Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
CNL-13-137, Third Progress Update on Improved Flood Mitigation System Project31 December 2013Third Progress Update on Improved Flood Mitigation System Project
ML13289A25631 December 20136.a.iv.3.7 SQN 2010
CNL-13-144, Third Quarterly Status Report to the Flooding Hazard Reevaluation Report Extension Request31 December 2013Third Quarterly Status Report to the Flooding Hazard Reevaluation Report Extension RequestFukushima Dai-Ichi
ML13361A02127 December 2013License Renewal IP71002 Exit Meeting Slides and Notes from December 17, 2013Aging Management
ML13361A15527 December 201312/17/2013 - Meeting Summary - License Renewal Inspection Public Exit Meeting for Sequoyah Nuclear PlantAging Management
CNL-13-143, TVA Submittal of Revisions to Central Emergency Control Center - Emergency Plan Implementing Procedures24 December 2013TVA Submittal of Revisions to Central Emergency Control Center - Emergency Plan Implementing Procedures
CNL-13-121, Service List Update for Routine Information24 December 2013Service List Update for Routine Information
CNL-13-146, Submittal of Central Emergency Control Center - Emergency Plan Implementing Procedure Revision24 December 2013Submittal of Central Emergency Control Center - Emergency Plan Implementing Procedure Revision
CNL-13-122, Service List Update for Documents Containing Official Use Only and Safeguards Information24 December 2013Service List Update for Documents Containing Official Use Only and Safeguards Information
CNL-13-145, TVA Submittal of Revisions to Central Emergency Control Center Emergency Plan Implementing Procedures24 December 2013TVA Submittal of Revisions to Central Emergency Control Center Emergency Plan Implementing Procedures
ML13353A53823 December 2013RAI Set 19Coatings
Aging Management
ML13360A19520 December 2013NPDES Permit No. TN0026450 - Agreed Order No. 89-3036
ML13353A64419 December 2013NRC Staff Status Update for December 2013 in the Matter of Sequoyah, Units 1 and 2, License Renewal
CNL-13-130, Response to NRC Request for Additional Information Regarding the Review of the License Renewal Application, B.1.41-4b, 3.0.3-1 (Requests La, 3a, 4a, 6a), B.1.23-2e, 3.4.2.1.1-2a, Tables (3.4.1, 3.4.2-3-5, 3.3.1..16 December 2013Response to NRC Request for Additional Information Regarding the Review of the License Renewal Application, B.1.41-4b, 3.0.3-1 (Requests La, 3a, 4a, 6a), B.1.23-2e, 3.4.2.1.1-2a, Tables (3.4.1, 3.4.2-3-5, 3.3.1..Boric Acid
High Radiation Area
Non-Destructive Examination
Fire Barrier
Weld Overlay
Coatings
Nondestructive Examination
Aging Management
Moisture barrier
Earthquake
Biofouling
Through-Wall Leak
Fire Protection Program
CNL-13-140, Submittal of Central Emergency Control Center - Emergency Plan Implementing Procedure Revision13 December 2013Submittal of Central Emergency Control Center - Emergency Plan Implementing Procedure Revision
IR 05000327/201301411 December 2013IR 05000327-13-014, 05000328-13-014; 9/23/2013 - 11/22/2013; Sequoyah Nuclear Plant, Units 1 and 2; Significance Determination ProcessSignificance Determination Process
Operability Determination
Fuel cladding
ML13347B26911 December 2013Tennessee Valley Authority (TVA) - Sequoyah Nuclear Plant - NPDES Permit No. TN0026450 - Discharge Monitoring Report (DMR) for November 2013
CNL-13-139, Response to Request for Additional Information Regarding Sequoyah Nuclear Plant, Units 1 and 2, Ultimate Heat Sink License Amendment Request (TS-SQN-13-01 and 13-02)11 December 2013Response to Request for Additional Information Regarding Sequoyah Nuclear Plant, Units 1 and 2, Ultimate Heat Sink License Amendment Request (TS-SQN-13-01 and 13-02)Safe Shutdown
Ultimate heat sink
Design basis earthquake
Press Release-II-13-062, NRC Schedules Meeting to Discuss Results of License Renewal Inspection at Sequoyah Nuclear Power Plant6 December 2013Press Release-II-13-062: NRC Schedules Meeting to Discuss Results of License Renewal Inspection at Sequoyah Nuclear Power Plant
