Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML16084A788 | 31 March 2016 | Interim Staff Response to Reevaluated Flood Hazards Submitted in Response to 10 CFR 50.54(F) Information Request - Flood-Causing Mechanism Reevaluation | FLEX Fukushima Dai-Ichi |
ML16084A903 | 31 March 2016 | MSFHI Tables 3-31-2016 | |
NG-16-0071, Open Phase Condition Initiative Commitment Change | 30 March 2016 | Open Phase Condition Initiative Commitment Change | Open Phase Condition |
NG-16-0072, Resubmittal of Affidavit Submitted with Response to Request for Additional Information | 30 March 2016 | Resubmittal of Affidavit Submitted with Response to Request for Additional Information | |
ML16089A396 | 29 March 2016 | Email,Duane Arnold Update Associated with Riverine and LIP | |
CAC:MF3683 | 29 March 2016 | ||
ML16088A205 | 28 March 2016 | Enclosure 1 - (72.30 DFP Reviews to Be Completed 2015) - Memo T Bowers from s Ruffin, Technial Assistance Requests - Review 2015 Tri-Annual Decommissioning Funding Plans for Multiple Independent Spent Fuel Storage Installations | Decommissioning Funding Plan |
ML16088A204 | 28 March 2016 | Memo T Bowers from s Ruffin, Technical Assistance Requests - Review 2015 Tri-Annual Decommissioning Funding Plans for Multiple Independent Spent Fuel Storage Installations W/ Encl 2 (Template) | Decommissioning Funding Plan |
L-2016-062, NextEra Energy Nuclear Property Insurance - 10 CFR 50.54(w)(3) | 28 March 2016 | NextEra Energy Nuclear Property Insurance - 10 CFR 50.54(w)(3) | |
NG-16-0064, Emergency Preparedness Department Document Transmittals Dated February 25, 2016, March 17, 2016 and March 21, 2016 | 25 March 2016 | Emergency Preparedness Department Document Transmittals Dated February 25, 2016, March 17, 2016 and March 21, 2016 | |
IR 05000331/2016007 | 22 March 2016 | Evaluations of Changes, Tests and Experiments, and Permanent Plant Modifications Baseline Inspection Report 05000331/2016007 (AAS) | Significance Determination Process |
ML16081A400 | 18 March 2016 | Notice of Category 3 Meeting to Provide Opportunities to Discuss NRC Activates and Duane Arnold Energy Performance for 2015 Calendar Year with Public | Open House |
ML16078A376 | 18 March 2016 | Public Outreach/Open House to Discuss NRC 2015 End-of-Cycle Plant Performance Assessment of Duane Arnold Energy Center | |
IR 05000331/2016403 | 16 March 2016 | NRC Security Baseline Inspection Report 05000331/2016403 - Cover Letter Only (Jxk) (Reissuance) | Affidavit |
CAC:MF7486 | 15 March 2016 | ||
NG-16-0052, License Amendment Request (TSCR-159) to Revise Technical Specifications Fuel Storage Requirements | 15 March 2016 | License Amendment Request (TSCR-159) to Revise Technical Specifications Fuel Storage Requirements | Coatings Surveillance Frequency Control Program Earthquake |
ML16075A003 | 14 March 2016 | NRR E-mail Capture - Request for Additional Information - Duane Arnold Energy Center - LAR to Reduce the Reactor Steam Dome Pressure Specified in the Technical Specifications 2.1.1, Reactor Core Safety Limits - MF6618 | |
ML16074A314 | 14 March 2016 | NRR E-mail Capture - Second Round RAIs - Duane Arnold Energy Center - LAR (TSCR-143) to Extend Containment Leakage Test Frequency - MF6619 | Probabilistic Risk Assessment |
NG-16-0055, Resubmittal of Affidavit Submitted with Response to Request for Additional Information, License Amendment Request (TSCR-144) to Revise and Relocate Pressure and Temperature Limit Curves to a Pressure and Temperature Limits Report - MF6617 | 11 March 2016 | Resubmittal of Affidavit Submitted with Response to Request for Additional Information, License Amendment Request (TSCR-144) to Revise and Relocate Pressure and Temperature Limit Curves to a Pressure and Temperature Limits Report - MF6617 | Pressure and Temperature Limits Report |
ML16056A139 | 11 March 2016 | Correction to the U.S. Nuclear Regulatory Commission Analysis of Licensees' Decommissioning Funding Status Reports | |
CAC:MF3686 | 7 March 2016 | ||
ML16067A387 | 7 March 2016 | NRC Security Baseline Inspection Report 05000331/2016403 (Cover Letter Only) | |
ML16071A439 | 7 March 2016 | Receipt of Cd Containing Revised I/O Files from NextEra Duane Arnold Energy Center Flood Hazard Re-evaulation Report | |
Press Release-16-011, NRC Issues Annual Assessments for Nation'S Nuclear Plants | 4 March 2016 | Press Release-16-011: NRC Issues Annual Assessments for Nation'S Nuclear Plants | |
IR 05000331/2015006 | 2 March 2016 | Annual Assessment Letter for Duane Arnold Energy Center (Inspection Report 05000331/2015006) | Coatings Spent Fuel Pool Instrumentation |
NG-16-0049, NextEra Energy Duane Arnold Energy Center, LLC Six Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events | 29 February 2016 | NextEra Energy Duane Arnold Energy Center, LLC Six Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events | FLEX Fukushima Dai-Ichi |
NG-16-0044, Fitness for Duty Performance Data - Duane Arnold Energy Center. Docket 50-331 - Renewed Operating License No. DPR-49 | 29 February 2016 | Fitness for Duty Performance Data - Duane Arnold Energy Center. Docket 50-331 - Renewed Operating License No. DPR-49 | Fitness for Duty |
