TASK STANDARDS:

  • The SRV actuation report is correctly filled out and SRV B21-F047A has been identified as leaking.

TOOLS, EQUIPMENT, OTHER SPECIAL REQUIREMENTS:

  • None PROCEDURAL/

REFERENCES:

  • CPS 9056.02, SAFETY/RELIEF VALVE ACTUATION TEST Rev. 29b
  • CPS 3831.01D002 ACTUATION LOG Rev. 6
  • CPS 3831.01F001 COMMENT SHEET Rev. 4 EVALUATOR INSTRUCTIONS:
  • Amplifying cues are provided within the JPM steps.
  • Provide the examinee with the following items:

o Initial Conditions and Initiating Cue page (page 14 of the JPM) o SRV Tailpipe Temperature Graph (page 15 of the JPM) o DCS Display 6D-04 (page 16 of the JPM) o DCS Display D05AD1 (page 17 of the JPM) o DCS Display DD5BD3 (page 18 of the JPM) o CPS 3831.01 Safety Relief Valve Report Rev. 6b (blank) o CPS 3831.01D002 Actuation Log Rev. 6 (with block 310 marked NA) o CPS 3831.01F001 Comment Sheet Rev. 4 (blank)

  • All pre-job briefings are completed.

Page 5 of 18

JPM Number: JPM407 - Rev 02 Clinton Power Station Job Performance Measure (JPM)

INITIAL CONDITIONS:

You are the B RO on dayshift.

The unit is operating at 80% power.

CPS 9056.02 SAFETY/RELIEF VALVE ACTUATION TEST was performed on B21-F047A on the previous shift (midshift) during steady state operations.

During the test, B21-F047A was opened at 0027 for 1 minute 0 seconds.

INITIATING CUE:

CAUTION

§ All pre-job briefings are completed.

§ Do NOT shine any type light into a panel.

The CRS has provided you with the following data sheets:

  • SRV B21-F047A tailpipe temperature graph
  • Pre-test and Post-test screen shots of PPC screens 6D-04 (IRM/APRM indications), D05AD1 (SPDS Summary Display), and DD5BD3 (SPDS RPV, Pri-Cnmt, and Hydrogen Display)

The CRS has marked block 310 of CPS 3831.01D002 Actuation Log NA.

The CRS has directed you to complete CPS 3831.01 Safety Relief Valve Report for 1B21-F047A.

START TIME:

Page 6 of 18

JPM Number: JPM407 - Rev 02 Clinton Power Station Job Performance Measure (JPM)

PERFORMANCE INFORMATION Critical steps are denoted with an asterisk (*) to the left of the step number and appear in BOLDED letters. Failure to meet the standards for a critical step constitutes failure of the Job Performance Measure. The sequence of steps is assumed unless denoted in the comments section of the JPM.

PERFORMANCE STEPS CPS 3831.01 Safety Relief Valve Report Section 8.0 Procedure CPS 3831.01D002 Actuation Log

  • JPM Step 1 Fill in block 302 of CPS 3831.01D002, ACTUATION LOG.

Standard: Examinee records B21-F047A in block 302.

Cue:

Comments SAT £ UNSAT £ Comment Number JPM Step 2 Fill in block 303 of CPS 3831.01D002, ACTUATION LOG.

Standard: Examinee records todays date in block 303.

Cue:

Comments SAT £ UNSAT £ Comment Number Page 7 of 18

JPM Number: JPM407 - Rev 02 Clinton Power Station Job Performance Measure (JPM)

JPM Step 3 Fill in block 304 of CPS 3831.01D002, ACTUATION LOG.

Standard: Examinee records 0027 in block 304.

Cue:

Comments SAT £ UNSAT £ Comment Number

  • JPM Step 4 Fill in block 305 of CPS 3831.01D002, ACTUATION LOG.

Standard: Examinee records B in block 305.

Cue:

Comments SAT £ UNSAT £ Comment Number

  • JPM Step 5 Fill in block 306 of CPS 3831.01D002, ACTUATION LOG.

Standard: Examinee records C in block 306.

Cue:

Comments SAT £ UNSAT £ Comment Number Page 8 of 18

JPM Number: JPM407 - Rev 02 Clinton Power Station Job Performance Measure (JPM)

  • JPM Step 6 Fill in block 307 of CPS 3831.01D002, ACTUATION LOG.

Standard: Examinee records E in block 307.

Cue:

Comments SAT £ UNSAT £ Comment Number JPM Step 7 Fill in block 308 of CPS 3831.01D002, ACTUATION LOG.

Standard: Examinee records 80% in block 308.

Cue:

Comments SAT £ UNSAT £ Comment Number

  • JPM Step 8 Fill in block 309 of CPS 3831.01D002, ACTUATION LOG.

Standard: Examinee determines that the tailpipe temperature for B21-F047A has not returned to normal or that the SRV is leaking. Block 309 may be left blank or N/Ad.

Cue: If the examinee determines that the tailpipe has not returned to normal or that the SRV is leaking, as the CRS instruct the examinee to leave the block blank if questioned and continue.

Comments The critical portion of this step is the determination that B21-F047A tailpipe temperature has not returned to normal value, not recording a data value. If the candidate enters a time value indicating that the tailpipe temperature has returned to normal, evaluate the critical step as unsat.

SAT £ UNSAT £ Comment Number Page 9 of 18

JPM Number: JPM407 - Rev 02 Clinton Power Station Job Performance Measure (JPM)

JPM Step 9 Fill in block 310 of CPS 3831.01D002, ACTUATION LOG.

Standard: No examinee action required - block is already filled in.

Cue:

Comments SAT £ UNSAT £ Comment Number JPM Step 10 Fill in block 311 of CPS 3831.01D002, ACTUATION LOG.

Standard: Examinee records 1013 in block 311.

Cue:

Comments SAT £ UNSAT £ Comment Number JPM Step 11 Fill in block 312 of CPS 3831.01D002, ACTUATION LOG.

Standard: Examinee records 1013 in block 312.

Cue: If the examinee requests the reseat pressure value, cue him/her that the valve reseated at the pressure indicated on the post test SPDS summary screen.

Comments SAT £ UNSAT £ Comment Number Page 10 of 18

JPM Number: JPM407 - Rev 02 Clinton Power Station Job Performance Measure (JPM)

JPM Step 12 Fill in block 313 of CPS 3831.01D002, ACTUATION LOG.

Standard: Examinee records 1 minute 0 seconds in block 313.

Cue: If the examinee requests the duration time for the actuation of B21-F047A, cue him/her that B21-F047A was open for 1 minute 0 seconds.

Comments SAT £ UNSAT £ Comment Number JPM Step 13 Fill in block 314 of CPS 3831.01D002, ACTUATION LOG.

Standard: Examinee records A and/or E in block 314.

Cue: Ask the examinee why the block 314 failure code was chosen.

Comments The examinee should reply that the failure code was chosen because SRV B21-F047A is leaking by its seat.

SAT £ UNSAT £ Comment Number JPM Step 14 Fill in block 315 of CPS 3831.01D002, ACTUATION LOG.

Standard: Examinee records N/A in block 315.

Cue: As the CRS, cue the examinee to record N/A in block 315.

Comments SAT £ UNSAT £ Comment Number Page 11 of 18

JPM Number: JPM407 - Rev 02 Clinton Power Station Job Performance Measure (JPM)

JPM Step 15 If CPS 3831.01F001 Comment Sheet is completed for this log entry, indicate YES IN BLOCK 316. If not completed, indicate NO in block 316.

Standard: Examinee records Yes or No in block 316.

Cue:

Comments If the examinee records Yes in block 316, an entry in CPS 3831.01F001 Comment Sheet should be made.

SAT £ UNSAT £ Comment Number JPM Step 16 Examinee completes CPS 3831.01D002 Actuation Log.

Standard: Examinee records his/her signature and date in the Completed By blanks and provides the completed CPS 3831.01D002 Actuation Log to Shift Supervision for review.

Cue: Cue the examinee that the JPM is complete.

Comments SAT £ UNSAT £ Comment Number TERMINATING CUES:

The JPM is complete when the student has delivered CPS 3831.01F001 Comment Sheet to Shift Supervision for review.

STOP TIME:

Page 12 of 18

JPM Number: JPM407 - Rev 02 Clinton Power Station Job Performance Measure (JPM)

Operators Name:

Job

Title:

£ EO £ RO £ SRO £ STA £ SRO Cert JPM

Title:

Complete an SRV Actuation Report JPM Number: JPM407 Revision Number: 02 Task Number and

Title:

383101.01, Complete Control Room actions to document data on failures and actuation's of the Safety Relief Valves in the Main Steam System and to generate reports required by the Nuclear Regulatory Commission K/A System K/A Number Importance (RO/SRO)

Generic 2.1.18 3.6 3.8 Ability to make accurate, clear, and concise logs, records, status boards, and reports.

Suggested Testing Environment: Classroom Actual Testing Environment: £ Simulator £ Plant £ Control Room Testing Method: £ Simulate Alternate Path: £ Yes ¢ No

¢ Perform SRO Only: £ Yes ¢ No Time Critical: £ Yes ¢ No Estimated Time to Complete: 18 minutes Actual Time Used: minutes

References:

  • CPS 9056.02, SAFETY/RELIEF VALVE ACTUATION TEST Rev. 29b
  • CPS 3831.01D002 ACTUATION LOG Rev. 6
  • CPS 3831.01F001 COMMENT SHEET Rev. 4 EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? £ Yes £ No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: £ Satisfactory £ Unsatisfactory Comments:

Evaluators Name: (Print)

Evaluators Signature: Date:

SRRS: 3D.105 (when utilized for operator initial or continuing training) Page 13 of 18

Clinton Power Station Job Performance Measure (JPM)

INITIAL CONDITIONS:

You are the B RO on dayshift.

The unit is operating at 80% power.

CPS 9056.02 SAFETY/RELIEF VALVE ACTUATION TEST was performed on B21-F047A on the previous shift (midshift) during steady state operations.

During the test, B21-F047A was opened at 0027 for 1 minute 0 seconds.

INITIATING CUE:

CAUTION

§ All pre-job briefings are completed.

§ Do NOT shine any type light into a panel.

The CRS has provided you with the following data sheets:

  • SRV B21-F047A tailpipe temperature graph
  • Pre-test and Post-test screen shots of PPC screens 6D-04 (IRM/APRM indications), D05AD1 (SPDS Summary Display), and DD5BD3 (SPDS RPV, Pri-Cnmt, and Hydrogen Display)

The CRS has marked block 310 of CPS 3831.01D002 Actuation Log NA.

The CRS has directed you to complete CPS 3831.01 Safety Relief Valve Report for 1B21-F047A.

Page 14 of 18

Clinton Power Station Job Performance Measure (JPM)

Attachments SRV 47A Tailpipe Temperature (°F)

SRV 47A Tailpipe Temperature (°F)

Time (hr:min)

B21-F047A Tailpipe Temperature Graph Page 15 of 18

Clinton Power Station Job Performance Measure (JPM)

Pre and Post Test Page 16 of 18

Clinton Power Station Job Performance Measure (JPM)

Pre and Post Test Page 17 of 18

Clinton Power Station Job Performance Measure (JPM)

Pre and Post Test Page 18 of 18

CLINTON POWER STATION Job Performance Measure Evaluate License Maintenance Requirements JPM Number: JPM484 Revision Number: 00 Date: 8/25/16 Developed By: T. Jennings 8/25/16 Instructor Date Validated By: Michael Antonelli 10/26/16 SME or Instructor Date Reviewed By: Jim Lucas 11/15/16 Operations Representative Date Approved By: Tony Jennings 11/15/16 Training Department Date JPM484 R0 RO Admin JPM 2.docx Retain approved Master Copy per SRRS 3D.126/3D.111

JPM Number: JPM484 - Rev 00 Clinton Power Station Job Performance Measure (JPM)

JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.

Prior to JPM usage, revalidate JPM using steps 8 and 12 below.

________ 1. Task description and number, JPM description and number are identified.

________ 2. Knowledge and Abilities (K/A) references are included.

________ 3. Performance location specified. (in-plant, control room, simulator, or other)

________ 4. Initial setup conditions are identified.

________ 5. Initiating cue (and terminating cue if required) are properly identified.

________ 6. Task standards identified and verified by SME review.

________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk

(*).

________ 8. Verify the procedure(s) referenced by this JPM reflects the current revision:

Procedure OP-AA-105-102 Rev: 11 Procedure Rev:

Procedure Rev:

________ 9. Verify cues both verbal and visual are free of conflict.

________ 10. Verify performance time is accurate

________ 11. If the JPM cannot be performed as written with proper responses, then revise the JPM.

________ 12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:

SME / Instructor Date SME / Instructor Date SME / Instructor Date Page 2 of 11

JPM Number: JPM484 - Rev 00 Clinton Power Station Job Performance Measure (JPM)

Revision Record (Summary)

Revision Date Description 00 8/25/16 New JPM.

Page 3 of 11

JPM Number: JPM484 - Rev 00 Clinton Power Station Job Performance Measure (JPM)

Simulator Setup Instructions

1. No simulator setup is required for this JPM.

Page 4 of 11

JPM Number: JPM484 - Rev 00 Clinton Power Station Job Performance Measure (JPM)

READ TO THE OPERATOR I will explain the initial conditions, which step(s) to simulate or discuss, and provide the initiating cues. When you complete the task successfully, the objective of this Job Performance Measure will be satisfied.

TASK STANDARDS:

  • The examinee correctly documents shifts worked during the quarter on OP-AA-105-102 Attachment 1 Active License Tracking Log and determines that 2 additional 8 hour9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> or 12 hour1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> RO watches are needed to maintain his/her license active past 12/31/16.

TOOLS, EQUIPMENT, OTHER SPECIAL REQUIREMENTS:

  • None PROCEDURAL/

REFERENCES:

  • OP-AA-105-102 NRC ACTIVE LICENSE MAINTENANCE Rev. 11 EVALUATOR INSTRUCTIONS:
  • Amplifying cues are provided within the JPM steps.
  • All pre-job briefings are completed.
  • Provide the examinee with a copy of the Initial Conditions and Initiating Cue page (back page of the JPM) when providing the initiating cue.
  • Provide the examinee with a blank copy of OP-AA-105-102 Attachment 1 Active License Tracking Log.

Page 5 of 11

JPM Number: JPM484 - Rev 00 Clinton Power Station Job Performance Measure (JPM)

INITIAL CONDITIONS:

You are a Reactor Operator with an active NRC license.

Today is 12/23/16.

You are currently assigned to relieve the A RO on 1/2/17.

During the current quarter (4th quarter of 2016) you worked a mixed shift schedule consisting of the following:

  • You stood three complete 12-hour day shift watches as the A RO on October 12th, 13th, and 14th.
  • You stood two 8-hour swing shift watches as the B RO on October 23rd and 24th.
  • You split 8-hour day shifts working 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> as the B RO and the remaining 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> as a clearance writer on October 1st, 2nd, 8th, 9th, 15th, 16th, 22nd, 27th, 29th, and 30th.
  • You split two 12-hour midnight shifts, working six hours as the A RO and the other six hours as a clearance writer during the outage on November 10th and 11th.
  • The remaining days in the 4th quarter of 2016 were spent as a clearance writer (Monday through Friday).
  • All shifts covered were entered in the Narrative log.

INITIATING CUE:

CAUTION

§ All pre-job briefings are completed.

§ Do NOT shine any type light into a panel.

You are to document your shift coverage for the 4th quarter of 2016 on OP-AA-105-102 Attachment 1 Active License Tracking Log, and determine your ability to assume shift for 1/2/17.

START TIME:

Page 6 of 11

JPM Number: JPM484 - Rev 00 Clinton Power Station Job Performance Measure (JPM)

PERFORMANCE INFORMATION Critical steps are denoted with an asterisk (*) to the left of the step number and appear in BOLDED letters. Failure to meet the standards for a critical step constitutes failure of the Job Performance Measure. The sequence of steps is assumed unless denoted in the comments section of the JPM.

PERFORMANCE STEPS OP-AA-105-102 NRC ACTIVE LICENSE MAINTENANCE JPM Step 1 Record shift coverage from 4th quarter of 2016.

Standard: Examinee records the dates, shifts, length of shift, position filled, and signs attachment 1 using information from the initial conditions per the key (next page).

Cue:

Comments SAT £ UNSAT £ Comment Number Page 7 of 11

JPM Number: JPM484 - Rev 00 Clinton Power Station Job Performance Measure (JPM)

KEY Attachment 1 Active License Tracking Log Page 1 of 1 Employee Number: ______________ 012345 (example)

SHIFT COVERAGE FOR THE _____(1 4th ST

, 2ND, 3RD, 4TH) CALENDAR QUARTER OF _____(YEAR) 2016 Examinees Name

_____________________ ACTIVE / INACTIVE Name of License Holder (Print) License Status At Start Quarter (Circle one)

RECORD OF 8 /12 HOUR SHIFTS WORKED DURING QUARTER Enter the date the shift ended, the shift, the shift length, the Unit, position covered, circle Y or N for logged in the SM log and signature. If working an 8 hour9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> or 8 / 12 hour1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> shift, enter a 1 for midnight shift, 2 for the day shift, or a 3 for the afternoon shift (only enter shifts at least 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> length for which turnovers were conducted). Seven shifts at least 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> in length are required per quarter. If working a straight 12 hour1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> shift, enter a N for night shift or a D for day shift (only enter shifts at least 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> in length for which turnovers were conducted). Five 12 hour1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> shifts are required per quarter. The quarterly shift watch requirement may be completed with a combination of complete 8 and 12 hour1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> shifts (in a position required by the plants Technical Specifications) at sites having a mixed shift schedule (enter appropriate shift designator), and watches shall not be truncated when the minimum quarterly requirement (56 hours6.481481e-4 days <br />0.0156 hours <br />9.259259e-5 weeks <br />2.1308e-5 months <br />) is satisfied. (NUREG 1021, Revision 9)

DATE SHIFT LENGTH UNIT POSITION SM LOG SIGNATURE OF (circle one) LICENSE HOLDER ONE Logged 10/12/16 D (or 2) 12 1 FHS SM US RO Y/N Examinee Signature TWO Logged 10/13/16 D (or 2) 12 1 FHS SM US RO Y/N Examinee Signature THREE 10/14/16 D (or 2) 12 1 FHS SM US RO Logged Examinee Signature Y/N FOUR Logged 10/23/16 3 8 1 FHS SM US RO Y/N Examinee Signature FIVE Logged 10/24/16 3 8 1 FHS SM US RO Y/N Examinee Signature SIX* Logged FHS SM US RO Y/N SEVEN* Logged FHS SM US RO Y/N

________________________/_____

Operations Support Manager Date KEY

  • JPM Step 2 Reviews requirements to maintain an active license.

Page 8 of 11

JPM Number: JPM484 - Rev 00 Clinton Power Station Job Performance Measure (JPM)

Standard: Examinee determines that he/she does NOT have the minimum number of hours required to maintain their license in an active status past 12/31/16.

Cue: Question 1 - Ask the candidate if he/she can stand watch on 1/2/17.

Question 2 (if necessary) - What must you do (as a minimum) to stand watch on 1/2/17?

Comments SAT £ UNSAT £ Comment Number

  • JPM Step 3 Determines the requirements to maintain their license active past 12/31/16.

Standard: Examinee determines that a minimum of one more complete eight hour or twelve hour watch is needed to maintain their license active past 12/31/16.

Cue: When the student has completed OP-AA-105-102 Attachment 1 Active License Tracking Log and determined eligibility to stand watch on 1/2/17 state that the JPM is complete.

Comments SAT £ UNSAT £ Comment Number TERMINATING CUES:

The JPM is complete when the student has completed OP-AA-105-102 Attachment 1 Active License Tracking Log and determined eligibility to stand watch on 1/2/17.

STOP TIME:

Page 9 of 11

JPM Number: JPM484 - Rev 00 Clinton Power Station Job Performance Measure (JPM)

Operators Name:

Job

Title:

£ EO £ RO £ SRO £ STA £ SRO Cert JPM

Title:

Evaluate License Maintenance Requirements JPM Number: JPM484 Revision Number: 00 Task Number and

Title:

LP85801.2.1.4 Knowledge of individual licensed operator responsibilities related to shift staffing, such as medical requirements, no solo operation, maintenance of active license status, 10CFR55, etc.

K/A System K/A Number Importance (RO/SRO)

Generic 2.1.4 3.3 3.8 Knowledge of individual licensed operator responsibilities related to shift staffing, such as medical requirements, no solo operation, maintenance of active license status, 10CFR55, etc.

Suggested Testing Environment: Classroom Actual Testing Environment: £ Simulator £ Plant £ Control Room Testing Method: £ Simulate Alternate Path: £ Yes ¢ No

¢ Perform SRO Only: £ Yes ¢ No Time Critical: £ Yes ¢ No Estimated Time to Complete: 15 minutes Actual Time Used: minutes

References:

SUMMARY

Were all the Critical Elements performed satisfactorily? £ Yes £ No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: £ Satisfactory £ Unsatisfactory Comments:

Evaluators Name: (Print)

Evaluators Signature: Date:

SRRS: 3D.105 (when utilized for operator initial or continuing training) Page 10 of 11

Clinton Power Station Job Performance Measure (JPM)

INITIAL CONDITIONS:

You are a Reactor Operator with an active NRC license.

Today is 12/23/16.

You are currently assigned to relieve the A RO on 1/2/17.

During the current quarter (4th quarter of 2016) you worked a mixed shift schedule consisting of the following:

  • You stood three complete 12-hour day shift watches as the A RO on October 12th, 13th, and 14th.
  • You stood two 8-hour swing shift watches as the B RO on October 23rd and 24th.
  • You split 8-hour day shifts working 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> as the B RO and the remaining 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> as a clearance writer on October 1st, 2nd, 8th, 9th, 15th, 16th, 22nd, 27th, 29th, and 30th.
  • You split two 12-hour midnight shifts, working six hours as the A RO and the other six hours as a clearance writer during the outage on November 10th and 11th.
  • The remaining days in the 4th quarter of 2016 were spent as a clearance writer (Monday through Friday).
  • All shifts covered were entered in the Narrative log.

INITIATING CUE:

CAUTION

§ All pre-job briefings are completed.

§ Do NOT shine any type light into a panel.

You are to document your shift coverage for the 4th quarter of 2016 on OP-AA-105-102 Attachment 1 Active License Tracking Log, and determine your ability to assume shift for 1/2/17.

Page 11 of 11

CLINTON POWER STATION Job Performance Measure Print Reading - Determine Isolation Boundaries and Depressurize 1B21-F022A Accumulator JPM Number: JPM526 Revision Number: 01 Date: 8/26/16 Developed By: T. Jennings 8/26/16 Instructor Date Validated By: Michael Antonelli 10/26/16 SME or Instructor Date Reviewed By: Jim Lucas 11/15/16 Operations Representative Date Approved By: T. Jennings 11/15/16 Training Department Date JPM526 R1 RO Admin JPM 3.docx Retain approved Master Copy per SRRS 3D.126/3D.111

JPM Number: JPM526 - rev 01 Clinton Power Station Job Performance Measure (JPM)

JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.

Prior to JPM usage, revalidate JPM using steps 8 and 12 below.

________ 1. Task description and number, JPM description and number are identified.

________ 2. Knowledge and Abilities (K/A) references are included.

________ 3. Performance location specified. (in-plant, control room, simulator, or other)

________ 4. Initial setup conditions are identified.

________ 5. Initiating cue (and terminating cue if required) are properly identified.

________ 6. Task standards identified and verified by SME review.

________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk

(*).

________ 8. Verify the procedure(s) referenced by this JPM reflects the current revision:

Procedure Rev:

Procedure Rev:

Procedure Rev:

________ 9. Verify cues both verbal and visual are free of conflict.

________ 10. Verify performance time is accurate

________ 11. If the JPM cannot be performed as written with proper responses, then revise the JPM.

________ 12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:

SME / Instructor Date SME / Instructor Date SME / Instructor Date Page 2 of 12

JPM Number: JPM526 - rev 01 Clinton Power Station Job Performance Measure (JPM)

Revision Record (Summary)

Revision Date Description 00 6/16/14 New JPM.

01 8/26/16 Corrected typographical error on page 5 and added revision numbers to the procedure references used for the JPM.

Page 3 of 12

JPM Number: JPM526 - rev 01 Clinton Power Station Job Performance Measure (JPM)

Simulator Setup Instructions

1. This is a RO Admin JPM and requires no simulator setup.

Page 4 of 12

JPM Number: JPM526 - rev 01 Clinton Power Station Job Performance Measure (JPM)

READ TO THE OPERATOR I will explain the initial conditions, which step(s) to simulate or discuss, and provide the initiating cues. When you complete the task successfully, the objective of this Job Performance Measure will be satisfied.

TASK STANDARDS:

  • The examinee determines isolation boundaries and depressurizes 1B21A001A Inboard MSIV 1B21-F022A accumulator using station mechanical drawings.

TOOLS, EQUIPMENT, OTHER SPECIAL REQUIREMENTS:

  • None PROCEDURAL/

REFERENCES:

  • M10-9002-5 Rev. D
  • M05-1040-14 Rev. AB EVALUATOR INSTRUCTIONS:
  • Amplifying cues are provided within the JPM steps.
  • All pre-job briefings are completed.
  • Administer this JPM in a location with access to station drawings and a computer (if requested).

Page 5 of 12

JPM Number: JPM526 - rev 01 Clinton Power Station Job Performance Measure (JPM)

INITIAL CONDITIONS:

The station is in a refueling outage.

All Inboard and Outboard Main Steam Line Isolation Valve hand switches are in the CLOSED position.

INITIATING CUE:

CAUTION

§ All pre-job briefings are completed.

You are an extra RO.

The CRS has requested that you determine which valves are required to:

1) isolate air to accumulator 1B21-A001A (1B21-F022A Inbd MSIV Air Accumulator), and
2) depressurize accumulator 1B21-A001A Report to the CRS after completing the task.

START TIME:

Page 6 of 12

JPM Number: JPM526 - rev 01 Clinton Power Station Job Performance Measure (JPM)

PERFORMANCE INFORMATION Critical steps are denoted with an asterisk (*) to the left of the step number and appear in BOLDED letters. Failure to meet the standards for a critical step constitutes failure of the Job Performance Measure. The sequence of steps is assumed unless denoted in the comments section of the JPM.

PERFORMANCE STEPS M10-9002-5 Evaluator Note - JPM steps 2-5 can be performed in any order.

Standard: The examinee can determine the correct print by using one of the following methods:

  • Passport equipment search
  • ESOMs equipment database
  • M05-1000 P&ID Index Cue:

Comments SAT £ UNSAT £ Comment Number Page 7 of 12

JPM Number: JPM526 - rev 01 Clinton Power Station Job Performance Measure (JPM)

Standard: Examinee determines that the IA supply line to accumulator 1B21-A001A is located on M05-1040 Sheet 14, and then determines that 1IA077A is the isolation valve for line 1IA80AA 1/2.

Cue:

Comments JPM steps 2 - 5 can be performed in any order.

SAT £ UNSAT £ Comment Number

Standard: Examinee determines that V3 is the accumulator drain and uses the table at the top of M10-9002-5 to determine that V3 for 1B21-A001A is 1B21-F083A.

Cue:

Comments JPM steps 2 - 5 can be performed in any order.

SAT £ UNSAT £ Comment Number Page 8 of 12

JPM Number: JPM526 - rev 01 Clinton Power Station Job Performance Measure (JPM) 4 Determines that opening V2 (1IA092A) will depressurize the air supply header upstream of accumulator 1B21-A001A.

Standard: Examinee determines that V2 is a drain that taps off of the IA supply line to 1B21-A001A upstream of check valve 1B21-F024A and determines that opening the valve will depressurize the IA supply line (but not the accumulator).

Cue:

Comments This is an optional step added in the event that the examinee determines that opening 1IA092A is appropriate in depressurizing the IA supply header upstream of check valve 1B21-F024A.

It is NOT a competency hit if the examinee includes or excludes 1IA092A in his/her answer. It would be a failure of a critical step, however, if the examinee determines that solely opening 1IA092A will depressurize accumulator 1B21-A001A and does not include 1B21-F083A in his/her answer.

JPM steps 2 - 5 can be performed in any order.

SAT £ UNSAT £ Comment Number Page 9 of 12

JPM Number: JPM526 - rev 01 Clinton Power Station Job Performance Measure (JPM) 5 Determines that closing 1IA078A will depressurize the actuator air supply header for 1B21-F022A.

Standard: Examinee determines that 1IA078A is the actuator air supply isolation valve supplying air to the actuator solenoids for 1B21-F022A.

Cue:

Comments This is an optional step added in the event that the examinee determines that closing 1IA078A is needed to isolate all air sources from 1B21-A001A.

