Issue date | Title | Topic | |
---|---|---|---|
CNL-13-137, Third Progress Update on Improved Flood Mitigation System Project | 31 December 2013 | Third Progress Update on Improved Flood Mitigation System Project | |
ML13289A256 | 31 December 2013 | 6.a.iv.3.7 SQN 2010 | |
CNL-13-144, Third Quarterly Status Report to the Flooding Hazard Reevaluation Report Extension Request | 31 December 2013 | Third Quarterly Status Report to the Flooding Hazard Reevaluation Report Extension Request | Fukushima Dai-Ichi |
ML13361A021 | 27 December 2013 | License Renewal IP71002 Exit Meeting Slides and Notes from December 17, 2013 | Aging Management |
ML13361A155 | 27 December 2013 | 12/17/2013 - Meeting Summary - License Renewal Inspection Public Exit Meeting for Sequoyah Nuclear Plant | Aging Management |
CNL-13-143, TVA Submittal of Revisions to Central Emergency Control Center - Emergency Plan Implementing Procedures | 24 December 2013 | TVA Submittal of Revisions to Central Emergency Control Center - Emergency Plan Implementing Procedures | |
CNL-13-121, Service List Update for Routine Information | 24 December 2013 | Service List Update for Routine Information | |
CNL-13-146, Submittal of Central Emergency Control Center - Emergency Plan Implementing Procedure Revision | 24 December 2013 | Submittal of Central Emergency Control Center - Emergency Plan Implementing Procedure Revision | |
CNL-13-122, Service List Update for Documents Containing Official Use Only and Safeguards Information | 24 December 2013 | Service List Update for Documents Containing Official Use Only and Safeguards Information | |
CNL-13-145, TVA Submittal of Revisions to Central Emergency Control Center Emergency Plan Implementing Procedures | 24 December 2013 | TVA Submittal of Revisions to Central Emergency Control Center Emergency Plan Implementing Procedures | |
ML13353A538 | 23 December 2013 | RAI Set 19 | Coatings Aging Management |
ML13360A195 | 20 December 2013 | NPDES Permit No. TN0026450 - Agreed Order No. 89-3036 | |
ML13353A644 | 19 December 2013 | NRC Staff Status Update for December 2013 in the Matter of Sequoyah, Units 1 and 2, License Renewal | |
CNL-13-130, Response to NRC Request for Additional Information Regarding the Review of the License Renewal Application, B.1.41-4b, 3.0.3-1 (Requests La, 3a, 4a, 6a), B.1.23-2e, 3.4.2.1.1-2a, Tables (3.4.1, 3.4.2-3-5, 3.3.1.. | 16 December 2013 | Response to NRC Request for Additional Information Regarding the Review of the License Renewal Application, B.1.41-4b, 3.0.3-1 (Requests La, 3a, 4a, 6a), B.1.23-2e, 3.4.2.1.1-2a, Tables (3.4.1, 3.4.2-3-5, 3.3.1.. | Boric Acid High Radiation Area Non-Destructive Examination Fire Barrier Weld Overlay Coatings Nondestructive Examination Aging Management Moisture barrier Earthquake Biofouling Through-Wall Leak Fire Protection Program |
CNL-13-140, Submittal of Central Emergency Control Center - Emergency Plan Implementing Procedure Revision | 13 December 2013 | Submittal of Central Emergency Control Center - Emergency Plan Implementing Procedure Revision | |
IR 05000327/2013014 | 11 December 2013 | IR 05000327-13-014, 05000328-13-014; 9/23/2013 - 11/22/2013; Sequoyah Nuclear Plant, Units 1 and 2; Significance Determination Process | Significance Determination Process Operability Determination Fuel cladding |
ML13347B269 | 11 December 2013 | Tennessee Valley Authority (TVA) - Sequoyah Nuclear Plant - NPDES Permit No. TN0026450 - Discharge Monitoring Report (DMR) for November 2013 | |
CNL-13-139, Response to Request for Additional Information Regarding Sequoyah Nuclear Plant, Units 1 and 2, Ultimate Heat Sink License Amendment Request (TS-SQN-13-01 and 13-02) | 11 December 2013 | Response to Request for Additional Information Regarding Sequoyah Nuclear Plant, Units 1 and 2, Ultimate Heat Sink License Amendment Request (TS-SQN-13-01 and 13-02) | Safe Shutdown Ultimate heat sink Design basis earthquake |
Press Release-II-13-062, NRC Schedules Meeting to Discuss Results of License Renewal Inspection at Sequoyah Nuclear Power Plant | 6 December 2013 | Press Release-II-13-062: NRC Schedules Meeting to Discuss Results of License Renewal Inspection at Sequoyah Nuclear Power Plant | |