NG-16-0047, NextEra Energy Duane Arnold Energy Center, LLC Six Month Status Report in Response to March 12, 2012 Commission Order to Modify Licenses with Regard to Reliable Spent Fuel Pool Instrumentation | 29 February 2016 | NextEra Energy Duane Arnold Energy Center, LLC Six Month Status Report in Response to March 12, 2012 Commission Order to Modify Licenses with Regard to Reliable Spent Fuel Pool Instrumentation | Spent Fuel Pool Instrumentation |
ML16060A216 | 26 February 2016 | Ltr. 02/26/16 NRC Participation in the Duane Arnold May 2016, Emergency Preparedness Exercise (Ingestion Pathway Only) | |
NG-16-0046, Request for Clarification of Amendment 292 Safety Evaluation | 22 February 2016 | Request for Clarification of Amendment 292 Safety Evaluation | |
ML16055A126 | 19 February 2016 | Response to Request for Additional Information, License Amendment Request (TSCR-144) to Revise and Relocate Pressure and Temperature Limit Curves to a Pressure and Temperature Limits Report - MF6617 | Hydrostatic Pressure and Temperature Limits Report |
NG-16-0042, Duane Arnold - Response to Request for Additional Information, License Amendment Request (TSCR-144) to Revise and Relocate Pressure and Temperature Limit Curves to a Pressure and Temperature Limits Report - MF6617 | 19 February 2016 | Duane Arnold - Response to Request for Additional Information, License Amendment Request (TSCR-144) to Revise and Relocate Pressure and Temperature Limit Curves to a Pressure and Temperature Limits Report - MF6617 | Hydrostatic Pressure and Temperature Limits Report |
ML16056A014 | 19 February 2016 | Marsh USA, Inc. - 2016 Nuclear Liability Certificates of Insurance | |
ML15364A544 | 18 February 2016 | Staff Review of High Frequency Confirmation Associated with Reevaluated Seismic Hazard Implementating Near-Term Task Force Recommendation 2.1 Seismic for Specific Licensees | Safe Shutdown Earthquake Fukushima Dai-Ichi Earthquake |
05000331/LER-2015-006 | 18 February 2016 | HPCI and RCIC Condensate Storage Tank Suction Transfer Inoperable LER 15-006-00 for Duane Arnold Regarding HPCI and RCIC Condensate Storage Tank Suction Transfer Inoperable | |
ML16046A006 | 15 February 2016 | Single Positive Test Form Collected on 01/11/2016 | |
ML16046A011 | 15 February 2016 | Annual Report Form for Drug and Alcohol Tests for 2015 | |
ML16027A088 | 11 February 2016 | Receipt of Dvd from Nextea Duane Arnold Energy Center Flood Hazard Re-evaluation Report | |
NG-16-0035, Notification of Deviation from Boiling Water Reactor Vessel and Internals Project (BWRVIP) Guidelines | 8 February 2016 | Notification of Deviation from Boiling Water Reactor Vessel and Internals Project (BWRVIP) Guidelines | EVT-1 |
ML16021A191 | 4 February 2016 | Request for Withholding Information from Public Disclosure for Duane Arnold Energy Center | Pressure and Temperature Limits Report |
IR 05000331/2015004 | 3 February 2016 | NRC Integrated Inspection Report 05000331/2015004; 07200032/2015001 | Safe Shutdown Mission time Offsite Dose Calculation Manual Past operability Temporary Modification Functionality Assessment Significance Determination Process Foreign Material Exclusion Operability Determination Maintenance Rule Program Fire Protection Program Operability Assessment |
IR 05000331/2015501 | 3 February 2016 | Ltr. 02/03/16 Duane Arnold Energy Center, Unit 1 - NRC Emergency Preparedness Annual Inspection Report No. 05000331/2015501 (Gph) | |
ML16028A116 | 29 January 2016 | January 7, 2016, Summary of Pre-Application Teleconference with NextEra Energy Duane Arnold, LLC, for Duane Arnold Spent Fuel Criticality Analyses | |
NG-16-0029, Response to Request for Additional Information, License Amendment Request (TSCR-143) to Extend Containment Leakage Test Frequency | 29 January 2016 | Response to Request for Additional Information, License Amendment Request (TSCR-143) to Extend Containment Leakage Test Frequency | Packing leak Probabilistic Risk Assessment Large early release frequency Moisture barrier Loctite |
05000331/LER-2015-002 | 28 January 2016 | Unanalyzed Condition Due to Degraded Primary Containment Suppression Pool Coating LER 15-002-01 for Duane Arnold Regarding Unanalyzed Condition Due to Degraded Primary Containment Suppression Pool Coating | Unanalyzed Condition Past operability Coatings |
ML16118A424 | 27 January 2016 | Gfes Results - December 2015 | Generic Fundamentals Examination |
ML16021A012 | 21 January 2016 | Request for Additional Information by the Containment & Ventilation Branch and PRA Licensing Branch License Amendment Request - Extension of the 10 CFR 50 Appendix J Containment Type a & Type C Test Intervals | Packing leak Probabilistic Risk Assessment Loctite |
CAC:MF5674 | 21 January 2016 | ||
ML16022A009 | 21 January 2016 | NRR E-mail Capture - Request for Additional Information - LAR to Revise and Relocate Pressure and Temperature Limit Curves to a Pressure and Temperature Limits Report - MF6617 | Pressure and Temperature Limits Report |
ML16008A086 | 21 January 2016 | Relief Request No. PR-01, PR-02, VR-01, VR-02, and VR-03 Related to the Inservice Testing Program for the Fifth 10-Year Interval | Stroke time VT-2 Incorporated by reference Excess Flow Check Valve Maintenance Rule Program Grace period |