Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML13364A283 | 30 December 2013 | Announcement of 2014 Generic Fundamentals Examination Administration Dates-Letter Dated Dec 30, 2013 | Generic Fundamentals Examination |
ML14006A299 | 27 December 2013 | NRR E-mail Capture - Logbook Entry: 12/27/2013 - Dead Sturgeon at Salem | |
ML14006A298 | 26 December 2013 | NRR E-mail Capture - Logbook Entry: 12/26/2013 | |
LR-N13-0265, License Amendment Request for Approval of the Revised PSEG Nuclear Cyber Security Plan Milestone 8 Implementation Schedule | 24 December 2013 | License Amendment Request for Approval of the Revised PSEG Nuclear Cyber Security Plan Milestone 8 Implementation Schedule | Cyber Security |
TAC:MF3384 | 24 December 2013 | ||
IR 05000272/2013007 | 23 December 2013 | IR 05000272-13-007 and 05000311-13-007; 11/4/13 - 11/22/13; Salem Nuclear Generating Station, Units 1 and 2; Engineering Specialist Plant Modifications Inspection | Fire Protection Program |
ML14001A007 | 20 December 2013 | Comment (00738) of Paul Duke on PR-51, Waste Confidence - Continued Storage of Spent Nuclear Fuel | |
LR-N13-0172, Enclosure 1 - Salem Nuclear Generating Station Unit 1 Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic | 20 December 2013 | Enclosure 1 - Salem Nuclear Generating Station Unit 1 Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic | Safe Shutdown Unanalyzed Condition Loop seal Safe Shutdown Earthquake Design basis earthquake Earthquake |
IR 05000272/2013202 | 20 December 2013 | IR 05000272-13-202, 05000311-13-202 & 05000354-13-201, September 9-13, 2013, Salem Nuclear Generating Station and Hope Creek Generating Station - Cover Letter | Affidavit |
ML13358A237 | 20 December 2013 | New Jersey Pollutant Discharge Elimination System Discharge Monitoring Report | NJPDES |
ML14006A297 | 20 December 2013 | NRR E-mail Capture - Logbook Entry: 12/20/2013-Salem Sturgeon | |
ML13364A182 | 20 December 2013 | Seismic Walkdown Report Update - Salem Generating Station Unit 1 Response to Recommendation 2.3: Seismic Walkdown of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident | Fukushima Dai-Ichi |
TAC:MF0171 | 20 December 2013 | ||
LR-N13-0088, Summary of Revised Regulatory Commitments | 13 December 2013 | Summary of Revised Regulatory Commitments | |
ML14006A296 | 13 December 2013 | NRR E-mail Capture - FW: Logbook Entry: 12/13/2013 - Endangered Species Report | |
ML13358A139 | 9 December 2013 | Letter from Nj DEP Shpo - Consultation Comments Pertaining to the PSEG ESP Application, December 9, 2013 | |
LR-N13-0271, Response to NRC Request for Additional Information Associated with Near-Term Task Force Recommendation 2.3: Seismic Walkdowns | 2 December 2013 | Response to NRC Request for Additional Information Associated with Near-Term Task Force Recommendation 2.3: Seismic Walkdowns | Fukushima Dai-Ichi |
TAC:MF0172 | 2 December 2013 | ||
ML13301A124 | 27 November 2013 | Issuance of Amendments Regarding Change to PSEG Emergency Plan to Remove the Backup R45 Plant Vent Radiation Monitor Indications | Offsite Dose Calculation Manual Fire Protection Program |
ML13338A172 | 25 November 2013 | Submittal of Discharge Monitoring Report for October 2013 | Grab sample NJPDES |
ML13330A567 | 22 November 2013 | Request for Additional Information: Salem Units 1 and 2 - Relief Request SC-14R-133 Repair of Service Water Piping (TAC MF1375 & 1376) | |
ML13336A690 | 20 November 2013 | Report of Impingement of Atlantic Sturgeon | |
LR-N13-0257, Snubber Program Plan for Salem Unit 2, Fourth Ten-Year Interval | 20 November 2013 | Snubber Program Plan for Salem Unit 2, Fourth Ten-Year Interval | Incorporated by reference |
ML13330A585 | 19 November 2013 | RAIs Associated with Review of Salem, Unit 2, 2R19 Steam Generator Tube Inspections | |
IR 05000272/2013004 | 19 November 2013 | NRC Integrated Inspection Report 05000272/2013004 and 05000311/2013004 | Packing leak Offsite Dose Calculation Manual Fire Barrier Water Inventory Control Enforcement Discretion Functionality Assessment Significance Determination Process Operability Determination |
ML13310A302 | 15 November 2013 | and Salem Nuclear Generating Station, Units 1 and 2, Reassignment of U.S. Nuclear Regulatory Commission | |
LR-N13-0263, License Renewal Commitment Implementation | 12 November 2013 | License Renewal Commitment Implementation | |