With the MSIV control switch in the CLOSE position (provided in the initiating cue), actuator air via 1IA078A is isolated from 1B21-A001A by the A and B operating solenoids. It is NOT a competency hit if the examinee includes or excludes 1IA078A in his/her answer. It would be a failure of a critical step however, if the examinee determines that solely closing 1IA078A will isolate air to accumulator 1B21-A001A and does not include 1IA077A in his/her answer.

JPM steps 2 - 5 can be performed in any order.

SAT £ UNSAT £ Comment Number TERMINATING CUES:

The examinee has identified the IA isolation and drain valve for accumulator 1B21A001A using station mechanical drawings.

STOP TIME:

Page 10 of 12

JPM Number: JPM526 - rev 01 Clinton Power Station Job Performance Measure (JPM)

Operators Name:

Job

Title:

£ EO £ RO £ SRO £ STA £ SRO Cert JPM

Title:

Print Reading - Determine Isolation Boundaries and Depressurize 1B21-F022A Accumulator JPM Number: JPM526 Revision Number: 00 Task Number and

Title:

0.13L Read Mechanical and Electrical Prints K/A System K/A Number Importance (RO/SRO)

NA 2.2.41 3.5 3.9 Suggested Testing Environment: Simulator or Classroom Actual Testing Environment: ¢ Simulator £ Plant £ Control Room Testing Method: £ Simulate Alternate Path: £ Yes ¢ No

¢ Perform SRO Only: £ Yes ¢ No Time Critical: £ Yes ¢ No Estimated Time to Complete: 20 minutes Actual Time Used: minutes

References:

M10-9002-5, M05-1040-14 EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? £ Yes £ No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: £ Satisfactory £ Unsatisfactory Comments:

Evaluators Name: (Print)

Evaluators Signature: Date:

SRRS: 3D.105 (when utilized for operator initial or continuing training) Page 11 of 12

Clinton Power Station Job Performance Measure (JPM)

INITIAL CONDITIONS:

The station is in a refueling outage.

All Inboard and Outboard Main Steam Line Isolation Valve hand switches are in the CLOSED position.

INITIATING CUE:

CAUTION

§ All pre-job briefings are completed.

You are an extra RO.

The CRS has requested that you determine which valves are required to:

1) isolate air to accumulator 1B21-A001A (1B21-F022A Inbd MSIV Air Accumulator), and
2) depressurize accumulator 1B21-A001A Report to the CRS after completing the task.

Page 12 of 12

CLINTON POWER STATION Job Performance Measure Use CPS RP On-Line To Determine Radiological Requirements JPM Number: JPM532 Revision Number: 01 Date: 8/29/16 Developed By: T. Jennings 8/29/16 Instructor Date Validated By: Michael Antonelli 10/26/16 SME or Instructor Date Reviewed By: Jim Lucas 11/15/16 Operations Representative Date Approved By: T. Jennings 11/15/16 Training Department Date Retain approved Master Copy per SRRS 3D.126/3D.111 JPM532_R1 CE Approval Copy

JPM Number: JPM532 - rev 01 Clinton Power Station Job Performance Measure (JPM)

JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.

Prior to JPM usage, revalidate JPM using steps 8 and 12 below.

________ 1. Task description and number, JPM description and number are identified.

________ 2. Knowledge and Abilities (K/A) references are included.

________ 3. Performance location specified. (in-plant, control room, simulator, or other)

________ 4. Initial setup conditions are identified.

________ 5. Initiating cue (and terminating cue if required) are properly identified.

________ 6. Task standards identified and verified by SME review.

________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk

(*).

________ 8. Verify the procedure(s) referenced by this JPM reflects the current revision:

Procedure RP-AA-210 Rev: 26 Procedure RP-AA-376 Rev: 9 Procedure RP-AA-403 Rev: 8 Procedure RP-AA-460 Rev: 28

________ 9. Verify cues both verbal and visual are free of conflict.

________ 10. Verify performance time is accurate

________ 11. If the JPM cannot be performed as written with proper responses, then revise the JPM.

________ 12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:

SME / Instructor Date SME / Instructor Date SME / Instructor Date Page 2 of 14

JPM Number: JPM532 - rev 01 Clinton Power Station Job Performance Measure (JPM)

Revision Record (Summary)

Revision Date Description 00 10/7/14 New JPM.

01 8/29/16 Updated procedure revisions and made editorial changes throughout.

Page 3 of 14

JPM Number: JPM532 - rev 01 Clinton Power Station Job Performance Measure (JPM)

Simulator Setup Instructions

1. There are no simulator setup instructions for this JPM.

Page 4 of 14

JPM Number: JPM532 - rev 01 Clinton Power Station Job Performance Measure (JPM)

READ TO THE OPERATOR I will explain the initial conditions, which step(s) to simulate or discuss, and provide the initiating cues. When you complete the task successfully, the objective of this Job Performance Measure will be satisfied.

TASK STANDARDS:

  • Given a specific location in a Radiological Controlled Area (RCA), demonstrate the ability to obtain survey data and determine highest dose rate.
  • Given a Radiological Work Permit (RWP), determine the RWP requirements for entering a specific location in an RCA.

TOOLS, EQUIPMENT, OTHER SPECIAL REQUIREMENTS:

  • None PROCEDURAL/

REFERENCES:

  • RP-AA-210, Rev. 26 DOSIMETRY ISSUE, USAGE, AND CONTROL
  • RP-AA-376, REV. 9 RADIOLOGICAL POSTINGS, LABELING, AND MARKINGS
  • RP-AA-403, Rev. 8 ADMINISTRATION OF THE RADIATION WORK PERMIT PROGRAM
  • Amplifying cues are provided within the JPM steps.
  • All pre-job briefings are completed.
  • This JPM can be performed in a classroom or other suitable setting that has access to a computer with LAN access. CPS RP On-Line Main Screen will be displayed.
  • This JPM contains 2 attachments (RWP and Survey Map) in addition to the Initial Conditions and Initiating Cue page (last) page of the JPM. Do NOT provide the examinee with these attachments until prompted to do so.
  • Provide the examinee with a copy of the Initial Conditions and Initiating Cue page (back page of the JPM) when providing the initiating cue.

Page 5 of 14

JPM Number: JPM532 - rev 01 Clinton Power Station Job Performance Measure (JPM)

INITIAL CONDITIONS:

It is 12/3/16.

The plant is operating at rated thermal power.

Annunciator 5130-6E O.G. Analyzer A Trouble Chk Status Lights has just been received on the A OG Hydrogen Analyzer at 1H13-P845 Off Gas Control Panel.

INITIATING CUE:

CAUTION All pre-job briefings are completed.

Retrieve and review the latest periodic survey data for the A OG Hydrogen Analyzer using CPS RP On-Line in preparation for entering the A OG Hydrogen Analyzer room to investigate the trouble alarm.

Determine requirements for entry and dose levels.

START TIME:

Page 6 of 14

JPM Number: JPM532 - rev 01 Clinton Power Station Job Performance Measure (JPM)

PERFORMANCE INFORMATION Critical steps are denoted with an asterisk (*) to the left of the step number and appear in BOLDED letters. Failure to meet the standards for a critical step constitutes failure of the Job Performance Measure. The sequence of steps is assumed unless denoted in the comments section of the JPM.

PERFORMANCE STEPS RP-AA-403 Administration of the Radiation Work Permit Program RP-AA-460 Controls for High and Locked High Radiation Areas RP-AA-1008 Unescorted Access To And Conduct In Radiologically Controlled Areas

  • 1 Examinee retrieves the latest periodic survey data for the A OG Hydrogen Analyzer using the CPS RP On-Line computer program.

Standard:

  • Examinee clicks on the box labeled Turbine Building.
  • Examinee clicks on the box labeled 800.
  • Examinee clicks the link for the latest periodic Pre-Treatment A/E PRM survey (in the Survey column).

Cue: 1. When the examinee has retrieved the survey sheet in CPS RP On-Line, provide the examinee with Attachment 2 - Survey Map and then close the CPS RP On-Line program.

2. Ask the examinee to determine the highest dose rate in the walking path to the OG Hydrogen Analyzers.

Comments

  • If the examinee chooses an incorrect survey map, and recognizes his/her mistake and subsequently chooses the correct survey map, allow him/her to continue performing the JPM.
  • If the examinee cannot locate the correct survey map, state the JPM is complete and grade the JPM as unsat.
  • When the examinee clicks the link for the latest Pre-Treatment A/E PRM survey, a PDF document of the survey sheet for the room will open.

SAT UNSAT Comment Number Page 7 of 14

JPM Number: JPM532 - rev 01 Clinton Power Station Job Performance Measure (JPM)

  • 2 Examinee determines the highest dose rate in the walking path to the A OG Hydrogen Analyzer Room.

Standard: Identifies the intended location on the map and determines the highest dose rate in the walking path to the A OG Hydrogen Analyzer is 2.2 mr/hr.

Cue: Ask the examinee to identify the location of the highest dose rate in the TB 805 EL. Pre-Treatment A/E PRM Room.

Comments The OG analyzers are indicated on the RWP Survey Map as the two boxes annotated with (A) and (B).

The contamination levels in the room are all less than 1,000 dpm/100cm2; no contaminated area posting is required.

SAT UNSAT Comment Number

  • 3 Examinee determines the location of the area containing the highest dose rate in the TB 805 EL. Pre-Treatment A/E PRM Room.

Standard: Examinee reviews the survey map and determines the highest dose rate is on a component in the HRA area by the A/E PRM (annotated by *1500/260).

Cue: Ask the examinee to identify the RWP requirements for entering the area with the highest dose rate.

Comments SAT UNSAT Comment Number Page 8 of 14

JPM Number: JPM532 - rev 01 Clinton Power Station Job Performance Measure (JPM)

  • 4 Examinee determines the RWP requirements for entering the HRA area.

Standard: Examinee determines that entry into the HRA area requires a specific HRA briefing.

Cue: JPM is complete.

Comments SAT UNSAT Comment Number TERMINATING CUES:

The examinee has demonstrated the proper method to enter a specific location in a Radiological Controlled Area (RCA).

STOP TIME:

Page 9 of 14

FOR TRAINING USE ONLY Operators Name:

Job

Title:

EO RO SRO STA SRO Cert JPM

Title:

Use CPS RP On-Line To Determine Radiological Requirements JPM Number: JPM532 Revision Number: 00 Task Number and

Title:

102405.01 Apply the administrative requirements of ALARA program K/A System K/A Number Importance (RO/SRO)

Generic 2.3.7 3.5 3.6 Ability to comply with radiation work permit requirements during normal or abnormal conditions.

Suggested Testing Environment: Classroom/Simulator Actual Testing Environment: Simulator Plant Control Room Testing Method: Simulate Alternate Path: Yes No Perform SRO Only: Yes No Time Critical: Yes No Estimated Time to Complete: 20 minutes Actual Time Used: minutes

References:

  • RP-AA-210, Rev. 26 Dosimetry Issue, Usage, and Control
  • RP-AA-376, Rev. 9 Radiological Postings, Labeling, and Markings
  • RP-AA-403, Rev. 8 Administration of the Radiation Work Permit Program

SUMMARY

Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: Satisfactory Unsatisfactory Comments:

Evaluators Name: (Print)

Evaluators Signature: Date:

Page 10 of 14

FOR TRAINING USE ONLY Attachment 1 - Radiation Work Permit (RWP)

Clinton Power Station Radiation Work Permit RWP#: 10010001 Rev: 0 Worker Information RWP

Description:

2016 Operations Department Generic Unit: Building: Elevation: Location:

1 All All Various Equipment: Various RWP Dose Approval: 25 mrem ED Dose Alarm: 20 mrem Dose Rate Alarm: 200 mrem/hr Exposure Monitoring Requirements Respiratory Protection Required DLR and Electronic Dosimeter Radiation Protection shall evaluate for engineering control and respiratory protection per RP-AA-401.

Teledosimetry may be used in lieu of standard ED.

ED setpoints may be raised IAW RP-AA-403 based upon current survey data in the work location.

Special Instructions Protective Clothing Requirements This RWP allows High Radiation Area access: A specific Protective Clothing ( 100,000 dpm/100 cm2)

HRA briefing is required to enter.

Coveralls, Hardhat cover, cotton liners, 1 pair rubber No LHRA access permitted on this RWP. gloves, rubber shoe covers and booties Electronic Dosimeters should be checked at approximately 15 minute intervals or more often in higher radiation areas. Protective Clothing (< 10,000 dpm/100 cm2)

RP APPROVAL REQUIRED Radiation Worker Pocket Data Sheet Trip Ticket will be used by each individual for each entry. Modesty garments, rubber shoe covers and booties, cotton liners, 1 pair rubber gloves Verify with RP that your work area has been surveyed AND that the ED dose rate alarm and dose alarm setpoints are Company modesty garments shall be worn under PCs.

adequate. If dose rates and/or contamination levels and/or dosimetry placement (when applicable) are not known for current plant status, an RPT may survey the area prior to start of work.

Contact RP prior to accessing areas above 7 ft.

NO work to be done in pools of water on this RWP, ie 755 Fuel/828&737 CT and suppression pool.

Stop Work Limits:

1. GA dose rates =/> 200 mr/hr
2. GA contamination levels =/> 100K dpm/100cm2
3. Airborne radioactivity =/> 0.3 DAC Page 11 of 14

FOR TRAINING USE ONLY Attachment 1 (contd) - Radiation Work Permit (RWP)

Clinton Power Station Radiation Work Permit RWP#: 10010001 Rev: 0 Radiation Protection Information Survey Frequency Requirements: Shielding Recommended:

Radiation : R None Contamination: R Temporary Airborne: R Permanent Pre-Job Briefing Notes:

RPT Coverage / Comments:

Initial Intermittent Continuous RP Supervisor ALARA Review By Prepared By Terminated By J. Smith 1/1/2016 Job Supervisor Page 12 of 14

FOR TRAINING USE ONLY Attachment 2 - Survey Map 12-01-16 12/1/16 12/31/16 12/31/16 12/1/16 Page 13 of 14

INITIAL CONDITIONS:

It is 12/3/16.

The plant is operating at rated thermal power.

Annunciator 5130-6E O.G. Analyzer A Trouble Chk Status Lights has just been received on the A OG Hydrogen Analyzer at 1H13-P845 Off Gas Control Panel.

INITIATING CUE:

CAUTION All pre-job briefings are completed.

Retrieve and review the latest survey data for the A OG Hydrogen Analyzer using CPS RP On-Line in preparation for entering the A OG Hydrogen Analyzer room to investigate the trouble alarm.

Determine requirements for entry and dose levels.

Page 14 of 14

CLINTON POWER STATION Job Performance Measure Review Surveillance 9820.01 Power Distribution Limits JPM Number: JPM425 Revision Number: 02 Date: 8/23/16 Developed By: T. Jennings 8/23/16 Instructor Date Validated By: Matt Baker 10/26/16 SME or Instructor Date Reviewed By: Jim Lucas 11/15/16 Operations Representative Date Approved By: T. Jennings 11/15/16 Training Department Date JPM425 R2 SRO Admin JPM 1.docx Retain approved Master Copy per SRRS 3D.126/3D.111

JPM Number: JPM425 - Rev 02 Clinton Power Station Job Performance Measure (JPM)

JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.

Prior to JPM usage, revalidate JPM using steps 8 and 12 below.

________ 1. Task description and number, JPM description and number are identified.

________ 2. Knowledge and Abilities (K/A) references are included.

________ 3. Performance location specified. (in-plant, control room, simulator, or other)

________ 4. Initial setup conditions are identified.

________ 5. Initiating cue (and terminating cue if required) are properly identified.

________ 6. Task standards identified and verified by SME review.

________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk

(*).

________ 8. Verify the procedure(s) referenced by this JPM reflects the current revision:

Procedure CPS 9820.01 Rev: 34 Procedure CPS 9820.01D001 Rev: 32e Procedure Rev:

________ 9. Verify cues both verbal and visual are free of conflict.

________ 10. Verify performance time is accurate

________ 11. If the JPM cannot be performed as written with proper responses, then revise the JPM.

________ 12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:

SME / Instructor Date SME / Instructor Date SME / Instructor Date Page 2 of 11

JPM Number: JPM425 - Rev 02 Clinton Power Station Job Performance Measure (JPM)

Revision Record (Summary)

Revision Date Description 00 7/26/10 New JPM number and updated revisions (10110001SAF01) 01 06/14/13 Converted to new template 02 8/23/16 Updated procedure references.

Page 3 of 11

JPM Number: JPM425 - Rev 02 Clinton Power Station Job Performance Measure (JPM)

Simulator Setup Instructions

1. This JPM can be performed in a classroom or other secure area with the 3D cases generated per step 2.
2. The following can be used as necessary to recreate the 3D Case printouts with out of spec MFLCPR and MFLPD:
a. Initialize to a full power IC.
b. Insert Malfunction M3D_FLCPR_V_10 to a final value of 1.012 to raise MFLCPR for fuel assembly 21-18 to a value greater than 1.0.
c. Insert Malfunction M3D_FLPD_V_2 to a final value of 1.083 to raise MFLPD for fuel assembly 23-32 to a value greater than 1.0.
d. Print out a 3D case.
e. Verify MFLCPR and MFLPD are > 1.0.
3. Freeze Simulator.
4. Markup a copy of 9820.01D001 Power Distribution Limits Data Sheet to match the attached example.
5. Attach the 3D Monicore Case to the copy of 9820.01D001.

Page 4 of 11

JPM Number: JPM425 - Rev 02 Clinton Power Station Job Performance Measure (JPM)

READ TO THE OPERATOR I will explain the initial conditions, which step(s) to simulate or discuss, and provide the initiating cues. When you complete the task successfully, the objective of this Job Performance Measure will be satisfied.

TASK STANDARDS:

  • The CRS review finds the two mistakes on the datasheet showing all thermal limits are in specification which is in conflict with the 3D Monicore Case showing a bundle with a MFLCPR and MFLPD of greater than one.
  • CPS No. 9820.01 Power Distribution Limits, Revision 34.
  • CPS No. 9820.01D001 Power Distribution Limits Data Sheet, Revision 32e.

TOOLS, EQUIPMENT, OTHER SPECIAL REQUIREMENTS:

  • None PROCEDURAL/

REFERENCES:

  • CPS No. 9820.01 Power Distribution Limits, Revision 34.
  • CPS No. 9820.01D001 Power Distribution Limits Data Sheet, Revision 32e.
  • Amplifying cues are provided within the JPM steps.
  • Provide the examinee with a copy of the Initial Conditions and Initiating Cue page (back page of the JPM) when providing the initiating cue.
  • When the initiating cue is read, provide the student with:

o CPS 9820.01 Power Distribution Limits o Marked up copy of 9820.01D001 with the attached 3D Monicore Printout.

  • All pre-job briefings are completed.

Page 5 of 11

JPM Number: JPM425 - Rev 02 Clinton Power Station Job Performance Measure (JPM)

INITIAL CONDITIONS:

The unit is at full power. A rod shuffle was completed one hour ago. The B RO has just completed 9820.01 Power Distribution Limits surveillance.

INITIATING CUE:

CAUTION

§ All pre-job briefings are completed.

§ Do NOT shine any type light into a panel.

1. You are the CRS. Review the completed surveillance data sheet, CPS No. 9820.01D001, Power Distribution Limits Data Sheet.
2. Take any required actions.

The evaluator will act as all other crew members.

START TIME:

Page 6 of 11

JPM Number: JPM425 - Rev 02 Clinton Power Station Job Performance Measure (JPM)

PERFORMANCE INFORMATION Critical steps are denoted with an asterisk (*) to the left of the step number and appear in BOLDED letters. Failure to meet the standards for a critical step constitutes failure of the Job Performance Measure. The sequence of steps is assumed unless denoted in the comments section of the JPM.

PERFORMANCE STEPS 9820.01D001 Power Distribution Limits Data Sheet

  • JPM Step 1 The examinee reviews the completed datasheet and notes that step 8.3 was 8.3 incorrectly marked indicating MFLCPR was less than 0.98 when the 3D Monicore case shows a bundle with MFLCPR is greater than 1.00.

Standard: CRS determines that the data sheet was not correctly filled out and MFLCPR is out of specification.

Cue:

Comments SAT £ UNSAT £ Comment Number 9820.01D001 Power Distribution Limits Data Sheet

  • JPM Step 2 The examinee reviews the completed datasheet and notes that step 8.4 was 8.4 incorrectly marked indicating MFLPD was less than 0.98 when the 3D Monicore case shows a bundle with MFLPD is greater than 1.00.

Standard: CRS determines that the data sheet was not correctly filled out and MFLPD is out of specification.

Cue:

Comments SAT £ UNSAT £ Comment Number Page 7 of 11

JPM Number: JPM425 - Rev 02 Clinton Power Station Job Performance Measure (JPM)

  • JPM Step 3 Technical Specifications - Minimum Critical Power Ratio (MCPR)

3.2.2 Standard

The examinee reviews Technical Specifications and enters Action 3.2.2 A.1 -

Restore MCPR to within limits within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />.

Cue:

Comments SAT £ UNSAT £ Comment Number

  • JPM Step 4 Technical Specifications - Linear Heat Generation Rate (LHGR)

3.2.3 Standard

The examinee reviews Technical Specifications and enters Action 3.2.3 A.1 -

Restore LHGR to within limits within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />.

Cue:

Comments SAT £ UNSAT £ Comment Number Page 8 of 11

JPM Number: JPM425 - Rev 02 Clinton Power Station Job Performance Measure (JPM)

JPM Step 5 Examinee contacts RE for instructions to restore MFLCPR and MFLPD to within limits within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />.

Standard: Examinee contacts the RE for instructions.

Cue: If the examinee consults with the RE, tell him/her that the REs are determining an appropriate course of action to restore MFLCPR and MFLPD to within limits.

Comments If the examinee requires a new 3D case, cue him/her that values are identical to the case used for the surveillance.

SAT £ UNSAT £ Comment Number JPM Step 6 Examinee notifies the Shift Manager that MFLCPR and MFLPD are outside Technical Specification Limits.

Standard: Examinee notifies the Shift Manager that the ITS limits for MCPR and LHGR have been exceeded and that ITS LCO 3.2.2 A.1 and 3.2.3 A.1 have been entered.

Cue: Acknowledge report from the examinee.

Comments SAT £ UNSAT £ Comment Number TERMINATING CUES:

The JPM is complete when the student has determined that the MFLCPR and MFLPD limit has been exceeded and determines the appropriate Technical Specification actions that are required.

STOP TIME:

Page 9 of 11

JPM Number: JPM425 - Rev 02 Clinton Power Station Job Performance Measure (JPM)

Operators Name:

Job

Title:

£ EO £ RO £ SRO £ STA £ SRO Cert JPM

Title:

Review Surveillance 9820.01 Power Distribution Limits JPM Number: JPM425 Revision Number: 01 Task Number and

Title:

(101100.01) Apply the administrative requirements of SURVEILLANCE TESTING PROGRAM K/A System K/A Number Importance (RO/SRO)

Generic 2.1.7 N/A 4.7 Ability to evaluate plant performance and make operational judgments based on operating characteristics, reactor behavior, and instrument interpretation.

Suggested Testing Environment: Simulator Actual Testing Environment: £ Simulator £ Plant £ Control Room Testing Method: £ Simulate Alternate Path: £ Yes ¢ No

¢ Perform SRO Only: ¢ Yes £ No Time Critical: £ Yes ¢ No Estimated Time to Complete: 10 minutes Actual Time Used: minutes

References:

CPS No. 9820.01 Power Distribution Limits, Revision 34.

CPS No. 9820.01D001 Power Distribution Limits Data Sheet, Revision 32e.

EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? £ Yes £ No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: £ Satisfactory £ Unsatisfactory Comments:

Evaluators Name: (Print)

Evaluators Signature: Date:

SRRS: 3D.105 (when utilized for operator initial or continuing training) Page 10 of 11

Clinton Power Station Job Performance Measure (JPM)

INITIAL CONDITIONS:

The unit is at full power. A rod shuffle was completed one hour ago. The B RO has just completed 9820.01 Power Distribution Limits surveillance.

INITIATING CUE:

CAUTION

§ All pre-job briefings are completed.

§ Do NOT shine any type light into a panel.

1. You are the CRS. Review the completed surveillance data sheet, CPS No. 9820.01D001, Power Distribution Limits Data Sheet.
2. Take any required actions.

The evaluator will act as all other crew members.

Page 11 of 11

CLINTON POWER STATION Job Performance Measure Evaluation of Work Hours IAW 10CFR26 JPM Number: JPM483 Revision Number: 00 Date: 8/24/16 Developed By: T. Jennings 8/24/16 Instructor Date Validated By: Matt Baker 10/26/16 SME or Instructor Date Reviewed By: Jim Lucas 11/15/16 Operations Representative Date Approved By: T. Jennings 11/15/16 Training Department Date JPM483 R0 SRO Admin JPM 2.docx Retain approved Master Copy per SRRS 3D.126/3D.111

JPM Number: JPM483 - rev 00 Clinton Power Station Job Performance Measure (JPM)

JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.

Prior to JPM usage, revalidate JPM using steps 8 and 12 below.

________ 1. Task description and number, JPM description and number are identified.

________ 2. Knowledge and Abilities (K/A) references are included.

________ 3. Performance location specified. (in-plant, control room, simulator, or other)

________ 4. Initial setup conditions are identified.

________ 5. Initiating cue (and terminating cue if required) are properly identified.

________ 6. Task standards identified and verified by SME review.

________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk

(*).

________ 8. Verify the procedure(s) referenced by this JPM reflects the current revision:

Procedure LS-AA-119________ Rev: 12 Procedure Rev:

Procedure Rev:

________ 9. Verify cues both verbal and visual are free of conflict.

________ 10. Verify performance time is accurate

________ 11. If the JPM cannot be performed as written with proper responses, then revise the JPM.

________ 12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:

SME / Instructor Date SME / Instructor Date SME / Instructor Date Page 2 of 9

JPM Number: JPM483 - rev 00 Clinton Power Station Job Performance Measure (JPM)

Revision Record (Summary)

Revision Date Description 00 8/24/16 New JPM.

Page 3 of 9

JPM Number: JPM483 - rev 00 Clinton Power Station Job Performance Measure (JPM)

READ TO THE OPERATOR I will explain the initial conditions, which step(s) to simulate or discuss, and provide the initiating cues. When you complete the task successfully, the objective of this Job Performance Measure will be satisfied.

TASK STANDARDS:

  • Examinee determines that LS-AA-119 work hour limits will be exceeded and reports findings to the Shift Manager.

TOOLS, EQUIPMENT, OTHER SPECIAL REQUIREMENTS:

  • None PROCEDURAL/

REFERENCES:

  • LS-AA-119 Rev. 12 Fatigue Management and Work Hour Limits EVALUATOR INSTRUCTIONS:
  • Amplifying cues are provided within the JPM steps.
  • All pre-job briefings are completed.
  • Provide the examinee with a copy of the Initial Conditions and Initiating Cue page (back page of the JPM) when providing the initiating cue.
  • Provide the examinee with the following items when requested:

o LS-AA-119 Fatigue Management and Work Hour Limits Page 4 of 9

JPM Number: JPM483 - rev 00 Clinton Power Station Job Performance Measure (JPM)

INITIAL CONDITIONS:

The plant is in Mode 1.

INITIATING CUE:

CAUTION

§ All pre-job briefings are completed.

You are a Shift Supervisor on an operating crew.

Review the proposed work schedule for the upcoming six weeks and determine if the requirements of LS-AA-119 Fatigue Management and Work Hour Limits will be met if implemented as written and report results to the Shift Manager.

SUN MON TUE WED THU FRI SAT Week 1 X D D D X X X Week 2 X X X D D D D Week 3 D R D X X N N Week 4 N N X R R R X Week 5 X X N N N X X Week 6 X T T T T T N X = Day Off D = 12 Hour Day N = 12 Hour Night (Starts at 1900 on previous day)

R = 8 Hour Relief Shift T = 8 Hour Training Day START TIME:

Page 5 of 9

JPM Number: JPM483 - rev 00 Clinton Power Station Job Performance Measure (JPM)

PERFORMANCE INFORMATION Critical steps are denoted with an asterisk (*) to the left of the step number and appear in BOLDED letters. Failure to meet the standards for a critical step constitutes failure of the Job Performance Measure. The sequence of steps is assumed unless denoted in the comments section of the JPM.

PERFORMANCE STEPS LS-AA-119 Fatigue Management and Work Hour Limits Comment SAT UNSAT STEP ELEMENT STANDARD Number Determines 10 CFR 26 Work Locates and reviews LS-AA-119 section 1

Hour Limits. 5.1.1 10CFR26 Work Hour Limits.