ML13323A0976 December 2013RAI Set 18Aging Management
ML13345A2505 December 2013Operator Licensing Written Examination Approval 05000327/13-302 & 05000328/13-302
CNL-13-134, Nuclear Quality Assurance Plan, TVA-NQA-PLN89-A5 December 2013Nuclear Quality Assurance Plan, TVA-NQA-PLN89-AFitness for Duty
Offsite Dose Calculation Manual
Safe Shutdown Earthquake
Coatings
Nondestructive Examination
B.5.b
Process Control Program
Fire Protection Program
Grace period
ML13346A4274 December 2013Cycle 20 Core Operating Limits Report
ML13330A93122 November 2013Enclosure 2 - Volume 11 - Improved Technical Specifications Conversion, ITS Section 3.6, Containment SystemsShutdown Margin
High Radiation Area
Stroke time
Hydrostatic
Probabilistic Risk Assessment
Condition Adverse to Quality
Surveillance Frequency Control Program
Large early release frequency
Power Operated Valves
Fuel cladding
ML13330A92522 November 2013Enclosure 2 - Volume 15 - Improved Technical Specifications Conversion, ITS Chapter 4.0, Design Features, Revision 0
ML13329A79222 November 2013Enclosure 2 - Volume 2 - Improved Technical Specifications Conversion, Generic Determination of Significant Hazards Consideration and Environmental AssessmentOffsite Dose Calculation Manual
Incorporated by reference
Surveillance Frequency Control Program
Large early release frequency
ML13329A85922 November 2013Enclosure 2 - Volume 7 - Improved Technical Specifications Conversion, ITS Section 3.2 Power Distribution Limits, Revision 0Anticipated operational occurrence
Surveillance Frequency Control Program
Fuel cladding
Power change
ML13329A71822 November 2013Enclosure 1 - Improved Technical Specifications (ITS) Submittal, Enclosure 3 - Licensee Identified Changes That May Require a Formal Technical Branch Review Through Enclosure 10Safe Shutdown Earthquake
Internal Flooding
Probabilistic Risk Assessment
Qualified Offsite Circuit
Large early release frequency
Earthquake
Offsite Circuit
ML13330A95322 November 2013Enclosure 4, Attachments 3, 4 and 5, Reactor Trip System (RTS) and Engineered Safety Fatures Actuation System (ESFAS) Instrumentation Completion Times, Bypass Times, and Surveillance Test Interval Extensions Based On..Safe Shutdown
High winds
Internal Flooding
Probabilistic Risk Assessment
Tornado Generated Missile
Large early release frequency
Maintenance Rule Program
ML13329A71722 November 2013Technical Specifications Conversion to NUREG-1431, Rev. 4.0 (SQN-TS-11-10)Probabilistic Risk Assessment
ML13329A91622 November 2013Sequoyah, Units 1 and 2, Enclosure 2 - Volume 6 - Improved Technical Specifications Conversion, ITS Section 3.3 Instrumentation, Revision 0
ML13329A79022 November 2013Enclosure 2 - Volume 3 - Improved Technical Specifications Conversion, ITS Chapter 1.0, Use and Application, Revision 0Time of Discovery
Shutdown Margin
Offsite Dose Calculation Manual
Pressure and Temperature Limits Report
Annual Radioactive Effluent Release Report
Surveillance Frequency Control Program
Process Control Program
Pressure Boundary Leakage
ML13330A92922 November 2013Enclosure 2 - Volume 10 - Improved Technical Specifications Conversion, ITS Section 3.5, Emergency Core Cooling Systems (Eccs), Revision 0Boric Acid
Stroke time
Surveillance Frequency Control Program
ML13330A92222 November 2013Enclosure 2 - Volume 16 - Improved Technical Specifications Conversion, ITS Chapter 5.0 Administrative Controls, Revision 0Shutdown Margin
High Radiation Area
Offsite Dose Calculation Manual
Post Accident Monitoring
Hydrostatic
Probabilistic Risk Assessment
Nondestructive Examination
Pressure and Temperature Limits Report
Annual Radioactive Effluent Release Report
Surveillance Frequency Control Program
Annual Radiological Environmental Operating Report
Process Control Program
Liquid penetrant
Pressure Boundary Leakage
Fire Protection Program
Backfit
ML13330A92722 November 2013Enclosure 2 - Volume 13 - Improved Technical Specifications Conversion, ITS Section 3.8, Electrical Power SystemsSafe Shutdown
Time of Discovery
Shutdown Margin