ML13323A097 | 6 December 2013 | RAI Set 18 | Aging Management |
ML13345A250 | 5 December 2013 | Operator Licensing Written Examination Approval 05000327/13-302 & 05000328/13-302 | |
CNL-13-134, Nuclear Quality Assurance Plan, TVA-NQA-PLN89-A | 5 December 2013 | Nuclear Quality Assurance Plan, TVA-NQA-PLN89-A | Fitness for Duty Offsite Dose Calculation Manual Safe Shutdown Earthquake Coatings Nondestructive Examination B.5.b Process Control Program Fire Protection Program Grace period |
ML13346A427 | 4 December 2013 | Cycle 20 Core Operating Limits Report | |
ML13330A931 | 22 November 2013 | Enclosure 2 - Volume 11 - Improved Technical Specifications Conversion, ITS Section 3.6, Containment Systems | Shutdown Margin High Radiation Area Stroke time Hydrostatic Probabilistic Risk Assessment Condition Adverse to Quality Surveillance Frequency Control Program Large early release frequency Power Operated Valves Fuel cladding |
ML13330A925 | 22 November 2013 | Enclosure 2 - Volume 15 - Improved Technical Specifications Conversion, ITS Chapter 4.0, Design Features, Revision 0 | |
ML13329A792 | 22 November 2013 | Enclosure 2 - Volume 2 - Improved Technical Specifications Conversion, Generic Determination of Significant Hazards Consideration and Environmental Assessment | Offsite Dose Calculation Manual Incorporated by reference Surveillance Frequency Control Program Large early release frequency |
ML13329A859 | 22 November 2013 | Enclosure 2 - Volume 7 - Improved Technical Specifications Conversion, ITS Section 3.2 Power Distribution Limits, Revision 0 | Anticipated operational occurrence Surveillance Frequency Control Program Fuel cladding Power change |
ML13329A718 | 22 November 2013 | Enclosure 1 - Improved Technical Specifications (ITS) Submittal, Enclosure 3 - Licensee Identified Changes That May Require a Formal Technical Branch Review Through Enclosure 10 | Safe Shutdown Earthquake Internal Flooding Probabilistic Risk Assessment Qualified Offsite Circuit Large early release frequency Earthquake Offsite Circuit |
ML13330A953 | 22 November 2013 | Enclosure 4, Attachments 3, 4 and 5, Reactor Trip System (RTS) and Engineered Safety Fatures Actuation System (ESFAS) Instrumentation Completion Times, Bypass Times, and Surveillance Test Interval Extensions Based On.. | Safe Shutdown High winds Internal Flooding Probabilistic Risk Assessment Tornado Generated Missile Large early release frequency Maintenance Rule Program |
ML13329A717 | 22 November 2013 | Technical Specifications Conversion to NUREG-1431, Rev. 4.0 (SQN-TS-11-10) | Probabilistic Risk Assessment |
ML13329A916 | 22 November 2013 | Sequoyah, Units 1 and 2, Enclosure 2 - Volume 6 - Improved Technical Specifications Conversion, ITS Section 3.3 Instrumentation, Revision 0 | |
ML13329A790 | 22 November 2013 | Enclosure 2 - Volume 3 - Improved Technical Specifications Conversion, ITS Chapter 1.0, Use and Application, Revision 0 | Time of Discovery Shutdown Margin Offsite Dose Calculation Manual Pressure and Temperature Limits Report Annual Radioactive Effluent Release Report Surveillance Frequency Control Program Process Control Program Pressure Boundary Leakage |
ML13330A929 | 22 November 2013 | Enclosure 2 - Volume 10 - Improved Technical Specifications Conversion, ITS Section 3.5, Emergency Core Cooling Systems (Eccs), Revision 0 | Boric Acid Stroke time Surveillance Frequency Control Program |
ML13330A922 | 22 November 2013 | Enclosure 2 - Volume 16 - Improved Technical Specifications Conversion, ITS Chapter 5.0 Administrative Controls, Revision 0 | Shutdown Margin High Radiation Area Offsite Dose Calculation Manual Post Accident Monitoring Hydrostatic Probabilistic Risk Assessment Nondestructive Examination Pressure and Temperature Limits Report Annual Radioactive Effluent Release Report Surveillance Frequency Control Program Annual Radiological Environmental Operating Report Process Control Program Liquid penetrant Pressure Boundary Leakage Fire Protection Program Backfit |