2 Reviews Week 1 of the proposed 5.1.1 schedule. Determines that the scheduled hours will not violate 10CFR26 work hour limits.

3 Reviews Week 2 of the proposed 5.1.1 schedule. Determines that the scheduled hours will not violate 10CFR26 work hour limits.

4 Reviews Week 3 of the proposed *5.1.1 schedule. Determines that the scheduled 80 hours9.259259e-4 days <br />0.0222 hours <br />1.322751e-4 weeks <br />3.044e-5 months <br /> from Week 2 Wednesday to Week 3 on Tuesday will violate 10CFR26 work hour limit of 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> in a 7-day period.

Evaluator Cue - When reported, acknowledge the report and cue the examinee to complete the schedule review.

5 Reviews Week 4 of the proposed 5.1.1 schedule. Determines that the scheduled hours will not violate 10CFR26 work hour limits.

6 Reviews Week 5 of the proposed 5.1.1 schedule. Determines that the scheduled hours will not violate 10CFR26 work hour limits.

Page 6 of 9

JPM Number: JPM483 - rev 00 Clinton Power Station Job Performance Measure (JPM)

Comment SAT UNSAT STEP ELEMENT STANDARD Number 7 Reviews Week 6 of the proposed *5.1.1 schedule. Determines that the scheduled hours will violate the following 10CFR26 work hour limits:

  • 16 in 24 (0700 on Friday until 0700 on Saturday = 20 hours2.314815e-4 days <br />0.00556 hours <br />3.306878e-5 weeks <br />7.61e-6 months <br /> in a 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> period), or
  • 26 in 48 (0700 on Thursday until 0700 on Saturday = 28 hours3.240741e-4 days <br />0.00778 hours <br />4.62963e-5 weeks <br />1.0654e-5 months <br /> in a 48 hour5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> period), or
  • 10 hour1.157407e-4 days <br />0.00278 hours <br />1.653439e-5 weeks <br />3.805e-6 months <br /> break between successive work periods (the transition from training on Friday to night shift on Saturday is 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />)

Evaluator Note - the 10 hour1.157407e-4 days <br />0.00278 hours <br />1.653439e-5 weeks <br />3.805e-6 months <br /> break requirement drives the violation of the 16 in 24 and 26 in 48 hour5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> requirements, so stating a violation of any one of the three limits above constitutes satisfactory performance of the step.

Evaluator Cue - When reported, acknowledge the report and cue the examinee that the JPM is complete.

TERMINATING CUES:

Candidate completes review of the proposed work schedule and reports identified issues to the Shift Manager.

STOP TIME:

Page 7 of 9

JPM Number: JPM483 - rev 00 Clinton Power Station Job Performance Measure (JPM)

Operators Name:

Job

Title:

£ EO £ RO £ SRO £ STA £ SRO Cert JPM

Title:

Evaluation of Work Hours IAW 10CFR26 JPM Number: JPM483 Revision Number: 00 Task Number and

Title:

999999.25 Prepare a Minimum Shift Complement Form K/A System K/A Number Importance (RO/SRO)

Generic 2.1.5 3.9 Ability to use procedures related to shift staffing, such as minimum crew complement, overtime limitations, etc.

Suggested Testing Environment: Classroom Actual Testing Environment: £ Simulator £ Plant £ Control Room Testing Method: £ Simulate Alternate Path: £ Yes ¢ No

¢ Perform SRO Only: ¢ Yes £ No Time Critical: £ Yes ¢ No Estimated Time to Complete: 15 minutes Actual Time Used: minutes

References:

LS-AA-119, Rev. 12, Fatigue Management and Work Hour Limits EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? £ Yes £ No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: £ Satisfactory £ Unsatisfactory Comments:

Evaluators Name: (Print)

Evaluators Signature: Date:

SRRS: 3D.105 (when utilized for operator initial or continuing training) Page 8 of 9

Clinton Power Station Job Performance Measure (JPM)

INITIAL CONDITIONS:

The plant is in Mode 1.

INITIATING CUE:

CAUTION

§ All pre-job briefings are completed.

You are a Shift Supervisor on an operating crew.

Review the proposed work schedule for the upcoming six weeks and determine if the requirements of LS-AA-119 Fatigue Management and Work Hour Limits will be met if implemented as written and report results to the Shift Manager.

SUN MON TUE WED THU FRI SAT Week 1 X D D D X X X Week 2 X X X D D D D Week 3 D R D X X N N Week 4 N N X R R R X Week 5 X X N N N X X Week 6 X T T T T T N X = Day Off D = 12 Hour Day N = 12 Hour Night (Starts at 1900 on previous day)

R = 8 Hour Relief Shift T = 8 Hour Training Day Page 9 of 9

CLINTON POWER STATION Job Performance Measure Tech Spec Call / Clearance Approval JPM Number: JPM469 Revision Number: 01 Date: 7/8/16 Developed By: T. Jennings 7/8/16 Instructor Date Validated By: Brian Glynn 10/26/16 SME or Instructor Date Reviewed By: Jim Lucas 11/15/16 Operations Representative Date Approved By: T. Jennings 11/15/16 Training Department Date JPM469 R1 SRO Admin JPM 3.docx Retain approved Master Copy per SRRS 3D.126/3D.111

JPM Number: JPM469 - rev 01 Clinton Power Station Job Performance Measure (JPM)

JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.

Prior to JPM usage, revalidate JPM using steps 8 and 12 below.

________ 1. Task description and number, JPM description and number are identified.

________ 2. Knowledge and Abilities (K/A) references are included.

________ 3. Performance location specified. (in-plant, control room, simulator, or other)

________ 4. Initial setup conditions are identified.

________ 5. Initiating cue (and terminating cue if required) are properly identified.

________ 6. Task standards identified and verified by SME review.

________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk

(*).

________ 8. Verify the procedure(s) referenced by this JPM reflects the current revision:

Procedure OP-AA-109-101 Rev: 12 Procedure CPS 3309.01E001 Rev: 8 Procedure CPS 3309.01V001 Rev: 11b Procedure M05-1074 SH001 Rev: AH Procedure E02-1HP99 SH110 Rev: H Procedure E02-1HP99 SH505 Rev: N Procedure ITS 3.5.1 Rev: 163 Procedure ITS B3.5.1 Rev: 10-3

________ 9. Verify cues both verbal and visual are free of conflict.

________ 10. Verify performance time is accurate

________ 11. If the JPM cannot be performed as written with proper responses, then revise the JPM.

________ 12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:

SME / Instructor Date SME / Instructor Date SME / Instructor Date Page 2 of 11

JPM Number: JPM469 - rev 01 Clinton Power Station Job Performance Measure (JPM)

Revision Record (Summary)

Revision Date Description 00 6/15/15 New JPM.

01 7/8/16 Updated procedure references.

Page 3 of 11

JPM Number: JPM469 - rev 01 Clinton Power Station Job Performance Measure (JPM)

READ TO THE OPERATOR I will explain the initial conditions, which step(s) to simulate or discuss, and provide the initiating cues. When you complete the task successfully, the objective of this Job Performance Measure will be satisfied.

TASK STANDARDS:

  • Candidate reviews the Technical Specifications and determines the correct Technical Specification Action requirement(s).
  • Candidate reviews the Clearance Order Checklist and determines:

o that compartment/circuit breaker AB MCC 1C COMPT 2C (1E22-S002/2C) for HPCS Water Leg Pump 1E22-C003 must be added to the Clearance Order Checklist.

o that EIN 1E22F356 is incorrect for the HPCS WTR LEG PUMP TEST LINE ISOL and that the correct EIN for the HPCS WTR LEG PUMP TEST LINE ISOL is 1E22F351.

TOOLS, EQUIPMENT, OTHER SPECIAL REQUIREMENTS:

  • None PROCEDURAL/

REFERENCES:

  • E02-1HP99 Sheet 110, Rev H HPCS Power Supply System
  • E02-1HP99 Sheet 505, Rev N HPCS WATER LEG PUMP (1E22-C003) AND (DIV 3)
  • ITS 3.5.1 ECCS-Operating Amendment No. 163
  • ITS B3.5.1 ECCS-Operating Rev No. 10-3 EVALUATOR INSTRUCTIONS:
  • Amplifying cues are provided within the JPM steps.
  • After providing the initiating cue, provide the examinee with a copy of:

o Clearance Order Checklist o OP-AA-109-101, Rev 12 CLEARANCE AND TAGGING

  • Allow candidate access to the remaining PROCEDURAL/REFERENCES listed above.

Page 4 of 11

JPM Number: JPM469 - rev 01 Clinton Power Station Job Performance Measure (JPM)

Page 5 of 11

JPM Number: JPM469 - rev 01 Clinton Power Station Job Performance Measure (JPM)

INITIAL CONDITIONS:

  • The plant is operating at rated power.
  • A Clearance Order Checklist has been prepared to isolate the HPCS Water Leg Pump leak and facilitate repairs.

INITIATING CUE:

As CRS you are tasked to:

  • Provide an independent Tech Spec call based on the conditions above.
  • Review the prepared Clearance Order Checklist for approval (Passport is NOT available).

START TIME:

Page 6 of 11

JPM Number: JPM469 - rev 01 Clinton Power Station Job Performance Measure (JPM)

PERFORMANCE INFORMATION Critical steps are denoted with an asterisk (*) to the left of the step number and appear in BOLDED letters. Failure to meet the standards for a critical step constitutes failure of the Job Performance Measure. The sequence of steps is assumed unless denoted in the comments section of the JPM.

PERFORMANCE STEPS Technical Specifications

  • 1. The candidate reviews the Technical Specifications and determines the correct Technical Specification Action requirement.

Standard: Determines the required action is TS 3.5.1 Action B.1 and B.2.

Cue:

Comments SAT £ UNSAT £ Comment Number Page 7 of 11

JPM Number: JPM469 - rev 01 Clinton Power Station Job Performance Measure (JPM)

Clearance Order Checklist OP-AA-109-101, Rev 12 Clearance And Tagging HPCS Water Leg Pump Drawing (E02-1HP99 Sheet 505) or equivalent

  • 2. The candidate reviews the Clearance Order Checklist and determines that the electrical isolation of the HPCS Water Leg Pump is incomplete. The HPCS Water Leg Pump Breaker must be added to the Clearance Order Checklist.

Standard: Determines that compartment/circuit breaker AB MCC 1C COMPT 2C (1E22-S002/2C) for HPCS Water Leg Pump 1E22-C003 must be added to the Clearance Order Checklist.

Cue: None Comments If the hang sequence is reported by the examinee (not required), the correct sequence is 2.

SAT £ UNSAT £ Comment Number Clearance Order Checklist High Pressure Core Spray (HP) Drawing (M05-1074 Sheet 001)

  • 3. The candidate reviews the Clearance Order Checklist and determines that the Equipment Identification Number (EIN) listed for the HPCS WTR LEG PUMP TEST LINE ISOL is incorrect.

Standard: Determines that EIN 1E22F356 is incorrect for the HPCS WTR LEG PUMP TEST LINE ISOL and that the correct EIN for the HPCS WTR LEG PUMP TEST LINE ISOL is 1E22F351.

Cue: None Comments SAT £ UNSAT £ Comment Number Page 8 of 11

JPM Number: JPM469 - rev 01 Clinton Power Station Job Performance Measure (JPM)

4. Task Completion Standard: Review is complete.

Cue: JPM is complete.

Comments SAT £ UNSAT £ Comment Number STOP TIME:

Page 9 of 11

JPM Number: JPM469 - rev 01 Clinton Power Station Job Performance Measure (JPM)

Operators Name:

Job

Title:

£ EO £ RO £ SRO £ STA £ SRO Cert JPM

Title:

Tech Spec Call / Clearance Approval JPM Number: JPM469 Revision Number: 00 Task Number and

Title:

140109.23 Apply the administrative requirements for Execution of Technical Specifications or Off-Site Dose Calculation Manual Requirements.

K/A System K/A Number Importance (RO/SRO)

Generic 2.2.40 3.4 4.7 Generic 2.2.13 4.1 4.3 Generic 2.2.41 3.5 3.9 Suggested Testing Environment: Simulator Actual Testing Environment: £ Simulator £ Plant £ Control Room Testing Method: £ Simulate Alternate Path: £ Yes ¢ No

¢ Perform SRO Only: ¢ Yes £ No Time Critical: £ Yes ¢ No Estimated Time to Complete: 25 minutes Actual Time Used: minutes

References:

See page 4 of 10.

EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? £ Yes £ No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: £ Satisfactory £ Unsatisfactory Comments:

Evaluators Name: (Print)

Evaluators Signature: Date:

SRRS: 3D.105 (when utilized for operator initial or continuing training) Page 10 of 11

Clinton Power Station Job Performance Measure (JPM)

INITIAL CONDITIONS:

  • The plant is operated at rated power.
  • A Clearance Order Checklist has been prepared to isolate the HPCS Water Leg Pump leak and facilitate repairs.

INITIATING CUE:

As CRS you are tasked to:

  • Provide an independent Tech Spec call based on the conditions above.
  • Review the prepared Clearance Order Checklist for approval (Passport is NOT available).

Page 11 of 11

CLINTON POWER STATION Job Performance Measure Review CPS 9038.70 Radiation Monitoring Source Check Surveillance JPM Number: JPM536 Revision Number: 01 Date: 8/23/16 Developed By: T. Jennings 8/23/16 Instructor Date Validated By: Brian Glynn 10/26/16 SME or Instructor Date Reviewed By: Jim Lucas 11/15/16 Operations Representative Date Approved By: T. Jennings 11/15/16 Training Department Date Retain approved Master Copy per SRRS 3D.126/3D.111 JPM536 R1 SRO Admin JPM 4.docx

JPM Number: JPM536 - rev 01 Clinton Power Station Job Performance Measure (JPM)

JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.

Prior to JPM usage, revalidate JPM using steps 8 and 12 below.

________ 1. Task description and number, JPM description and number are identified.

________ 2. Knowledge and Abilities (K/A) references are included.

________ 3. Performance location specified. (in-plant, control room, simulator, or other)

________ 4. Initial setup conditions are identified.

________ 5. Initiating cue (and terminating cue if required) are properly identified.

________ 6. Task standards identified and verified by SME review.

________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk

(*).

________ 8. Verify the procedure(s) referenced by this JPM reflects the current revision:

Procedure CY-CL-170-301 Rev: 25 Procedure CPS 9038.70 Rev: 3e Procedure Rev:

________ 9. Verify cues both verbal and visual are free of conflict.

________ 10. Verify performance time is accurate

________ 11. If the JPM cannot be performed as written with proper responses, then revise the JPM.

________ 12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:

SME / Instructor Date SME / Instructor Date SME / Instructor Date Page 2 of 12

JPM Number: JPM536 - rev 01 Clinton Power Station Job Performance Measure (JPM)

Revision Record (Summary)

Revision Date Description 00 10/9/14 New JPM.

01 8/23/16 Updated procedure references.

Page 3 of 12

JPM Number: JPM536 - rev 01 Clinton Power Station Job Performance Measure (JPM)

Simulator Setup Instructions

1. No simulator setup is required for this JPM.
2. This JPM should be conducted in a location that provides easy access to the required reference procedures (simulator, library, SM office, etc.).
3. The following procedures are required to be available should the candidate request them:
a. CY-CL-170-301 Offsite Dose Calculation Manual - Clinton Power Station Page 4 of 12

JPM Number: JPM536 - rev 01 Clinton Power Station Job Performance Measure (JPM)

READ TO THE OPERATOR I will explain the initial conditions, which step(s) to simulate or discuss, and provide the initiating cues. When you complete the task successfully, the objective of this Job Performance Measure will be satisfied.

TASK STANDARDS:

TOOLS, EQUIPMENT, OTHER SPECIAL REQUIREMENTS:

  • None PROCEDURAL/

REFERENCES:

25

  • CPS 9038.70 Radiation Monitoring Source Check Surveillance Rev. 3e EVALUATOR INSTRUCTIONS:
  • Amplifying cues are provided within the JPM steps.
  • All pre-job briefings are completed.

Page 5 of 12

JPM Number: JPM536 - rev 01 Clinton Power Station Job Performance Measure (JPM)

INITIAL CONDITIONS:

The plant is operating at 97% power.

NO LCOs are in effect.

1RIX-PR041 Off Gas Post-Treatment Monitor is currently NON-FUNCTIONAL for maintenance.

The OG Vault Refrigeration (VO) System has been shut down for repairs. The repairs have just been completed, and the VO system is being prepared for startup. The OG Charcoal Beds are in BYPASS to support VO system startup IAW CPS 3407.01 Off-Gas Vault Refrigeration (VO) step 4.1.

CPS 9038.70 Radiation Monitoring Source Check Surveillance has just been completed for the gaseous radiation monitors, OG Pre-treatment process radiation monitor, and the OG Post-Treatment process radiation monitors.

INITIATING CUE:

CAUTION

§ All pre-job briefings are completed.

As an on-shift SRO, perform the supervisory review of CPS 9038.70 Radiation Monitoring Source Check Surveillance.

START TIME:

Page 6 of 12

JPM Number: JPM536 - rev 01 Clinton Power Station Job Performance Measure (JPM)

PERFORMANCE INFORMATION Critical steps are denoted with an asterisk (*) to the left of the step number and appear in BOLDED letters. Failure to meet the standards for a critical step constitutes failure of the Job Performance Measure. The sequence of steps is assumed unless denoted in the comments section of the JPM.

PERFORMANCE STEPS CY-CL-170-301 Clinton Power Station Unit 1 Offsite Dose Calculation Manual 1 Examinee reviews section 5.0 Prerequisites of CPS 9038.70 Radiation Monitoring Source Check Surveillance.

Standard: Examinee reviews section 5.0 and determines section is filled out correctly.

Cue: Provide the examinee with the completed copy of CPS 9038.70 and attached data sheets for this step.

Comments SAT £ UNSAT £ Comment Number Page 7 of 12

JPM Number: JPM536 - rev 01 Clinton Power Station Job Performance Measure (JPM)

  • 2 Examinee evaluates surveillance data for 1RIX-PR034 Off-Gas Pre-treatment PRM.

Standard: Examinee reviews surveillance data for 1RIX-PR034 and determines the following:

  • Monitor failed to reach the required value of 1.5 times the current cpm value during the surveillance.
  • The following ODCM 3.2.1 Required Actions must be taken:

o A.1, C.1, C.2.1.1, and C.2.1.2, OR o A.1, C.1, C.2.2.1, C2.2.2, and C2.2.3 (requires that the OG Charcoal Beds must immediately be placed in service)

Cue: If the examinee reports the failure, acknowledge the report and direct the examinee to complete the task.

If the examinee attempts to check the calculations on the data sheets, inform the examinee that the calculations have already been verified and to assume the calculations are correct.

Comments The examinee may perform review steps in any order.

Per the initiating cue, the OG Charcoal Beds are bypassed to support startup of the OG Vault Refrigeration System.

SAT £ UNSAT £ Comment Number Page 8 of 12

JPM Number: JPM536 - rev 01 Clinton Power Station Job Performance Measure (JPM)

  • 3 Examinee evaluates surveillance data for 1RIX-PR035 Off-gas Post-treatment PRM
  1. 1.

Standard: Examinee reviews surveillance data for 1RIX-PR035 and determines the following:

  • Monitor failed to reach 30 cpm and 1.5 times the current cpm value when the source check was performed.
  • With 1RIX-PR041 already NON-FUNCTIONAL for maintenance, the following ODCM Required Actions must be taken:

o A.1, D.1, and D.2.1, OR o A.1, D.1, D.2.2.1, and D.2.2.2 Cue: If the examinee reports the failure, acknowledge the report and direct the examinee to complete the task.

If the examinee attempts to check the calculations on the data sheets, inform the examinee that the calculations have already been verified and to assume the calculations are correct.

Comments The examinee may perform review steps in any order.

SAT £ UNSAT £ Comment Number Page 9 of 12

JPM Number: JPM536 - rev 01 Clinton Power Station Job Performance Measure (JPM) 4 Examinee evaluates surveillance data for the remainder of the Gaseous Monitors in the surveillance.

Standard: Examinee reviews surveillance data for each of the remaining gaseous radiation monitors and determines the following:

  • Each monitor passed channel functional testing with the exception of 0RIX-PR002 HVAC Exhaust PRM #2 Iodine channel.
  • 0RIX-PR002 HVAC Exhaust PRM #2 Iodine Sampler is required to be FUNCTIONAL at all times, and that the non-ODCM failure does not impact functionality.

Cue: If the examinee reports the failure, acknowledge the report and direct the examinee to complete the task.

If asked, 0RIX-PR001 is in service.

If the examinee attempts to check the calculations on the data sheets, inform the examinee that the calculations have already been verified and to assume the calculations are correct.

Comments The examinee may perform review steps in any order.

SAT £ UNSAT £ Comment Number TERMINATING CUES:

CPS 9038.70 Radiation Monitoring Source Check Surveillance has been reviewed and ODCM impact has been evaluated and appropriate actions taken.

STOP TIME:

Page 10 of 12

JPM Number: JPM536 - rev 01 Clinton Power Station Job Performance Measure (JPM)

Operators Name:

Job

Title:

£ EO £ RO ¢ SRO £ STA £ SRO Cert JPM

Title:

Review CPS 9038.70 Radiation Monitoring Source Check Surveillance JPM Number: JPM536 Revision Number: 00 Task Number and

Title:

999999.19 Review the results of Surveillance Tests.

K/A System K/A Number Importance (RO/SRO)

Generic 2.3.15 NA 3.1 Knowledge of radiation monitoring systems, such as fixed radiation monitors and alarms, portable survey instruments, personnel monitoring equipment, etc.

Suggested Testing Environment: Classroom or Simulator Actual Testing Environment: £ Simulator £ Plant £ Control Room Testing Method: £ Simulate Alternate Path: £ Yes ¢ No

¢ Perform SRO Only: ¢ Yes £ No Time Critical: £ Yes ¢ No Estimated Time to Complete: 15 minutes Actual Time Used: minutes

References:

Rev. 25

  • CPS 9038.70 Radiation Monitoring Source Check Surveillance Rev. 3e EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? £ Yes £ No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: £ Satisfactory £ Unsatisfactory Comments:

Evaluators Name: (Print)

Evaluators Signature: Date:

SRRS: 3D.105 (when utilized for operator initial or continuing training) Page 11 of 12

Clinton Power Station Job Performance Measure (JPM)

INITIAL CONDITIONS:

The plant is operating at 97% power.

NO LCOs are in effect.

1RIX-PR041 Off Gas Post-Treatment Monitor is currently NON-FUNCTIONAL for maintenance.

The OG Vault Refrigeration (VO) System has been shut down for repairs. The repairs have just been completed, and the VO system is being prepared for startup. The OG Charcoal Beds are in BYPASS to support VO system startup IAW CPS 3407.01 Off-Gas Vault Refrigeration (VO) step 4.1.

CPS 9038.70 Radiation Monitoring Source Check Surveillance has just been completed for the gaseous radiation monitors, OG Pre-treatment process radiation monitor, and the OG Post-Treatment process radiation monitors.

INITIATING CUE:

CAUTION

§ All pre-job briefings are completed.

As an on-shift SRO, perform the supervisory review of CPS 9038.70 Radiation Monitoring Source Check Surveillance.

Page 12 of 12

CLINTON POWER STATION Job Performance Measure Classify An Emergency Event and Determine Protective Action Recommendations JPM Number: JPM482 Revision Number: 00 Date: 08/24/16 Developed By: T. Jennings 8/24/16 Instructor Date Validated By: Matt Baker 10/26/16 SME or Instructor Date Reviewed By: Jim Lucas 11/15/16 Operations Representative Date Approved By: T. Jennings 11/15/16 Training Department Date JPM482 R0 SRO Admin JPM 5.docx Retain approved Master Copy per SRRS 3D.126/3D.111

JPM Number: JPM482 - Rev 00 Clinton Power Station Job Performance Measure (JPM)

JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.

Prior to JPM usage, revalidate JPM using steps 8 and 12 below.

________ 1. Task description and number, JPM description and number are identified.

________ 2. Knowledge and Abilities (K/A) references are included.

________ 3. Performance location specified. (in-plant, control room, simulator, or other)

________ 4. Initial setup conditions are identified.

________ 5. Initiating cue (and terminating cue if required) are properly identified.

________ 6. Task standards identified and verified by SME review.

________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk

(*).

________ 8. Verify the procedure(s) referenced by this JPM reflects the current revision:

Procedure EP-AA-111 Rev: 19 Procedure EP-AA-1003 Addendum 3 Rev: 1 Procedure EP-AA-111-F-07 Rev: G Procedure EP-AA-112-100-F-01 Rev: V

________ 9. Verify cues both verbal and visual are free of conflict.

________ 10. Verify performance time is accurate

________ 11. If the JPM cannot be performed as written with proper responses, then revise the JPM.

________ 12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:

SME / Instructor Date SME / Instructor Date SME / Instructor Date Page 2 of 11

JPM Number: JPM482 - Rev 00 Clinton Power Station Job Performance Measure (JPM)

Revision Record (Summary)

Revision Date Description 00 8/24/16 New JPM Page 3 of 11

JPM Number: JPM482 - Rev 00 Clinton Power Station Job Performance Measure (JPM)

READ TO THE OPERATOR I will explain the initial conditions, which step(s) to simulate or discuss, and provide the initiating cues. When you complete the task successfully, the objective of this Job Performance Measure will be satisfied.

TASK STANDARDS:

  • Examinee classifies the event, and determines appropriate PARs (evacuate Sub Area 1) within the required time frame.

TOOLS, EQUIPMENT, OTHER SPECIAL REQUIREMENTS:

  • None PROCEDURAL/

REFERENCES:

  • EP-AA-111, Emergency Classification and Protective Action Recommendations, Rev 19
  • EP-AA-1003 Addendum 3, Emergency Action Levels For Clinton Station, Rev 1
  • EP-AA-111-F-07, Clinton PAR Flowchart, Rev G
  • EP-AA-112-100-F-01 Shift Emergency Director Checklist, Rev. V EVALUATOR INSTRUCTIONS:
  • Amplifying cues are provided within the JPM steps.
  • All pre-job briefings are completed.
  • Provide the examinee with a copy of the Initial Conditions and Initiating Cue page (back page of the JPM) when providing the initiating cue.
  • Provide the examinee with the following items when requested:

o Shift Emergency Director Binder o EP-AA-1003, Addendum 3 EALs o EP-AA-1003, Addendum 3 Bases Page 4 of 11

JPM Number: JPM482 - Rev 00 Clinton Power Station Job Performance Measure (JPM)

INITIAL CONDITIONS:

You are the Shift Manager.

The plant was operating at rated thermal power when a transient occurred.

Plant conditions are as follows:

  • Reactor Water level is -177 inches and lowering with no injection sources available.
  • Radiation levels in the containment are 37 R/hr.
  • Hydrogen concentration in the drywell is 9.2%.
  • No release is in progress.

INITIATING CUE:

CAUTION

§ All pre-job briefings are completed.

§ No equipment or controls will be manipulated during this evaluation, only Simulated Actions will occur.

§ Do NOT shine any type light into a panel.

This JPM is time critical.

You are to determine if any Emergency Action Levels have been exceeded.

Evaluator: Log START TIME as soon as the Initiating Cue is read and acknowledged by the examinee.

START TIME:

Page 5 of 11

JPM Number: JPM482 - Rev 00 Clinton Power Station Job Performance Measure (JPM)

PERFORMANCE INFORMATION Critical steps are denoted with an asterisk (*) to the left of the step number and appear in BOLDED letters. Failure to meet the standards for a critical step constitutes failure of the Job Performance Measure. The sequence of steps is assumed unless denoted in the comments section of the JPM.

PERFORMANCE STEPS EP-AA-1003 Radiological Emergency Plan Annex For Clinton Station

  • JPM Step 1 Examinee determines that a Site Area Emergency EAL has been exceeded due to FS1 Loss or Potential Loss of ANY two barriers.

Standard: Examinee reviews EP-AA-1003 Hot Matrix and determines that FS1 threshold has been exceeded due to:

  • Potential Loss of Fuel Clad because RPV level cannot be restored and maintained > -162 inches (TAF).
  • Loss of Reactor Coolant System because Containment Radiation Monitor is reading > 33 R/hr and RPV level cannot be restored and maintained > -

162 inches (TAF).

  • Potential Loss of Containment because Drywell hydrogen concentration 9%

Cue: Acknowledge report from the examinee.

Comments Evaluator Note: A 15-minute clock to declare the EAL starts as soon as the initiating cue is read and acknowledged via 3-part communication by the examinee. Record the time of the declaration below. The time declared must be no more than 15 minutes from the START TIME.