TAC:MF3334 | 12 November 2013 | ||
LR-N13-0256, Inservice Inspection (Lsi) Program Plan, Fourth Ten-Year Interval | 11 November 2013 | Inservice Inspection (Lsi) Program Plan, Fourth Ten-Year Interval | Boric Acid Weld Overlay Hydrostatic Nondestructive Examination VT-2 Incorporated by reference Aging Management EVT-1 Through-Wall Leak Through-Wall Leakage Dissimilar Metal Weld |
IR 05000272/2013404 | 6 November 2013 | IR 05000272-13-404, 05000311-13-404, and 05000354/2013404; 9/23/2013 to 9/27/2013; Salem Nuclear Generating Station, Units 1 and 2, Hope Creek Generating Station; Security (Letter Only) | Affidavit |
ML13311A366 | 6 November 2013 | U. S. Nuclear Regulatory Commission Assessment of Pseg'S Response on the Potential Impact of a U.S. District Court Finding on the Work Environment at Salem and Hope Creek | |
LR-N13-0259, Steam Generator Tube Inspection Report - Twenty-Second Refueling Outage (1R22) | 4 November 2013 | Steam Generator Tube Inspection Report - Twenty-Second Refueling Outage (1R22) | Nondestructive Examination |
ML13304B418 | 1 November 2013 | Request for Additional Information Associated with Near-Term Task Force Recommendation 2.3, Seismic Walkdowns | |
RS-13-264, Company, Executed Trust Fund Agreement Amendments and Subordinate Trust Agreement | 29 October 2013 | Company, Executed Trust Fund Agreement Amendments and Subordinate Trust Agreement | Incorporated by reference |
ML13304B936 | 29 October 2013 | Request for Additional Information: Salem Units 1 and 2 - Relief Request SC-14R-133 Repair of Service Water Piping (TAC MF1375 & 1376) | |
ML13301A815 | 28 October 2013 | NRR E-mail Capture - Logbook Entry: 10/28/2013 | |
ML13358A201 | 28 October 2013 | Letter from Nj DEP Shpo - Consulation Comments Pertaining to the PSEG ESP Application, October 28, 2013 | |
ML13325B014 | 25 October 2013 | New Jersey Pollutant Discharge Elimination System Discharge Monitoring Report Salem Generating Station NJPDES Permit NJ0005622 | NJPDES |
ML13270A414 | 17 October 2013 | Interim Staff Evaluation and Request for Additional Information Regarding the Overall Integrated Plan for Implementation of Order EA-12-051, Reliable Spent Fuel Pool Instrumentation (TAC Nos. MF0913 and Mf | High Radiation Area FLEX Spent Fuel Pool Instrumentation Fire Protection Program |
LR-N13-0236, Loss of Coolant Accident Peak Cladding Temperature Margin Tracking - Annual Report | 11 October 2013 | Loss of Coolant Accident Peak Cladding Temperature Margin Tracking - Annual Report | Loop seal |
SCH13-037, New Jersey Pollutant Discharge Elimination System Discharge Monitoring Report Salem Generating Station NJPDES Permit NJ0005622 | 24 September 2013 | New Jersey Pollutant Discharge Elimination System Discharge Monitoring Report Salem Generating Station NJPDES Permit NJ0005622 | NJPDES |
ML13269A368 | 17 September 2013 | Report of Impingement of Kemp'S Ridley Turtle | |
LR-N13-0205, Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Seismic Aspects of Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident-Base Case Velocity... | 10 September 2013 | Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Seismic Aspects of Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident-Base Case Velocity... | Safe Shutdown Earthquake Fukushima Dai-Ichi Earthquake |
TAC:MF3707 | 10 September 2013 | ||
LR-N13-0207, Independent Spent Fuel Storage Installation - Report of 10 CFR 72.48 Changes, Tests, and Experiments | 6 September 2013 | Independent Spent Fuel Storage Installation - Report of 10 CFR 72.48 Changes, Tests, and Experiments | |
ML13249A011 | 5 September 2013 | Weko Seal Relief Request RAI | |
IR 05000272/2013006 | 3 September 2013 | ROP-14 Mid-Cycle Performance Review and Inspection Plan Report 05000272/2013006 and 05000311/2013006 | |
ML13267A056 | 31 August 2013 | NRR E-mail Capture - Salem Seaturtle Logbook Entry: 8/31/2013 | |
ML13246A123 | 29 August 2013 | 8/29/13 Ltr to Mr. Denight Participation in Commission Meeting on Flooding and Other Extreme Weather Events | |
LR-N13-0193, Submittal of Report in Accordance Wtih Technical Specification (TS) 6.9.1.5c, for Period 01/01/12 Until 01/01/13 | 29 August 2013 | Submittal of Report in Accordance Wtih Technical Specification (TS) 6.9.1.5c, for Period 01/01/12 Until 01/01/13 |