Anticipated operational occurrence
Probabilistic Risk Assessment
Qualified Offsite Circuit
Surveillance Frequency Control Program
Battery sizing
Recently irradiated fuel
Offsite Circuit
ML13330A92822 November 2013Enclosure 2 - Volume 9 - Improved Technical Specifications Conversion, ITS Section 3.4, Reactor Coolant System (Rcs), Revision 0Unanalyzed Condition
Boric Acid
Shutdown Margin
Non-Destructive Examination
Grab sample
Stroke time
Anticipated operational occurrence
Hydrostatic
Incorporated by reference
Surveillance Frequency Control Program
Power Operated Valves
Fuel cladding
Pressure Boundary Leakage
Power change
Unidentified leakage
ML13329A85422 November 2013Enclosure 2 - Volume 4 - Improved Technical Specifications Conversion, ITS Chapter 2.0, Safety Limits, Revision 0Anticipated operational occurrence
Fuel cladding
ML13329A79122 November 2013Enclosure 2 - Volume 1 - Improved Technical Specifications Conversion, Application of Sequoyah Criteria to the Sequoyah Technical SpecificationsShutdown Margin
Ultimate heat sink
Probabilistic Risk Assessment
Pressure Boundary Leakage
ML13329A85822 November 2013Enclosure 2 - Volume 6 - Improved Technical Specifications Conversion, ITS Section 3.1 Reactivity Control Systems, Revision 0Boric Acid
Shutdown Margin
Anticipated operational occurrence
Surveillance Frequency Control Program
Fuel cladding
ML13329A85522 November 2013Enclosure 2 - Volume 5 - Improved Technical Specifications Conversion, ITS Section 3.0, LCO and SR Applicability, Revision 0Safe Shutdown
Time of Discovery
Fire Barrier
Tornado Missile
Internal Flooding
Missed surveillance
Turbine Missile
Liquid penetrant
Offsite Circuit
ML13330A93022 November 2013Enclosure 2 - Volume 14 - Improved Technical Specifications Conversion, ITS Section 3.9 Refueling OperationsBoric Acid
Shutdown Margin
Time to boil
Surveillance Frequency Control Program
Fuel cladding
Recently irradiated fuel
ML13330A92422 November 2013Enclosure 2 - Volume 12 - Improved Technical Specifications Conversion, ITS Section 3.7, Plant Systems
ML13325B00221 November 2013Staff Status Update November 2013
ML13312A41521 November 2013Interim Staff Evaluation and Request for RAI Regarding the Overall Integrated Plan for Implementation of Order EA-12-051, Reliable Spent Fuel Pool InstrumentationHigh Radiation Area
Safe Shutdown Earthquake
FLEX
Spent Fuel Pool Instrumentation
Battery sizing
Fire Protection Program
ML13323A49419 November 2013NRR E-mail Capture - Sequoyah 1 and 2 - Acceptance Review for Requests for Alternatives 13-ISI-1 and 13-ISI-2 to Extend the Reactor Vessel Weld Inservice Inspection Interval
CNL-13-117, 10 CFR 50.46 - Combined Annual and 30-Day Report18 November 201310 CFR 50.46 - Combined Annual and 30-Day Report
CNL-13-106, Response to NRC Request for Additional Information Regarding the Review of the Sequoyah Nuclear Plant, Units I and 2, License Renewal Application, Sets 13 (B.1.34-5a), 15 (4.2-1a), 16 (B.1.23-2c), 17 (B.1.23-2d), LRA Sections A.1.34 and B15 November 2013Response to NRC Request for Additional Information Regarding the Review of the Sequoyah Nuclear Plant, Units I and 2, License Renewal Application, Sets 13 (B.1.34-5a), 15 (4.2-1a), 16 (B.1.23-2c), 17 (B.1.23-2d), LRA Sections A.1.34 and B.1Safe Shutdown
High Radiation Area
Fire Barrier
Weld Overlay
Coatings
Aging Management
Moisture barrier
Earthquake
Biofouling
Fire Protection Program
ML13301A65312 November 2013Audit Report Regarding Seismic Walkdowns to Support Implementation of Near-Term Task Force Recommendation 2.3 Related to the Fukushima Dai-Ichi Nuclear Power Plant AccidentUnanalyzed Condition
Boric Acid
Fukushima Dai-Ichi
Earthquake
ML13316A77512 November 2013Pointer in ADAMS to Public Document Room for SQN Ghg Excel Spreadsheets, Listed in Letter from TVA, Dated Sep 20, 2013, in Response to RAIs 6.a.i.2 - 8 Referenced in the SQN License Renewal Supplemental Environmental Impact Statement
ML13318A89112 November 2013NPDES Permit No. TN0026450 - Discharge Monitoring Report (DMR) for October 2013