Record Time EAL Declared ___________

Record Start Time (from Page 5) ___________

NOT longer than 15 minutes between the time EAL Declared and Start Time:

YES / NO Page 6 of 11

JPM Number: JPM482 - Rev 00 Clinton Power Station Job Performance Measure (JPM)

SAT £ UNSAT £ Comment Number JPM Step 2 Evaluator provides an additional cue.

Standard: Examinee acknowledges the additional information provided by the evaluator.

Cue: After the EAL call has been made, cue the examinee as follows:

  • Hydrogen concentration in the Drywell is now 10.2%.
  • Radiation level in the containment is now 103 R/hr.
  • No release is in progress.

Determine if any Emergency Action Levels have been exceeded.

Comments Evaluator Note: A 15-minute clock to declare the EAL starts as soon as the initiating cue in JPM step 2 is read and acknowledged via 3-part communication by the examinee.

Record Start Time ___________

SAT £ UNSAT £ Comment Number Page 7 of 11

JPM Number: JPM482 - Rev 00 Clinton Power Station Job Performance Measure (JPM)

  • JPM Step 3 Examinee determines that a General Emergency EAL has been exceeded due to FG1 Loss of ANY two barriers AND Loss or Potential Loss of third barrier.

Standard: Examinee reviews EP-AA-1003 Hot Matrix and determines that FG1 threshold has been exceeded due to:

  • Loss of Fuel Clad because Containment Radiation Monitor is reading >

41.3 R/hr.

  • Loss of Reactor Coolant System because Containment Radiation Monitor is reading > 33 R/hr and RPV level cannot be restored and maintained > -

162 inches (TAF).

  • Potential Loss of Containment because Containment Radiation Monitor is reading > 97 R/hr and DW Hydrogen concentration is 9%.

Cue: Acknowledge report from the examinee. Ask examinee to determine what (if any)

Protective Action Recommendations (PARs) are required.

Comments Evaluator Note: A 15-minute clock to declare the EAL starts as soon as the initiating cue is read and acknowledged via 3-part communication by the examinee. Record the time of the declaration below. The time declared must be no more than 15 minutes from the START TIME.

Record Time EAL Declared ___________

Record Start Time (from JPM Step 2) ___________

NOT longer than 15 minutes between the time EAL Declared and Start Time:

YES / NO SAT £ UNSAT £ Comment Number Page 8 of 11

JPM Number: JPM482 - Rev 00 Clinton Power Station Job Performance Measure (JPM)

  • JPM Step 4 Examinee determines the protective action recommendation is to Evacuate Sub Area 1 for a 2 mile radius and 10 miles downwind.

Standard: Examinee reviews EP-AA-111-F-07 Clinton PAR Flowchart and determines that a Rapidly Progressing Severe Accident is not in progress (primary containment has not be lost), requiring evacuation of Sub Area 1.

Cue: If requested, cue the examinee that wind direction is 159°.

Comments SAT £ UNSAT £ Comment Number TERMINATING CUES:

EAL thresholds evaluated and Protective Action Recommendations determined.

STOP TIME:

Page 9 of 11

JPM Number: JPM482 - Rev 00 Clinton Power Station Job Performance Measure (JPM)

Operators Name:

Job

Title:

£ EO £ RO £ SRO £ STA £ SRO Cert JPM

Title:

Classify An Emergency Event and Determine Protective Action Recommendations JPM Number: JPM482 Revision Number: 00 Task Number and

Title:

997777.02, Determine a Protective Action Recommendation K/A System K/A Number Importance (RO/SRO)

Generic 2.4.44 2.4 4.4 Knowledge of emergency plan protective action recommendations.

Suggested Testing Environment: Simulator Actual Testing Environment: £ Simulator £ Plant £ Control Room Testing Method: £ Simulate Alternate Path: £ Yes ¢ No

¢ Perform SRO Only: ¢ Yes £ No Time Critical: ¢ Yes £ No Estimated Time to Complete: 20 minutes Actual Time Used: minutes

References:

  • EP-AA-111, Emergency Classification and Protective Action Recommendations, Rev. 19
  • EP-AA-1003 Addendum 3 Emergency Action Levels For Clinton Station, Rev. 1
  • EP-AA-111-F-07, Clinton Plant based Par Flowchart, Rev G
  • EP-AA-112-100-F-01 Shift Emergency Director Checklist, Rev. V EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? £ Yes £ No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: £ Satisfactory £ Unsatisfactory Comments:

Evaluators Name: (Print)

Evaluators Signature: Date:

SRRS: 3D.105 (when utilized for operator initial or continuing training) Page 10 of 11

Clinton Power Station Job Performance Measure (JPM)

INITIAL CONDITIONS:

You are the Shift Manager.

The plant was operating at rated thermal power when a transient occurred.

Plant conditions are as follows:

  • Reactor Water level is -177 inches and lowering with no injection sources available.
  • Radiation levels in the containment are 37 R/hr.
  • Hydrogen concentration in the drywell is 9.2%.
  • No release is in progress.

INITIATING CUE:

CAUTION

§ All pre-job briefings are completed.

§ No equipment or controls will be manipulated during this evaluation, only Simulated Actions will occur.

§ Do NOT shine any type light into a panel.

This JPM is time critical.

You are to determine if any Emergency Action Levels have been exceeded.

Page 11 of 11

CLINTON POWER STATION Job Performance Measure Transfer RR Pumps from Fast to Slow Speed JPM Number: JPM448 Revision Number: 02 Date: 9/14/16 Developed By: Tony Jennings 9/14/16 Instructor Date Validated By: Brian Glynn 10/26/16 SME or Instructor Date Reviewed By: Jim Lucas 11/15/16 Operations Representative Date Approved By: T. Jennings 11/15/16 Training Department Date JPM448 R2 System JPM a.docx Retain approved Master Copy per SRRS 3D.126/3D.111

JPM448 - Rev 02 Clinton Power Station Job Performance Measure (JPM)

JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.

Prior to JPM usage, revalidate JPM using steps 8 and 12 below.

________ 1. Task description and number, JPM description and number are identified.

________ 2. Knowledge and Abilities (K/A) references are included.

________ 3. Performance location specified. (in-plant, control room, simulator, or other)

________ 4. Initial setup conditions are identified.

________ 5. Initiating cue (and terminating cue if required) are properly identified.

________ 6. Task standards identified and verified by SME review.

________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).

________ 8. Verify the procedure(s) referenced by this JPM reflects the current revision:

Procedure CPS 3302.01 Rev: 35f Procedure Rev:

Procedure Rev:

________ 9. Verify cues both verbal and visual are free of conflict.

________ 10. Verify performance time is accurate

________ 11. If the JPM cannot be performed as written with proper responses, then revise the JPM.

________ 12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:

SME / Instructor Date SME / Instructor Date SME / Instructor Date Page 2 of 12

JPM448 - Rev 02 Clinton Power Station Job Performance Measure (JPM)

Revision Record (Summary)

Revision Date Description 00 2/23/11 Modified from JPM 215. Removed alternate path.

01 11/27/12 Updated procedure references.

02 8/29/16 Updated procedure references. Converted to new template.

Made editorial changes throughout. Added new instructions for setting up the IC.

Page 3 of 12

JPM448 - Rev 02 Clinton Power Station Job Performance Measure (JPM)

Simulator Setup Instructions

1. IC Setup
a. Reset the simulator to IC-7 or equivalent with power 33%.
b. Lower RR flow (if necessary) until reactor power is ~ 33%.
c. Perform CPS 3006.01 Unit Shutdown steps 8.2.1 - 8.2.4.
d. Ensure plant is stable and then save to a different IC if JPM is being used more than once.

IC-228 (pw: 76319) is saved for the ILT 15-1 NRC Exam.

2. JPM Setup
a. Reset the simulator to the IC saved in 1.d above with power ~ 33%.
b. Open and execute Simulator Lesson Plan ILT 15-1 NRC Exam JPMs/JPM448 containing the following:
1) RR_FBYPSA to Bypass on Remote1
2) RR_FBYPSB to Bypass on Remote2
c. When the above steps are completed for this and other JPMs to be run concurrently, then validate the concurrently run JPMs if applicable.
d. This completes the setup for this JPM.

Page 4 of 12

JPM448 - Rev 02 Clinton Power Station Job Performance Measure (JPM)

READ TO THE OPERATOR I will explain the initial conditions, which step(s) to simulate or discuss, and provide the initiating cues. When you complete the task successfully, the objective of this Job Performance Measure will be satisfied.

TASK STANDARDS:

TOOLS, EQUIPMENT, OTHER SPECIAL REQUIREMENTS:

  • None PROCEDURAL/

REFERENCES:

  • CPS 3302.01, Rev 35f Reactor Recirculation (RR)

EVALUATOR INSTRUCTIONS:

  • Provide the examinee with a copy of the Initial Conditions and Initiating Cue page (back page of the JPM) when providing the initiating cue.
  • Provide the examinee with a copy of CPS 3302.01, Reactor Recirculation (RR) with the cue sheet.
  • Amplifying cues are provided within the JPM steps.
  • All pre-job briefings are completed.

Page 5 of 12

JPM448 - Rev 02 Clinton Power Station Job Performance Measure (JPM)

INITIAL CONDITIONS:

A plant shutdown is in progress with power at approximately 33% of rated thermal power. One TDRFP is in operation with level control on the Master Level Controller (MLC).

INITIATING CUE:

As the Reactor Operator you are directed to transfer the Reactor Recirculation Pumps to Slow Speed per CPS 3302.01 Reactor Recirculation (RR).

Annunciators associated with Reactor Recirculation Pump transfer are to be considered Expected Annunciators and treated as such.

The Field Operator is available via PCS phone. RP has been notified.

The B RO will respond to all back-panel annunciators.

START TIME:

Page 6 of 12

JPM448 - Rev 02 Clinton Power Station Job Performance Measure (JPM)

PERFORMANCE INFORMATION Critical steps are denoted with an asterisk (*) to the left of the step number and appear in BOLDED letters. Failure to meet the standards for a critical step constitutes failure of the Job Performance Measure. The sequence of steps is assumed unless denoted in the comments section of the JPM.

CPS 3302.01, REACTOR RECIRCULATION

  • 8.1.3.1 1. Start both LFMGs:
  • Close LFMG A Bkr 1A for RR pump 1A.
  • Close LFMG B Bkr 1B for RR pump 1B Standard: Examinee depresses the CLOSE pushbutton for LFMG A Mtr Bkr 1A and LFMG B Mtr Bkr 1B (red light is on and the green light is off for both breakers).

Cue: As CRS respond to A RO report of start of the LFMGs. If candidate requests condition of LFMGs from the field, report both LFMGs are operating normally.

Comments The field cue will be performed by the Simulator Booth Operator (Field Operator) if candidate uses PCS phone to contact the Field Operator.

SAT £ UNSAT £ Comment Number Page 7 of 12

JPM448 - Rev 02 Clinton Power Station Job Performance Measure (JPM) 8.1.3.2 (Local) At 1B33-P001A and B, LFMG Aux Relay Panel, place following keylock switches to BYPASS:

A pump: ° S126A, Power Interlock (Both on FB 781 East)

° S127A, Total Feedwater Low Flow Interlock B pump: ° S126B, Power Interlock (Both on FB 781 West)

° S127B, Total Feedwater Low Flow Interlock Standard: Examinee requests area operator to place S126A&B and S127A&B in BYPASS at panels 1B33-P001A and 1B33-P001B.

Cue: Insert REMOTE 1 and REMOTE 2 and inform the examinee that S126A&B and S127A&B are in BYPASS.

Comments The cue will be performed by the Simulator Booth Operator (Field Operator) if candidate uses PCS phone to contact the Field Operator.

SAT £ UNSAT £ Comment Number 8.1.3.3 Make the following RR pump transfer notifications:

1) Notify RP of potential change in Rad levels.
2) Make a plant wide Gaitronics announcement that the RR pumps will be transferred to slow.

Standard: Simulates calling RP to notify them of potential rad level changes.

Simulates making Gaitronics announcement, Transferring RR Pumps to Slow Speed.

Cue: Respond as RP acknowledging notification of changing rad levels.

Comments Part of initiating cue. Candidate should recognize condition met. Only respond if needed.

SAT £ UNSAT £ Comment Number Page 8 of 12

JPM448 - Rev 02 Clinton Power Station Job Performance Measure (JPM)

  • 8.1.3.4 Place both 1B33-F060A & B, Recirc FCVs at ~ 10%, but not > 10% position.

Standard: Examinee positions both FCV slide levers (one at a time) to the left until both 1B33-F060A & B, Recirc FCVs are at ~ 10% (but not > 10%) position.

Cue:

Comments Alarms 5006-3D OPRM Enabled, 5004-3D & 5005-3D TCV/TSV Trip Bypassed, and 5006-3H Low Power Alarm Point are expected alarms.

SAT £ UNSAT £ Comment Number

  • 8.1.3.5 Transfer the RR pumps to the LFMG by depressing both TRANSFER TO LFMG A and B push-buttons simultaneously.

Standard: Examinee simultaneously depresses both RECIRC PUMP A & B DRIVE MOTOR BKR 5A & 5B TRANS TO LFMG A and B push-buttons.

Cue: As CRS respond to A RO report of RR Pump transfer to slow speed.

Comments SAT £ UNSAT £ Comment Number Page 9 of 12

JPM448 - Rev 02 Clinton Power Station Job Performance Measure (JPM) 8.1.3.6 Observe that the 5A and 5B breakers open and when pump speed decreases, the 2A and 2B breakers close.

Standard: Examinee observes that the 5A and 5B breakers open (red light off, green light on) and when pump speed decreases the 2A and 2B breakers close (red light on, green light off).

Cue: State that the JPM is complete.

Comments CPS 3302.01 steps 8.1.3.7 and 8.1.3.8 are not performed as a part of this JPM.

These steps provide no additional observable actions to the JPM and unnecessarily lengthen the JPM.

SAT £ UNSAT £ Comment Number TERMINATING CUES:

RR Pumps A and B have been shifted to slow speed.

STOP TIME:

Page 10 of 12

JPM448 - Rev 02 Clinton Power Station Job Performance Measure (JPM)

Operators Name:

Job

Title:

£ NLO £ RO £ SRO £ STA £ SRO Cert JPM

Title:

Transfer RR Pumps from Fast to Slow Speed JPM Number: JPM448 Revision Number: 02 Task Number and

Title:

330201.24 RR Pump Transfer To Slow Speed K/A System K/A Number Importance (RO/SRO) 202001 A4.01 3.7 3.7 Ability to manually operate and/or monitor in the control room:

Recirculation pumps.

Suggested Testing Environment: Simulator Actual Testing Environment: ¢ Simulator £ Plant £ Control Room Testing Method: £ Simulate Alternate Path: £ Yes ¢ No

¢ Perform SRO Only: £ Yes ¢ No Time Critical: £ Yes ¢ No Estimated Time to Complete: 20 minutes Actual Time Used: minutes

References:

  • CPS No. 3302.01, Rev 35f REACTOR RECIRCULATION (RR)

EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? £ Yes £ No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: £ Satisfactory £ Unsatisfactory Comments:

Evaluators Name: (Print)

Evaluators Signature: Date:

SRRS: 3D.105 (when utilized for operator initial or continuing training) Page 11 of 12

Clinton Power Station Job Performance Measure (JPM)

INITIAL CONDITIONS:

A plant shutdown is in progress with power at approximately 33% of rated thermal power. One TDRFP is in operation with level control on the Master Level Controller (MLC).

INITIATING CUE:

As the Reactor Operator you are directed to transfer the Reactor Recirculation Pumps to Slow Speed per CPS 3302.01 Reactor Recirculation (RR).

Annunciators associated with Reactor Recirculation Pump transfer are to be considered Expected Annunciators and treated as such.

The Field Operator is available via PCS phone. RP has been notified.

The B RO will respond to all back-panel annunciators.

Page 12 of 12

CLINTON POWER STATION Job Performance Measure Turbine Driven Reactor Feed Pump (TDRFP) B Startup (Alternate Path)

JPM Number: JPM530 Revision Number: 01 Date: 9/16/16 Developed By: T. Jennings 9/16/16 Instructor Date Validated By: Michael Antonelli 10/25/16 SME or Instructor Date Reviewed By: Jim Lucas 11/15/16 Operations Representative Date Approved By: T. Jennings 11/15/16 Training Department Date JPM530 R1 System JPM b.docx Retain approved Master Copy per SRRS 3D.126/3D.111

JPM Number: JPM530 - rev 01 Clinton Power Station Job Performance Measure (JPM)

JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.

Prior to JPM usage, revalidate JPM using steps 8 and 12 below.

________ 1. Task description and number, JPM description and number are identified.

________ 2. Knowledge and Abilities (K/A) references are included.

________ 3. Performance location specified. (in-plant, control room, simulator, or other)

________ 4. Initial setup conditions are identified.

________ 5. Initiating cue (and terminating cue if required) are properly identified.

________ 6. Task standards identified and verified by SME review.

________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk

(*).

________ 8. Verify the procedure(s) referenced by this JPM reflects the current revision:

Procedure CPS 3103.01 Rev: 31 Procedure CPS 5002.02 Rev: 29e Procedure CPS 5002.03 Rev: 28b

________ 9. Verify cues both verbal and visual are free of conflict.

________ 10. Verify performance time is accurate

________ 11. If the JPM cannot be performed as written with proper responses, then revise the JPM.

________ 12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:

SME / Instructor Date SME / Instructor Date SME / Instructor Date Page 2 of 13

JPM Number: JPM530 - rev 01 Clinton Power Station Job Performance Measure (JPM)

Revision Record (Summary)

Revision Date Description 00 7/25/14 New JPM.

01 9/16/16 Updated procedure references.

Page 3 of 13

JPM Number: JPM530 - rev 01 Clinton Power Station Job Performance Measure (JPM)

Simulator Setup Instructions

1. IC Setup
a. Initialize to any suitable IC (comparable with IC-26) with TDRFP A on the MLC in auto and the TDRFP B in rolling standby.
b. Save to a different IC if JPM is being used more than once. IC-225 is saved for the ILT 15-1 NRC Exam (password 76319).
2. JPM Setup
a. Reset the simulator to the IC saved in step 1 above.
b. Open and execute Simulator Lesson Plan ILT 15-1 NRC Exam JPMs.
c. Release JPM530 which will perform the following:
  • Insert vibration alarms and indications when TDRFP B speed is increased above 2800 rpm.
  • Insert seat leakage into the HPSV & HPCV (9% & 2% respectively)
a. MS0ASLVALVE41 9%
b. MS0ASLVALVE40 2%
3. When the above steps are completed for this and other JPMs to be run concurrently, then validate the concurrently run JPMs if applicable.
4. This completes the setup for this JPM.
5. Freeze Simulator.

Page 4 of 13

JPM Number: JPM530 - rev 01 Clinton Power Station Job Performance Measure (JPM)

READ TO THE OPERATOR I will explain the initial conditions, which step(s) to simulate or discuss, and provide the initiating cues. When you complete the task successfully, the objective of this Job Performance Measure will be satisfied.

TASK STANDARDS:

  • Mitigating actions have been taken for high vibrations on the B TDRFP and the RFP has been secured.

TOOLS, EQUIPMENT, OTHER SPECIAL REQUIREMENTS:

  • None PROCEDURAL/

REFERENCES:

  • CPS No. 5002.03, Rev 28b Alarm Panel 5002 Annunciators - Row 3 EVALUATOR INSTRUCTIONS:
  • Amplifying cues are provided within the JPM steps.
  • All pre-job briefings are completed.
  • Provide the examinee with a copy of the Initial Conditions and Initiating Cue page (back page of the JPM) when providing the initiating cue.
  • Provide the examinee with a marked up copy of CPS 3103.01 Feedwater (FW) with section 8.1.4.2 TDRFP NORMAL Startup to Rolling STANDBY marked complete.

Page 5 of 13

JPM Number: JPM530 - rev 01 Clinton Power Station Job Performance Measure (JPM)

INITIAL CONDITIONS:

A reactor startup / power ascension is in progress.

Reactor power is ~ 50%.

Turbine Driven Reactor Feed Pump (TDRFP) A is operating on the Master Level Controller (MLC) in auto feeding the RPV.

TDRFP B is in rolling standby IAW CPS 3103.01 Feedwater (FW) section 8.1.4.2 TDRFP NORMAL Startup to Rolling STANDBY.

5 Condensate Polishers (A - E) are in service.

INITIATING CUE:

CAUTION

§ All pre-job briefings are completed.

The CRS has directed you to place TDRFP B in service feeding the RPV using the AUTO method IAW CPS 3103.01 Feedwater (FW) section 8.1.4.4. Transfer rolling STANDBY TDRFP to feeding RPV through 1FW002A (B).

Permission has been granted to perform all critical steps required to perform the task.

Report to the CRS after completing the task.

START TIME:

Page 6 of 13

JPM Number: JPM530 - rev 01 Clinton Power Station Job Performance Measure (JPM)

PERFORMANCE INFORMATION Critical steps are denoted with an asterisk (*) to the left of the step number and appear in BOLDED letters. Failure to meet the standards for a critical step constitutes failure of the Job Performance Measure. The sequence of steps is assumed unless denoted in the comments section of the JPM.

PERFORMANCE STEPS CPS 3103.01 Feedwater (FW) section 8.1.4.4 Transfer rolling STANDBY TDRFP to feeding RPV through 1FW002A (B)

Comment SAT UNSAT STEP ELEMENT STANDARD Number

  • 8.1.4.4 Transfer rolling STANDBY TDRFP 8.1.4.4.1 B to feeding RPV through Examinee determines TDRFP B is in rolling 1FW002B. standby per the initiating cue.

8.1.4.4.2 Examinee determines that 5 Condensate Polishers are adequate to perform the evolution.

Cue: 5 Condensate Polishers are in service.

8.1.4.4.3 Examinee observes Red M on the Digital Feedwater Display for 1FW010B and the 1FW010B valve icon is red.

8.1.4.4.4 Examinee clicks on:

  • FPB
  • TDRFP B (and observes the blue outline on the control box)
  • (and observes TDRFP B RPM decreasing to ~ 2370 rpm)
  • Exit
  • 8.1.4.4.5 Examinee clicks on:
  • Valve icon for 1FW002B
  • TDRFP Main Discharge Valve 1FW002B (and observes the blue outline on the control box)
  • Open (and then verifies indication changes to Intermediate and then Full Open)
  • Exit Page 7 of 13

JPM Number: JPM530 - rev 01 Clinton Power Station Job Performance Measure (JPM)

Comment SAT UNSAT STEP ELEMENT STANDARD Number

  • 8.1.4.4 Transfer rolling STANDBY TDRFP B to *8.1.4.4.6 feeding RPV through 1FW002B (cont.) Examinee clicks on:
  • Valve icon for 1FW010B
  • 1FW010B Min Flow (and observes the blue outline on the control box)
  • Close
  • Exit Note: 1FW010B will not physically close with TDRFP B reset and 1FW002B full open.

If the examinee depresses the 1FW010B close pushbutton before 1FW002B is full open, 1FW010B will close. If this happens, the error should be considered a failure of a critical step.

NOTE Step 8.1.4.4.7 is N/A.

  • 8.1.4.4 *8.1.4.4.8 (cont.) Examinee observes that TDRFP B indicates FPB Speed Setter.

Examinee clicks on:

  • FPB Speed Setter
  • TDRFP B Speed Setpoint Mode (and observes the blue outline on the control box)
  • Bring Pump On-Line (and then verifies TDRFP B speed increasing)
  • Exit Page 8 of 13

JPM Number: JPM530 - rev 01 Clinton Power Station Job Performance Measure (JPM)

ALTERNATE PATH BEGINS Annunciator 5002-2F High Vibr RFP 1B Shaft will be received when TDRFP B speed increases above 2800 rpm.

Annunciator 5002-3F High Vibr RFPT 1B Shaft will be received 30 seconds later.

Comment SAT UNSAT STEP ELEMENT STANDARD Number 8.1.4.4.8 Reduce Turbine Speed to clear vibration 8.1.4.4.8.c alarms (fails) Examinee clicks on:

5002-2F

  • FPB Speed Setter 5002-3F
  • TDRFP B Speed Setpoint Mode (and observes the blue outline on the control box)
  • Speed Setter Mode
  • Exit Examinee clicks on:
  • FPB (pump icon)
  • TDRFP B (and observes the blue outline on the control box)
  • until setpoint (SP) indicates 0 RPM (and then observes that TDRFP B speed begins to lower, but stabilizes at ~ 2000 RPM and that annunciators 5002-2F and 3F remain locked in)
  • Exit Cue: If the examinee requests an Equipment Operator to investigate, acknowledge the order and then cue the examinee, Vibrations can be felt on the floor of TB 800. Im leaving due to safety concerns.

Page 9 of 13

JPM Number: JPM530 - rev 01 Clinton Power Station Job Performance Measure (JPM)

Comment SAT UNSAT STEP ELEMENT STANDARD Number 8.1.10 TDRFP Shutdown 8.1.10.1 Examinee discusses with the CRS the need to lockout the RR FCVs during the TDRFP S/D.

Cue: Do not lockout the RR FCVs.

Note: If the examinee elects to trip B TDRFP based on the report from the Equipment Operator, this step is NA.

8.1.10.4 Examinee clicks on:

  • FPB Trip/Reset pushbutton
  • TDRFP B (and observes the blue outline on the control box)
  • TDRFP B Trip (and then observes that the HP and LP Stop Valves remain full open)
  • Exit (may or may not perform)

Examinee reports failure of the B TDRFP to trip to the CRS.

  • 8.3.14 Securing A TDRFP That Will Not Trip 8.3.14.1 From P680 On 1H13-P680-5002, the examinee depresses the L pushbutton on the B TDRFP SLIM Controller and verifies the L pushbutton red light illuminates.

8.3.14.2 No action required; the SLIM is at 0%

output.

  • 8.3.14.3 Examinee locates control switch for 1B21-F303B on 1H13-P870-5016, rotates the control switch counter clockwise to the close position, and then verifies the green light illuminates and the red light extinguishes.

Examinee verifies TDRFP B RPM lowering, and that the high vibration annunciators clear.

Cue: the JPM is complete.

Page 10 of 13

JPM Number: JPM530 - rev 01 Clinton Power Station Job Performance Measure (JPM)

TERMINATING CUES:

The B TDRFP is secured IAW CPS No. 3103.01 section 8.3.14 Securing A TDRFP That Will Not Trip From P680.

STOP TIME:

Page 11 of 13

JPM Number: JPM530 - rev 01 Clinton Power Station Job Performance Measure (JPM)

Operators Name:

Job

Title:

£ EO £ RO £ SRO £ STA £ SRO Cert JPM

Title:

Turbine Driven Reactor Feed Pump (TDRFP) B Startup (Alternate Path)

JPM Number: JPM530 Revision Number: 00 Task Number and

Title:

310301.40d TDRFP Normal Startup/Rolling Standby Operation K/A System K/A Number Importance (RO/SRO) 259001 A4.02 3.9 3.7 Ability to manually operate and/or monitor in the control room:

Manually start/control a RFP/TDRFP Suggested Testing Environment: Simulator Actual Testing Environment: ¢ Simulator £ Plant £ Control Room Testing Method: £ Simulate Alternate Path: ¢ Yes £ No

¢ Perform SRO Only: £ Yes ¢ No Time Critical: £ Yes ¢ No Estimated Time to Complete: 25 minutes Actual Time Used: minutes

References:

CPS No. 3103.01, Rev 31 Feedwater (FW)

CPS 5002.02, Rev 29e Alarm Panel 5002 Annunciators - Row 2 CPS No. 5002.03, Rev 28b Alarm Panel 5002 Annunciators - Row 3 EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? £ Yes £ No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: £ Satisfactory £ Unsatisfactory Comments:

Evaluators Name: (Print)

Evaluators Signature: Date:

SRRS: 3D.105 (when utilized for operator initial or continuing training) Page 12 of 13

Clinton Power Station Job Performance Measure (JPM)

INITIAL CONDITIONS:

A reactor startup / power ascension is in progress.

Reactor power is ~ 50%.

Turbine Driven Reactor Feed Pump (TDRFP) A is operating on the Master Level Controller (MLC) in auto feeding the RPV.

TDRFP B is in rolling standby IAW CPS 3103.01 Feedwater (FW) section 8.1.4.2 TDRFP NORMAL Startup to Rolling STANDBY.

5 Condensate Polishers (A - E) are in service.

INITIATING CUE:

CAUTION

§ All pre-job briefings are completed.

The CRS has directed you to place TDRFP B in service feeding the RPV using the AUTO method IAW CPS 3103.01 Feedwater (FW) section 8.1.4.4. Transfer rolling STANDBY TDRFP to feeding RPV through 1FW002A (B).

