NG-16-0071, Open Phase Condition Initiative Commitment Change

From kanterella
Jump to navigation Jump to search
Open Phase Condition Initiative Commitment Change
ML16095A211
Person / Time
Site: Duane Arnold NextEra Energy icon.png
Issue date: 03/30/2016
From: Vehec T
NextEra Energy Duane Arnold
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
NG-16-0071
Download: ML16095A211 (1)


Text

NEXTera' ENERGY~

DUANE AR.NOLD March 30, 2016 NG-16-0071 U.S. Nuclear Regulatory Commission A TIN: .Document Control Desk Washington, DC 20555 Duane Arnold Energy Center Docket No. 50-331 Renewed Op. License No. DPR-49 Open Phase Condition Initiative Commitment Change

Reference:

(1) NextEra Energy Duane Arnold, LLC Response to Request for Additional Information Regarding NRC Bulletin 2012-01 Design Vulnerability in Electric Power System, dated January 30, 2014(ML14034A107)

Via Reference (1), NextEra Energy Duane Arnold, LLC (NextEra) committed to follow the generic schedule provided in Nuclear Energy Institute (NEI) letter to the NRC, Industry Initiative on Open Phase Condition (OPC). NEI has revised the industry initiative on OPC. NextEra commits to follow Revision 1 of the NEI OPC Initiative dated March 2015, or any subsequent revision issued by NEI on behalf of the industry.

The Regulatory Commitment contained in Reference (1) states:

  • NextEra Energy Duane Arnold hereby commits to the generic schedule provided in NEI 13-12, Open Phase Condition Industry Guidance Document. It is our intention to meet the milestones of this schedule; however, any deviation from the generic schedule will be documented through the deviation/exemption process addressed in the NEI 13-12, Open Phase Condition Industry Guidance Document when it is available.

NextEra is modifying this Regulatory Commitment to state:

  • NextEra commits to adhering to the NEI Open Phase Condition Initiative, Revision 1, dated March 2015, or any subsequent revision issued by NEI. NextEra intends to follow the generic schedule therein.

If you h ve any questions please contact Mr. Mike Davis, Licensing Manager, at 319-8 -7032.

T.A.Vehec Vice President, Duane Arnold Energy Center NextEra Energy Duane Arnold, LLC cc: Administrator, Region Ill, USNRC Project Manager, DAEC, USNRC Resident Inspector, DAEC, USNRC NextEra Energy Duane Arnold, LLC, 3277 DAEC Road, Palo, IA 52324

NEXTera' ENERGY~

DUANE AR.NOLD March 30, 2016 NG-16-0071 U.S. Nuclear Regulatory Commission A TIN: .Document Control Desk Washington, DC 20555 Duane Arnold Energy Center Docket No. 50-331 Renewed Op. License No. DPR-49 Open Phase Condition Initiative Commitment Change

Reference:

(1) NextEra Energy Duane Arnold, LLC Response to Request for Additional Information Regarding NRC Bulletin 2012-01 Design Vulnerability in Electric Power System, dated January 30, 2014(ML14034A107)

Via Reference (1), NextEra Energy Duane Arnold, LLC (NextEra) committed to follow the generic schedule provided in Nuclear Energy Institute (NEI) letter to the NRC, Industry Initiative on Open Phase Condition (OPC). NEI has revised the industry initiative on OPC. NextEra commits to follow Revision 1 of the NEI OPC Initiative dated March 2015, or any subsequent revision issued by NEI on behalf of the industry.

The Regulatory Commitment contained in Reference (1) states:

  • NextEra Energy Duane Arnold hereby commits to the generic schedule provided in NEI 13-12, Open Phase Condition Industry Guidance Document. It is our intention to meet the milestones of this schedule; however, any deviation from the generic schedule will be documented through the deviation/exemption process addressed in the NEI 13-12, Open Phase Condition Industry Guidance Document when it is available.

NextEra is modifying this Regulatory Commitment to state:

  • NextEra commits to adhering to the NEI Open Phase Condition Initiative, Revision 1, dated March 2015, or any subsequent revision issued by NEI. NextEra intends to follow the generic schedule therein.

If you h ve any questions please contact Mr. Mike Davis, Licensing Manager, at 319-8 -7032.

T.A.Vehec Vice President, Duane Arnold Energy Center NextEra Energy Duane Arnold, LLC cc: Administrator, Region Ill, USNRC Project Manager, DAEC, USNRC Resident Inspector, DAEC, USNRC NextEra Energy Duane Arnold, LLC, 3277 DAEC Road, Palo, IA 52324