ML13330A927 | 22 November 2013 | Enclosure 2 - Volume 13 - Improved Technical Specifications Conversion, ITS Section 3.8, Electrical Power Systems | Safe Shutdown Time of Discovery Shutdown Margin Anticipated operational occurrence Probabilistic Risk Assessment Qualified Offsite Circuit Surveillance Frequency Control Program Battery sizing Recently irradiated fuel Offsite Circuit |
ML13330A928 | 22 November 2013 | Enclosure 2 - Volume 9 - Improved Technical Specifications Conversion, ITS Section 3.4, Reactor Coolant System (Rcs), Revision 0 | Unanalyzed Condition Boric Acid Shutdown Margin Non-Destructive Examination Grab sample Stroke time Anticipated operational occurrence Hydrostatic Incorporated by reference Surveillance Frequency Control Program Power Operated Valves Fuel cladding Pressure Boundary Leakage Power change Unidentified leakage |
ML13329A854 | 22 November 2013 | Enclosure 2 - Volume 4 - Improved Technical Specifications Conversion, ITS Chapter 2.0, Safety Limits, Revision 0 | Anticipated operational occurrence Fuel cladding |
ML13329A791 | 22 November 2013 | Enclosure 2 - Volume 1 - Improved Technical Specifications Conversion, Application of Sequoyah Criteria to the Sequoyah Technical Specifications | Shutdown Margin Ultimate heat sink Probabilistic Risk Assessment Pressure Boundary Leakage |
ML13329A858 | 22 November 2013 | Enclosure 2 - Volume 6 - Improved Technical Specifications Conversion, ITS Section 3.1 Reactivity Control Systems, Revision 0 | Boric Acid Shutdown Margin Anticipated operational occurrence Surveillance Frequency Control Program Fuel cladding |
ML13329A855 | 22 November 2013 | Enclosure 2 - Volume 5 - Improved Technical Specifications Conversion, ITS Section 3.0, LCO and SR Applicability, Revision 0 | Safe Shutdown Time of Discovery Fire Barrier Tornado Missile Internal Flooding Missed surveillance Turbine Missile Liquid penetrant Offsite Circuit |
ML13330A930 | 22 November 2013 | Enclosure 2 - Volume 14 - Improved Technical Specifications Conversion, ITS Section 3.9 Refueling Operations | Boric Acid Shutdown Margin Time to boil Surveillance Frequency Control Program Fuel cladding Recently irradiated fuel |
ML13330A924 | 22 November 2013 | Enclosure 2 - Volume 12 - Improved Technical Specifications Conversion, ITS Section 3.7, Plant Systems | |
ML13325B002 | 21 November 2013 | Staff Status Update November 2013 | |
ML13312A415 | 21 November 2013 | Interim Staff Evaluation and Request for RAI Regarding the Overall Integrated Plan for Implementation of Order EA-12-051, Reliable Spent Fuel Pool Instrumentation | High Radiation Area Safe Shutdown Earthquake FLEX Spent Fuel Pool Instrumentation Battery sizing Fire Protection Program |
ML13323A494 | 19 November 2013 | NRR E-mail Capture - Sequoyah 1 and 2 - Acceptance Review for Requests for Alternatives 13-ISI-1 and 13-ISI-2 to Extend the Reactor Vessel Weld Inservice Inspection Interval | |
CNL-13-117, 10 CFR 50.46 - Combined Annual and 30-Day Report | 18 November 2013 | 10 CFR 50.46 - Combined Annual and 30-Day Report | |
CNL-13-106, Response to NRC Request for Additional Information Regarding the Review of the Sequoyah Nuclear Plant, Units I and 2, License Renewal Application, Sets 13 (B.1.34-5a), 15 (4.2-1a), 16 (B.1.23-2c), 17 (B.1.23-2d), LRA Sections A.1.34 and B | 15 November 2013 | Response to NRC Request for Additional Information Regarding the Review of the Sequoyah Nuclear Plant, Units I and 2, License Renewal Application, Sets 13 (B.1.34-5a), 15 (4.2-1a), 16 (B.1.23-2c), 17 (B.1.23-2d), LRA Sections A.1.34 and B.1 | Safe Shutdown High Radiation Area Fire Barrier Weld Overlay Coatings Aging Management Moisture barrier Earthquake Biofouling Fire Protection Program |
ML13301A653 | 12 November 2013 | Audit Report Regarding Seismic Walkdowns to Support Implementation of Near-Term Task Force Recommendation 2.3 Related to the Fukushima Dai-Ichi Nuclear Power Plant Accident | Unanalyzed Condition Boric Acid Fukushima Dai-Ichi Earthquake |
ML13316A775 | 12 November 2013 | Pointer in ADAMS to Public Document Room for SQN Ghg Excel Spreadsheets, Listed in Letter from TVA, Dated Sep 20, 2013, in Response to RAIs 6.a.i.2 - 8 Referenced in the SQN License Renewal Supplemental Environmental Impact Statement | |
ML13318A891 | 12 November 2013 | NPDES Permit No. TN0026450 - Discharge Monitoring Report (DMR) for October 2013 |