Permission has been granted to perform all critical steps required to perform the task.

Report to the CRS after completing the task.

Page 13 of 13

CLINTON POWER STATION Job Performance Measure Steam Bypass Valve Tests JPM Number: JPM419 Revision Number: 00 Date: 2/18/15 Developed By: T. Jennings 2/18/15 Instructor Date Validated By: Matt Baker 10/25/16 SME or Instructor Date Reviewed By: Jim Lucas 11/15/16 Operations Representative Date Approved By: T. Jennings 11/15/16 Training Department Date JPM419 R0 System JPM c.docx Retain approved Master Copy per SRRS 3D.126/3D.111

JPM Number: JPM419 - rev 00 Clinton Power Station Job Performance Measure (JPM)

JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.

Prior to JPM usage, revalidate JPM using steps 8 and 12 below.

________ 1. Task description and number, JPM description and number are identified.

________ 2. Knowledge and Abilities (K/A) references are included.

________ 3. Performance location specified. (in-plant, control room, simulator, or other)

________ 4. Initial setup conditions are identified.

________ 5. Initiating cue (and terminating cue if required) are properly identified.

________ 6. Task standards identified and verified by SME review.

________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk

(*).

________ 8. Verify the procedure(s) referenced by this JPM reflects the current revision:

Procedure CPS 9072.01 Rev: 32e Procedure Rev:

Procedure Rev:

________ 9. Verify cues both verbal and visual are free of conflict.

________ 10. Verify performance time is accurate

________ 11. If the JPM cannot be performed as written with proper responses, then revise the JPM.

________ 12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:

SME / Instructor Date SME / Instructor Date SME / Instructor Date Page 2 of 12

JPM Number: JPM419 - rev 00 Clinton Power Station Job Performance Measure (JPM)

Revision Record (Summary)

Revision Date Description 00 2/18/15 New JPM.

Page 3 of 12

JPM Number: JPM419 - rev 00 Clinton Power Station Job Performance Measure (JPM)

Simulator Setup Instructions

1. Reset the simulator to an IC with the Main Turbine On-line.
2. No Simulator Lesson Plan is required for this JPM.
3. When the above steps are completed for this and other JPMs to be run concurrently, then validate the concurrently run JPMs if applicable.
4. This completes the setup for this JPM.
5. Save to a different IC if JPM is being used more than once. IC-225 is saved for the ILT 15-1 NRC Exam (password 76319).
6. Freeze Simulator.
7. Station a training instructor to monitor Main Turbine Bypass Valve Positions at 1H13-P678 and to initial IV blanks in 9072.01 Table 2: BPV Test Data when requested.

Page 4 of 12

JPM Number: JPM419 - rev 00 Clinton Power Station Job Performance Measure (JPM)

READ TO THE OPERATOR I will explain the initial conditions, which step(s) to simulate or discuss, and provide the initiating cues. When you complete the task successfully, the objective of this Job Performance Measure will be satisfied.

TASK STANDARDS:

  • The Steam Bypass Valve Tests are complete IAW CPS 9072.01 Steam Bypass Valve Tests.

TOOLS, EQUIPMENT, OTHER SPECIAL REQUIREMENTS:

  • None PROCEDURAL/

REFERENCES:

  • CPS No. 9072.01, Rev 32e Steam Bypass Valve Tests EVALUATOR INSTRUCTIONS:
  • Amplifying cues are provided within the JPM steps.
  • All pre-job briefings are completed.
  • This JPM contains cues provided to the examinee from the instructor stationed at 1H13-P678.

Review these cues with the instructor to ensure the communications between the instructor and examinee are clear and coordinated.

Page 5 of 12

JPM Number: JPM419 - rev 00 Clinton Power Station Job Performance Measure (JPM)

INITIAL CONDITIONS:

The reactor is in Mode 1 at ~ 50% power.

INITIATING CUE:

CAUTION

§ All pre-job briefings are completed.

You are an extra RO. The CRS has directed you to perform CPS 9072.01 Steam Bypass Valve Tests.

CPS 9072.01 Section 5.0 Prerequisites are complete.

The activity has been screened for production risk.

Another operator will monitor BPV positions at 1H13-P678.

Report to the CRS after completing the task.

START TIME:

Page 6 of 12

JPM Number: JPM419 - rev 00 Clinton Power Station Job Performance Measure (JPM)

PERFORMANCE INFORMATION Critical steps are denoted with an asterisk (*) to the left of the step number and appear in BOLDED letters. Failure to meet the standards for a critical step constitutes failure of the Job Performance Measure. The sequence of steps is assumed unless denoted in the comments section of the JPM.

PERFORMANCE STEPS CPS 9072.01 Steam Bypass Valve Tests Comment SAT UNSAT STEP ELEMENT STANDARD Number Note - CPS 9072.01 step 8.1 is a continuous action step with no physical actions required.

Step 8.2 1 Performs pre-test verifications.

Examinee locates the position meters for Bypass Valves 1-6 on 1H13-P678 and verifies they read 0% and then initials step 8.2 of the surveillance.

  • Note to evaluator - if the examinee requests the training instructor stationed at P678 to perform the verification, cue the examinee to perform the verifications instead.

Procedure step 8.3 is NA - step only applies if the plant is shutdown with a low vacuum condition present.

Step 8.4

  • 2 Aligns system for testing.

Examinee locates and momentarily depresses the BPV testing push-button on 1H13-P680-5006, and then verifies the:

  • TESTING light energizes
  • READY TO SELECT light energizes
  • OFF light de-energizes Examinee initials blanks for steps 8.4.1, 8.4.2, and 8.4.3.

Page 7 of 12

JPM Number: JPM419 - rev 00 Clinton Power Station Job Performance Measure (JPM)

Comment SAT UNSAT STEP ELEMENT STANDARD Number Note - CPS 9072.01 steps 8.5.1.1 & 8.5.1.2 are continuous action steps with no expected actions required.

  • 3 Strokes #1 BPV from fully open to fully 8.5.1.3 shut. Examinee depresses and holds the TEST BPV 1 push-button on 1H13-P680-5006 and observes the following:
1. Annunciator 5006-5M BYPASS VALVE OPEN CHECK LPSP alarms
2. The #1 BPV fast acting solenoid energizes during the last 5-15% of of travel.
3. The #1 BPV CLOSED light is de-energized.
4. The #1 BPV FULL OPEN light is energized.
5. 1H13-P678 meter indication for #1 BPV indicates ~ 100% and stops moving.

Cue - When #1 BPV reaches 100% open, the Training Instructor stationed at 1H13-P678 should cue the examinee that #1 BPV opened quickly the last 10% of opening travel and that the meter stopped moving.

8.5.1.4 Examinee releases the TEST BPV 1 push-button on 1H13-P680-5006 and observes the following:

1. The #1 BPV FULL OPEN light is de-energized.
2. The #1 BPV OPEN light is de-energized.
3. The #1 BPV CLOSED light is energized.
4. 1H13-P678 meter indication for #1 BPV indicates ~ 0% and stops moving.
5. Annunciator 5006-5M BYPASS VALVE OPEN CHECK LPSP resets Cue - When #1 BPV reaches 0% open, the Training Instructor stationed at 1H13-P678 should cue the examinee that #1 BPV meter is indicating 0% and has stopped moving.

Page 8 of 12

JPM Number: JPM419 - rev 00 Clinton Power Station Job Performance Measure (JPM)

Comment SAT UNSAT STEP ELEMENT STANDARD Number Evaluators

  • JPM Step #4 is optional - if desired, cue the examinee to proceed to CPS 9072.01 step 8.6 and perform step 8.6 and remaining steps of the surveillance.
  • If performing JPM step #4 on the remaining Bypass Valves, the examinee should allow a 7 minute stabilization period between cycling each BPV (procedure recommendation only).

8.5.2.3 (8.5.3.3, 8.5.4.3, 8.5.5.3, 8.5.6.3)

Examinee depresses and holds the TEST BPV 2-6 push-buttons (one at a time) on 1H13-P680-5006 and observes the following:

1. Annunciator 5006-5M BYPASS VALVE OPEN CHECK LPSP alarms for each valve tested.
2. The respective BPV fast acting solenoid energizes during the last 5-15% of of travel.
3. The respective BPV CLOSED light is de-energized.

Strokes #2 - 6 BPVs fully open, and

4. The respective BPV FULL OPEN then fully shut.

light is energized.

5. 1H13-P678 meter indication for the respective BPV indicates ~ 100%

and stops moving.

  • 4 Cue - When respective BPV reaches (optional) 100% open, the Training Instructor stationed at 1H13-P678 should cue the examinee that #1 BPV opened quickly the Evaluator placekeeping table - check after each BPV is tested. last 10% of opening travel and that the BPV BPV BPV BPV BPV meter stopped moving.
  1. 2 #3 #4 #5 #6 8.5.2.4 (8.5.3.4, 8.5.4.4, 8.5.5.4, 8.5.6.4)

Examinee releases the TEST BPV 1 push-button on 1H13-P680-5006 and observes the following:

1. The respective BPV FULL OPEN light is de-energized.
2. The respective BPV OPEN light is de-energized.
3. The respective BPV CLOSED light is energized.
4. 1H13-P678 meter indication for #1 BPV indicates ~ 0% and stops moving.
5. Annunciator 5006-5M BYPASS VALVE OPEN CHECK LPSP resets Page 9 of 12

JPM Number: JPM419 - rev 00 Clinton Power Station Job Performance Measure (JPM)

Comment SAT UNSAT STEP ELEMENT STANDARD Number Cue - When the respective BPV reaches 0% open, the Training Instructor stationed at 1H13-P678 should cue the examinee that the BPV meter is indicating 0% and has stopped moving.

8.6 - When all bypass valves have been tested, examinee momentarily depresses the OFF push-button on 1H13-P680-5006, and then verifies the following:

  • TESTING light de-energizes
  • READY TO SELECT light de-energizes
  • OFF light energizes
  • 5 Restores system alignment.

8.7 - Notifies the Electrical Supply Dispatcher and the Exelon Power Team of the test completion.

Cue - Notify the examinee that the JPM is complete.

TERMINATING CUES:

The Steam Bypass Valves have been tested IAW CPS 9072.01 Steam Bypass Valve Tests.

STOP TIME:

Page 10 of 12

JPM Number: JPM419 - rev 00 Clinton Power Station Job Performance Measure (JPM)

Operators Name:

Job

Title:

£ EO £ RO £ SRO £ STA £ SRO Cert JPM

Title:

Steam Bypass Valve Tests JPM Number: JPM419 Revision Number: 00 Task Number and

Title:

907201.01 Steam Bypass Valve Tests K/A System K/A Number Importance (RO/SRO) 241000 A4.06 3.9 3.9 Reactor Turbine Pressure Regulating System - Ability to manually operate and/or monitor in the control room: Bypass valves (operation).

Suggested Testing Environment: Simulator Actual Testing Environment: ¢ Simulator £ Plant £ Control Room Testing Method: £ Simulate Alternate Path: £ Yes ¢ No

¢ Perform SRO Only: £ Yes ¢ No Time Critical: £ Yes ¢ No Estimated Time to Complete: 10 minutes* Actual Time Used: minutes

  • only if JPM step 4 is omitted, otherwise 60 minutes

References:

CPS No. 9072.01, Rev 32e Steam Bypass Valve Tests EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? £ Yes £ No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: £ Satisfactory £ Unsatisfactory Comments:

Evaluators Name: (Print)

Evaluators Signature: Date:

SRRS: 3D.105 (when utilized for operator initial or continuing training) Page 11 of 12

Clinton Power Station Job Performance Measure (JPM)

INITIAL CONDITIONS:

The reactor is in Mode 1 at ~ 50% power.

INITIATING CUE:

CAUTION

§ All pre-job briefings are completed.

You are an extra RO. The CRS has directed you to perform CPS 9072.01 Steam Bypass Valve Tests.

CPS 9072.01 Section 5.0 Prerequisites are complete.

The activity has been screened for production risk.

Another operator will monitor BPV positions at 1H13-P678.

Report to the CRS after completing the task.

Page 12 of 12

CLINTON POWER STATION Job Performance Measure Perform a HPCS Pump Operability Test (Alternate Path)

JPM Number: JPM288 Revision Number: 02 Date: 8/29/16 Developed By: Tony Jennings 8/29/16 Instructor Date Validated By: Matt Baker 10/25/16 SME or Instructor Date Reviewed By: Jim Lucas 11/15/16 Operations Representative Date Approved By: T. Jennings 11/15/16 Training Department Date JPM288 R2 System JPM d.docx Retain approved Master Copy per SRRS 3D.126/3D.111

JPM288 - Rev 02 Clinton Power Station Job Performance Measure (JPM)

JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.

Prior to JPM usage, revalidate JPM using steps 8 and 12 below.

________ 1. Task description and number, JPM description and number are identified.

________ 2. Knowledge and Abilities (K/A) references are included.

________ 3. Performance location specified. (in-plant, control room, simulator, or other)

________ 4. Initial setup conditions are identified.

________ 5. Initiating cue (and terminating cue if required) are properly identified.

________ 6. Task standards identified and verified by SME review.

________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).

________ 8. Verify the procedure(s) referenced by this JPM reflects the current revision:

Procedure CPS 9051.01 Rev: 48 Procedure CPS 9051.01D001 Rev: 48 Procedure CPS 5062.04 Rev: 27b

________ 9. Verify cues both verbal and visual are free of conflict.

________ 10. Verify performance time is accurate

________ 11. If the JPM cannot be performed as written with proper responses, then revise the JPM.

________ 12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:

SME / Instructor Date SME / Instructor Date SME / Instructor Date Page 2 of 12

JPM288 - Rev 02 Clinton Power Station Job Performance Measure (JPM)

Revision Record (Summary)

Revision Date Description 0 6/21/12 New JPM 1 8/4/14 Updated procedure references.

2 8/29/16 Updated procedure references.

Page 3 of 12

JPM288 - Rev 02 Clinton Power Station Job Performance Measure (JPM)

Simulator Setup Instructions

1. IC Setup
a. Reset the simulator to any at power IC with HPCS Suction aligned to the RCIC Storage Tank (E22F001 open, E22F015 shut).
b. Place the HPCS Out of Service Switch to INOP.
c. Place the HPCS Test Prep Switch to TEST.
d. Save to a different IC if JPM is being used more than once. IC-225 (pw: 76319) is saved for the ILT 15-1 NRC Exam.
2. Simulator Setup
a. Reset the simulator to the IC established in step 1 above.
b. Open and execute Simulator Lesson Plan ILT 15-1 NRC Exam JPMs.
c. Release JPM288 to cause the following:
  • Energizes 1E22-F010 (completed prerequisite in 9051.01)
  • Fails 1E22-F001 Green light to off and Red light to on
  • Close 1E22-F001 (simulates suction clogging/collapsing) when HPCS flow is approximately greater than 2000 gpm.
  • Fails 1E22-F015 Control Switch to the Close position.
d. Verify HPCS Out of Service Switch to INOP.
e. Verify HPCS Test Prep Switch to TEST.
3. WHEN IC IS RESET, OVERRIDE SWITCH CHECK FOR A05-A02-A15S23 (if necessary).

Page 4 of 12

JPM288 - Rev 02 Clinton Power Station Job Performance Measure (JPM)

READ TO THE OPERATOR I will explain the initial conditions, which step(s) to simulate or discuss, and provide the initiating cues. When you complete the task successfully, the objective of this Job Performance Measure will be satisfied.

TASK STANDARDS:

  • HPCS Pump has been tripped due to loss of suction source.

TOOLS, EQUIPMENT, OTHER SPECIAL REQUIREMENTS:

  • None PROCEDURAL/

REFERENCES:

  • CPS No. 9051.01, Rev 48 HPCS Pump HPCS Water Leg Pump Operability
  • CPS No. 9051.01D001, Rev 48 HPCS Pump HPCS Water Leg Pump Operability Data Sheet
  • CPS No. 5062.04, Rev 27b Alarm Panel 5062 Annunciators - Row 4 EVALUATOR INSTRUCTIONS:
  • Provide the examinee with a copy of the Initial Conditions and Initiating Cue page (back page of the JPM) when providing the initiating cue.
  • Provide the examinee with marked up copies of :

o CPS No. 9051.01, HPCS Pump & HPCS Water Leg Pump Operability - up to and including step 8.2.7.1.

o CPS No. 9051.01D001, HPCS Pump & HPCS Water Leg Pump Operability Data Sheet -

up to and including any data collected up to step 8.2.7.1.

  • Amplifying cues are provided within the JPM steps.
  • All pre-job briefings are completed.

Page 5 of 12

JPM288 - Rev 02 Clinton Power Station Job Performance Measure (JPM)

INITIAL CONDITIONS:

You are the Extra RO assuming the shift.

CPS 9051.01, HPCS Pump & HPCS Water Leg Pump Operability is in progress.

An Equipment Operator is stationed locally at the HPCS Pump and has established communication with the Main Control Room.

INITIATING CUE:

Continue performing CPS 9051.01, HPCS Pump & HPCS Water Leg Pump Operability commencing at step 8.2.7.2.

Inform the CRS when section 8.2 is complete.

START TIME:

Page 6 of 12

JPM288 - Rev 02 Clinton Power Station Job Performance Measure (JPM)

PERFORMANCE INFORMATION Critical steps are denoted with an asterisk (*) to the left of the step number and appear in BOLDED letters. Failure to meet the standards for a critical step constitutes failure of the Job Performance Measure. The sequence of steps is assumed unless denoted in the comments section of the JPM.

9051.01 HPCS PUMP & HPCS WATER LEG PUMP OPERABILITY 8.2.7.2 Verify HPCS WATER LEG DISCHARGE PRESSURE LOW annunciator 5062-7D is cleared.

Standard: Examinee observes annunciator 5062-7D is clear (not illuminated).

Cue:

Comments SAT £ UNSAT £ Comment Number

Standard: Examinee places control switch for 1E22-C001 to the START position. Verifies RED light ON, GREEN light OFF. Observes HPCS motor current pegging high and then lowering into the meter green band.

Cue:

Comments SAT £ UNSAT £ Comment Number Page 7 of 12

JPM288 - Rev 02 Clinton Power Station Job Performance Measure (JPM) 8.2.7.4.1 Observe/perform (Record): Verify 1E22-F012, HPCS Pump Min Flow To Suppr Pool, indicates open.

Standard: Examinee observes RED light ON, GREEN light OFF for 1E22-F012. Records SAT on the data sheet for step 8.2.7.4.1 (D001 page 6).

Cue:

Comments SAT £ UNSAT £ Comment Number

  • 8.2.7.4.2 Alternately slowly throttle open both 1E22-F010 and 1E22-F011, HPCS First and Second Test Vlv To Storage Tank, and increase flow to ~ 5050 gpm as read on Comp Pt HP-DA301.

Standard: Examinee alternately places both control switches for 1E22-F010 and 1E22-F011 to the throttle open position.

Cue: If examinee reports receipt of Annunciator 5062-4D, acknowledge report.

Comments The suction line will start clogging when HPCS flow exceeds approximately 2000 gpm. HPCS Pump amps and flow will rapidly oscillate.

SAT £ UNSAT £ Comment Number Page 8 of 12

JPM288 - Rev 02 Clinton Power Station Job Performance Measure (JPM)

BEGINS ALTERNATE PATH 5062-4D, HPCS PUMP SUCTION PRESSURE ABNORMAL NOTE: Steps 1 and 2 may be performed in any order.

1. Verify/establish an available HPCS Suction Path (1E22-F001 preferred unless RCIC Tank/Suction Piping is not available) per CPS 3309.01, High Pressure Core Spray (HPCS). Refer to CPS 3309.01 (HPCS) CLOC PRECAUTION criteria.

Standard: Examinee verifies 1E22-F001 is full open (red light ON, green light OFF).

Cue:

Comments Examinee may elect to trip the HPCS Pump based on abnormal indications without referring to the Annunciator Response Procedure. This is an acceptable action.

SAT £ UNSAT £ Comment Number

  • 2 If HPCS pump is running for testing, and normal suction pressure was not restored by the previous step, trip the HPCS pump.

Standard: Examinee trips the HPCS Pump using the associated control switch.

Cue: If an operator is dispatched to investigate, cue the examinee that loud surging noises are coming from the HPCS Pump.

Comments SAT £ UNSAT £ Comment Number Page 9 of 12

JPM288 - Rev 02 Clinton Power Station Job Performance Measure (JPM)

Informs Control Room Supervisor.

Standard: Examinee informs Control Room Supervisor the HPCS was tripped per Annunciator Response Procedure.

Cue: Acknowledge the report. State JPM is complete.

Comments 1.

SAT £ UNSAT £ Comment Number TERMINATING CUES:

HPCS Pump has been tripped due to loss of suction source.

STOP TIME:

Page 10 of 12

JPM288 - Rev 02 Clinton Power Station Job Performance Measure (JPM)

Operators Name:

Job

Title:

£ NLO £ RO £ SRO £ STA £ SRO Cert JPM

Title:

Perform a HPCS Pump Operability Test (Alternate Path)

JPM Number: JPM288 Revision Number: 02 Task Number and

Title:

905101.06 - HPCS Pump & HPCS Water Leg Pump Operability K/A System K/A Number Importance (RO/SRO) 209002 A4.01 3.7 3.7 Ability to manually operate and/or monitor in the control room: HPCS pump.

Suggested Testing Environment: Simulator Actual Testing Environment: ¢ Simulator £ Plant £ Control Room Testing Method: £ Simulate Alternate Path: ¢ Yes £ No

¢ Perform SRO Only: £ Yes ¢ No Time Critical: £ Yes ¢ No Estimated Time to Complete: 15 minutes Actual Time Used: minutes

References:

  • CPS No. 9051.01, Rev 47e HPCS Pump HPCS Water Leg Pump Operability
  • CPS No. 9051.01D001, Rev 48 HPCS Pump HPCS Water Leg Pump Operability Data Sheet
  • *CPS No. 5062.04, Rev 27B Alarm Panel 5062 Annunciators - Row 4
  • Procedures with an asterisk do not need to be copied for the JPM administration.

EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? £ Yes £ No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: £ Satisfactory £ Unsatisfactory Comments:

Evaluators Name: (Print)

Evaluators Signature: Date:

SRRS: 3D.105 (when utilized for operator initial or continuing training) Page 11 of 12

Clinton Power Station Job Performance Measure (JPM)

INITIAL CONDITIONS:

You are the Extra RO assuming the shift.

CPS 9051.01, HPCS Pump & HPCS Water Leg Pump Operability is in progress.

An Equipment Operator is stationed locally at the HPCS Pump and has established communication with the Main Control Room.

INITIATING CUE:

Continue performing CPS 9051.01, HPCS Pump & HPCS Water Leg Pump Operability commencing at step 8.2.7.2.

Inform the CRS when section 8.2 is complete.

Page 12 of 12

CLINTON POWER STATION Job Performance Measure Place Feedwater Leakage Control (FWLC) In-Service JPM Number: JPM473 Revision Number: 00 Date: 9/14/16 Developed By: T. Jennings 9/14/16 Instructor Date Validated By: Matt Baker 10/26/16 SME or Instructor Date Reviewed By: Jim Lucas 11/15/16 Operations Representative Date Approved By: T. Jennings 11/15/16 Training Department Date JPM473 R0 System JPM e.docx Retain approved Master Copy per SRRS 3D.126/3D.111

JPM Number: JPM473 - rev 00 Clinton Power Station Job Performance Measure (JPM)

JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.

Prior to JPM usage, revalidate JPM using steps 8 and 12 below.

________ 1. Task description and number, JPM description and number are identified.

________ 2. Knowledge and Abilities (K/A) references are included.

________ 3. Performance location specified. (in-plant, control room, simulator, or other)

________ 4. Initial setup conditions are identified.

________ 5. Initiating cue (and terminating cue if required) are properly identified.

________ 6. Task standards identified and verified by SME review.

________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk

(*).

________ 8. Verify the procedure(s) referenced by this JPM reflects the current revision:

Procedure CPS 3312.01 Rev: 45b Procedure Rev:

Procedure Rev:

________ 9. Verify cues both verbal and visual are free of conflict.

________ 10. Verify performance time is accurate

________ 11. If the JPM cannot be performed as written with proper responses, then revise the JPM.

________ 12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:

SME / Instructor Date SME / Instructor Date SME / Instructor Date Page 2 of 10

JPM Number: JPM473 - rev 00 Clinton Power Station Job Performance Measure (JPM)

Revision Record (Summary)

Revision Date Description 00 9/14/16 New JPM.

Page 3 of 10

JPM Number: JPM473 - rev 00 Clinton Power Station Job Performance Measure (JPM)

Simulator Setup Instructions

1. IC Setup
a. Reset the simulator to any shutdown IC.
b. Open or verify open 1B21-F065A and B RPV Inlet Valves.
c. Open and execute Simulator Lesson Plan JPM473 containing the following:
1) RAT_B_DIFFERENTIAL
2) YP_XMFTB_1 HPCS PMP MTR COUPLING FAILURE
3) YFRIPPSS RCIC PUMP SHEARED SHAFT
4) Ed01LMalfMot(32) = 3 LPCS Motor Short Circuit
5) Ed01LMalfMot(35) = 3 RHR Pump C002C Motor Short Circuit
6) YPXMALSE_510 RR03B-RR B SUCTION LINE LEAK (51%)
d. Allow ADS to automatically initiate and depressurize the RPV.
e. Ensure plant is stable and then save to a different IC if JPM is being used more than once.

IC-227 (pw: 76319) is saved for the ILT 15-1 NRC Exam.

2. JPM Setup
a. Reset the simulator to the IC saved in Section 1 above with the reactor shutdown, a LOCA present, and RHR A and B operating in LPCI injection mode.
b. No Simulator Lesson Plan is required once the IC has been established.
c. When the above steps are completed for this and other JPMs to be run concurrently, then validate the concurrently run JPMs if applicable.
d. This completes the setup for this JPM.
e. Place the simulator in freeze.

Page 4 of 10

JPM Number: JPM473 - rev 00 Clinton Power Station Job Performance Measure (JPM)

READ TO THE OPERATOR I will explain the initial conditions, which step(s) to simulate or discuss, and provide the initiating cues. When you complete the task successfully, the objective of this Job Performance Measure will be satisfied.

TASK STANDARDS:

  • Examinee has successfully placed the Feedwater Leakage Control System (FWLCS) in service.

TOOLS, EQUIPMENT, OTHER SPECIAL REQUIREMENTS:

  • None PROCEDURAL/

REFERENCES:

EVALUATOR INSTRUCTIONS:

  • Provide the examinee with a copy of the Initial Conditions and Initiating Cue page (back page of the JPM) when providing the initiating cue.
  • Amplifying cues are provided within the JPM steps.
  • All pre-job briefings are completed.

Page 5 of 10

JPM Number: JPM473 - rev 00 Clinton Power Station Job Performance Measure (JPM)

INITIAL CONDITIONS:

A Loss of Coolant Accident has occurred.

FW/CB/CD injection is no longer available.

INITIATING CUE:

CAUTION

§ All pre-job briefings are completed.

This is a time critical JPM.

The CRS has directed you to place Feedwater Leakage Control System (FWLCS) in service per CPS 3312.01 Residual Heat Removal (RHR) section 8.3.1 Feedwater Leakage Control System (FWLCS).

Report to the CRS when the task has been completed.

START TIME:

Page 6 of 10

JPM Number: JPM473 - rev 00 Clinton Power Station Job Performance Measure (JPM)

PERFORMANCE INFORMATION Critical steps are denoted with an asterisk (*) to the left of the step number and appear in BOLDED letters. Failure to meet the standards for a critical step constitutes failure of the Job Performance Measure. The sequence of steps is assumed unless denoted in the comments section of the JPM.

PERFORMANCE STEPS CPS 3312.01, Residual Heat Removal (RHR) Section 8.3.1 Comment SAT UNSAT STEP ELEMENT STANDARD Number

  • 1 Aligns RHR A and B to the Feedwater 8.3.1.1 Leakage Control (FWLC) System. Examinee determines FW/CB/CD injection is no longer available.

Cue: If asked, cue the examinee that FW/CB/CD injection is no longer available.

Evaluator - Record current time: ________

  • 8.3.1.2 Examinee rotates the control switches for 1B21-F065A and B RPV Inlet Valves (1H13-P870-5016) counter clockwise to the close position and verifies green lights are illuminated and red lights are extinguished.

8.3.1.3 Examinee observes that RPV pressure is <

330 psig using PPC or MCR meter indications.

8.3.1.4 Examinee observes that RHR Pumps A and B are operating in LPCI mode.

  • 8.3.1.5 On 1H13-P601-5065, examinee turns the control switch for 1E12-F496, RHR to Feedwater B Keep Fill Valve clockwise to the Open position and verifies red light illuminated and green light extinguished.

Page 7 of 10

JPM Number: JPM473 - rev 00 Clinton Power Station Job Performance Measure (JPM)

Comment SAT UNSAT STEP ELEMENT STANDARD Number

  • 1 (contd) *8.3.1.6 On 1H13-P601-5064, examinee turns the control switch for 1E12-F497, RHR to Feedwater A Keep Fill Valve clockwise to the Open position and verifies red light illuminated and green light extinguished.

Evaluator - Record current time: ________

Evaluator - Verify times recorded in step 8.3.1.6 and 8.3.1.1 does not exceed 20 minutes.

Cue: State the JPM is complete.

TERMINATING CUES:

RHR A and B are aligned to the Feedwater Leakage Control (FWLC) System.

STOP TIME:

Page 8 of 10

JPM Number: JPM473 - rev 00 Clinton Power Station Job Performance Measure (JPM)

Operators Name:

Job

Title:

£ EO £ RO £ SRO £ STA £ SRO Cert JPM

Title:

Place Feedwater Leakage Control (FWLC) In-Service JPM Number: JPM473 Revision Number: 00 Task Number and

Title:

331201.22 Feedwater Leakage Control System (FWLCS)

K/A System K/A Number Importance (RO/SRO) 223001 A2.01 4.3 4.4 Ability to (a) predict the impacts of the following on the PRIMARY CONTAINMENT SYSTEM AND AUXILIARIES; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those abnormal conditions or operations: Loss of coolant accident Suggested Testing Environment: Simulator Actual Testing Environment: ¢ Simulator £ Plant £ Control Room Testing Method: £ Simulate Alternate Path: £ Yes ¢ No

¢ Perform SRO Only: £ Yes ¢ No Time Critical: ¢ Yes £ No Estimated Time to Complete: 10 minutes Actual Time Used: minutes

References:

CPS 3312.01, Rev 45b RESIDUAL HEAT REMOVAL (RHR)

EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? £ Yes £ No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: £ Satisfactory £ Unsatisfactory Comments:

Evaluators Name: (Print)

Evaluators Signature: Date:

SRRS: 3D.105 (when utilized for operator initial or continuing training) Page 9 of 10

Clinton Power Station Job Performance Measure (JPM)

INITIAL CONDITIONS:

A Loss of Coolant Accident has occurred.

FW/CB/CD injection is no longer available.

INITIATING CUE:

CAUTION

§ All pre-job briefings are completed.

This is a time critical JPM.

The CRS has directed you to place Feedwater Leakage Control System (FWLCS) in service per CPS 3312.01 Residual Heat Removal (RHR) section 8.3.1 Feedwater Leakage Control System (FWLCS).

Report to the CRS when the task has been completed.

Page 10 of 10

CLINTON POWER STATION Job Performance Measure Re-energize 4160V Bus 1A JPM Number: JPM503 Revision Number: 01 Date: 9/16/16 Developed By: T. Jennings 9/16/16 Instructor Date Validated By: Brian Glynn 10/25/16 SME or Instructor Date Reviewed By: Jim Lucas 11/15/16 Operations Representative Date Approved By: T. Jennings 11/15/16 Training Department Date JPM503 R1 System JPM f.docx Retain approved Master Copy per SRRS 3D.126/3D.111

JPM Number: JPM503 - rev 01 Clinton Power Station Job Performance Measure (JPM)

JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.

Prior to JPM usage, revalidate JPM using steps 8 and 12 below.

________ 1. Task description and number, JPM description and number are identified.

________ 2. Knowledge and Abilities (K/A) references are included.

________ 3. Performance location specified. (in-plant, control room, simulator, or other)

________ 4. Initial setup conditions are identified.

________ 5. Initiating cue (and terminating cue if required) are properly identified.

________ 6. Task standards identified and verified by SME review.

________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk

(*).

________ 8. Verify the procedure(s) referenced by this JPM reflects the current revision:

Procedure CPS 4200.01 Rev: 24 Procedure CPS 3501.01 Rev:28c Procedure Rev:

________ 9. Verify cues both verbal and visual are free of conflict.

________ 10. Verify performance time is accurate

________ 11. If the JPM cannot be performed as written with proper responses, then revise the JPM.

________ 12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:

SME / Instructor Date SME / Instructor Date SME / Instructor Date Page 2 of 10

JPM Number: JPM503 - rev 01 Clinton Power Station Job Performance Measure (JPM)

Revision Record (Summary)

Revision Date Description 00 11/17/12 New JPM.

01 9/16/16 Updated procedure references. Updated to new template.

Page 3 of 10

JPM Number: JPM503 - rev 01 Clinton Power Station Job Performance Measure (JPM)

Simulator Setup Instructions

1. IC Setup
a. Initialize to any suitable at power IC.
b. Verify CRD Pump B is running.
c. Insert a manual scram and allow the MDRFP to stabilize RPV level.
d. Place the following control switches in PTL or Lock/Stop:
1) Component Cooling Water Pump 1A, 1CC01PA
2) Component Cooling Water Pump 1C, 1CC01PC
3) Plant Service Water Pump 1A, 1WS01PA
4) Plant Service Water Pump 1C, 1WS01PC
5) Service Air Compressor 0, 0SA01C
6) Condensate Pump 1A, 1CD01PA
7) Condensate Pump 1C, 1CD01PC
8) Condensate Booster A, 1CB01PA / Cond Booster Pmp 1A Aux Lube Oil Pmp, 1CB07PA
9) Condensate Booster C, 1CB01PC / Cond Booster Pmp 1C Aux Lube Oil Pmp, 1CB07PC
e. Save to a different IC if JPM is being used more than once. IC-226 (IC Password: 76319) is saved for ILT 15-1 NRC Exam. When IC-226 is reset, override switch check for A04_A23_S06 (if necessary).
2. JPM Setup
a. Reset the simulator to the IC saved in Section 1 above.
b. Open and execute simulator lesson plan ILT 15-1 NRC Exam JPMs.
c. Release JPM503 which performs the following:
1) Inserts override to switch 4160V BUS 1A RES BKR 1AP06EM to the PTL position.
2) Overrides 1AP06EM GREEN LITE to ON.
d. When the above steps are completed for this and other JPMs to be run concurrently, then validate the concurrently run JPMs if applicable.
e. This completes the setup for this JPM.
f. Freeze Simulator.

Page 4 of 10

JPM Number: JPM503 - rev 01 Clinton Power Station Job Performance Measure (JPM)

READ TO THE OPERATOR I will explain the initial conditions, which step(s) to simulate or discuss, and provide the initiating cues. When you complete the task successfully, the objective of this Job Performance Measure will be satisfied.

TASK STANDARDS:

  • 4160 Volt Bus 1A is re-energized per CPS 4200.01 Loss of AC Power section 4.3 and CPS 3501.01 High Voltage Auxiliary Power System section 8.1.2 Energizing 4160V Bus 1A, 1AP06E.

TOOLS, EQUIPMENT, OTHER SPECIAL REQUIREMENTS:

  • None PROCEDURAL/

REFERENCES:

  • CPS No. 4200.01, Rev 24 Loss Of AC Power
  • CPS No. 3501.01, Rev 28c High Voltage Auxiliary Power System EVALUATOR INSTRUCTIONS:
  • Amplifying cues are provided within the JPM steps.
  • All pre-job briefings are completed.
  • Provide the examinee with a copy of the Initial Conditions and Initiating Cue page (back page of the JPM) when providing the initiating cue.
  • Provide the examinee with copies of CPS 4200.01 Loss of AC Power and CPS 3501.01 High Voltage Auxiliary Power System marked up as follows:

o CPS 4200.01, section 4.3, all steps complete up to and including step 4.3.3.2.

o CPS 3501.01 (blank)

Page 5 of 10

JPM Number: JPM503 - rev 01 Clinton Power Station Job Performance Measure (JPM)

INITIAL CONDITIONS:

A scram has occurred.

4160V Bus 1A failed to transfer to the reserve source due to a breaker failure.

The breaker failure has been corrected.

INITIATING CUE:

CAUTION

§ All pre-job briefings are completed.

You are the B RO.

The CRS has directed you to re-energize 4160V Bus 1A IAW CPS 4200.01 Loss of AC Power, section 4.3 Loss of Non-ECCS Busses.

In CPS 4200.01 section 4.3, all steps are complete up to and including step 4.3.3.2 (completed by another Reactor Operator). Equipment control switches listed in CPS 4200.01 Appendix A for 4160V Bus 1A have been placed in PULL-TO-LOCK or LOCKED and verified.

After 4160V Bus 1A has been re-energized, restoration actions will be performed by another Reactor Operator.

Report to the CRS after completing the task.

START TIME:

Page 6 of 10

JPM Number: JPM503 - rev 01 Clinton Power Station Job Performance Measure (JPM)

PERFORMANCE INFORMATION Critical steps are denoted with an asterisk (*) to the left of the step number and appear in BOLDED letters. Failure to meet the standards for a critical step constitutes failure of the Job Performance Measure. The sequence of steps is assumed unless denoted in the comments section of the JPM.

PERFORMANCE STEPS CPS 4200.01 Loss of AC Power CPS 3501.01 High Voltage Auxiliary Power Comment SAT UNSAT STEP ELEMENT STANDARD Number

  • 1 Prepares 4160V Bus 1A for re-energization. *CPS 4200.01 step 4.3.3.3 On 1H13-P870-5012, examinee places the following control switches in PTL:
  • 4160V Bus 1A Mn Bkr 1A 1AP06EK
  • 4160V Bus 1A Res Bkr 1A 1AP06EM Cue: If asked about the availability of DC control power to 4160V Bus 1A, cue the examinee that DC control power was unaffected by the failure.

CPS 4200.01 step 4.3.3.4 Examinee proceeds to CPS 3501.01 High Voltage Auxiliary Power System to re-energize 4160V Bus 1A.

CPS 3501.01 step 8.1.2.1 Examinee verifies that 4160V Bus 1A Mn Bkr 1A 1AP06EK and 4160V Bus 1A Res Bkr 1A 1AP06EM are in the Pull-To-Lock position (performed in CPS 4200.01 step 4.3.3.3 above).

CPS 3501.01 step 8.1.2.2 On 1H13-P870-5012, examinee opens/verifies open (green light illuminated, red light extinguished) the following breakers:

  • 480V XFMR Q & I BKR, 1AP06EJ
  • 480V XFMR G & K BKR, 1AP06EQ CPS 3501.01 steps 8.1.2.3 & 8.1.2.4 Examinee verifies control switches for 4160V Bus 1A loads are in Pull-To-Lock or Lock/Stop.

Evaluator note - no action is required by the examinee. This verification was noted as complete in the initiating cue.

Page 7 of 10

JPM Number: JPM503 - rev 01 Clinton Power Station Job Performance Measure (JPM)

Comment SAT UNSAT STEP ELEMENT STANDARD Number

  • 2 Re-energizes 4160V Bus 1A *CPS 3501.01 step 8.1.2.5 On 1H13-P870-5012, examinee places 4160V Bus 1A Res Bkr Sync switch to ON.
  • CPS 3501.01 step 8.1.2.6 On 1H13-P870-5012, examinee places 4160V Bus 1A Res Bkr 1AP06EM in CLOSE (red light illuminated and green light extinguished).

CPS 3501.01 step 8.1.2.7 Examinee verifies 4160 Bus 1A energized by observing any/all of the following indications:

  • Bus energized red light
  • 4160 V Bus 1A Voltage Meter on P870

CPS 3501.01 step 8.1.2.8 On 1H13-P870-5012, examinee places 4160V Bus 1A Res Bkr Sync switch to OFF.

CPS 3501.01 step 8.1.2.9 Examinee may place 4160V Bus 1A Mn Bkr, 1AP06EK C/S to AUTO.

Evaluator note - Examinee may N/A step 8.1.2.9 in anticipation of placing the plant in a normal shutdown alignment. If that occurs, is should not be considered a competency hit.

CPS 3501.01 step 8.1.2.10 Re-energize 480V Unit Subs No action required by examinee.

Cue - State that the JPM is complete.

TERMINATING CUES:

4160V Bus 1A is re-energized IAW CPS 4200.01 Loss of AC Power and CPS 3501.01 High Voltage Auxiliary Power System.

STOP TIME:

Page 8 of 10

JPM Number: JPM503 - rev 01 Clinton Power Station Job Performance Measure (JPM)

Operators Name:

Job

Title:

£ EO £ RO £ SRO £ STA £ SRO Cert JPM

Title:

Re-energize 4160V Bus 1A JPM Number: JPM503 Revision Number: 01 Task Number and

Title:

350101.17 Energize 4160V Bus 1A 1AP06E K/A System K/A Number Importance (RO/SRO) 295003 AA1.01 3.7 3.8 Ability to operate and/or monitor the following as they apply to PARTIAL OR COMPLETE LOSS OF A.C. POWER: A.C. electrical distribution system.

Suggested Testing Environment: Simulator Actual Testing Environment: ¢ Simulator £ Plant £ Control Room Testing Method: £ Simulate Alternate Path: £ Yes ¢ No

¢ Perform SRO Only: £ Yes ¢ No Time Critical: £ Yes ¢ No Estimated Time to Complete: 15 minutes Actual Time Used: minutes

References:

  • CPS 4200.01, Rev 24 Loss of AC Power
  • CPS 3501.01, Rev 28c High Voltage Auxiliary Power System EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? £ Yes £ No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: £ Satisfactory £ Unsatisfactory Comments:

Evaluators Name: (Print)

Evaluators Signature: Date:

SRRS: 3D.105 (when utilized for operator initial or continuing training) Page 9 of 10

Clinton Power Station Job Performance Measure (JPM)

INITIAL CONDITIONS:

A scram has occurred.

4160V Bus 1A failed to transfer to the reserve source due to a breaker failure.

The breaker failure has been corrected.

INITIATING CUE:

CAUTION

§ All pre-job briefings are completed.

You are the B RO.

The CRS has directed you to re-energize 4160V Bus 1A IAW CPS 4200.01 Loss of AC Power, section 4.3 Loss of Non-ECCS Busses.

In CPS 4200.01 section 4.3, all steps are complete up to and including step 4.3.3.2 (completed by another Reactor Operator). Equipment control switches listed in CPS 4200.01 Appendix A for 4160V Bus 1A have been placed in PULL-TO-LOCK or LOCKED and verified.

After 4160V Bus 1A has been re-energized, restoration actions will be performed by another Reactor Operator.

Report to the CRS after completing the task.

Page 10 of 10

CLINTON POWER STATION Job Performance Measure Restore ADS Air Supply To Normal Source JPM Number: JPM427 Revision Number: 02 Date: 8/29/16 Developed By: T. Jennings 8/29/16 Instructor Date Validated By: Matt Baker 10/25/16 SME or Instructor Date Reviewed By: Jim Lucas 11/15/16 Operations Representative Date Approved By: T. Jennings 11/15/16 Training Department Date JPM427 R2 System JPM g.docx Retain approved Master Copy per SRRS 3D.126/3D.111

JPM Number: JPM427 - Rev 02 Clinton Power Station Job Performance Measure (JPM)

JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.

Prior to JPM usage, revalidate JPM using steps 8 and 12 below.

________ 1. Task description and number, JPM description and number are identified.

________ 2. Knowledge and Abilities (K/A) references are included.

________ 3. Performance location specified. (in-plant, control room, simulator, or other)

________ 4. Initial setup conditions are identified.

________ 5. Initiating cue (and terminating cue if required) are properly identified.

________ 6. Task standards identified and verified by SME review.

________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk

(*).

________ 8. Verify the procedure(s) referenced by this JPM reflects the current revision:

Procedure CPS 3101.01 Rev: 23e Procedure Rev:

Procedure Rev:

________ 9. Verify cues both verbal and visual are free of conflict.

________ 10. Verify performance time is accurate

________ 11. If the JPM cannot be performed as written with proper responses, then revise the JPM.

________ 12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:

SME / Instructor Date SME / Instructor Date SME / Instructor Date Page 2 of 13

JPM Number: JPM427 - Rev 02 Clinton Power Station Job Performance Measure (JPM)

Revision Record (Summary)

Revision Date Description 00 07/28/10 Update Procedure Revs, KAs and JPM number (31010107LSN02) 01 06/14/13 Updated to new template 02 8/29/16 Updated procedure references. Made editorial changes to the simulator setup instructions.

Page 3 of 13

JPM Number: JPM427 - Rev 02 Clinton Power Station Job Performance Measure (JPM)

Simulator Setup Instructions Simulator Setup

1. Initialize to any suitable shutdown IC.
2. Place ADS Backup Air Bottles in service with 1IA012A & 13A open, and 1IA012B & 13B shut IAW 3101.01 Steps 8.2.4.1 through 8.2.4.2.
3. Save to a different IC if JPM is being used more than once. IC-226 (PW 76319) is saved for the ILT 15-1 NRC Exam.

JPM Administration

1. Initialize to IC-226 (PW 76319).
2. Open and execute Simulator Lesson Plan ILT 15-1 NRC Exam JPMs.
3. Release JPM427 which will insert the following instructor overrides and malfunctions:
  • Fail 1PI-IA079 to 125 psig (0.5) on a 2 minute ramp when 1IA013A is shut.
  • Fail 1PI-IA078 to 125 psig (0.5) on a 2 minute ramp when 1IA012A is shut.
  • Delete the 1PI-IA079 (P601) instructor override when 1IA013A is reopened.
  • Delete the 1PI-IA078 (P601) instructor override when 1IA012A is reopened.
  • Clear Annunciator 5040-6F when both 1IA013A and 1IA012A open.
4. Prepare a (blank) administration copy of CPS 3101.01 MAIN STEAM (MS, IS & ADS) for candidate place-keeping.
5. When the above steps are completed for this and other JPMs to be run concurrently, then validate the concurrently run JPMs if applicable.
6. This completes the setup for this JPM.
7. Freeze Simulator.

Page 4 of 13

JPM Number: JPM427 - Rev 02 Clinton Power Station Job Performance Measure (JPM)

READ TO THE OPERATOR I will explain the initial conditions, which step(s) to simulate or discuss, and provide the initiating cues. When you complete the task successfully, the objective of this Job Performance Measure will be satisfied.

TASK STANDARDS:

ADS)

TOOLS, EQUIPMENT, OTHER SPECIAL REQUIREMENTS:

  • None PROCEDURAL/

REFERENCES:

EVALUATOR INSTRUCTIONS:

  • Amplifying cues are provided within the JPM steps.
  • All pre-job briefings are completed.
  • Provide the examinee with a copy of the Initial Conditions and Initiating Cue page (back page of the JPM) when providing the initiating cue.

Page 5 of 13

JPM Number: JPM427 - Rev 02 Clinton Power Station Job Performance Measure (JPM)

INITIAL CONDITIONS:

You are the B RO.

Due to a loss of IA, the ADS backup air bottles were placed in service.

INITIATING CUE:

CAUTION

§ All pre-job briefings are completed.

Instrument Air has been restored.

Return ADS to the normal air supply per 3101.01 Main Steam (MS, IS & ADS) step 8.2.4.5.

Report to the CRS after completing the task.

START TIME:

Page 6 of 13

JPM Number: JPM427 - Rev 02 Clinton Power Station Job Performance Measure (JPM)

PERFORMANCE INFORMATION Critical steps are denoted with an asterisk (*) to the left of the step number and appear in BOLDED letters. Failure to meet the standards for a critical step constitutes failure of the Job Performance Measure. The sequence of steps is assumed unless denoted in the comments section of the JPM.

PERFORMANCE STEPS CPS No. 3101.01 MAIN STEAM (MS, IS & ADS)

  • 8.2.4.5.1 Place Control Switches for 1IA012A AND 1IA013A, ADS IA CNMT Outbd Isol Vlv to CLOSE.

Standard: At 1H13-P800-5041, examinee:

  • locates the control switch for 1IA012A and rotates the switch counter clockwise to the CLOSE position and then verifies the Green light comes ON and the Red light goes OFF.
  • locates the control switch for 1IA013A and rotates the switch counter clockwise to the CLOSE position and then verifies the Green light comes ON and the Red light goes OFF.

Cue:

Comments SAT £ UNSAT £ Comment Number

  • 8.2.4.5.2 Place Control Switches for 1IA012B AND 1IA013B, ADS IA CNMT Inbd Isol Vlv to OPEN.

Standard: At 1H13-P800-5041, examinee:

  • locates the control switch for 1IA012B and rotates the switch clockwise to the OPEN position and then verifies the Red light comes ON and the Green light goes OFF.
  • locates the control switch for 1IA013B and rotates the switch clockwise to the OPEN position and then verifies the Red light comes ON and the Green light goes OFF.

Cue:

Page 7 of 13

JPM Number: JPM427 - Rev 02 Clinton Power Station Job Performance Measure (JPM)

Comments SAT £ UNSAT £ Comment Number 8.2.4.5.3 Return Control Switches for 1IA012A AND 1IA013A to AUTO.

Standard: At 1H13-P800-5041, examinee:

  • Locates the control switch for 1IA012A and rotates the switch clockwise to the AUTO position.
  • Locates the control switch for 1IA013A and rotates the switch clockwise to the AUTO position.

Cue:

Comments No valve movement will occur when the 1IA012A and 13A control switches are restored to AUTO.

SAT £ UNSAT £ Comment Number 8.2.4.5.4 Verify ADS Air Hdr Pressure on 1H13-P601 (1PI-IA078 / 79) is 160 - 170 psig.

Standard: Locates 1PI-IA078 / 79 on 1H13-P601-5067 and determines air pressure is less than 160 psig.

Cue: If the examinee requests an Equipment Operator to check air amplifier operation, cue him/her that the Containment is not accessible.

Comments SAT £ UNSAT £ Comment Number Page 8 of 13

JPM Number: JPM427 - Rev 02 Clinton Power Station Job Performance Measure (JPM)

ALTERNATE PATH BEGINS HERE Annunciator 5040-6F High/Low Press ADS IA Supply Div 1 or 2.

Alternate Path Responds to Annunciator 5040-6F High/Low Press ADS IA Supply Div 1 or 2.

Step 1 OPERATOR ACTIONS

4. As appropriate, shift to ADS Backup Air Bottles or Normal IA Standard: Examinee refers to Annunciator Response Procedure 5040-6F and determines that Operator Action 4 applies.

Cue: If the examinee reports receipt of annunciator 5040-6F, acknowledge the report.

Comments SAT £ UNSAT £ Comment Number CPS No. 3101.01 MAIN STEAM (MS, IS & ADS)

  • Alternate Shut 1IA012B, ADS IA CNMT Inbd Isol Vlv. Verify 1IA012A, ADS IA Path Step 2 CNMT Outbd Isol Vlv opens.
  • 8.2.4.1 Standard:
  • Examinee locates the control switch for 1IA012B ADS IA CNMT Inbd Isol Vlv on 1H13-P800-5041, rotates the switch counter clockwise and then verifies the Green light comes ON and the Red light goes OFF.
  • Examinee locates the control switch for 1IA012A and verifies the Red light comes ON and the Green light goes OFF.

Cue:

Comments Closing 1IA012B is the only portion of the step that is critical.

SAT £ UNSAT £ Comment Number Page 9 of 13

JPM Number: JPM427 - Rev 02 Clinton Power Station Job Performance Measure (JPM)

  • Alternate Shut 1IA013B, ADS IA CNMT Inbd Isol Vlv. Verify 1IA013A, ADS IA Path Step 3 CNMT Outbd Isol Vlvs opens.

8.2.4.2 Standard:

  • Examinee locates the control switch for 1IA013B ADS IA CNMT Inbd Isol Vlv on 1H13-P800-5041, rotates the switch counter clockwise and then verifies the Green light comes ON and the Red light goes OFF.
  • Examinee locates the control switch for 1IA013A and verifies the Red light comes ON and the Green light goes OFF.

Cue:

Comments Closing 1IA013B is the only portion of the step that is critical.

SAT £ UNSAT £ Comment Number JPM Step 8 Verify (1H13-P601, 5067):

8.2.4.3 o ADS Instrument Air Hdr Pressure, 1PI-IA078/79 > 147.5 psig.

o ADS Backup Air Hdr Pressure, 1PI-IA080/81 > 2300 psig.

Standard:

Cue: If the examinee reports that the ADS Backup Air Bottles have been placed on service, acknowledge the report.

Comments SAT £ UNSAT £ Comment Number Page 10 of 13

JPM Number: JPM427 - Rev 02 Clinton Power Station Job Performance Measure (JPM)

TERMINATING CUES:

ADS Backup Air Bottles have been placed in service IAW CPS No. 3101.01 Main Steam (MS, IS, &

ADS) section 8.2.4 Placing ADS Backup Air Bottles On Service.

STOP TIME:

Page 11 of 13

JPM Number: JPM427 - Rev 02 Clinton Power Station Job Performance Measure (JPM)

Operators Name:

Job

Title:

£ EO £ RO £ SRO £ STA £ SRO Cert JPM

Title:

Restore ADS Air Supply To Normal Source JPM Number: JPM427 Revision Number: 02 Task Number and

Title:

310101.08 Complete control room actions to perform placing ADS backup air bottles in service.

K/A System K/A Number Importance (RO/SRO) 300000 A4.01 2.6 2.7 Ability to manually operate and/or monitor in the control room:

Pressure gauges Suggested Testing Environment: Simulator Actual Testing Environment: ¢ Simulator £ Plant £ Control Room Testing Method: £ Simulate Alternate Path: ¢ Yes £ No

¢ Perform SRO Only: £ Yes ¢ No Time Critical: £ Yes ¢ No Estimated Time to Complete: 15 minutes Actual Time Used: minutes

References:

  • CPS 5040.06 (6F) HIGH/LOW PRESS ADS IA SUPPLY DIV 1 OR 2, Rev. 28b EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? £ Yes £ No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: £ Satisfactory £ Unsatisfactory Comments:

Evaluators Name: (Print)

Evaluators Signature: Date:

SRRS: 3D.105 (when utilized for operator initial or continuing training) Page 12 of 13

Clinton Power Station Job Performance Measure (JPM)

INITIAL CONDITIONS:

You are the B RO.

Due to a loss of IA, the ADS backup air bottles were placed in service.

INITIATING CUE:

CAUTION

§ All pre-job briefings are completed.

Instrument Air has been restored.

Return ADS to the normal air supply per 3101.01 Main Steam (MS, IS & ADS) step 8.2.4.5.

Report to the CRS after completing the task.

Page 13 of 13

CLINTON POWER STATION Job Performance Measure VF Trip During Swap of VC Trains (Alternate Path)

JPM Number: JPM474 Revision Number: 00 Date: 9/14/16 Developed By: T. Jennings 9/14/16 Instructor Date Validated By: Michael Antonelli 10/25/16 SME or Instructor Date Reviewed By: Jim Lucas 11/15/16 Operations Representative Date Approved By: T. Jennings 11/15/16 Training Department Date JPM474 R0 System JPM h.docx Retain approved Master Copy per SRRS 3D.126/3D.111

JPM Number: JPM474 - rev 00 Clinton Power Station Job Performance Measure (JPM)

JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.

Prior to JPM usage, revalidate JPM using steps 8 and 12 below.

________ 1. Task description and number, JPM description and number are identified.

________ 2. Knowledge and Abilities (K/A) references are included.

________ 3. Performance location specified. (in-plant, control room, simulator, or other)

________ 4. Initial setup conditions are identified.

________ 5. Initiating cue (and terminating cue if required) are properly identified.

________ 6. Task standards identified and verified by SME review.

________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk

(*).

________ 8. Verify the procedure(s) referenced by this JPM reflects the current revision:

Procedure CPS 3402.01P001 Rev: 6b Procedure CPS 3319.01 Rev:17 Procedure CPS 3404.01 Rev:13e

________ 9. Verify cues both verbal and visual are free of conflict.

________ 10. Verify performance time is accurate

________ 11. If the JPM cannot be performed as written with proper responses, then revise the JPM.

________ 12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:

SME / Instructor Date SME / Instructor Date SME / Instructor Date Page 2 of 15

JPM Number: JPM474 - rev 00 Clinton Power Station Job Performance Measure (JPM)

Revision Record (Summary)

Revision Date Description 00 9/14/16 New JPM.

Page 3 of 15

JPM Number: JPM474 - rev 00 Clinton Power Station Job Performance Measure (JPM)

Simulator Setup Instructions

1. IC Setup
a. Reset the simulator to any shutdown or at power IC with VC Train A in service and VC Train B secured.
b. Insert Remote Function VC10VC_CHILLERATCC OFF to secure VC Chiller A.
c. Ensure plant is stable and then save to a different IC if JPM is being used more than once.

IC-225 (pw: 76319) is saved for the ILT 15-1 NRC Exam.

2. JPM Setup
a. Reset the simulator to the IC saved in Section 1 above.
b. Open and execute Simulator Lesson Plan ILT 15-1 NRC Exam JPMs.
c. Release JPM474 which will trigger the following when the 0VC03CB Cont Rm Sply Fan is started:
1) A12_A06_DS164_1 OFF (1VF06Y/7Y Green Light Off)
2) A12_A06_DS142_1 ON (1VF07Y Green Light On)
3) A12_A05_S24 OFF (VF Exhaust Fans Off)
4) A12_A05_DS124_1 ON (1VF04CA/B Amber Light On)
5) A12_A05_DS70_1 OFF (1VF03CA/B Red Light Off)
6) A12_A05_DS68_1 ON (1VF03CA/B Amber Light On)
7) A12_A05_DS69_1 ON (1VF03CA/B Green Light On)
d. When the above steps are completed for this and other JPMs to be run concurrently, then validate the concurrently run JPMs if applicable.
e. This completes the setup for this JPM.

Page 4 of 15

JPM Number: JPM474 - rev 00 Clinton Power Station Job Performance Measure (JPM)

READ TO THE OPERATOR I will explain the initial conditions, which step(s) to simulate or discuss, and provide the initiating cues. When you complete the task successfully, the objective of this Job Performance Measure will be satisfied.

TASK STANDARDS:

  • Examinee has successfully placed one of the two Standby Gas Treatment Trains in service to restore secondary containment differential pressure.

TOOLS, EQUIPMENT, OTHER SPECIAL REQUIREMENTS:

  • None PROCEDURAL/

REFERENCES:

  • CPS 3402.01P001, Rev 6b CONTROL ROOM HVAC (VC) TRAIN SHIFTING
  • CPS 3319.01, Rev. 17 STANDBY GAS TREATMENT (VG)
  • CPS 3404.01, Rev. 13e FUEL BUILDING HVAC (VF)

EVALUATOR INSTRUCTIONS:

  • This JPM was developed from events detailed in LER 2014-001-00 Premature Failure Of Air Supply Solenoid Results in Isolation of Fuel Building Ventilation System and Loss of Secondary Containment Pressure.
  • During performance of this JPM, when 0VC03CB Main Control Room Ventilation (VC)

System B Supply fan is started, the resultant voltage transient will result in a trip of the Fuel Building Supply and Exhaust Fans and high differential pressure in the Secondary Containment. These conditions will require the examinee to pursue the alternate path task to start one of the two Standby Gas Treatment (VG) Trains to restore Secondary Containment differential pressure.

  • Provide the examinee with a copy of the Initial Conditions and Initiating Cue page (back page of the JPM) when providing the initiating cue.
  • Provide the examinee with a marked up copy of CPS 3402.01P001, CONTROL ROOM HVAC (VC) TRAIN SHIFTING with the cue sheet ONLY. Do NOT provide copies of CPS 3319.01 or CPS 3404.01 until prompted to do so after JPM step 3 and step 4.
  • Amplifying cues are provided within the JPM steps.
  • All pre-job briefings are completed.

Page 5 of 15

JPM Number: JPM474 - rev 00 Clinton Power Station Job Performance Measure (JPM)

Page 6 of 15

JPM Number: JPM474 - rev 00 Clinton Power Station Job Performance Measure (JPM)

INITIAL CONDITIONS:

Main Control Room Ventilation (VC) Train A is in-service.

INITIATING CUE:

CAUTION

§ All pre-job briefings are completed.

The CRS has directed you to shift Control Room HVAC (VC) trains to B in service and A secured in accordance with CPS 3402.01P001 CONTROL ROOM HVAC (VC) TRAIN SHIFTING starting at step 8.1.7.4.2.

The following steps have already been completed:

  • 8.1.7.1 - 8.1.7.3 (all steps)
  • 8.1.7.4.1
  • 8.1.7.5.1 - 8.1.7.5.6
  • 8.1.7.6.1 - 8.1.7.6.6 Report to the CRS when the task has been completed.

START TIME:

Page 7 of 15

JPM Number: JPM474 - rev 00 Clinton Power Station Job Performance Measure (JPM)

PERFORMANCE INFORMATION Critical steps are denoted with an asterisk (*) to the left of the step number and appear in BOLDED letters. Failure to meet the standards for a critical step constitutes failure of the Job Performance Measure. The sequence of steps is assumed unless denoted in the comments section of the JPM.

PERFORMANCE STEPS CPS 3402.01P001, Control Room HVAC (VC) Train Shifting Section 8.1.7.4 Comment SAT UNSAT STEP ELEMENT STANDARD Number

  • 1 Secures VC Ventilation Train A. 8.1.7.4.2 On panel 1H13-P801-5050, examinee shuts 0VC69Y Locker Rm Exh Fan 11C Isol Dmpr.

8.1.7.4.3 On panel 1H13-P801-5052, examinee shuts 0VC70Y Locker Rm Exh Fan 11C Isol Dmpr.

8.1.7.4.4 On panel 1H13-P801-5050, examinee verifies 0VC11C Cont Rm Locker Rm Exhaust Fan not running (green light illuminated, red light extinguished).

8.1.7.4.5 On panel 1H13-P801-5050, examinee either secures or leaves running Cont Rm HVAC Eq Rm Sply Fan 0VC18CA.

Cue: If asked, cue the examinee to leave 0VC18CA running.

8.1.7.4.6 Examinee verifies CPS 3402.01P001 section 8.1.7.3 Chiller Shutdown is complete.

  • 8.1.4.7 On panel 1H13-P801-5050, examinee secures 0VC03CA, Cont Rm Trn A Supply Fan.

Page 8 of 15

JPM Number: JPM474 - rev 00 Clinton Power Station Job Performance Measure (JPM)

Comment SAT UNSAT STEP ELEMENT STANDARD Number

  • 1 8.1.7.4.8 (contd)

On 1H13-P801-5050, examinee verifies the following VC A Ventilation components automatically realign:

0VC03YA damper shuts 0VC115YA damper shuts 0VC04CA, Cont Rm Rtrn Fan stops 0VC08YA damper shuts 0VC08PA, Cont Rm Ch Wtr Pump A stops 0VC21YA damper shuts 0VC24YA damper shuts 0VC27YA damper shuts 0VC30YA damper shuts 0VC33YA damper shuts 0VC36YA damper shuts 0VC39YA damper shuts 0VC04YA damper shuts

  • 2 Starts VC Ventilation Train B. 8.1.7.5.7 On 1H13-P801-5050 and 5052, examinee verifies 0VC01YA, Cont Rm Trn A Min OS Air Dmpr and 0VC01YB, Cont Rm Trn B Min OS Air Dmpr are open (red light illuminated, green light extinguished)
  • 8.1.7.5.8 On 1H13-P801-5052, examinee starts 0VC03CB, Cont Rm Trn B Supply Fan (red light illuminated, green light extinguished).

Begin Alternate Path CPS 5042-5D High Diff Press Fuel Bldg Page 9 of 15

JPM Number: JPM474 - rev 00 Clinton Power Station Job Performance Measure (JPM)

Comment SAT UNSAT STEP ELEMENT STANDARD Number 3 Responds to High Differential Pressure in Operator Action 1 the Fuel Building (Secondary Containment Dispatches an operator to local panel 1PL44J to determine cause of the high differential pressure condition.

Cue: If the examinee does not respond to 1H13-P800-5042 alarms, cue him/her to report 1H13-P800 alarms and take appropriate actions.

Cue: when examinee reports trip of the Fuel Building Ventilation System to the CRS, acknowledge the report and direct the examinee to respond to annunciators as appropriate.

Cue: (when asked to investigate local panel alarm), acknowledge the order and state, I am on my way to the panel to investigate.

Operator Action 3 Starts the Standby Gas Treatment System.

Cue - If the examinee reports to the CRS that 5042-5D references ITS LCO 3.6.4.1 and may be reportable per SAF 1.8, acknowledge the report and state that you will refer to Technical Specifications and the Reportability Manual.

CPS 3319.01 STANDBY GAS TREATMENT (VG) (Provide copy to the examinee) (hard card use is acceptable - if used, jump to JPM step 6) 4 Makes preparations for starting one of the 8.2.1.1 two Standby Gas Treatment System trains.

Verify/secure all diesel exhaust sources (i.e., truck engines in the Fuel Bldg) which have the potential of being drawn into VG charcoal beds.

Cue - If asked about diesel exhaust sources in the Fuel Building, cue the examinee that there are no diesel exhaust sources in the Fuel Building.

8.2.1.2 Examinee verifies either 0RIX-PR003 or PR004, SGTS Stack PRM in-service and operable.

Cue - If asked about the operability status of 0RIX-PR003 and/or PR004, state that both monitors are operable.

Page 10 of 15

JPM Number: JPM474 - rev 00 Clinton Power Station Job Performance Measure (JPM)

Comment SAT UNSAT STEP ELEMENT STANDARD Number 8.2.1.3

  • 4 (contd) Examinee notifies RP that VG will be manually started.

Cue - When examinee reports that VG will be manually started, acknowledge the report.

8.2.1.4 Notifies Chemistry after SGTS flow is initiated to perform sampling per CPS 9940.01, Weekly Chemistry Surveillance Log.

Cue - when the examinee requests Chemistry to perform sampling per CPS 9940.01 acknowledge the order.

8.2.1.5 Examinee monitors Secondary Containment pressure using Secondary CNMT DP (Div 1 - 5050) or Secondary CNMT DP (Div 2 - 5052) on 1H13-P801 as needed through the remainder of this section.

8.2.1.6 Examinee performs manual shutdown and isolation of VF using CPS 3404.01, Fuel Building HVAC (VF) to prevent tripping on high differential pressure.

CPS 3404.01 Fuel Building HVAC (VF) (Provide copy to the examinee after the procedure is located in the rack) 5 Performs manual shutdown and isolation of 8.3.1.1 VF.

Notifies RP of pending VF system shutdown.

Cue - when the examinee reports pending VF system shutdown, acknowledge the report.

8.3.1.2 Examinee directs equipment operator to turn Heater 1VF02A H/S to OFF.

Cue - as the Area Operator, report that the 1VF02A handswitch was already off.

Page 11 of 15

JPM Number: JPM474 - rev 00 Clinton Power Station Job Performance Measure (JPM)

Comment SAT UNSAT STEP ELEMENT STANDARD Number 8.3.1.3 - 8.3.1.7 5 (contd)

Examinee directs equipment operator to perform local panel 1PL44J shutdown actions for the Fuel Building Ventilation System.

Cue - as the Area Operator, report that steps CPS 3404.01 steps 8.3.1.3 - 8.3.1.7 are complete.

8.3.1.8 On 1H13-P801-5050, examinee closes 1VF04Y/9Y Fuel Bldg Sply Outbd Isol Dmprs (green lights illuminated, red lights extinguished).

8.3.1.9 On 1H13-P801-5052, examinee closes 1VF06Y/7Y Fuel Bldg Sply Inbd Isol Dmprs (green lights illuminated, red lights extinguished).

8.3.1.10 If desired, place 1RIX-PR019, Fuel Bldg CAM (EOP-8 Monitor) in STANDBY per CPS 3315.03 (AR/PR).

Cue - as the CRS, state that another operator will place 1RIX-PR019 in standby and to proceed with placing Standby Gas Treatment in service.

Page 12 of 15

JPM Number: JPM474 - rev 00 Clinton Power Station Job Performance Measure (JPM)

CPS 3319.01 STANDBY GAS TREATMENT (VG)

On 1H13-P801-5050 or 5052, the examinee places the selected SGTS train in service by starting SGTS Trn A(B) Exh Fan, 0VG02CA(B), and then performs the following verifications:

1VG17YA(B) Closes 1VG16YA(B) Closes 1VG04YA(B) Opens 1VG05YA(B) Opens 1VG06YA(B) Opens 1VG02YA(B) Opens 0VG01YA(B) Opens (modulates) 0VG04AA(B) Energizes 0VG02YA(B) Opens 0VG05YA(B) Opens 0VG03CA(B) Stops (if running) 0VG05CA(B) Starts (local indication)

Cue - when directed to verify status of 0VG05CA(B)(depending on which VG train was started), report that 0VG05CA(B) is running.

Cue - State that the JPM is complete when verifications are completed.

TERMINATING CUES:

The Standby Gas Treatment System has been manually initiated to restore Secondary Containment differential pressure.

STOP TIME:

Page 13 of 15

JPM Number: JPM474 - rev 00 Clinton Power Station Job Performance Measure (JPM)

Operators Name:

Job

Title:

£ EO £ RO £ SRO £ STA £ SRO Cert JPM

Title:

VF Trip During Swap of VC Trains (Alternate Path)

JPM Number: JPM474 Revision Number: 00 Task Number and

Title:

340401.05 Respond to High or Low Fuel Building Differential Pressure K/A System K/A Number Importance (RO/SRO) 288000 A4.01 3.1 2.9 Ability to manually operate and/or monitor in the control room: Start and stop fans.

Suggested Testing Environment: Simulator Actual Testing Environment: ¢ Simulator £ Plant £ Control Room Testing Method: £ Simulate Alternate Path: ¢ Yes £ No

¢ Perform SRO Only: £ Yes ¢ No Time Critical: £ Yes ¢ No Estimated Time to Complete: 15 minutes Actual Time Used: minutes

References:

  • CPS 3402.01P001, Rev 6b CONTROL ROOM HVAC (VC) TRAIN SHIFTING
  • CPS 3319.01, Rev. 17 STANDBY GAS TREATMENT (VG)
  • CPS 3404.01, Rev. 13e FUEL BUILDING HVAC (VF)

EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? £ Yes £ No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: £ Satisfactory £ Unsatisfactory Comments:

Evaluators Name: (Print)

Evaluators Signature: Date:

SRRS: 3D.105 (when utilized for operator initial or continuing training) Page 14 of 15

Clinton Power Station Job Performance Measure (JPM)

INITIAL CONDITIONS:

Main Control Room Ventilation (VC) Train A is in-service.

INITIATING CUE:

CAUTION

§ All pre-job briefings are completed.

The CRS has directed you to shift Control Room HVAC (VC) trains to B in service and A secured in accordance with CPS 3402.01P001 CONTROL ROOM HVAC (VC) TRAIN SHIFTING starting at step 8.1.7.4.2.

The following steps have already been completed:

  • 8.1.7.1 - 8.1.7.3 (all steps)
  • 8.1.7.4.1
  • 8.1.7.5.1 - 8.1.7.5.6
  • 8.1.7.6.1 - 8.1.7.6.6 Report to the CRS when the task has been completed.

Page 15 of 15

CLINTON POWER STATION Job Performance Measure RCIC Startup at the RSP - Alternate Path JPM Number: JPM247 Revision Number: 03 Date: 9/19/16 Developed By: T. Jennings 9/19/16 Instructor Date Validated By: Brian Glynn 10/25/16 SME or Instructor Date Reviewed By: Jim Lucas 11/15/16 Operations Representative Date Approved By: T. Jennings 11/15/16 Training Department Date JPM247_R3 In-Plant JPM i.docx Retain approved Master Copy per SRRS 3D.126/3D.111

JPM Number: JPM247 - rev 03 Clinton Power Station Job Performance Measure (JPM)

JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.

Prior to JPM usage, revalidate JPM using steps 8 and 12 below.

________ 1. Task description and number, JPM description and number are identified.

________ 2. Knowledge and Abilities (K/A) references are included.

________ 3. Performance location specified. (in-plant, control room, simulator, or other)

________ 4. Initial setup conditions are identified.

________ 5. Initiating cue (and terminating cue if required) are properly identified.

________ 6. Task standards identified and verified by SME review.

________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk

(*).

________ 8. Verify the procedure(s) referenced by this JPM reflects the current revision:

Procedure CPS 4003.01 Rev: 17c Procedure CPS 4003.01C002 Rev: 5a Procedure CPS 4003.01C003 Rev: 1 Procedure OP-AA-101-111 Rev: 9

________ 9. Verify cues both verbal and visual are free of conflict.

________ 10. Verify performance time is accurate

________ 11. If the JPM cannot be performed as written with proper responses, then revise the JPM.

________ 12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:

SME / Instructor Date SME / Instructor Date SME / Instructor Date Page 2 of 23

JPM Number: JPM247 - rev 03 Clinton Power Station Job Performance Measure (JPM)

Revision Record (Summary)

Revision Date Description 00 08/08/09 Updated numbering convention and technically corrected. Old JPM number: 40030104LSA01.

01 06/06/12 Updated format, aligned with procedure revision and revision numbers.

02 10/09/12 Revision due to procedure and template revision.

03 9/19/16 Updated procedure references.

Page 3 of 23

JPM Number: JPM247 - rev 03 Clinton Power Station Job Performance Measure (JPM)

Simulator Setup Instructions

1. IC Setup
a. To establish initial conditions for JPM247, perform the following actions:
1) Reset to any at power IC.
2) Place Reactor Mode Switch in Shutdown and stabilize RPV level below level 3 but above level 2 with the Motor Driven Reactor Feed Pump. May have to secure RD Pumps to get level down.
3) Open and execute Simulator Lesson Plan JPM247 to cause the RSP RCIC Flow Controller to be overridden in Manual.
4) Place the simulator in Run.
5) Depress the RCIC Flow Controller Close Pushbutton until controller output is at zero.
6) Save to a different IC if JPM is being used more than once. IC-226 (PW-76319) is saved for the ILT 15-1 NRC Exam.
2. JPM Administration
1) Reset the simulator to the IC saved in step 1 above.
2) Verify command A17_A01_A02_4 RSP RCIC Turb Flow Controller - Man/Auto =

Manual is active.

3) Place book of Remote Shutdown procedures in RSP Room.
4) Verify RCIC is not initiated.
5) Verify the RCIC controller at the Remote Shutdown Panel is in Auto set at 620 gpm.
6) Verify the RCIC suction is aligned to the RCIC Storage Tank.
7) No simulator lesson plan is required for this JPM once initial conditions have been established per step 1.
8) Freeze Simulator.

Page 4 of 23

JPM Number: JPM247 - rev 03 Clinton Power Station Job Performance Measure (JPM)

READ TO THE OPERATOR I will explain the initial conditions, which step(s) to simulate or discuss, and provide the initiating cues. When you complete the task successfully, the objective of this Job Performance Measure will be satisfied.

TASK STANDARDS:

  • The RCIC System is started from the Remote Shutdown Panel and injecting to the Reactor Vessel to restore and control RPV water level, Level 3 to Level 8 per CPS 4003.01C002 RSP -

RCIC Operation.

TOOLS, EQUIPMENT, OTHER SPECIAL REQUIREMENTS:

  • None PROCEDURAL/

REFERENCES:

  • OP-AA-101-111, ROLES AND RESPONSIBILITES OF ON-SHIFT PERSONNEL EVALUATOR INSTRUCTIONS:
  • Amplifying cues are provided within the JPM steps.
  • All pre-job briefings are completed.
  • Provide the examinee with a copy of the Initial Conditions and Initiating Cue page (back page of the JPM) when providing the initiating cue.
  • When the examinee has acknowledged the initiating cue, provide him/her with the following procedures:

o CPS 4003.01 Remote Shutdown (RS) - place kept with step 4.1.1 marked N/A.

o CPS 4003.01C002 RSP - RCIC Operations (blank) o CPS 4003.01C003 RSP - RCIC Alarm Light Responses (blank)

Page 5 of 23

JPM Number: JPM247 - rev 03 Clinton Power Station Job Performance Measure (JPM)

INITIAL CONDITIONS:

A plant transient has resulted in a reactor scram, loss of Feedwater, and loss of RCIC control from 1H13-P601.

INITIATING CUE:

CAUTION

§ All pre-job briefings are completed.

The CRS directs you to startup the RCIC system from the Remote Shutdown Panel and inject to the Reactor Vessel to restore and control RPV water level from Level 3 to Level 8 per CPS 4003.01 Remote Shutdown (RS) section 4.3, CPS 4003.01C002, RSP - RCIC Operation and CPS 4003.01C003, RSP - Alarm Light Responses.

Inform the CRS when the task is complete.

START TIME:

Page 6 of 23

JPM Number: JPM247 - rev 03 Clinton Power Station Job Performance Measure (JPM)

PERFORMANCE INFORMATION Critical steps are denoted with an asterisk (*) to the left of the step number and appear in BOLDED letters. Failure to meet the standards for a critical step constitutes failure of the Job Performance Measure. The sequence of steps is assumed unless denoted in the comments section of the JPM.

PERFORMANCE STEPS 4003.01C002 RSP - RCIC Operation 4.0 RCIC TRANSFER TO THE RSP

4.1 Verify

1. Power to 4160V Bus 1A1 available as indicated by the following energized blue lights:
  • 120 VAC CONTROL POWER CKT #12, AB MCC 1A1
2. RCIC TURBINE TRIP in NORM.
3. RCIC TURB FLOW CONTROLLER, C61-R001 set to A (Automatic)/620 gpm.

Standard

  • For substep 1, the examinee verifies two blue lights lit on the upper left hand side of the Remote Shutdown Panel.
  • For substep 3, the examinee verifies the RCIC Turbine Flow Controller M/A slide switch is positioned to the right and the tape set is set to 620 gpm.

Cue: None Comments SAT £ UNSAT £ Comment Number Page 7 of 23

JPM Number: JPM247 - rev 03 Clinton Power Station Job Performance Measure (JPM)

  • 4.2 Verify / Place following TRANSFER SWITCHES to EMERG:
1. C61-S3
2. C61-S2
3. C61-S11 Standard: Examinee places the above 3 switches in the EMERG position.

Cue: None Comments SAT £ UNSAT £ Comment Number 4.3 Verify GLAND SEAL COMPRESSOR, 1E51-C002F in STOP if compressor is off, or in START if the compressor is running.

Standard Examinee verifies control switch for the RCIC Gland Seal Compressor, 1E51-C002F is in the vertical position (STOP).

Cue: Cue the examinee that the RCIC Gland Seal Compressor is not running.

Comments SAT £ UNSAT £ Comment Number Page 8 of 23

JPM Number: JPM247 - rev 03 Clinton Power Station Job Performance Measure (JPM)

  • 4.4 Verify / Place TRANSFER SWITCH C61-S4 to EMERG.

Standard Examinee places Transfer Switch C61-S4 in the EMERG position.

Cue: None Comments SAT £ UNSAT £ Comment Number 4.5 Place/verify 1E51-F068, RCIC TURB EXH TO SUPPR POOL STOP VLV switch in OPEN.

Standard Examinee verifies 1E51-F068, RCIC Turb Exh To Suppr Pool Stop Vlv is in the OPEN position by verifying the control switch is rotated clockwise to the OPEN position and observing the RED status light is lit and the green status light is extinguished.

Cue: None Comments SAT £ UNSAT £ Comment Number Page 9 of 23

JPM Number: JPM247 - rev 03 Clinton Power Station Job Performance Measure (JPM)

  • 4.6 Verify / Place TRANSFER SWITCH C61-S5 to EMERG.

Standard Examinee places Transfer Switch C61-S5 in the EMERG position.

Cue: None Comments SAT £ UNSAT £ Comment Number 4.7.1 Verify open 1E51-F063, RHR & RCIC STM SUPP INBD ISOL VALVE.

Standard Examinee verifies 1E51-F063 is OPEN by observing the RED status light is lit and the GREEN status light is off.

Cue: None Comments SAT £ UNSAT £ Comment Number Page 10 of 23

JPM Number: JPM247 - rev 03 Clinton Power Station Job Performance Measure (JPM) 4.7.2 Verify open 1E51-F064, RHR & RCIC STM SUPP OUTBD ISOL VALVE.

Standard Examinee verifies 1E51-F064 is OPEN by observing the RED status light is lit and the GREEN status light is off.

Cue: None Comments Step 4.7.3 is N/A.

SAT £ UNSAT £ Comment Number 4.8 Check RCIC status:

  • RCIC TURB SPEED, C61-R003.
  • RCIC PUMP FLOW, C61-R001-1.

Standard Examinee observes meters C61-R003 and C61-R001-1 read 0 and determines RCIC is Shutdown.

Cue: None Comments SAT £ UNSAT £ Comment Number Page 11 of 23

JPM Number: JPM247 - rev 03 Clinton Power Station Job Performance Measure (JPM) 4.8.1 IF RCIC is running, THEN verify that Section 5.0, RCIC STARTUP actions have occurred.

OTHERWISE, proceed to 5.0, RCIC STARTUP to startup RCIC.

Standard Examinee proceeds to Section 5.0 of 4003.01C002.

Cue: None Comments SAT £ UNSAT £ Comment Number 5.0 RCIC STARTUP 5.1 At DC MCC 1A-12A (1DC13E12A), Shut circuit #21.

[Energizes AOV 1E51-F005/F026 to allow for steam line/condensate pot drain down. Circuit will be deenergized in step 5.9.]

Standard Examinee states they would perform or dispatches an Equipment Operator to shut circuit #21 at DC MCC 1A-12A (1DC13E12A)

Cue: Acknowledge request/dispatch and state the component is in the position requested.

Comments SAT £ UNSAT £ Comment Number Page 12 of 23

JPM Number: JPM247 - rev 03 Clinton Power Station Job Performance Measure (JPM) 5.2 Open 1E51-C002E, TURBINE TRIP THROTTLE VALVE.

[Trips on Mechanical Overspeed]

Standard Examinee verifies 1E51-C002E, Turbine Trip Throttle Valve is open by observing the RED status light is lit and the GREEN status light is extinguished.

Cue: None Comments SAT £ UNSAT £ Comment Number 5.3 IF RCIC Cond Stor Tnk Lvl, C61-R505 3.2 ft, or Suppression Pool Level, C61-R504 19.9 ft, THEN Open 1E51-F010, RCIC STORAGE TANK SUCTION VALVE, OTHERWISE Open 1E51-F031, RCIC SUPPR POOL SUCTION VALVE.

Standard Examinee observes RCIC Cond Stor Tnk Lvl and Suppression Pool Level indicators on the RSP and determines that RCIC tank level is > 3.2 ft and Suppression Pool Level is <19.9 ft and then determines 1E51-F010 is Open by observing the RED status light is lit and the GREEN status light is extinguished.

Cue: None Comments SAT £ UNSAT £ Comment Number Page 13 of 23

JPM Number: JPM247 - rev 03 Clinton Power Station Job Performance Measure (JPM) 5.4 Open / Verify Open:

1. 1E51-F077, RCIC EXH VAC BKR OUTBD ISOL VALVE.
2. 1E51-F078, RCIC EXH VAC BKR INBD ISOL VALVE.

Standard Examinee verifies 1E51-F077, RCIC Exh Vac Bkr Outbd Isol Valve and 1E51-F078, RCIC Exh Vac Bkr Inbd Isol Valve are open by observing RED status lights are lit and GREEN status lights are extinguished.

Cue: None Comments SAT £ UNSAT £ Comment Number 5.5 Start GLAND SEAL COMPRESSOR, 1E51-C002F.

Standard Examinee rotates the control switch for the Gland Seal Compressor, 1E51-C002F clockwise to the start position and and verifies the RED status light is lit and the GREEN status light is extinguished.

Cue: None Comments This step is not critical because RCIC will perform its intended safety function without the Gland Seal Air Compressor running.

SAT £ UNSAT £ Comment Number Page 14 of 23

JPM Number: JPM247 - rev 03 Clinton Power Station Job Performance Measure (JPM)

Standard Examinee rotates the control switch for 1E51-F019, RCIC Pmp Min Flow Recirc To Suppr Pool clockwise to the open position and verifies the RED status light is lit and the GREEN status light is extinguished.

Cue: None Comments SAT £ UNSAT £ Comment Number 5.7 Open / Verify Open 1E51-F068, RCIC TURB EXH TO SUPPR POOL STOP VLV.

Standard Examinee verifies 1E51-F068, RCIC Turb Exh To Suppr Pool Stop Vlv open by observing the RED status light is lit and the GREEN status light is extinguished.

Cue: None Comments SAT £ UNSAT £ Comment Number Page 15 of 23

JPM Number: JPM247 - rev 03 Clinton Power Station Job Performance Measure (JPM)

Standard Examinee opens 1E51-F045, RCIC Turb Stm Supp Shutoff Valve and observes RED status light is lit and the GREEN status light is extinguished.

Cue: None Comments Due to RCIC Turbine Speed being low because of C61-R001 Controller failure, it is acceptable for the examinee to take manual control and adjust the C61-R001 Controller (manual actions for failed Auto Actions).

SAT £ UNSAT £ Comment Number 5.9 While continuing with steps 5.10 or 5.11:

At DC MCC 1A-12A (1DC13E12A), open circuit #21.

[Deenergizes AOV 1E51-F005/F026 to prevent possible steam releases (temp/rad concerns) into RCIC room and Turbine Bldg.]

Standard Examinee state they would perform or dispatches an equipment operator to open circuit #21 at DC MCC 1A-12A.

Acknowledge request/dispatch and state the component is in the position requested.

Comments SAT £ UNSAT £ Comment Number Page 16 of 23

JPM Number: JPM247 - rev 03 Clinton Power Station Job Performance Measure (JPM)

Standard Examinee turns the control switch for 1E51-F013, RCIC Pump Disch To Rx Outbd Isol Valve clockwise to the open position and observes the RED status light is lit and the GREEN status light is extinguished.

Cue: None Comments Per limitation 3.5, the minimum flow orifice is sized for 60 to 76 gpm. RCIC pump operation under this condition should be limited to < 20 seconds to prevent potential degradation of internal pump parts.

SAT £ UNSAT £ Comment Number 5.10.2 Shut 1E51-F022, RCIC PMP FIRST TEST VALVE TO STOR TNK.

Standard Examinee verifies 1E51-F022, RCIC Pmp First Test Valve To Stor Tnk is shut by observing the RED status light is extinguished and the GREEN status light is lit.

Cue: None Comments Valve is normally shut.

SAT £ UNSAT £ Comment Number Page 17 of 23

JPM Number: JPM247 - rev 03 Clinton Power Station Job Performance Measure (JPM) 5.10.3 Shut 1E51-F059, RCIC PMP SECOND TEST VALVE TO STOR TNK.

Standard Examinee verifies 1E51-F059, RCIC Pmp Second Test Valve To Stor Tnk is shut by observing the RED status light is extinguished and the GREEN status light is lit.

Cue: None Comments Valve is normally shut.

SAT £ UNSAT £ Comment Number 5.10.4 Adjust RCIC TURB FLOW CONTROLLER, C61-R001 to maintain flow 80 to 700 gpm.

NOTE: Avoid AUTO when < 450 gpm (see Precaution 1.4).

Standard Reports to SRO failure of RCIC controller or takes manual control of controller.

Cue: When the student reports the controller has failed, cue the Examinee: RCIC is needed to restore vessel level, inject with RCIC.

Comments Expected response it to take manual control to establish injection flow.

Cue/direction to restore level.

SAT £ UNSAT £ Comment Number BEGIN ALTERNATE PATH Page 18 of 23

JPM Number: JPM247 - rev 03 Clinton Power Station Job Performance Measure (JPM)

  • Places controller C61-R001 selector to M (MANUAL).

Standard Examinee positions Controller C61-R001 mode selector to the left in M position.

Cue: None Comments OP-AA-101-111 step 4.7.2.5 directs taking manual control.

SAT £ UNSAT £ Comment Number

  • Adjusts controller in MANUAL to raise RCIC turbine speed and pump flow above minimum requirements and to achieve rising RPV level.

Standard Examinee adjusts Controller to establish >60 gpm flow and >1500 rpm and rising RPV level.

Cue: None Comments SAT £ UNSAT £ Comment Number Page 19 of 23

JPM Number: JPM247 - rev 03 Clinton Power Station Job Performance Measure (JPM) 5.10.5 Shut 1E51-F019, RCIC PMP MIN FLOW RECIRC TO SUPPR POOL.

Standard Examinee shuts 1E51-F019, RCIC Pmp Min Flow Recirc To Suppr Pool and observes the RED status light is extinguished and the GREEN status light is lit.

Cue: None Comments Valve is normally shut.

SAT £ UNSAT £ Comment Number 5.10.6 Verify 1VY04C, RCIC PMP RM SPLY FAN has started.

Standard Examinee verifies 1VY04C, RCIC Pmp Rm Sply Fan has started by observing the RED status light is lit and the GREEN status light is extinguished.

Cue: None Comments SAT £ UNSAT £ Comment Number Task Completion Standard: Informs Control Room Supervisor he/she has commenced RCIC injection into the Reactor Pressure Vessel.

Cue: Acknowledge the report. State JPM is complete.

Comments SAT £ UNSAT £ Comment Number Page 20 of 23

JPM Number: JPM247 - rev 03 Clinton Power Station Job Performance Measure (JPM)

STOP TIME: _____________________

Page 21 of 23

JPM Number: JPM247 - rev 03 Clinton Power Station Job Performance Measure (JPM)

Operators Name:

Job

Title:

£ EO £ RO £ SRO £ STA £ SRO Cert JPM

Title:

RCIC Startup at the RSP - Alternate Path JPM Number: JPM247 Revision Number: 02 Task Number and

Title:

40030104, Remote Shutdown tasks that DO require MCR evacuation K/A System K/A Number Importance (RO/SRO) 217000 A2.10 3.1 3.1 Ability to (a) predict the impacts of the following on the RCIC ; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those abnormal conditions or operations: Turbine control system failures Suggested Testing Environment: Simulator Actual Testing Environment: ¢ Simulator £ Plant £ Control Room Testing Method: £ Simulate Alternate Path: ¢ Yes £ No

¢ Perform SRO Only: £ Yes ¢ No Time Critical: £ Yes ¢ No Estimated Time to Complete: 20 minutes Actual Time Used: minutes

References:

CPS 4003.01, REMOTE SHUTDOWN (RS), Rev. 17c CPS 4003.01C002, RSP - RCIC OPERATION, Rev. 5a CPS 4003.01C003, RSP - RCIC ALARM LIGHT RESPONSES, Rev. 1 OP-AA-101-111, ROLES AND RESPONSIBILITES OF ON-SHIFT PERSONNEL, Rev. 9*

  • Procedure is not required to be copied for JPM administration.

EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? £ Yes £ No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: £ Satisfactory £ Unsatisfactory Comments: Examinee successfully located the Remote Shutdown Panel in the plant. Yes / No Evaluators Name: (Print)

Evaluators Signature: Date:

SRRS: 3D.105 (when utilized for operator initial or continuing training) Page 22 of 23

Clinton Power Station Job Performance Measure (JPM)

INITIAL CONDITIONS:

A plant transient has resulted in a reactor scram, loss of Feedwater, and loss of RCIC control from 1H13-P601.

INITIATING CUE:

CAUTION

§ All pre-job briefings are completed.

The CRS directs you to startup the RCIC system from the Remote Shutdown Panel and inject to the Reactor Vessel to restore and control RPV water level from Level 3 to Level 8 per CPS 4003.01 Remote Shutdown (RS) section 4.3, CPS 4003.01C002, RSP - RCIC Operation and CPS 4003.01C003, RSP - Alarm Light Responses.

Inform the CRS when the task is complete.

Page 23 of 23

CLINTON POWER STATION Job Performance Measure High Containment Pool Level Protective Actions JPM Number: JPM222 Revision Number: 02 Date: 09/19/2016 Developed By: Tony Jennings 09/19/16 Instructor Date Validated By: Brian Glynn 10/27/16 SME or Instructor Date Reviewed By: Jim Lucas 11/15/16 Operations Representative Date Approved By: T. Jennings 11/15/16 Training Department Date JPM222 R02 In-Plant JPM j.docx Retain approved Master Copy per SRRS 3D.126/3D.111

JPM Number: JPM222 - Rev 02 Clinton Power Station Job Performance Measure (JPM)

JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.

Prior to JPM usage, revalidate JPM using steps 8 and 12 below.

________ 1. Task description and number, JPM description and number are identified.

________ 2. Knowledge and Abilities (K/A) references are included.

________ 3. Performance location specified. (in-plant, control room, simulator, or other)

________ 4. Initial setup conditions are identified.

________ 5. Initiating cue (and terminating cue if required) are properly identified.

________ 6. Task standards identified and verified by SME review.

________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk

(*).

________ 8. Verify the procedure(s) referenced by this JPM reflects the current revision:

Procedure CPS 4411.05 Rev: 4b Procedure Rev:

Procedure Rev:

________ 9. Verify cues both verbal and visual are free of conflict.

________ 10. Verify performance time is accurate

________ 11. If the JPM cannot be performed as written with proper responses, then revise the JPM.

________ 12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:

SME / Instructor Date SME / Instructor Date SME / Instructor Date Page 2 of 11

JPM Number: JPM222 - Rev 02 Clinton Power Station Job Performance Measure (JPM)

Revision Record (Summary)

Revision Date Description 00 07/11/2007 Updated numbering convention. Old JPM number:

44110502NSN01.

01 08/02/2010 Updated format and task number 02 06/14/13 Updated to new template Page 3 of 11

JPM Number: JPM222 - Rev 02 Clinton Power Station Job Performance Measure (JPM)

READ TO THE OPERATOR I will explain the initial conditions, which step(s) to simulate or discuss, and provide the initiating cues. When you complete the task successfully, the objective of this Job Performance Measure will be satisfied.

No equipment or controls will be manipulated during this evaluation, only Simulated Actions will occur.

TASK STANDARDS:

  • Complete the Outside MCR portion of CPS No. 4411.05 High Containment Pool Level Protective Actions, Table 1, TOOLS, EQUIPMENT, OTHER SPECIAL REQUIREMENTS:
  • None.

PROCEDURAL/

REFERENCES:

  • CPS No. 4411.05 Rev 4b, High Containment Pool Level Protective Actions.

EVALUATOR INSTRUCTIONS:

  • Amplifying cues are provided within the JPM steps.
  • All pre-job briefings are completed.
  • Do NOT allow examinee to shine any type of light into any panel.
  • Provide the Initiating Cue in the R&S Line in the Radwaste Building.
  • Steps in this JPM can be performed in any order.
  • Provide the examinee with a copy of the Initial Conditions and Initiating Cue page (back page of the JPM) when providing the initiating cue.
  • Once the initiating cue has been acknowledged by the examinee, provide him/her with a marked up copy of CPS 4411.05 High Containment Pool Level Protective Actions with the following notations:
  • Page 2, step 2.1, TABLE 1 STARTED: <10 minutes prior to current time>
  • Page 4, STARTED: <todays date> / <10 minutes prior to current time>
  • Page 4, step 1) MCR - fill in initials for MCR actions in Table 1 Page 4 of 11

JPM Number: JPM222 - Rev 02 Clinton Power Station Job Performance Measure (JPM)

INITIAL CONDITIONS:

The decision has been made to flood the Primary Containment. Current level in the Primary Containment is 22 5 and rising at ~1 every 5 minutes.

INITIATING CUE:

CAUTION

§ All pre-job briefings are completed.

§ No equipment or controls will be manipulated during this evaluation, only Simulated actions will occur.

§ Do NOT shine any type light into a panel.

You are directed to deenergize electrical loads per CPS No. 4411.05 High Containment Pool Level Protective Actions, Table 1, Section 2, OUTSIDE MCR.

Report to the CRS after completing the task.

START TIME:

Page 5 of 11

JPM Number: JPM222 - Rev 02 Clinton Power Station Job Performance Measure (JPM)

PERFORMANCE INFORMATION Critical steps are denoted with an asterisk (*) to the left of the step number and appear in BOLDED letters. Failure to meet the standards for a critical step constitutes failure of the Job Performance Measure. The sequence of steps is assumed unless denoted in the comments section of the JPM.

PERFORMANCE STEPS CPS No. 4411.05 High Containment Pool Level Protective Actions Deenergizes electrical equipment per Table 1, Section 2 Outside MCR.

At AB 781 East At AB MCC 1A1, Cubicle 1D place both breakers to the OFF position for

  • Drywell Cooling Fan 1A.

Standard:

  • Examinee wears the following PPE(as a minimum):

o Gripper gloves o Safety glasses or safety goggles o Hard Hat o Natural fiber long sleeve shirt and pants

  • Examinee simulates rotating both breaker handles to the OFF position.

Cue: The breaker handles are in the position described.

Comments The critical element of this step is to turn the required breakers to OFF. Wearing less than the minimum PPE should be considered a competency hit.

Steps in this JPM can be performed in any order.

SAT £ UNSAT £ Comment Number Page 6 of 11

JPM Number: JPM222 - Rev 02 Clinton Power Station Job Performance Measure (JPM)

At AB 762 East At AB MCC 1F, Cubicle 3D place both breakers to the OFF position for

  • Drywell Equip Drain Sump Pump 1A.

Standard:

  • Examinee wears the following PPE(as a minimum):

o Gripper gloves o Safety glasses or safety goggles o Hard Hat o Natural fiber long sleeve shirt and pants

  • Examinee simulates rotating both breaker handles to the OFF position.

Cue: The breaker handles are in the position described.

Comments The critical element of this step is to turn the required breakers to OFF. Wearing less than the minimum PPE should be considered a competency hit.

Steps in this JPM can be performed in any order.

SAT £ UNSAT £ Comment Number At AB 762 East At AB MCC 1F, Cubicle 5B place both breakers to the OFF position for

  • Drywell Floor Drain Sump Pump 1A.

Standard:

  • Examinee wears the following PPE(as a minimum):

o Gripper gloves o Safety glasses or safety goggles o Hard Hat o Natural fiber long sleeve shirt and pants

  • Examinee simulates rotating both breaker handles to the OFF position.

Cue: The breaker handles are in the position described.

Comments The critical element of this step is to turn the required breakers to OFF. Wearing less than the minimum PPE should be considered a competency hit.

Steps in this JPM can be performed in any order.

SAT £ UNSAT £ Comment Number Page 7 of 11

JPM Number: JPM222 - Rev 02 Clinton Power Station Job Performance Measure (JPM)

At AB 762 West At AB MCC 1G, Cubicle 4A place both breakers to the OFF position for

  • Drywell Equip Drain Sump Pump 1B.

Standard:

  • Examinee wears the following PPE(as a minimum):

o Gripper gloves o Safety glasses or safety goggles o Hard Hat o Natural fiber long sleeve shirt and pants

  • Examinee simulates rotating both breaker handles to the OFF position.

Cue: The breaker handles are in the position described.

Comments The critical element of this step is to turn the required breakers to OFF. Wearing less than the minimum PPE should be considered a competency hit.

Steps in this JPM can be performed in any order.

SAT £ UNSAT £ Comment Number At AB 762 West At AB MCC 1G, Cubicle 4C place both breakers to the OFF position for

  • Drywell Floor Drain Sump Pump 1B.

Standard:

  • Examinee wears the following PPE(as a minimum):

o Gripper gloves o Safety glasses or safety goggles o Hard Hat o Natural fiber long sleeve shirt and pants

  • Examinee simulates rotating both breaker handles to the OFF position.

Cue: The breaker handles are in the position described.

Comments The critical element of this step is to turn the required breakers to OFF. Wearing less than the minimum PPE should be considered a competency hit.

Steps in this JPM can be performed in any order.

SAT £ UNSAT £ Comment Number Page 8 of 11

JPM Number: JPM222 - Rev 02 Clinton Power Station Job Performance Measure (JPM)

At AB 781 West At AB MCC 1B1, Cubicle 2C place both breakers to the OFF position for

  • Drywell Cooling Fan 1B.

Standard:

  • Examinee wears the following PPE(as a minimum):

o Gripper gloves o Safety glasses or safety goggles o Hard Hat o Natural fiber long sleeve shirt and pants

  • Examinee simulates rotating both breaker handles to the OFF position.

Cue: The breaker handles are in the position described.

Comments The critical element of this step is to turn the required breakers to OFF. Wearing less than the minimum PPE should be considered a competency hit.

Steps in this JPM can be performed in any order.

SAT £ UNSAT £ Comment Number TERMINATING CUES:

All breakers simulated being placed in the OFF position per CPS No. 4411.05 High Containment Pool Level Protective Actions, Table 1, Section 2, Outside MCR.

STOP TIME:

Page 9 of 11

JPM Number: JPM222 - Rev 02 Clinton Power Station Job Performance Measure (JPM)

Operators Name:

Job

Title:

£ EO £ RO £ SRO £ STA £ SRO Cert JPM

Title:

High Containment Pool Level Protective Actions JPM Number: JPM222 Revision Number: 02 Task Number and

Title:

441105.01 High Containment Pool Level Protective Actions K/A System K/A Number Importance (RO/SRO) 295029 2.4.35 3.8 4.0 Knowledge of local auxiliary operator tasks during an emergency and the resultant operational effects.

Suggested Testing Environment: Plant Actual Testing Environment: £ Simulator ¢ Plant £ Control Room Testing Method: ¢ Simulate Alternate Path: £ Yes ¢ No

£ Perform SRO Only: £ Yes ¢ No Time Critical: £ Yes ¢ No Estimated Time to Complete: 18 minutes Actual Time Used: minutes

  • The JPM task would normally be assigned in the OSC; therefore 3 minutes were added on to the JPM Estimated Time to account for the transient time between the OSC and the R&S Line location

References:

CPS No. 4411.05 Rev 4b, High Containment Pool Level Protective Actions.

EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? £ Yes £ No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: £ Satisfactory £ Unsatisfactory Comments:

Evaluators Name: (Print)

Evaluators Signature: Date:

SRRS: 3D.105 (when utilized for operator initial or continuing training) Page 10 of 11

Clinton Power Station Job Performance Measure (JPM)

INITIAL CONDITIONS:

The decision has been made to flood the Primary Containment. Current level in the Primary Containment is 22 5 and rising at ~1 every 5 minutes.

INITIATING CUE:

CAUTION

§ All pre-job briefings are completed.

§ No equipment or controls will be manipulated during this evaluation, only Simulated actions will occur.

§ Do NOT shine any type light into a panel.

You are directed to deenergize electrical loads per CPS No. 4411.05 High Containment Pool Level Protective Actions, Table 1, Section 2, OUTSIDE MCR.

Report to the CRS after completing the task.

Page 11 of 11

CLINTON POWER STATION Job Performance Measure Startup the Fuel Building HVAC VF System to support Emergency Containment Venting JPM Number: JPM431 Revision Number: 02 Date: 9/19/16 Developed By: T. Jennings 9/19/16 Instructor Date Validated By: Matt Baker 10/27/16 SME or Instructor Date Reviewed By: Jim Lucas 11/15/16 Operations Representative Date Approved By: T. Jennings 11/15/16 Training Department Date JPM431 R2 In-Plant JPM k.docx Retain approved Master Copy per SRRS 3D.126/3D.111

JPM Number: JPM431 - rev 02 Clinton Power Station Job Performance Measure (JPM)

JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.

Prior to JPM usage, revalidate JPM using steps 8 and 12 below.

________ a) Task description and number, JPM description and number are identified.

________ b) Knowledge and Abilities (K/A) references are included.

________ c) Performance location specified. (in-plant, control room, simulator, or other)

________ d) Initial setup conditions are identified.

________ e) Initiating cue (and terminating cue if required) are properly identified.

________ f) Task standards identified and verified by SME review.

________ g) Critical steps meet the criteria for critical steps and are identified with an asterisk

(*).

________ h) Verify the procedure(s) referenced by this JPM reflects the current revision:

Procedure CPS 3404.01 Rev: 13e Procedure Rev:

Procedure Rev:

________ i) Verify cues both verbal and visual are free of conflict.

________ j) Verify performance time is accurate

________ k) If the JPM cannot be performed as written with proper responses, then revise the JPM.

________ l) When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:

SME / Instructor Date SME / Instructor Date SME / Instructor Date Page 2 of 13

JPM Number: JPM431 - rev 02 Clinton Power Station Job Performance Measure (JPM)

Revision Record (Summary)

Revision Date Description 00 7/28/10 New JPM.

01 6/14/14 Updated to new JPM template and updated procedure revisions.

02 9/19/16 Updated procedure references.

Page 3 of 13

JPM Number: JPM431 - rev 02 Clinton Power Station Job Performance Measure (JPM)

Simulator Setup Instructions

1. This is an in-plant JPM and requires no simulator setup..

Page 4 of 13

JPM Number: JPM431 - rev 02 Clinton Power Station Job Performance Measure (JPM)

READ TO THE OPERATOR I will explain the initial conditions, which step(s) to simulate or discuss, and provide the initiating cues. When you complete the task successfully, the objective of this Job Performance Measure will be satisfied.

TASK STANDARDS:

  • The Fuel Building HVAC system is in operation IAW CPS No. 3404.01 Fuel Building HVAC (VF)

TOOLS, EQUIPMENT, OTHER SPECIAL REQUIREMENTS:

  • None PROCEDURAL/

REFERENCES:

  • CPS No. 340401, Rev 13e FUEL BUILDING HVAC (VF)

EVALUATOR INSTRUCTIONS:

  • Provide the examinee with a copy of the Initial Conditions and Initiating Cue page (back page) of the JPM) when providing the initiating cue.
  • Provide the examinee with a copy of CPS 3404.01 Fuel Building HVAC (VF) when providing the initiating cue.
  • Amplifying cues are provided within the JPM steps.
  • All pre-job briefings are completed.

Page 5 of 13

JPM Number: JPM431 - rev 02 Clinton Power Station Job Performance Measure (JPM)

INITIAL CONDITIONS:

A condition exists which requires Emergency Venting of the Containment.

VF System is shutdown IAW CPS 3404.01 FUEL BUILDING HVAC (VF) section 8.3 Shutdown.

The Standby Gas Treatment System (VG) is shut down.

EOP checklist CPS No. 4410.00C011, DEFEATING LOW RPV WATER LEVEL AND HIGH DRYWELL PRESSURE FUEL BUILDING VENTILATION ISOLATIONS, has been completed.

INITIATING CUE:

CAUTION

§ All pre-job briefings are completed.

The CRS has directed you to restart the Fuel Building HVAC system to support the venting process per the normal startup section of CPS 3404.01 FUEL BUILDING HVAC (VF), section 8.1.7.

MCR actions per steps 8.1.1 through 8.1.6 are complete.

Report to the CRS after completing the task.

START TIME:

Page 6 of 13

JPM Number: JPM431 - rev 02 Clinton Power Station Job Performance Measure (JPM)

PERFORMANCE INFORMATION Critical steps are denoted with an asterisk (*) to the left of the step number and appear in BOLDED letters. Failure to meet the standards for a critical step constitutes failure of the Job Performance Measure. The sequence of steps is assumed unless denoted in the comments section of the JPM.

PERFORMANCE STEPS CPS 3404.01 FUEL BUILDING HVAC (VF)

  • 8.1.7.1 For all available Exhaust/Supply fan(s):

a) Place 1VF04CA, Exhaust Fan H/S [1HS-VF005] to AFTER-STOP.

b) Place 1VF04CB, Exhaust Fan H/S [1HS-VF006] to AFTER-STOP.

c) Place 1VF03CA, Supply Fan H/S [1HS-VF002] to AFTER-STOP.

d) Place 1VF03CB, Supply Fan H/S [1HS-VF003] to AFTER-STOP.

Standard: Examinee locates the control switches for 1VF04CA, 4CB, 3CA, and 3CB at 1PL44J and simulates taking each control switch out of PTL and into AFTER-STOP.

Cue: The components are in the position youve described.

Comments SAT £ UNSAT £ Comment Number Page 7 of 13

JPM Number: JPM431 - rev 02 Clinton Power Station Job Performance Measure (JPM)

  • 8.1.7.2 Start 1VF04CA(CB), Exhaust Fan [1HS-VF005(006)].

Observe the following:

a) 1VF11YA(YB), Exh Fan Disch Dmpr opens.

b) Fuel Bldg Average Pressure (1PDI-VF035B) begins to go negative.

Standard: Examinee locates control switches for 1VF04CA or 1VF04CB, simulates turning the respective control switch 1HS-VF005 or 1HS-VF006 clockwise to the START position and then releases.

Examinee verifies the following:

  • 1VF04CA(B) RED light ON and GREEN light OFF.
  • 1VF11YA(YB) RED light ON and GREEN light OFF.

Cue: If the examinee asks which set of supply and/or exhaust fans to start, cue him/her that the MCR has no preference on which fans are started.

When the exhaust fan is started, cue the indicator needle (with an ink pen or similar device) on 1PDI-VF035B trending slowly in the negative direction.

Cue the examinee that components and indications are as youve described.

Comments If checked INITIALLY, 1PDI-VF035B reads 0 inches water.

SAT £ UNSAT £ Comment Number Page 8 of 13

JPM Number: JPM431 - rev 02 Clinton Power Station Job Performance Measure (JPM)

  • 8.1.7.3 WHEN Fuel Bldg Average Pressure reaches -0.5 H2O, THEN Start 1VF03CA(CB), Supply Fan [1HS-VF002(003)].

Observe the following:

a) 1VF02YA(YB), Supply Fan Disch Dmpr opens.

b) 1VF01Y, Supply Fan Intake Dmpr opens.

c) Fuel Bldg Average Pressure steadies out at ~ -0.7 inches water (1PDI-VF035B)

Standard: Examinee locates control switches for 1VF03CA or 1VF03CB, simulates turning the respective control switch 1HS-VF002 or 1HS-VF003 clockwise to the START position and then releases.

Examinee verifies the following:

  • 1VF03CA(B) RED light ON and GREEN light OFF.
  • 1VF02YA(YB) RED light ON and GREEN light OFF.
  • Verifies 1VF01Y RED light ON and GREEN light OFF.

Cue: After the VF supply fan has been started, cue the indicator needle on 1PDI-VF035B trending slowly in the negative direction and then steadying out at ~ -0.7 inches water.

Cue the examinee that components and indications are as youve described.

Comments SAT £ UNSAT £ Comment Number Page 9 of 13

JPM Number: JPM431 - rev 02 Clinton Power Station Job Performance Measure (JPM) 8.1.7.4 4) IF Needed to maintain building temperature, THEN Place Heater, 1VF02A, H/S to ON (1HS-VF028).

Standard: No action required.

Cue: If examinee asks whether to energize heater 1VF02A, respond as MCR Do NOT start building heater.

Comments SAT £ UNSAT £ Comment Number 8.1.8 Place/verify 1RIX-PR019, Fuel Bldg CAM (EOP-8 Monitor) in NORMAL per CPS 3315.03, Radiation Monitoring (AR/PR).

Standard: No action required (MCR Action).

Cue: May contact RP or MCR to perform this action.

Comments SAT £ UNSAT £ Comment Number 8.1.9 Following system stabilization, position supply and exhaust fan switches to agree with running and standby status of the respective fan(s) (red flag/green flag).

Standard: No action required; switch positions should be in agreement with the running and standby status of each fan.

Cue:

Comments SAT £ UNSAT £ Comment Number Page 10 of 13

JPM Number: JPM431 - rev 02 Clinton Power Station Job Performance Measure (JPM)

TERMINATING CUES:

Fuel Building HVAC is in service IAW CPS No. 3404.01 FUEL BUILDING HVAC (VF).

STOP TIME:

Page 11 of 13

JPM Number: JPM431 - rev 02 Clinton Power Station Job Performance Measure (JPM)

Operators Name:

Job

Title:

£ EO £ RO £ SRO £ STA £ SRO Cert JPM

Title:

Startup the Fuel Building HVAC VF System to support Emergency Containment Venting JPM Number: JPM431 Revision Number: 02 Task Number and

Title:

340401.01 Start up of the VF system.

K/A System K/A Number Importance (RO/SRO) 288000 A2.03 3.5 3.7 Ability to (a) predict the impacts of the following on the PLANT VENTILATION SYSTEMS; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those abnormal conditions or operations: Loss of coolant accident: Plant-Specific Suggested Testing Environment: Plant Actual Testing Environment: £ Simulator ¢ Plant £ Control Room Testing Method: ¢ Simulate Alternate Path: £ Yes ¢ No

£ Perform SRO Only: £ Yes ¢ No Time Critical: £ Yes ¢ No Estimated Time to Complete: 15 minutes Actual Time Used: minutes

References:

CPS No. 3404.01, Rev 13e FUEL BUILDING HVAC (VF)

EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? £ Yes £ No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: £ Satisfactory £ Unsatisfactory Comments:

Evaluators Name: (Print)

Evaluators Signature: Date:

SRRS: 3D.105 (when utilized for operator initial or continuing training) Page 12 of 13

Clinton Power Station Job Performance Measure (JPM)

INITIAL CONDITIONS:

A condition exists which requires Emergency Venting of the Containment.

VF System is shutdown IAW CPS 3404.01 FUEL BUILDING HVAC (VF) section 8.3 Shutdown.

The Standby Gas Treatment System (VG) is shut down.

EOP checklist CPS No. 4410.00C011, DEFEATING LOW RPV WATER LEVEL AND HIGH DRYWELL PRESSURE FUEL BUILDING VENTILATION ISOLATIONS, has been completed.

INITIATING CUE:

CAUTION

§ All pre-job briefings are completed.

The CRS has directed you to restart the Fuel Building HVAC system to support the venting process per the normal startup section of CPS 3404.01 FUEL BUILDING HVAC (VF), section 8.1.7.

MCR actions per steps 8.1.1 through 8.1.6 are complete.

Report to the CRS after completing the task.

Page 13 of 13